HomeMy WebLinkAbout820 Merganser Dr - Correspondence - 07/07/2000 (25)July 7, 2000
Sycamore Construction, Ltd.
4891 Independence St., Suite 149
Wheat Ridge, CO 80033
Attn: Mr. Jeff Hiser
Re: Lateral Bracing Observation
Bull Run Apartments — Buildings 1, 2 & Clubhouse
Fort Collins, Colorado
EEC Project No. 1994037
Mr. Hiser:
SEC
EARTH ENGINEERING
CONSULTANTS, INC.
U c e 6pz'
As requested, on February 17, 2000, a project engineer from Earth Engineering Consultants, Inc.
(EEC) observed the lateral bracing for Buildings 1, 2 and the Clubhouse for the above -referenced
project. On that trip, EEC personnel observed the shear wall anchor placement and shear wall
straps and clips. The results of those observations are provided with this report. ,
On February 17, 2000, an EEC project engineer observed the placement of the shear wall anchors
at-Buildings-1 -2-and the Clubhouse. Those anchors -were placed in general conformance-witlrthe-
lateral bracing plans. Also on January 17, 2000, an EEC project engineer observed the exterior
straps and interior clips for the above -referenced project. The type and location of the clips and
straps appeared to be in general conformance with the lateral bracing and framing plans.
We appreciate the opportunity to be of service to you on this project. If you have any questions
reqarding this report, or if we can be of further service to you in any way, please do not hesitate to
contact us.
Very truly yours,
Earth Engineering Consultants, Inc.
Michael J. Coley, E.I.T.
Project Engineer
Principal Engineer