HomeMy WebLinkAbout3519 Richmond Dr - Correspondence - 01/01/2000THE(ce GROUP
BUILDING SYSTEMS EArG/NEER/NG
February 10, 1999
Mr. Mike -Nebo
City of Fort Collins
281 North College Avenue
P.O. Box 580
Fort Collins, CO 80522.0580
Project: Associates in Family Medicine — Permit Application 4 0985420
Subject: Building Sanitary Sewer
Dear Mike,
To confirm our phone conversation some time ago regarding the building sanitary sewer, we are
proceeding with the installation based on the following as we discussed:
■ Building Sanitary Sewer will be 4" at 1% slope to 5' outside the building at which point it will
change to 6" run at r/z% slope to the manhole so that we can hit the inlet invert elevation.
■ Transition from 4" to 6" will be made with an eccentric fitting so that the bottom flow line will be
maintained.
Please feel free to give me a call if you have any questions.
Mark D'Rosario
Principal
C.C. Allen P&H - Dan Haynes
Drahota — Jeff Jensen
TST — Eric Furman
CE 1 \e\projects\98009\corresp\city001
2407 COCHETOPA COURT, FORT COLLINS, COLORADO 80525
PHONE: 970.282.8641 E—MAIL: MARKDOINF02000.NET FAX:970.282.8671
� 110 Granite Street, Suite D •Loveland, Colorado 80538 •(9'0) 663-01 38 Fax (970) 663-1660
500 Kimbark Street, Suite 101 -Longmont, Colorado 80501 •(303) 702-0661 Fax (303) 774-8413