Loading...
HomeMy WebLinkAbout5115 Stillwater Creek Dr - Correspondence/Engineering - 01/18/2001 (3)Excavation/Footing CTL/THOMPSON, INC. Inspection CONSULTING GEOTECHNICAL AND MATERIALS ENGINEERS CLIENT: ADDRESS: rr II ff -- r The Writer Corporation SGdor�!YJY3�fG Northern Colorado Division & f-,1 Wq r H 6 G 8285 McWhinney Blvd, Ste 1n0 LOT to - I; BLOCK Loveland Cnlorado 8n5";8 FILING NO. JOB NO. __ C- 1319 Gttn- Mr_ Kan Grioan Recommended Foundation System CTL/THOMPSON JOB NO. fC - (3)f DATED Ia -I3- OPT ❑ SPREAD FOOTINGS MAXIMUM SOIL PRESSURE OF MINIMUM WIDTH INCHES FOOTINGS WITH MINIMUM DEAD -LOAD MAXIMUM SOIL PRESSURE OF �0 PSF. MINIMUM DEAD -LOAD PRESSURE OF 900 PSF. `'� PROVIDE A INCH VOID BENEATH GRADE BEAMS. I MINIMUM WIDTH a INCHES ❑ GRADE BEAMS AND PADS DESIGNED FOR: MAXIMUM SOIL PRESSURE OF PSF. MINIMUM DEAD -LOAD PRESSURE OF PSF. PROVIDE A INCH VOID BENEATH GRADE BEAMS Foundation Plan C b �b BY . PLAN NO. WALL FOOTING WIDTH I INCHES COLUMN PAD INCHES REINFORCEMENT AS PER PLAN: YES ❑ NO ❑ NONE REQUIRED ® AT SITE ❑ WALLED Soil Conditio s At Footing Lev �S�KJy TORVANE OR VANE SHEAR DENVER PENETROMETER TEST Ground Water Conditions 19 NONE IN EXCAVATION ❑ NONE ENCOUNTERED IN BORING NO. TO FEET ❑ ENCOUNTERED AT FEET IN BORING NO. Remarks: P Foundation Layout {yi j -.- a.wn-...,..•,. - ... _.R.- Instructions To Contractor 46 APPROVED ❑ REJECTED RECOMMENDED CORRECTIVE PROCEDURE Kor �i01 .4