HomeMy WebLinkAbout820 Merganser Dr - Correspondence - 07/07/2000 (17)July 7, 2000
Sycamore Construction, Ltd.
4891 Independence St., Suite 149
Wheat Ridge, CO 80033
Attn: Mr. Jeff Hiser
Re: Lateral Bracing Observation
Bull Run Apartments — Buildings 3, 4 & 5
Fort Collins, Colorado
EEC Project No. 1994037
Mr. Hiser:
E7EC
EARTH ENGINEERING
CONSULTANTS, INC.
"ao'se-e- 1
As requested, on February 21, 2000, a project engineer from Earth Engineering Consultants, Inc.
(EEC) observed the lateral bracing for Buildings 3, 4 and 5 for the above -referenced project. On
that trip, EEC personnel observed the shear wall anchor placement and shear wall straps and
clips. The results of those observations are provided with this report.
On February 21, 2000, an EEC project engineer observed the placement of the shear wall anchors
at Buildings 3, 4 and 5. Those anchors were placed in general conformance with the lateral
bracing plans. Also on January 21, 2000, an EEC project engineer observed the exterior straps
and interior clips for the above -referenced project. The type and location of the clips and straps
appeared to be in general conformance with the lateral bracing and framing plans.
We appreciate the opportunity to be of service to you on this project. If you have any questions
reqarding this report, or if we can be of further service to you in any way, .please do not hesitate to
contact us.
Very truly yours,
Earth Engineering Consultants, Inc.
Michael J. Coley, E.I.T.
Project Engineer
Principal Engineer
CENTRE FOR ADVANCED TECHNOLOGY
2301 RESEARCH BOULEVARD, SUITE 1 04
FORT COLLINS, COLORADO a0525
(970) 224-1 522 (FAX) 224-4564