HomeMy WebLinkAbout7321 Crooked Arrow Ln - Special Inspections/Engineering - 01/16/2009January 16, 2009
Shadow Creek Homes
2861 W. 12& Avenue, Suite 240
Westminster, Colorado 80234
Attn: Mr. Toby Terhune
Re: Foundation Footing Sizes, Wall Steel and CEE
Provincetowne Residential Development
7321 Crooked Arrow Lane — Lot 7, Block 2
Fort Collins, Colorado
Terracon Project No. 20075058
A representative from Terracon observed the interior and
steel reinforcement, including the °concrete -encased el(
referenced lot on January 9 and 14, 2009, as requested.
Based upon our limited on -site observations, and provided ti
on the field report were followed, the foundations were col
steel appeared to have been placed in general accordance
the geotechnical engineering report. It should be noted th;
were performed on an as -requested basis, and only when re
client or their designated representative. Terracon's services
the locations or elevations of foundations elements. We
material and/or construction not observed by Terracon rep
provided solely for the benefit for the above -listed client and
the rights and obligations of third parties, including contract(
may have provided the materials and/or construction service:
Sincerely,
Terracon Consultants, Inc.
Todd A. Tumey
Project Manager
Copies to: Addressee (4)
I ret
Consulting
ac®n
ineers & Scientists
;rracon Consultants, Inc.
301 North Howes
Collins, Colorado 80521
Phone 970.484.0359
Fax 970.484.0454
www.terracon.com
for footing sizes and wall
le" (CEE), for the above
t recommendations noted
ructed and the observed
h the provided plans and
our observation services
ested by the above -listed
).not include surveying of
Fer no opinio� regarding
aentatives. This letter is
ies not impact in any way
and subcontractors who
/aymond . Denton, rf,
Delivering Success for Clients and Employees Sine 1965
More Than 95 Offices. Nationwide
gwo,UC
IN
''�t
� yso`1D f_
40208?�
�V4/
� �ONeLi*
Manager
January 20, 2009
Shadow Creek Homes
2861 W. 120th Avenue, Suite 240
Westminster, Colorado 80234
Attn: Mr. Toby Terhune
Re: Damp Proofing Observation
Provincetowne Residential Development
7321 Crooked Arrow Lane - Lot 7, Block 2
Fort Collins, Colorado
Terracon Project No. 20075058
Irei
Consulting
A representative of Terracon Consultants, Inc. (Terracon) perfo ed a foundati
observation at the subject site on January 19, 2009. The pu ose of these
observe:
• That dampproofing had been applied to the foundatio system in ge
with Foundation Dampproofing, 2003 International R sidential Cod
R406.
• That dampproofing was in locations of below
enclosing habitable space areas.
It should be noted that our observation services were performed
only when requested by the above -listed client or their designai
opinion regarding materials and/or construction not observed by
letter is provided solely for the benefit for the above -listed client
the rights and obligations of third parties, including contractors an
provided the materials and/or construction services observed.
Sincerely,
Terracon Consultants, Inc.
Christopher . Gemperline
Engineeri g Geologist
Copies to: Addressee (4)
basement
:on
& Scientists
:*n Consultants, Inc.
301 North Howes
tins, Colorado 80521
Phone 970.484.0359
Fax 970.484.0454
www.terracon.com
dampproofing
rvices was to
ral accordance
(IRC), Section
walls
an as -requested basis, and
-epresentative. We. offer no
acon representatives. This
does not impact in any way
ibcontractoi�s who may have
J L. Denton,
nical Depar
Delivering Success for Clients and Employees Si14te 1965
More Than 95 Offices Nationwide IW1
�•
N 40208
Manager
January 20, 2009
Shadow Creek Homes
2861 W. 120' Avenue, Suite 240
Westminster, Colorado 80234
Attn: Mr. Toby Terhune
Re: Exterior Perimeter Drain Observation
Provincetowne Residential Development
7321 Crooked Arrow Lane — Lot 7, Block 2
Fort Collins, Colorado
Terracon Project No. 20075058
A representative of Terracon Consultants, Inc. (Terracon) o
the subject site on January 19, 2009. The purpose of these
• Observe that properly sized pipe and gravel had been
• Observe that the perimeter drain system had
recommended in the Geotechnical Engineering Re
Project No. 20075058.
• Confirm that the perimeter drain system had been
Based upon our limited on -site observations, and provided that
field report were followed, the observed drain appeared to ha
accordance with the provided plans and the referenced geotechr
be noted that our observation services were performed on an as
requested by the above -listed 'client I or their designated repr(
regarding materials and/or construction not observed by Terracc
provided solely for the benefit for the above -listed client and doe:
and obligations of third parties, including contractors and subcor
the materials and/or construction services tested or observed.
Sincerely,
Terracon Consultants, Inc.
"
Christopher . emperline
Engineers Geologist
Copies to: Addressee (4)
Irerracon
Consulting Engineers & Scientists
Terracon Consultants, Inc.
301 North Howes
Fort Collins, Colorado 80521
Phone 970.484.0359
Fax 970.484.0454
www.terracori.com
the installed perimeter drain at
s was to:
as recommended.
placed at the locations
Terracon Consultants, Inc.
to a sump pit for discharge.
(commendations noted on the
been constructed in general
0 engineering report. It should
:quested basis, and only when
Intative. We offer no opinion
representatives. This letter is
of impact in any way the rights
actors who may have provided
6-e-1 Y"
L. Denton, II,
1cal Department
Delivering Success for Clients and Employees Sie 1965
More Than 95 Offices Nationwide