Loading...
HomeMy WebLinkAbout748 Rocky Mountain Way - Permits/Solar - 06/24/1985City of Fort Collins BUILDING INSPECTION DIVISION APPLICATION FOR BUILDING PERMIT AND CERTIFICATE OF OCCUPANCY Applicant complete this part of form omy. Press firmly using ball point pen. Job Address 7 C y M , Name �I L (�gt�E6G5 a c Mail Address — 3 O Phone ZZ 1 Name-5gAVBLT Address c U -- License No. S� PhoneZ G �5 Lot Block Filing Number _ _ Subdivision m d J PUD - DESCRIPTION OF WORK 56 Jar Stock Options Plan No... _ Codes _-__-- _-_ Est, Total Cost tincluding labor, material, profit) I hereby acknowledge that I have read this application and state that the above is correct and agree to comply with all city ordinances and state laws regulating building construction. signed date — CLASS OF WORK New Alteration Addition Demolish Move ❑ ❑ ❑ ❑ ❑ Plbg. Mech. Elec. Struct. Fire Prot. ❑ ❑ ❑ ❑ ❑ Dec. Gr. Type Const. Use Zone Use of Building Heighties EFloorArea TLotrea 2FrontageOcc. load Change from Plat File No. No. D.U. Garage area Fin. Bsmt. area Type heat No. Fireplaces or stoves — RELEASES — Dates Zoning Engineering Fire Department Electric Department Water R Sewer Plan Review Special Conditions: Valuation FEES Plan Check _ Permit Parkland DO Sales Tax St. Oversizing Water Plant Investment Sewer Plant Investment Storm Drainage Electric Underground Total Fees Disinbuhun Original - Apphcanf. Rlua Office. Canary - Sales Tax Pink - Ppphcant Tag - Bag Insp. Off -Street Parking (No. Cars) Interior Lot ❑ Corner Lot ❑ Reversed Corner Lot ❑ a m r a� m US c 0 ti Street c 0 a M ZBA Case # Date BBA Case # Date Building Insp. Approval by date d9 Permit No. Date