Loading...
HomeMy WebLinkAbout5121 Stillwater Creek Dr - Correspondence/Engineering - 01/24/2001 (3)Excavation/Footing Inspection CTL/THOMPSON, INC. CONSULTING GEOTECHNICAL 19 AND MATERIALS ENGINEERS CLIENT: ADDRESS. JJ The Writer Corporation lit'/j t:. I: ��k j,f� Northern Colorado Division 5191 S 11 We )c 5285 McWh4nney Blvd„ Ste 100 LOT - y . BLOCK _ Tyr Loveland, Colorado 80538 FILING NO. JOB NO. Y C - Attn- Mr- Kan rMpan Recommended Foundatiorp System CTL/THOMPSON JOB NO. rG 132 S DATED lal- 1 3 `' 94 -SPREAD FOOTINGS - MAXIMUM SOIL PRESSURE OF PSF. MINIMUM WIDTH INCHES ® FOOTINGS WITH MINIMUM DEAD -LOAD MAXIMUM SOIL PRESSURE OF _Q. � Dj C PSF. MINIMUM DEAD -LOAD PRESSURE OF goo PSF. PROVIDE A Ll INCH VOID BENEATH GRADE BEAMS. MINIMUM WIDTH i a INCHES ❑ GRADE BEAMS AND PADS DESIGNED FOR: MAXIMUM SOIL PRESSURE OF PSF. MINIMUM DEAD -LOAD PRESSURE OF PSF. PROVIDE A INCH VOID BENEATH GRADE BEAMS. Foundation Plan BY Cobb PLAN NO WALL FOOTING WIDTH a INCHES COLUMN PAD REINFORCEMENT AS PER PLAN: ® YES ❑ NO ❑ NONE REQUIRED ® AT SLTE ❑ INSTALLED Soil Conditions At Footing Level C TORVANE OR VANE SHEAR DENVER PENETROMETER TEST Ground Water Conditions ® NONE IN EXCAVATION ❑ NONE ENCOUNTERED IN BORING NO. TO FEET ❑ ENCOUNTERED AT FEET IN BORING NO. rA Remarks: Foundation Layout fin/,4YV Instructions To Contractor 0 APPROVED ❑ REJECTED RECOMMENDED CORRECTIVE PROCEDURE Cr r- Q,�S.Ags• ,F� ,, roe, C `Xhy ;a. E AnI/l // IA n 33319 ^'? 1-)4 U r