HomeMy WebLinkAbout3908 Ridgeway Ct - Miscellaneous - 02/05/1998Fort Collins residential energy code
I
Job address:
General contractor.
Mechanical contractor.
Space heating system
Space cooling system
Water heating system
Certification
I/We certify that the above4isted equipment was installed in the building at the above locations in conformance with the
current requirements of the City of Fort Collins Residential Energy Code and Mechanical Code, and that it was installed in
accordance with manufacturer's instructions. VWe certify that any ductwork has been installed in conformance with
the current requirements of the City of Fort Collins Residential Energy Code and Mechanical Code.
Certified by: Robert Puller Phone: 970_223_8873
Business firm: Northern Colorado Air, IncDate:
Address: 1823 E. Harmony Rd. Signature:
Instructions
This disclosure form is to be signed by the mechanical contractor or representative of the
Please type or print, except for the signature. general contractor.
If there are multiple systems serving any function, make multiple entries to describe them.
One copy of this form shall be provided to the Building and Zoning Department at final inspection.
One copy of this form shall be provided to the homebuyer.
mclWfu.wEt/557! — 824M
Builders
Insulation Statement
CertainTeed Ci
lnsulisafeut,
Fiber Glass Insulation
InsulSafe III' has been installed with the
manufacturer's recommendations to pro-
vide a value of R 30 using 17 bags
of insulation to cover 879 square feet of
area at a minimum thickness of 15.5
inches.
;/?
Installer Cont ctor igrry
GALE I SULAT'TON
Company Name l
Date
Builder (Sign)
ROBART DEVELOPMENT
Company Name
zin
and Blanket
ue Insulation Thickness
10", 12",
814", 10"
61/,"
54:"
6y^
31/2"
T/,••
372"
with ASTM C 665
glass batts or rolls have been
id in accordance with the manu-
facturer's recommendation to provide
an R-value of 30 in the ceiling, 13 in
the exterior walls, 30 in the floor
or crawl space perimeter.
Instal er Contract-r (Sign)
GALE IN&fJLATI
Com an Name
Date.
Builder (Sign)
ROBART D=,1,QPNI7MT
Company Name
Date
Thermal Performance — Attic Blowing Application
A In accordance with the chart below, you must install the minimum number of bags per 1,000 sq. ft.
of net area for each R-Value listed.
3 The maximum net coverage must not exceed that specified for each R-Value.
N The installed insulation must be at or above the specified minimum thickness for each R-Value.
Failure to install the required minimum weight per sq. ft. of insulation at or above the minimum
thickness will result in reduced R-Value.
B This product should not be mixed with other blown insulations or the thermal claims will become
invalid.
rt-values are determined in accordance with ASTM C 687 and 518. Complies with ASTM C 764
as Type I insulation.
"R" means resistance to heat flow. The higher the R-Value, the greter the insulating power. To
get the marked R-Value, it is essential that the insulation is installed properly.
DANGER: RECESSED LIGHT FIXTURES — TO PREVENT OVERHEATING, DO NOT
INSULATE ON TOP OR WITHIN 3" OF SUCH DEVICES. DOES NOT APPLY
TO TYPE IC LIGHT FIXTURES OR TO FLUORESCENT FIXTURES WITH
THERMALLY PROTECTED BALLASTS.
naming Adjustment
To compensate for framing members the number of bags per 1000 sq. ft. of net area should be
reduced as follows:
Joist Size
Bags to Deduct / 1000 sq. ft.
Bags to Deduct / 1000 sq. 0.
Joists 1e0.c.
Joists 24O.C.
2" x 4"
0.5
o.a
2 x 6
0.9
0.6
2" x 8"_
1.1
O.B
1.4
1.0
CertainTeed Corporation, P.O. Box 860, Valley Forge, PA 19482
Code No.30-24-092
1997 CertainTeed Corporation 5/97
Manufacturer Insulation Fact Sheet
Thrs is CertainTeed Corporation Inlilfelll
Fiber Mass Blowing Insulation
CertainTeed Corporation
P.O. Box 860
Valley Forge, PA 19482
CertainTeedEq
Thermal Performance —horizontal Open Blow
The following thermal performances are achieved at weights and coverages specified when insulation is installed with pneumatic equipment with
a horizontal open blow:
-- ivy u cot ana c bid. Conforms to ASTM C 764.
Thermal Performance—Sidewall Application
When installed with pneumatic equipment in sidewalls, the following thermal performance is achieved at the thicknesses, weights and coverages
specified.
R-VALUE
1000 SD. FT.
BAGS PERT54"37,'
UM
BAG
MINIMUM WEIGHT
POUNDS PER SO. Fr
MINIMUM
To obtain a
thermal resistance
(R) of:
Bags per
1000 sq. tt.
f bag
cover
Weight per sq. ft. of
q insulation
�nnotllbe
THICKNESS
Installed insulation
of net area:
(sq. ft.)
lass tha(Ibs )Id
.97
less than: (etcbe
hes)
R-29
38.5
R-22
29.4
.73
5'/z"R-16-
21:3
.534"R-15
19.3.48
3s/e'R-14
18.7.47
3'h"
READ THIS BEFORE YOU BUY
What you should know about R-Values.
The chart shows the R-Value of this insulation. R means resistance to heat flow.. The higher the R-Value, the
the insulating
greater
power. Compare insulation R-Values before you buy.
There are other factors to consider. The amount of insulation you need depends mainly
on the climate you live in. Also, your fuel savings from insulation will depend upon the climate, the type and size of
house,
your the amount of
insulation already in your house, and your fuel use patterns and family size. If you buy too much insulation,
you more than what you'll save on fuel. it will cost
To get the marked R-Value, it is essential that this insulation be installed properly.
Fort Collins residential energy code 7/96
Air sealing disclosure
A. Prescriptive path
I/We certify that the air sealing requirements specified in the current City of Fort Collins Residential Energy Code
have been completed in this building, in accordance with the "Air Sealing Checklist' published by the City of Fort Collins.
Certified by:�ti o1. lc /�� Phone:
Business firm: J�-+�% `;J. Date:
Address: 1/3(�,Signature:
B. Performance path
I/We certify that this building has met the air leakage performance threshold specified in the current
City of Fort Collins Residential Energy Code, in accordance with the "Blower Door Test Procedures," published
by the City of Fort Collins.
Testing contractor:
Date of test:
CFM50:
Volume:
ACH50:
Certified by:
Business firm:
Address:
Air flow through the blower door at 50 Pascals pressure difference (cfm)
Volume of home (cu. ft.)
Air change rate per hour at 50 Pascals pressure difference
ACH50 = (CFM50 x 60) / Volume
The performance threshold for code compliance is ACH50
not exceeding 5.0 ac/h
Phone:
Date:
Signature:
Instructions
Complete either Part A or Part B.
Part A is to be signed by the air sealing contractor or representative of the general contractor.
Part B is to be signed by the blower door testing contractor or representative of the general contractor.
The "Blower Door Test Report' or equivalent documentation must be attached.
Please type or print, except for the signature.
If components vary, make multiple entries to describe them.
One copy of this form shall be provided to the Building and Zoning Department at final inspection.
One copy of this form shall be provided to the homebuyer.
esdx.wb1MM3— 6/24M