HomeMy WebLinkAbout1204 S College Ave - Correspondence/Building Inspection - 07/24/1984i� o y' S. Co%lC/off
Larsen
Associates
Professional
Corporation
CONFERENCE REPO
PROJECT: /Helrishire House III JOB NO: ,8418
i, aoLl �
PARTICIPANTS: Felix Lee PLACE: City of Fort Collins
Larry Trampe Building Inspection
Bob Mooney
DATE: 7/24/84
This'is
my understanding of the items discussed and decisions reached:-
1.
The proposed addition for Helmshire House when added to the
square footage of the existing building.does not exceed the
r
maximum area for a Type 5, 1-Hour rated building.
tl
2.
In lieu'of the 1-Hour construction throughout, the building will
be fully fire sprinkled.
4
3.
The Carden level of the addition could be considered a separate
®
dwelling with an occupancy type of R-3 without requiring
separation from the upper floors. Therefore, only one exit is
required from the garden level of the addition. This does not
relinquish the need for egress windows from sleeping rooms.
4. The door from the garden level to the exit stairway must be a 1-
Hour assembly. The stairway to the garden level may be included
within the garden level living area without separating it from
that living area. However, the 1-Hour enclosure assembly for the
stairway above must be maintained at the upper stairways.
5. Only one handicapped unit must be provided for the addition
because four handicapped units will be provided in the existing
building, and there are only 36 units total.
6. The garden level must be identified on the plans when submitted
for building permit as an R-3 occupancy.
If you have any additions, deletions, or modifications to the above,
please do not hesitate to contact this office.
Sincerely,
Robert J. lloon
Project Arc ect
xc: Participants
Member
American Institute of Architects
7 Clock Tower Square
323 South College Avenue
Fort Collins, Colorado 80524-2898
303 484 0126
Consultants
-
,vi7/� �ccci++rvr�} wi�� 521y[ 45