Loading...
HomeMy WebLinkAbout914 Pear St - Disclosures - 08/10/1999Job address: General contractor: t Collins resider Air sealing d VIC- 0,, �— energy code 7/96 )sure form Air sealing contractor: �we A. Prescriptive path I/We certify that the air sealing requirements specified in the current City of Fort Collins Residential Energy Code have been completed in this building, in accordance with the "Air Sealing Checklist' published by the City of Fort Collins. Certified by: _ PN��i 5 4,// Phone: Business firm: f �i e e-V �� Date: b'- iU Sq Address:Signature B. Performance path I/We certify that this building has met the air leakage performance threshold specified in the current City of Fort Collins Residential Energy Code, in accordance with the "Blower Door Test Procedures," published by the City of Fort Collins. Testing contractor: Date of test: CFM50: Volume: ACH50: Certified by: Business firm: Address: Air flow through the blower door at 50 Pascals pressure difference (cfm) Volume of home (cu. ft.) Air change rate per hour at 50 Pascals pressure difference ACH50 = (CFM50 x 60) / Volume The performance threshold for code compliance is ACH50 not exceeding 5.0 ac/h Phone: Date: Signature: Instructions Complete either Part A or Part B. Part A is to be signed by the air sealing contractor or representative of the general contractor. Part B is to be signed by the blower door testing contractor or representative of the general contractor. The "Blower Door Test Report" or equivalent documentation must be attached. Please type or print, except for the signature. If components vary, make multiple entries to describe them. One copy of this form shall be provided to the Building and Zoning -Department at final inspection. One copy of this form shall be provided to the homebuyer. esdisc.wb1/SS23 — 62496 Fort Collins residential energy code 7/96 Insulation disclosure form Job address: `%/41 r-eC' //-1-st, General contractor: Insulation contractor: Insulation Location Location I Materials Thickness Int / ext Notes Flat or vaulted ceilings with attics above vc_iG (.r%an ( Ceilings with enclosed rafter cavities lRe Frame walls and rim/bandjoists -to exterior " Frame walls and rim/band joists -- to attic, garage Frame floor -cantilever q SS / n ' BO Frame floor - over garage or crawl space Slab -on -grade (0-12") Crawl space walls Basement walls Certification I/We certify that the above -listed insulation was installed in the building at the above locations in conformance with the current requirements of the City of Fort Collins Residential Energy Code, and that it was installed in accordance with the applicable "Insulation Installation Guidelines" published by the City of Fort Collins. Certified by: �e�-- S (� / ci- Phone: C/ -70) -'-// 6 -- yi 63 Business firm: �oMe J, er Date: C) Address: c/,Y p�� ST F1, Cn ((,S Signature: Instructions This disclosure form is to be signed by the insulation contractor or representative of the general contractor. Please type or print, except for the signature. If components vary, make multiple entries to describe them. .o dmu, 1=25-M4M One copy of this form shall be provided to the Building and Zoning Department at final inspection. One copy of this form shall be provided to the homebuyer. Fort Collins residential energy code 7/96 Mechanical systems disclosure form Job address: General contractor: Mechanical contractor: Space heating system' Location Fuel T e Manufacturer Model # Input capacity kBtuh or kW AFUE or HSPF Space cooling system Location Fuel TyPe I Manufacturer I Model # Input capacity I kBtuh or kW I SEER Water heating system Location Fuel Type I Manufacturer I Model # Input capacity I kBtuh or kW Energy I Factor Storage I volume c.... s �.� !L'- Cx,s ,Gas G E CiG`fos6q 28 coo �s3 p G Certification INVe certify that the above -listed equipment was installed in the building at the above locations in conformance with the current requirements of the City of Fort Collins Residential Energy Code and Mechanical Code, and that it was installed in accordance with manufacturer's instructions. INUe certify that any ductwork has been installed in conformance with the current requirements of the City of Fort Collins Residential Energy Code and Mechanical Code. Certified by: �e.,�,,,s Wi L ,r Phone: (??O) — W G - Business firm: �/G V c, Date: $ - jD - 95p Address: 9/y f ,, 5, Signature: i� �S �,J �yrir/ Instructions This disclosure form is to be signed by the mechanical contractor or representative of the general contractor. Please type or print, except for the signature. If there are multiple systems serving any function, make multiple entries to describe them. One copy of this form shall be provided to the Building and Zoning Department at final inspection. One copy of this form shall be provided to the homebuyer, mchdlsc.w IV S23-6o4ve