Loading...
HomeMy WebLinkAbout4324 Mill Creek Ct - Correspondence - 10/09/1992FOUNDATION II Consulting ENGINEERING Engineers, Ltd. October 8, 1992 Commission No. 1455-03-04-02 Odau Construction Post Office Box 1149 Fort Collins, CO 80522 Gentlemen: We have observed the drilling of several of the ten (10) inch diameter, straight shaft piers supporting the residence under construction at Lot 12, Westbrooke Subdivision (4324 Mill Creek Court), a subdivision of Fort Collins, Colorado. This inspection was performed -on September 23, 1992. Exposed soils consist of four (4) feet of sandy clay over a sandy claystone bedrock which extends to the depths drilled, approximately ten (10) feet. All piers observed were plumb, properly cleaned and of adequate length as specified on ourfoundation plan, Job No..1455-03-01-03. No water was encountered during drilling. Casing was not required. If you have any questions, please feel free to call. s--- �O�Cr\a�ydl i E Pqr ju!t`,p Kevin W. Patterson, P.E. FOUNDATION ENGINEERING, C0ILTI4ENGIRS, LTD. KWP:sbs 100 East 3rd Street • Loveland, Colorado 80537 • (303) 663-0138