HomeMy WebLinkAbout3756 S Timberline Rd - Special Inspections/Engineering - 09/13/2001Sep 14 01 08:42a David Mastin 3035169511 p.8
david c. mastin p.e.
1350 Pine St. # 4
boulder, colorado 80302
September 13, 2001
Maxwell Construction
333 W. Hampden Ave. Suite 325
Englewood, CO 80110
Attn. Jim Gorr
RE Fox Meadows
3756 South Timberline ,Peie--
Ft. Collins, CO 80525
Building G
Perot # B0010080
The purpose of this letter is to confirm that a representative of my office has made a site
observation of the above noted building foundation prior to the concrete being poured. The
foundation was found to be acceptable, and in significant compliance with the contract
documents.
Please find a copy of my individual site observations for both the stiffening beams and the slab
portions of the foundation.
A representative of my office has reviewed the stressing records for the post -tension tendons,
and found them to be acceptable. Permission to cut off and patch the tendons has been given to
the contractor.
A representative of my office has reviewed the concrete test results and found them to be
acceptable.
A representative of my office has reviewed the letter from the soils engineer that verifies that
the soil met all requirements prior to the placement of the foundations.
, �
OR/ it 10,111,
. Lem IT, F7112