Loading...
HomeMy WebLinkAbout1111 Cherry St - Special Inspections/Engineering - 01/27/1997January 27, 1997 Mr. Mike Coleman 1111 Cherry Street Fort Collins, Colorado 80524 RE: 1111 Cherry Street Fort Collins, Colorado Project No. 20976011 Dear Mr. Coleman 1rer 'acon CONSULTANTS WESTERN, INC. P.O. Box 503 • 301 N. Howes Fort Collins, Colorado 80522 (970)484-0359 Fax: (970) 484-0454 Larry G. O'Dell, P.E. William J. Attwool, P.E. Neil R. Sherrod, C.P.G. g;7,5a67d On January 23, 1997 a representative of Terracon Consultants Western, Inc. visited the referenced site as requested. The purpose of this visit was to render an opinion based on visual observations and site measurements regarding the support of the second floor cantilever at the northeast corner of the structrure. Based on the existing construction it is recomended a column be added at the corner of the cantilever. The column should be a 3" diameter 11 gage adjustable, steel pipe column. The column may bear on the slab in the tool shed provided the slab is at least 3 1/2" thick. If the slab is less than 3 1/2" thick a 16" x 16" x 8" concrete pad should be placed beneath the pipe column bearing on undisturbed soil. Additionally a 2x8 should be added to the north and east side of the cantilever extending from the column to the bearing walls. If you have any questions, please contact us. )N CONSULTANT�S\NWE%TFflZN, INC. its/ib n ���a RE cisl %, r; �Vur% leeks, P.E.5;} t V Engineer ='' /�yylafill lil li \1j1�`\\ Offices of The Terrecon Companies, Inc. Geotechnical, Environmental and Materials Engineers Arizona ■ Arkansas ■ Colorado ■ Idaho ■ Illinois ■- Iowa ■ Kansas ■ Minnesota Missouri ■ Montana ■ Nebraska ■ Nevada ■ Oklahoma ■ Tennessee ■ Texas ■ Utah Wyoming QUALITY ENGINEERING SINCE 1965