HomeMy WebLinkAbout3839 Gardenwall Ct - Correspondence - 08/28/2001FOUNDATION COMPLIANCE FORM
BUILDING PERMIT# �B0 (()3 2 q0 (By Builder)
CONSTRUCTION SITE ADDRESS: 8�
Subdivision:
Lot: c2r
.27 Bfock:
BUILDER'S NAME AND PHONE:
Richmond American Homes
Northern Division
3561 Stagecoach Road, Suite 200
Longmont, Colorado 80504
(303)684-2956
UWe hereby state that the foundation system for the above referenced project was constructed in
general conformance with the foundation plans and specifications designed for this project and
the site where it is constructed.
Date: Initials:
4100r AR",
R ON I sm.
* 23702
��;s°�9I25Io
Inspection:
FOOTING TRENCH
CONCRETE -ENCASED ELECTRODE PLACEMENT
TENDON PLACEMENT
CONCRETE PLACEMENT
TENDON STRESSING
POST TENSION FINAL
*
6000 EAST EVANS AVENUE 0 BUILDING 2, SUITE 100 ■ DENVER, COLORADO 80222 ■ ( 3 0 3 1 5 0 4 - 9 3 3 0 ■ FAX: (303) 504-9620