Re: Post -tensioned Slab Observation/Testing
Bull Run Apartments (Waterfield)
Buildings 1-6
Fort Collins, Colorado
EEC Project No. 1994037
Mr. Hiser:
EARTH ENGINEERING
CONSULTANTS, INC.
dO %�UZe a �-t sew UP,
As you requested, on December 16, December 22 and December 28, 1999, Earth Engineering
Consultants, Inc. (EEC) personnel provided construction observation and testing services for the
referenced project. Those services were provided on a part-time, on -call basis and included
observation and testing of post -tensioned slab construction for the referenced project. Results
of the post -tensioned slab observations completed by EEC personnel on the referenced dates are
included with this report.
When requested, EEC personnel observed and tested Portland cement concrete delivered to the
site for placement in the post -tensioned slab foundations. The tests completed on the plastic
concrete included slump, air content, and concrete temperature. The ambient air temperature at
the time of placement was also recorded. Concrete test cylinders were cast from representative
samples of the plastic concrete for laboratory curing and compressive strength testing. Results
of the field and laboratory testing are being provided in separate reports.
CENTRE FOR ADVANCED TECHNOLOGY
2301 RESEARCH BOULEVARD, SUITE 1 04
FORT COLLINS, COLORADO 80526
(970) 224-1522 (FAX) 224-4564