HomeMy WebLinkAboutOld Town Sq (Master) - Correspondence - 08/03/19841 1 Observation Report RECEIVED AUG 3 1984 ❑ Project :c OLD T(WN - #83/116 CR ,eoort o;e 25 July 1984 -_ tects ,eprese�tctive Gayle Udall, Lynn Moore Gayle Udall - SLP Pre�e Lynn Moore - SLP Jim Reidhead - Old Town Associates Mark Pertzborn - Madsen Len Gough - Harris Mechanical John Bosio - Madsen Mark Pertzborn - Madsen o Guy Javarone - Madsen Tim-Ruble-y - Madsen - Jim Reidhead - Madsen Dick Beardmore - A-E Design John Davis - Richard Weingardt Rick Osbaugh - Osbaugh/biller Rirt Davis - Engineering Partnership Felix Lee - Ft. Collins Building Department 3/83 f 0 OLD TOWN - #83/116 OR 25 July 1984 Page 2 of 4 ITEMS OBSERVED: 01. Expansion joint material at concrete band should be held down to allow for sealant on top, as detailed and specified. 02. North side Building A, third bay: cut stone should be placed as a sill below the storefront to match the existing stone band to the north, re-establishing the existing line. 03. Building A - cast iron entry: stabilize stone pillar on west side of entry. 04. Building A, door #5: SLP has received verbal approval from the Building Department to swing door in, instead of out, so that the handicap access is workable. 05. The City has inspected and approved some of the work in Trimble Court. While it may be functionally okay, aesthetics is a prime concern. SLP needs to request the City take this into consideration. 06. Jim Reidhead to have City review the fire stair situation out of the Avery Building into Trimble Court. 07. The 10" level differential between the 2nd floors of Buildings E and F will be resolved as follows: The floor of F will be lowered to meet E at the doorway. A ramp extending to the east along the common wall will lead back up to the existing level of E. SLP will have Weingardt review this scheme structurally and provide details. 08. Building G, Pella windows: The sills, on the windows supplied, do not extend far enough to lap over the joint between the masonry and the sheathing. Flashing of the sills is mandatory to prevent leakage. 09. Several utility covers throughout the site are not at the correct finish elevation and need to be adjusted so that they are flush with finish grade. OLD TOWN - #83/116 OR 25 July 1984 Page 3 of 4 ITEMS OBSERVED: 10. Concrete surrounding storm manhole at curb along Walnut (north of Building B) is poured too low and does not meet surrounding paver finish elevations. This elevation change creates a "trip," is a hazard to pedestrians and is rejected as poured. 11. Installed pavers between Walnut and Buildings A and B have shifted towards Walnut leaving a gap (as large as 1 1/2" in some areas) between the concrete banding and pavers. This gap poses a - potential hazard to the pedestrian. Madsen is requested to review with Soderberg how this can be corrected and avoided in the future. 12. Concrete encased city power bank in alley to west of Building A is posing a potential problem for the cobble paver installation in the Walnut Street/Trimble Court intersection. The duct is laid at a high elevation in relation to the surrounding paver work. Heath is going to look into potential conflicts in this area. A discussion as to how far to the west the paver apron should extend along Walnut came up but is still unresolved. Jim Reidhead will investigate options with the City. 13. Trimble Court alley: Paving work was reviewed and rejected based on quality of the work and the ponding created to the west of A. 14. The new storm inlet in west Trimble Court by Artisans is not square within itself or any surrounding buildings and is therefore rejected as discussed with Sue (Schmidt) and Mark (MWB). 15. Two existing inlets in curb and gutter at Artisans are to have concrete poured over manhole covers. Heath will saw cut out approximately 1'-0" from each side of manhole and repour new gutter. 16. Concrete banding in West Trimble Court should be poured next to buildings (as typical)_ and ioa_ araLuui buildings- as necessary-. 3/83 3/83 -w =r��,e�.^;o Old Town Fort Collins #82/152 GA Date 1 November 1982 -in,e 11:00 AM - 12:00 PM occf,, Old Town Associates, Ft. Collins Present Chief Building Official (CBO): Madsen Western Builders (MWB): Downing -Leach (DL): SLP, A PROFESSIONAL CORPORATION (SLP): MEETING OBJECTIVE: To identify major code concerns. ?TE LIS- D1,SC9SSED_ 1. Gayle Udall briefly reviewed the project scope for the Chief Building Official after introducing SLP as the managing architect and Downing -Leach as the associate architect. 2. Code issues as they relate to historic buildings were discussed in a general manner due to the present schematic nature of the building and exterior space use concept plans. These code issues include the following: a. Skylights - existing skylights over occupied space must follow the general guidelines of Chapter 34. Other vertical faces within clerestory structures (such as light monitors) are not skylights by definition. b. Local handicap pedestrian codes are less restrictive than the 1979 UBC, with no requirement for 5' diameter circle within toilet areas. c. Interpretation of a corridor versus an intervening room, will have to be made as plans become more defined. d. Exit stairways of two stories do not have to be enclosed. �_- Felix Lee John Bosio Nore Winter Rodger Evans Doug Stelling Gayle Udall Kim Prentice ACTION- & DEADLINE