Loading...
HomeMy WebLinkAbout5115 Madison Creek Dr - Correspondence - 12/17/2000Excavation/Footing Inspection CTL/THOMPSON, INC. CONSULTING GEOTECHNICAL AND MATERIALS ENGINEERS CLIENT: The Wnlwr Corporation ADDRESS: fr 1 s.3•- (O c Northern Golnrado nivision 51Its Ih.J, C k sc., V ./ p-. 5285 McWhinney Blvd, Ste 100 LOT BLOCK Loveland, Colorado 80538 FILING NO. �C JOB NC ft l l Mr Mark Miller Recommended Foundation Syst Foundation Layout � CTU/THOMPSON JOB NO. C' Js7 (�4 DATED ► �7-Dy _...; _ ❑ SPREAD FOOTINGS - } MAXIMUM SOIL PRESSURE OF PSF. I _ MINIMUM WIDTH INCHES FOOTINGS WITH MINIMUM DEAD -LOAD MAXIMUM SOIL PRESSURE OF 01 '1i00 `by PSF. MINIMUM DEAD -LOAD PRESSURE OF PSF. PROVIDE A w INCH VOID BENEATH GRADE BEAMS. MINIMUM WIDTH ta INCHES ❑ GRADE BEAMS AND PADS DESIGNED FOR: MAXIMUM SOIL PRESSURE OF PSF. ---- j MINIMUM DEAD -LOAD PRESSURE OF PSF. PROVIDE A INCH VOID BENEATH GRADE BEAMS. Foundation Plan By Cell PLAN NO, 010 WALL FOOTING WIDTH ( _INCHES COLUMN PAD Q (y y ') it A/O INCHES REINFORCEMENT AS PER PLAN: ® YES ❑ NO ❑ NONE REWIRED AT SITE ❑ WALLED Soil Conditions At Footing Level u TORVANE OR VANE SHEAR DENVER PENETROMETER TEST Ground Water Conditions ID NONE IN EXCAVATION ❑ NONE ENCOUNTERED IN BORING NO. TO FEET ENCOUNTERED AT 1 I FEET IN BORING NO. L 3 Remarks: r^ . �I-•� {-2 4 f t I r • 1 Instructions To Contractor i APPROVED ❑ REJECTED RECOMMENDED CORRECTIVE PROCEDURE FIELD Cv. K_ 1 DATE OF INSPECTION