Loading...
HomeMy WebLinkAbout820 Merganser Dr - Correspondence - 07/07/2000 (8)EEC July 7, 2000 Sycamore Construction, Ltd. 4891 Independence St., Suite 149 Wheat Ridge, CO 80033 Attn: Mr. Jeff Hiser 5;�o Re: Lateral Bracing Observation Bull Run Apartments — Buildings 1, 2 & Clubhouse_ Fort Collins, Colorado EEC Project No. 1994037 Mr. Hiser: EARTH ENGINEERING CONSULTANTS, INC. As requested, on February 17, 2000, a project engineer from Earth Engineering Consultants, Inc. (EEC) observed the lateral bracing for Buildings 1, 2 and the Clubhouse for the above -referenced project. On that trip, EEC personnel observed the shear wall anchor placement and shear wall straps and clips. The results of those observations are provided with this report. On February 17, 2000, an EEC project engineer observed the placement of the shear wall anchors at Buildings 1, 2 and the Clubhouse. Those anchors were placed in general conformance with the lateral bracing plans. Also on January 17, 2000, an EEC project engineer observed the exterior straps and interior clips for the above -referenced project. The type and location of the clips and straps appeared to be in general conformance with the lateral bracing and framing plans. We appreciate the opportunity to be of service to you on this project. If you have any questions reqarding this report, or if we can be of further service to you in any way, please do not hesitate to contact us. Very truly yours, Earth Engineering Consultants, Inc. Michael J. Coley, E.I.T. Project Engineer Principal Engineer CENTRE FOR ADVANCED TECHNOLOGY 2301 RESEARCH BOULEVARD, SUITE 1 04 FORT COLLINS, COLORADO 80526 (970) 224-1522 (FAX) 224-4564