HomeMy WebLinkAboutOld Town Sq (Master) - Correspondence - 08/15/1984 (3)0L1 J oot r, Lldla:��r�
� Y
Observation Report
Project,"No
OLD TOWN SOUARE - PLAZA #83/121.03 aR
Report
^; +e
August 15, 1984
-Lme
8:30 a.m. - 5:00 p.m.
�cn�ractor
Madsen Western Builders
representa`ive
Lynn A. Moore
_ooation
Job Site
e 1*ner
Warm, Sunny
'went
Jim Reidhead, OTA
Dick Beardmore, AE Design
��stnbut+on Those Present
John Bosio - Madsen Western Builders
Mark Pertzborn - Madsen Western Builders
Tim Rubley - Madsen Western Builders
John Davis - Richard Weingardt
Rick Osbaugh - Osbaugh/Miller
Rirt Davis - Engineering Partnership
Felix Lee - Ft. Collins Building Dept.
Gayle Udall, SLP
3/83
OLD TO" SQUARE — PLAZA #83/121.03 OR
15 August 1984
Page 2 of 6
ITEMS OBSERVED:
01. Pavers to the north of Buildings A and B seem to be separating and
Leonard, of Soderberg Masonry, was asked as to why this was
happening. He did not know and suggested that we wait a week or
two to see if the separation continues before we reach a solution.
There was some discussion as to how to fill the 1" + joint between
the concrete banding around the buildings and the pavers. Leonard
suggested that we make a concrete slurry and pour this between the
banding and pavers and then pour sand on the top while the slurry
is still wet so that it will provide a solid joint. We will look
into this further, nothing was decided at that time.
02. Trimble Court Alley:
a. Pavers have been installed at the intersection of Trimble
Court Alley and Walnut Street.
b. Concrete banding has been installed to cover the city power
duct bank that runs through the Trimble Court Alley/Walnut
Street intersection.
C. The concrete banding across the alley to the west and other
paving throughout the alley is inconsistent in quality. Some
areas are poured at different elevations to the pours
adjacent to- them, expansiofr material- is- use& in soave places
and not in others, finishes are inconsistent, etc. The
finished quality is not what SLP feels is acceptable.
d. A thin layer of
concrete
has been poured over
the two
existing manholes
in front
of the Artisan's Center
and has
been poorly blended
to meet
the existing concrete around it.
It was previously
discussed
on the site with both Madsen and
Heath to sawcut
one foot on either side of these
existing
manholes, remove
that existing concrete gutter and
repour,
3/83
OLD TOWN SQUARE - PLAZA #83/121.03 OR
15 August 1984
Page 3 of 6
ITEM OBSERVED:
covering the entire manhole so that it is one monolithic
pour. This was not done.
e. About half of the concrete paving in the west Trimble Court
Alley has been installed.
03. South Plaza:
a. The concrete banding has been poured around the Avery
Building including around the new stair going down to the
basement of the building. Pavers have been installed up to
the door at the circular corner of the building.
b. The three southern most planters have been poured and are
having the finish applied. The largest planter in the
southern most portion has been poured and the forms are being
removed.
C. The plumbing stubout for the drinking fountain is in place.
d. Tree blockouts are evident in all of the poured planters.
e. The gold goose logo has been installed on the top corner of
Building G.
04. North Plaza:
a. Concrete banding has been installed around Buildings B and C
and is inconsistent and not of the quality that SLP finds
acceptable.
b. The metal framework of the pavilion is in place.
3/83
rr�c�� re
OLD TOWN SOOARE — PLAZA #83/121.03 OR
15 August 1984
Page 4 of 6
ITEM OBSERVED:
c. Crews are working around the existing lead encased telephone
duct that bisects the bottom of the water feature. They are
covering the duct bank with poly and then pouring concrete
over it to form the bottom of the fountain. The telephone
company has requested that this duct bank not be removed at
this time.
05. Market Place:
a. Pavers have been installed between Buildings J and R.
b. Some paver banding has been installed in the southern most
wagon wheel.
c. The electrical has been stubbed out •for the light poles.
06. Pavers are being installed in front of Buildings G and I along
Mountain Avenue.
**END OF OBSERVATION REPORT**
The preceeding observations and/or comments represent an overview
of progress and condition(s) of the work. Please notify us of any
misunderstandings or required interpretations or clarifications
within three (3) working days of receipt of this Observation
Report, as we will proceed on the basis that these items are as
agreed to by all parties concerned.
3/83
w,n. Town SQUARE
Page 5 of 6
#1
Paver separation at
Building A, along
Walnut Street, 8/15/84
2
Concrete covered manhole
at Artisans Center in
Trimble Court Alley,
8/15/84
4
LAV
77
nLD TOWN SQUARE
?age 6 of 6
#3
Concrete banding and
pavers at Avery
Building, 8/15/84
Or
Concrete planter wall
in South Plaza showing
tree blockouts, 8/15/84
C5
Existing lead encased
telephone line running
through water feature
base, 8/15/84
b