Loading...
HomeMy WebLinkAbout1635 Blue Spruce Dr - Correspondence/Engineering - 05/08/1975TO: Building Department FROM: Engineering Department RE: Subdivision Clearance The following subdivision :<or`list- ortion thereof has been approved for the issuance o (building permits) SUBDIVISS/ION NAME: /✓�'l /`PGA/% //� `/%cml//l<T��G�//�h !L/w 4 By Engineering Department to (Construction Inspection) Donald M. Par ns ! City Enginee. By Planning Department (Zoning Inspection) _ Date Diana Eer,alhausen Zoning Inspector Notes: erfi� 7-1 vw f y XoLe- Only engineering signatizre required for building nermi.f: signatures for certificate of occupancy release. Both Empire Laboratories, Inc. P.O. Box 429 . 214 North Hawes Fort Collins, Colorado 80522 . Telephone (303) 484-0359 June 27, 1975 Nolan Construction Co 5842 Old Mill Street Littleton, Colorado 80120 Attention: Mr. Phil Nolan Gentlemen: Re: Evergreen Park Medical Professional Center ELI Project No. 1906-75 Enclosed are the results of the caisson inspections at the above referenced project. A member of our firm made continuous inspection during the drilling operations. The objectives of the inspections were to determine (1) the firm bedrock stratum; (2) the penetration into the firm bedrock; (3) make sure the holes were clean and dry prior to the placement of con- crete; and (4) note any variations in the soil conditions encountered at the site. It is felt that the caissons were drilled in accordance; with the plans and specifications for the project. If we can be of any, further help to you on this project, please feel free to call us. Very truly yours, EMPIRE LABORATORIES, INC. �14e - Chester C. Smith, P.E. Vice President jib Enclosures cc: E.H. Tippets Co D.C. Miller & Co RFC�'VFp BY BUI[B/N but 7 C /y�FCpUp 1g75, :MATERIALS AND FOUNDATION ENGINEERS . MEMBER OF CONSULTING ENGINEERS COUNCIL OFFICES AND LABORATORIES IN FORT COLLINS. COLORADO AND CHEYENNE, WYO\ZING