Loading...
HomeMy WebLinkAbout820 Merganser Dr - Correspondence - 08/07/2000 (18)EEC EARTH ENGINEERING CONSULTANTS, INC. August 7, 2000 Sycamore Construction Ltd. 4891 Independence Street, Suite 149 Denver, Colorado 80333 Attn: Mr. Jeff Hiser Re: Post -tensioned Slab Observation/Testing Bull Run Apartments (Waterfield) 90-0 M1011 Buildings 12, 13, 15, 19, 20 & 22 Fort Collins, Colorado �✓ EEC Project No. 1994037 Mr. Hiser: As you requested, during the period from January 6 through January 25, 2000, Earth Engineering Consultants, Inc. (EEC) personnel provided construction observation and testing services for the referenced project. Those services were provided on a part-time, on -call basis and included observation and testing of post -tensioned slab construction for the referenced project. Results of the post -tensioned slab observations completed by EEC personnel on the referenced dates are included with this report. When requested, EEC personnel observed and tested Portland cement concrete delivered to the site for placement in the post -tensioned slab foundations. The tests completed on the plastic concrete included slump, air content, and concrete temperature. The ambient air temperature at the time of placement was also recorded. Concrete test cylinders were cast from representative samples of the plastic concrete for laboratory curing and compressive strength testing. Results of the field and laboratory testing are being provided in separate reports. CENTRE FOR ADVANCED TECHNOLOGY 2301 RESEARCH BOULEVARD, SUITE 104 FORT COLLINS, COLORADO 80526 (970) 224- 1 522 (FAX) 224-4564