Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout2018CV01 - Sutherland V. City Of Fort Collins, Et Al - 022D - Agenda Item Part 4HCM 2010 Signalized Intersection Summary 8: College (US 287) & Johnson/Spring Park
long background am
City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 9 Light Report
Page 2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 15 5 5 30 5 80 10 1865 20 15 1115 10
Future Volume (veh/h) 15 5 5 30 5 80 10 1865 20 15 1115 10
Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.99 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1824 1863 1824 1863 1937 1824 1863 1863 1824 1863 1863 1824
Adj Flow Rate, veh/h 17 6 0 34 6 16 11 2119 22 17 1267 10
Adj No. of Lanes 010110130130
Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88
Percent Heavy Veh, % 222222222222
Cap, veh/h 36 13 0 72 19 50 380 4130 43 188 4142 33
Arrive On Green 0.03 0.03 0.00 0.04 0.04 0.04 0.80 0.80 0.80 0.80 0.80 0.80
Sat Flow, veh/h 1328 469 0 1774 466 1242 431 5189 54 187 5204 41
Grp Volume(v), veh/h 23 0 0 34 0 22 11 1384 757 17 825 452
Grp Sat Flow(s),veh/h/ln 1796 0 0 1774 0 1707 431 1695 1853 187 1695 1855
Q Serve(g_s), s 1.4 0.0 0.0 2.1 0.0 1.4 0.8 15.5 15.5 3.8 7.2 7.2
Cycle Q Clear(g_c), s 1.4 0.0 0.0 2.1 0.0 1.4 8.0 15.5 15.5 19.3 7.2 7.2
Prop In Lane 0.74 0.00 1.00 0.73 1.00 0.03 1.00 0.02
Lane Grp Cap(c), veh/h 49 0 0 72 0 69 380 2698 1475 188 2698 1476
V/C Ratio(X) 0.47 0.00 0.00 0.47 0.00 0.32 0.03 0.51 0.51 0.09 0.31 0.31
Avail Cap(c_a), veh/h 163 0 0 161 0 155 380 2698 1475 188 2698 1476
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 52.7 0.0 0.0 51.6 0.0 51.3 4.1 3.9 3.9 7.2 3.0 3.0
Incr Delay (d2), s/veh 6.7 0.0 0.0 4.8 0.0 2.6 0.1 0.7 1.3 1.0 0.3 0.5
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.8 0.0 0.0 1.1 0.0 0.7 0.1 7.4 8.3 0.2 3.4 3.9
LnGrp Delay(d),s/veh 59.4 0.0 0.0 56.4 0.0 53.9 4.3 4.6 5.2 8.2 3.3 3.6
LnGrp LOS E E D AAAAAA
Approach Vol, veh/h 23 56 2152 1294
Approach Delay, s/veh 59.4 55.4 4.8 3.5
Approach LOS EEAA
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 92.5 8.0 92.5 9.4
Change Period (Y+Rc), s 6.0 6.0 6.0 6.0
Max Green Setting (Gmax), s 74.0 9.0 74.0 9.0
Max Q Clear Time (g_c+I1), s 17.5 3.4 21.3 4.1
Green Ext Time (p_c), s 30.3 0.0 29.2 0.0
Intersection Summary
HCM 2010 Ctrl Delay 5.5
HCM 2010 LOS A
Notes
Traffic Impact Study Appendix
ATTACHMENT 12 to
Staff Report to P&Z
Timing Report, Sorted By Phase 8: College (US 287) & Johnson/Spring Park
long background am
City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 9 Light Report
Page 4
Phase Number 2468
Movement NBTL EBTL SBTL WBTL
Lead/Lag
Lead-Lag Optimize
Recall Mode C-Max None Max None
Maximum Split (s) 80 15 80 15
Maximum Split (%) 72.7% 13.6% 72.7% 13.6%
Minimum Split (s) 23.5 10 23.5 31
Yellow Time (s) 4343
All-Red Time (s) 2323
Minimum Initial (s) 10 4 10 4
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7 7 7
Flash Dont Walk (s) 10 10 18
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 40 10 40 25
End Time (s) 10 25 10 40
Yield/Force Off (s) 4 19 4 34
Yield/Force Off 170(s) 104 19 104 16
Local Start Time (s) 30 0 30 15
Local Yield (s) 104 9 104 24
Local Yield 170(s) 94 9 94 6
Intersection Summary
Cycle Length 110
Control Type Actuated-Coordinated
Natural Cycle 80
Offset: 10 (9%), Referenced to phase 2:NBTL, Start of Red
Splits and Phases: 8: College (US 287) & Johnson/Spring Park
Traffic Impact Study Appendix
ATTACHMENT 12 to
Staff Report to P&Z
HCM 2010 Signalized Intersection Summary 8: College (US 287) & Johnson/Spring Park
long background pm
City of Fort Collins Signal Timing 4:30 pm 08/09/2012 Synchro 9 Light Report
Page 2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 35 5 10 115 5 80 25 1960 30 45 2690 10
Future Volume (veh/h) 35 5 10 115 5 80 25 1960 30 45 2690 10
Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.99 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1824 1863 1824 1863 1937 1824 1863 1863 1824 1863 1863 1824
