Loading...
HomeMy WebLinkAbout514 Shadbury Ct - Correspondence - 02/03/2000Excavation/Pier Inspection CLIENT: Engle Homes 7340 Caley Avenue Ste 300 Englewood, Colorado 80111 Attn: Mr. Eric Eckber lulCTL/THOMPSON, INC. CONSULTING GEOTECHNICAL AND MATERIALS ENGINEERS ADDRESS: O LOT \ /\ BLOCK C-./ FILING NO. b JOB NO. F Recommended Foundation System CTL/THOMPSON JOB NO. �r3 DATED ❑ DRILLED FRICTION PIERS MAXIMUM END PRESSURE FOR PIERS = PSF. PSF. SKIN FRICTION OF PSF MINIMUM DEAD -LOAD PRESSURE OF' PROVIDE A INCH VOID BENEATH GRADFBENMS: MINIMUM LENGTH FEET DRILLED PIERS INTO BEDROCK O� PSF MAXIMUM END PRESSURE FOR PIERS= SKIN FRICTION OF PSF. MINIMUM DEAD-L D PRESSURE OF PROVIDE A INCH VOID BENEATH GRADE BEAMS. BEDROCK PENETRATION %0 FEET MINIMUM LENGTH ��1 FEET Foundation Plan BY tZ PLAN NO. Q ��� - INCHES PIER DIAMETER _ WALL PIER PENETRATION ` � FEET \ COLUMN PIER PENETRATION FEET Reintq�cement -- 0 d, NO GRADE BARS Conditions observea L SOILS IN EXCAVATION: SOILS IN PIERS: Lam Foundation Layout Ground Water Conditions -kP^ NONE IN EXCAVATION �ch71 �Q_FEET NONE ENCOUNTERED IN BORING NO. ��s- _TO ❑ ENCOUNTERED AT FEET IN BORING NO. Q� I o- - INDICATES PIER INSPECTED DRILLING COMPANY z LOWER LEVEL UPPER LEVEL PIER NO. -� IN OVERBURDEN -FT. _----FT. IN BEDROCK FT. FT. DEPTH TO GROUNDWATER ' FT. FT. FT. 1 CASED DEPTH FT. Instructio SO Contractor PIERS OB RVED WERE SUPPORTED BY MATERIALS SUITABLFAFOR T RECOM NDED DE CRITERI , ❑ PIER N ALLATION OT APPR FIELD NTAT VE - VIE \ � r ATE OF INSPECTION