Loading...
HomeMy WebLinkAbout5108 Stetson Creek Ct - Correspondence - 10/12/1999Excavation/Footing Inspection CTL/THOMPSON, INC. CONSULTING GEOTECHNICAL AND MATERIALS ENGINEERS •rr I ` ovelanel Colorado : 1 NO. ♦• Recommended Foundation System Foundation Layout CTL/THOMPSON JOB NO. r C —//$S DATED May 21. 099 ❑ SPREAD FOOTINGS i-- MAXIMUM SOIL PRESSURE OF PSF. FOOTINGS WITH MINIMUM DEAD -LOAD MAXIMUM SOIL PRESSURE OF _�.00%O PSF. MINIMUM DEAD -LOAD PRESSURE OF SQD PSF. PROVIDE A INCH VOID BENEATH GRADE BEAMS, ❑ GRADE BEAMS AND PADS DESIGNED FOR: MAXIMUM SOIL PRESSURE OF PSF, MINIMUM DEAD -LOAD PRESSURE OF PSF,`- ; i �..- 17 1-17 t PROVIDE A INCH VOID BENEATH GRADE BEAMS. Foundation Plan By Coaa Assaaanls I PLAN NO. WALL FOOTING WIDTH 12 INCHES:i— COLUMN PAD AS Ala7e'o O,/ irekvgE INCHES - REINFORCEMENT AS PER PLAN: YES ❑ NO ❑ NOW REQUIRED Q AT SITE ❑ INSTALLED j { i. ..,.. `.. SeConditions At Footing Level .�y SAdDy� s.�Ty� sc�.Ko�sr gRaw.J + , -n,r STUN SArK Instructions To Contractor APPROVED ❑ REJECTED RECOMMENDED CORRECTIVE PROCEDURE TORVANE OR VANE SHEAR PSF. DENVER PENETROMETER TEST G Ur d Water Conditions NONE IN EXCAVATION ❑ NONE ENCOUNTERED IN BORING NO. TO FEET ENCOUNTERED AT 111C FEET IN BORING NO. )1'% FC-1es-