Loading...
HomeMy WebLinkAbout5114 Stetson Creek Ct - Correspondence - 10/20/1999Excavation/Footing CTL/THOMPSON, INC. Inspection ANNDSULTING MA ERIAGLSGTECHNICAL ENGINEERS CLIENT: The Writer Corporation ADDRESS: _ Northern Colorado Division 5200 Hahns Peak Dr., Ste 160 Loveland. Colorado 80638 Attn• Mr- Mark Miller LOT a -� FILING NO, BLOCK JOB NO. Recommended Foundation System CTL/THOMPSONJOB NO. DATED qCz> ❑ SPREAD FOOTINGS MAXIMUM SOIL PRESSURE OF MINIMUM WIDTH INCHES Foundation Layout FOOTINGS WITH MINIMUM DEAD -LOAD MAXIMUM SOIL PRESSURE OF � .00O PSF. MINIMUM DEAD -LOAD PRESSURE OF PSF. PROVIDE A INCH VOID BENEATH GRADE BEAMS. MINIMUM WIDTH \-;)L INCHES ❑ GRADE BEAMS AND PADS DESIGNED FOR: 1 MAXIMUM SOIL PRESSURE OF PSF. a MINIMUM DEAD -LOAD PRESSURE OF PSF. PROVIDE A INCH VOID BENEATH GRADE BEAMS. Foundation Plan BY C.o1'Q LSA�'�� PLAN NO. '$-�34'x's WALL FOOTING WIDTH NCHES COLUMN PAD " % 6z:' 3�"��x\a.- �'o� 3E,�3t VDL INCHES REINFORCEMENT AS PER PLAN: 0 ❑ YES ❑ NO ❑ NONE REQUIRED J5 , AT STTE ❑ INSTALLED Soil Conditions AtFooting Level e Instructions To Contractor K APPROVED ❑ REJECTED RECOMMENDED CORRECTIVE PROCEDURE TORVANE OR VANE SHEAR DENVER PENETROMETER TEST Ground Water Conditions E& NONE IN EXCAVATION ❑ NONE ENCOUNTERED IN BORING NO. TO FEET ENCOUNTERED AT FEET IN BORING 1\107'�)C1'� �T\A-� Remarks:E FIELD PI-1: S a OP�V S ABS T�9� !EPRESENTATIVE Q U . m• O 33319