Loading...
HomeMy WebLinkAbout1415 Blue Spruce Dr - Special Inspections/Engineering - 01/20/19771. chen and associates, inc. ,. CONSULTING ENGINEERS SOIL& FOUNDATION 96 S. ZUNI DENVER, COLORADO 80223 303/744.7105 " ENGINEERING 1924 EAST FIRST STREET • GASPER, WYOMING 62601 • 307/234.2126 January 20, 1977 Subject: Fill Control, Warehouse Build Evergreen Park, Fort Collins, Colorado. / Job No. 1 Nolen Construction Company 1625 West Union Avenue #6 Englewood, Colorado 80110 Gentlemen: We understand It is desirable to place some footings at the subject site on compacted fill. Our original soil and foundation investigation indicated all footings should be excavated to natural soils, however, footings placed on structural fill compacted to at least 95% standard Proctor density are satisfactory. We Inspected and tested the east interior footings on January 20, 1977. There is approximately 2 feet of fill beneath these footings. Results of compaction tests taken in this area are presented in the attached dally report. Based on the results of our tests, these footing excavations are satisfactory. The remaining footing excavations should be inspected to verify fill or natural soils. We are available for further Inspection and testing upon your notifica- tion. - Very truly yours, CHEN AND ASSOCIATES, INC. By Jeffrey T. Johnson JTJlak F CO Rev. By: D.H.A. Enclosures cc: E.N. Tippets City of Fort Collins Attn: Mr. Bill Waldo, Chief Bldg. Inspector RECEIVED BY BUILDING IUSPECTIDS JAN 2 4 1977 r`{ men and associates, inc. i CONSULTING ENGINEERS 96 S. ZUN1 • DENVER, COLORADO 80223 303/744.7105 To Nolen Construction Company 1825 West Union Ave. #6 Job No. 14,079 Date 1-20-77 Subject FILL CONTROL AT Warehouse Bldg., Evergreen Park, Fort Collins. Colorado Englewood, Colorado 80110 Daily Report No. 10 TEST NO. LOCATION DEPTH OR ELEVATION TEST TYPE LABORATORY FIELD TEST PERCENT COMPACTION SOIL TYRE MAX. DEN. (pcf) O.M.C. (%) DENSITY (Pcf) MOISTURE t8 #2 Pit from South End 2.016 G N Silty Sand & Gravel 19 _ # Pit from South End 2.018,13 N ;/" 132.5 .8.3 - 132.4 -3.2. 100 20 #6 Pit from South End 2.018 G N 132.5 8 12 ' 9Sit 21 #8 Pit from South End 01 8 11 Specification compaction 8 material 95% standard Proctor density Type 8 No. earth moving equipment Type 8 No. of compaction equipment Thickness of lift Number of posses Method of adding moisture Natural Progress Report Tests taken in east side pad excavations. C�XXN P Periodic inspections being continued unless advised otherwise . O 6 FVA ❑ Full time supervision of fill placement being continued unless advised other > 0 �`�" O'IAL LNG-'Q RXX In our opinion the fill hot been.ploced according to the specified requirements an s�o 'oa satisfactorily. QIn our opinion the fill described above does not meet specification requirements and should be removed. The contractor has been advised. Alan Springett cc: E.H. Tippets City of Fort Collins Attn: Hr. Bill Waldo, 61ef .Bldg. Inspector Field Engineer Approved by: Jeffrey T. Johnson By: RCH CA -BA