Loading...
HomeMy WebLinkAbout826 Roma Valley Dr - Correspondence - 09/04/2001FROM PHONE NO. : 970 416 5331 Nov. 17 200a 03:40PN Pi F C EARTH ENGINEERING CONSULTANTS, INC. September 4, 2001 Columbia Crest Homes, Inc. 5312 Highcastle Court Fort Collins, Colorado 80525 Attn: Mr. Loren McColley Re: Construction Observation and Testing & Roma Valley Drive Ila-(ley [)�2 Miramont Valley Fort Collins, Colorado EEC Project No. 1013072 Mr. McColley: As requested, during the period July IS through August 4, 2001, Earth Engineering Consultants, Inc. (EEC) personnel provided constriction observation and testing services to you for the referenced project. Those services were provided on a part-time, on -call basis and involved observation and testing of foundation overexcavation backfill placed within the building footprint. Results of the observation and testing completed by EEC personnel during the referenced period are provided with this report. During the referenced period, EEC personnel performed field density tests on backfill materials that had been placed and compacted prior to and during our site visits. The field density tests were completed at random locations and elevations on the backfill materials and were performed in general accordance with ASTM Specification D-2922. The results of the field density tests completed by EEC personnel during the referenced period are shown on the attached summary sheet. The field density test results met the project compaction requirements of at least 95% of standard Proctor maximum dry density. CENTRE FOR AOVANCCO TkcmNoLcoy 2301 RESEARCH e0U'':EVARD, SUITE 104 FORT COLUNS, COLORADO 80526 (970) 224-1522 MX) 224.4564 FROM PHONE NO. : 970 416 53E1 Nov. 17 2007 03:41PM P3 EEC Project No. 1013072 September 4, 2001 Page 2 Earth Gngineerirnuft n;g Co, Inc. Based on observation and testing performed as outlined above, it is our opinion the backfill soils as placed could be used for support of footing foundations for the referenced single family residence. We appreciate the opportunity to work with you on this project. If you have any questions concerning the enclosed information, or if we can be of further service to you in any other way, please do not hesitate to contact us. Very truly yours, Earth Engineering Consultants, Inc. Brian D. Thomas Project Manager BDT/LLL/tjr Principal Engineer FROM : PHONE NO. : 970 416 5381 Nov. 17 2000 03:40Pr P2 MEN mm �� i•mSESIMMMI _ mmmm MENMEN � � MEE ANNE � � MENI IMEN�■■►v�� INMEEMMI � MENmm ��i■���ii���■■■� mm ����- MEN ��■���INNEWv MEN mm INNIMmmm �r���� �IMEN m� � MENa MEN MENMEN INME __ IMME SEEM �IMME � � M ��o��■� MEN INEE������ Proator Designation A tA9X{mum Dry Density (pm 110.0 00mm Moiswm Conant (*A) 17094 Required Moisture Variance 4 MC +1.2% Rayulrad Pa %Comtpacdcn 95% .990ratory McVW ASTM 0698 Projeel; 876 Roma VWe:y Drive Project No: 1013072 LocationFort Cd14i*. C,clo ,uln Date: August 2001 8`t3Co ��-Cl, ��