Loading...
HomeMy WebLinkAbout3519 Richmond Dr - Correspondence - 01/01/2000THE(ce GROUP BUILDING SYSTEMS EArG/NEER/NG February 10, 1999 Mr. Mike -Nebo City of Fort Collins 281 North College Avenue P.O. Box 580 Fort Collins, CO 80522.0580 Project: Associates in Family Medicine — Permit Application 4 0985420 Subject: Building Sanitary Sewer Dear Mike, To confirm our phone conversation some time ago regarding the building sanitary sewer, we are proceeding with the installation based on the following as we discussed: ■ Building Sanitary Sewer will be 4" at 1% slope to 5' outside the building at which point it will change to 6" run at r/z% slope to the manhole so that we can hit the inlet invert elevation. ■ Transition from 4" to 6" will be made with an eccentric fitting so that the bottom flow line will be maintained. Please feel free to give me a call if you have any questions. Mark D'Rosario Principal C.C. Allen P&H - Dan Haynes Drahota — Jeff Jensen TST — Eric Furman CE 1 \e\projects\98009\corresp\city001 2407 COCHETOPA COURT, FORT COLLINS, COLORADO 80525 PHONE: 970.282.8641 E—MAIL: MARKDOINF02000.NET FAX:970.282.8671 � 110 Granite Street, Suite D •Loveland, Colorado 80538 •(9'0) 663-01 38 Fax (970) 663-1660 500 Kimbark Street, Suite 101 -Longmont, Colorado 80501 •(303) 702-0661 Fax (303) 774-8413