Loading...
HomeMy WebLinkAbout820 Merganser Dr - Correspondence - 04/28/2000Senn uy: etu; w rueiC44004; Apr-Ye-vu 11:�"AM; rage III ' ZO -e EEC April 29, 2000 Brisben Development, Inc. 4891 bdepeadence St., Ste. 149 What Ridge, CO 80033 Aft: Mr. Pat Thompson EARM ENeitNEEt�NG CONSULTAMM. WC. <1zo Re: Bull Run Aparanents Lateral Bracing Observations Buildings 1 through 22 A Clubhouse EEC Project Number 1994037 W. Thompson: Over the period from February 21 duou$h April 24, 2000, Earth Engwu ng Coasultants, Iac. (EEC) peasonuel completed obeavaboas of the lateral bracing =dxns, straps, ad plywood shearwatl nailing for the refaea+ted project At the final obeervation date for each of the buildings, all lateral bracing hardware appeared to have bees placed m general accordance with the construction pleas. Individual legs for each of the referenced buildings will be provided at a later date. We appreciate the oppommity to be of service to you on this project.. If you have any questions about ibis rcpott or if we can be of further assistance to you in any other way, please: do not hesitate to contact us. very truly yes. Earth Eagtmrlag Conaddtuts, Le. b ichacl J. ilkely, E.T.T. Project Engineer 09MMe roA ADVArce[o'tO"143L9 W 2301 fftWAMCM BOuMvwW. Sum 104 (070) P24-1522 IFNO 224-45e5a