Loading...
HomeMy WebLinkAbout5121 Stillwater Creek Dr - Correspondence/Engineering - 01/26/2001 (3)Foundation Wall Reinforcement Inspection CLIENT: The FoundaffdifTild*C KI riegg By L 0E ' PLAN NO. % ss.3 2'5 �Foundation Type XSI SPREAD FOOTINGS ON NATURAL SOIL • -a •: FOOTINGS W1 MINIMUM DEADLOAD ❑ GRADE BEAMS AND PADS ❑ DRILLED FRICTION PIERS ❑ DRILLED PIERS INTO BEDROCK ❑ OTHER Foundation Void ❑ REQUIRED THICKNESS INCHES ❑ NOT REQUIRED Reinforcing Steel- L GRADE BAR SIZE NO. OF BARS ___? TOP BOTTOM VERTICAL d'- I tructions To Contractor FOUNDATION REINFORCEMENT IN GENERAL CONFORMANCE WITH PLAN ❑ REJECTED RECOMMENDED CORRECTIVE PROCEDURE CTL/THOMPSON, INC. CONSULTING GEOTECHNICAL AND MATERIALS ENGINEERS ADDRESS: lam'° LOT ��i y BLOCK FILING NO. JOB NO. Foundation Wall Layout Comment: REVIEWED BY �p FiEG�S T�, S.ABsP�o 33319