Loading...
HomeMy WebLinkAbout7321 Crooked Arrow Ln - Special Inspections/Engineering - 01/16/2009January 16, 2009 Shadow Creek Homes 2861 W. 12& Avenue, Suite 240 Westminster, Colorado 80234 Attn: Mr. Toby Terhune Re: Foundation Footing Sizes, Wall Steel and CEE Provincetowne Residential Development 7321 Crooked Arrow Lane — Lot 7, Block 2 Fort Collins, Colorado Terracon Project No. 20075058 A representative from Terracon observed the interior and steel reinforcement, including the °concrete -encased el( referenced lot on January 9 and 14, 2009, as requested. Based upon our limited on -site observations, and provided ti on the field report were followed, the foundations were col steel appeared to have been placed in general accordance the geotechnical engineering report. It should be noted th; were performed on an as -requested basis, and only when re client or their designated representative. Terracon's services the locations or elevations of foundations elements. We material and/or construction not observed by Terracon rep provided solely for the benefit for the above -listed client and the rights and obligations of third parties, including contract( may have provided the materials and/or construction service: Sincerely, Terracon Consultants, Inc. Todd A. Tumey Project Manager Copies to: Addressee (4) I ret Consulting ac®n ineers & Scientists ;rracon Consultants, Inc. 301 North Howes Collins, Colorado 80521 Phone 970.484.0359 Fax 970.484.0454 www.terracon.com for footing sizes and wall le" (CEE), for the above t recommendations noted ructed and the observed h the provided plans and our observation services ested by the above -listed ).not include surveying of Fer no opinio� regarding aentatives. This letter is ies not impact in any way and subcontractors who /aymond . Denton, rf, Delivering Success for Clients and Employees Sine 1965 More Than 95 Offices. Nationwide gwo,UC IN ''�t � yso`1D f_ 40208?� �V4/ � �ONeLi* Manager January 20, 2009 Shadow Creek Homes 2861 W. 120th Avenue, Suite 240 Westminster, Colorado 80234 Attn: Mr. Toby Terhune Re: Damp Proofing Observation Provincetowne Residential Development 7321 Crooked Arrow Lane - Lot 7, Block 2 Fort Collins, Colorado Terracon Project No. 20075058 Irei Consulting A representative of Terracon Consultants, Inc. (Terracon) perfo ed a foundati observation at the subject site on January 19, 2009. The pu ose of these observe: • That dampproofing had been applied to the foundatio system in ge with Foundation Dampproofing, 2003 International R sidential Cod R406. • That dampproofing was in locations of below enclosing habitable space areas. It should be noted that our observation services were performed only when requested by the above -listed client or their designai opinion regarding materials and/or construction not observed by letter is provided solely for the benefit for the above -listed client the rights and obligations of third parties, including contractors an provided the materials and/or construction services observed. Sincerely, Terracon Consultants, Inc. Christopher . Gemperline Engineeri g Geologist Copies to: Addressee (4) basement :on & Scientists :*n Consultants, Inc. 301 North Howes tins, Colorado 80521 Phone 970.484.0359 Fax 970.484.0454 www.terracon.com dampproofing rvices was to ral accordance (IRC), Section walls an as -requested basis, and -epresentative. We. offer no acon representatives. This does not impact in any way ibcontractoi�s who may have J L. Denton, nical Depar Delivering Success for Clients and Employees Si14te 1965 More Than 95 Offices Nationwide IW1 �• N 40208 Manager January 20, 2009 Shadow Creek Homes 2861 W. 120' Avenue, Suite 240 Westminster, Colorado 80234 Attn: Mr. Toby Terhune Re: Exterior Perimeter Drain Observation Provincetowne Residential Development 7321 Crooked Arrow Lane — Lot 7, Block 2 Fort Collins, Colorado Terracon Project No. 20075058 A representative of Terracon Consultants, Inc. (Terracon) o the subject site on January 19, 2009. The purpose of these • Observe that properly sized pipe and gravel had been • Observe that the perimeter drain system had recommended in the Geotechnical Engineering Re Project No. 20075058. • Confirm that the perimeter drain system had been Based upon our limited on -site observations, and provided that field report were followed, the observed drain appeared to ha accordance with the provided plans and the referenced geotechr be noted that our observation services were performed on an as requested by the above -listed 'client I or their designated repr( regarding materials and/or construction not observed by Terracc provided solely for the benefit for the above -listed client and doe: and obligations of third parties, including contractors and subcor the materials and/or construction services tested or observed. Sincerely, Terracon Consultants, Inc. " Christopher . emperline Engineers Geologist Copies to: Addressee (4) Irerracon Consulting Engineers & Scientists Terracon Consultants, Inc. 301 North Howes Fort Collins, Colorado 80521 Phone 970.484.0359 Fax 970.484.0454 www.terracori.com the installed perimeter drain at s was to: as recommended. placed at the locations Terracon Consultants, Inc. to a sump pit for discharge. (commendations noted on the been constructed in general 0 engineering report. It should :quested basis, and only when Intative. We offer no opinion representatives. This letter is of impact in any way the rights actors who may have provided 6-e-1 Y" L. Denton, II, 1cal Department Delivering Success for Clients and Employees Sie 1965 More Than 95 Offices Nationwide