Loading...
HomeMy WebLinkAbout5103 Madison Creek Dr - Correspondence - 10/17/2000M Excavation/Footing Inspection CTL/THOMPON, INC. IL�Jy CONSULTING GEOTECHNICAL AND MATERIALS ENGINEERS CLIENT: ADDRESS: 1 The Writer Corporation S1 ef_%, Cv )a Northern Colorado Division 903 Cv r �v- 5285 McWhinne_y Blvd, Ste 100 LOT I BLOCK Loveland Colorado 80538 FILING NO. i JOB NO. I-^C - )4 3� Otfn- Mr. Mark Millar Recommended Foundation vstem CTL/THOMPSON JOB NO. (0 1 -3 %- %Goo DATED IN SPREAD FOOTINGS :)o MAXIMUM SOIL PRESSURE OF oo PSF. MINIMUM WIDTH la INCHES ❑ FOOTINGS WITH MINIMUM DEAD -LOAD MAXIMUM SOIL PRESSURE OF PSF. MINIMUM DEAD -LOAD PRESSURE OF PSF. PROVIDE A INCH VOID BENEATH GRADE BEAMS. MINIMUM WIDTH INCHES ❑ GRADE BEAMS AND PADS DESIGNED FOR, MAXIMUM SOIL PRESSURE OF PSF. MINIMUM DEAD -LOAD PRESSURE OF PSF. PROVIDE A INCH VOID BENEATH GRADE BEAMS. Foundation Plan BY Co bto PLAN NO. a WALL FOOTING WIDTH INCHES COLUMN PAD INCHES REINFORCEMENT AS PER PLAN: IF YES ❑ NO ❑ NONE REQUIRED M AT SITE ❑ INSTALLED Soil Conditions At Footing Level c1 SeNly, A,,4wM -Tan TORVANE OR VANE SHEAR PSF. DENVER PENETROMETER TEST Ground Water Conditions NONE IN EXCAVATION ❑ NONE ENCOUNTERED IN BORING NO. TO FEET ENCOUNTERED AT f2 FEET IN BORING NO. L 31 Remarks: Foundation Layout i 6/is0a C PAL Instructions To Contractor ® APPROVED ❑ REJECTED RECOMMENDED CORRECTIVE PROCEDURE DATE OF INSPECTION `-i'. �<�.~`