Adj Flow Rate, veh/h 36 5 0 119 5 42 26 2021 30 46 2773 7
Adj No. of Lanes 010110130130
Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97
Percent Heavy Veh, % 222222222222
Cap, veh/h 59 8 0 160 16 134 105 3835 57 178 3891 10
Arrive On Green 0.04 0.04 0.00 0.09 0.09 0.09 0.74 0.74 0.74 0.74 0.74 0.74
Sat Flow, veh/h 1567 218 0 1774 176 1482 99 5163 77 204 5237 13
Grp Volume(v), veh/h 41 0 0 119 0 47 26 1327 724 46 1794 986
Grp Sat Flow(s),veh/h/ln 1784 0 0 1774 0 1658 99 1695 1849 204 1695 1860
Q Serve(g_s), s 2.7 0.0 0.0 7.8 0.0 3.2 23.5 19.8 19.9 14.8 34.7 34.8
Cycle Q Clear(g_c), s 2.7 0.0 0.0 7.8 0.0 3.2 58.2 19.8 19.9 34.6 34.7 34.8
Prop In Lane 0.88 0.00 1.00 0.89 1.00 0.04 1.00 0.01
Lane Grp Cap(c), veh/h 67 0 0 160 0 150 105 2519 1374 178 2519 1382
V/C Ratio(X) 0.61 0.00 0.00 0.74 0.00 0.31 0.25 0.53 0.53 0.26 0.71 0.71
Avail Cap(c_a), veh/h 134 0 0 163 0 152 105 2519 1374 178 2519 1382
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 56.9 0.0 0.0 53.2 0.0 51.1 24.4 6.5 6.5 13.8 8.4 8.4
Incr Delay (d2), s/veh 8.6 0.0 0.0 16.5 0.0 1.2 5.6 0.8 1.5 3.5 1.7 3.2
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.5 0.0 0.0 4.6 0.0 1.5 0.8 9.5 10.6 1.0 16.6 18.7
LnGrp Delay(d),s/veh 65.5 0.0 0.0 69.7 0.0 52.3 29.9 7.3 8.0 17.3 10.2 11.6
LnGrp LOS E E D C AABBB
Approach Vol, veh/h 41 166 2077 2826
Approach Delay, s/veh 65.5 64.8 7.8 10.8
Approach LOS EEAB
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 94.6 9.5 94.6 15.8
Change Period (Y+Rc), s 6.5 6.0 6.5 6.0
Max Green Setting (Gmax), s 83.5 8.0 83.5 10.0
Max Q Clear Time (g_c+I1), s 60.2 4.7 36.8 9.8
Green Ext Time (p_c), s 22.1 0.0 42.4 0.0
Intersection Summary
HCM 2010 Ctrl Delay 11.8
HCM 2010 LOS B
Notes
Traffic Impact Study Appendix
ATTACHMENT 12 to
Staff Report to P&Z
Timing Report, Sorted By Phase 8: College (US 287) & Johnson/Spring Park
long background pm
City of Fort Collins Signal Timing 4:30 pm 08/09/2012 Synchro 9 Light Report
Page 4
Phase Number 2468
Movement NBTL EBTL SBTL WBTL
Lead/Lag
Lead-Lag Optimize
Recall Mode C-Max None Max None
Maximum Split (s) 90 14 90 16
Maximum Split (%) 75.0% 11.7% 75.0% 13.3%
Minimum Split (s) 23.5 10 23.5 31
Yellow Time (s) 4.5 3 4.5 3
All-Red Time (s) 2323
Minimum Initial (s) 10 4 10 4
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7 7 7
Flash Dont Walk (s) 10 10 18
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 114.5 84.5 114.5 98.5
End Time (s) 84.5 98.5 84.5 114.5
Yield/Force Off (s) 78 92.5 78 108.5
Yield/Force Off 170(s) 68 92.5 68 90.5
Local Start Time (s) 36.5 6.5 36.5 20.5
Local Yield (s) 0 14.5 0 30.5
Local Yield 170(s) 110 14.5 110 12.5
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 100
Offset: 78 (65%), Referenced to phase 2:NBTL, Start of Yellow
Splits and Phases: 8: College (US 287) & Johnson/Spring Park
Traffic Impact Study Appendix
ATTACHMENT 12 to
Staff Report to P&Z
HCM 2010 TWSC 3: College (US 287) & Arthur
long background am
City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 9 Light Report
Page 1
Intersection
Int Delay, s/veh 0.8
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 5 0 10 5 0 5 10 1885 5 5 1140 5
Future Vol, veh/h 5 0 10 5 0 5 10 1885 5 5 1140 5
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - 50 - - 50 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 88 88 88 88 88 88 88 88 88 88 88 88
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 6 0 11 6 0 6 11 2142 6 6 1295 6
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 2190 3480 651 2698 3481 1074 1301 0 0 2148 0 0
Stage 1 1310 1310 - 2168 2168 - - - - - - -
Stage 2 880 2170 - 530 1313 - - - - - - -
Critical Hdwy 6.44 6.54 7.14 6.44 6.54 7.14 5.34 - - 5.34 - -
Critical Hdwy Stg 1 7.34 5.54 - 7.34 5.54 - - - - - - -
Critical Hdwy Stg 2 6.74 5.54 - 6.74 5.54 - - - - - - -
Follow-up Hdwy 3.82 4.02 3.92 3.82 4.02 3.92 3.12 - - 3.12 - -
Pot Cap-1 Maneuver 48 6 352 23 6 185 279 - - 105 - -
Stage 1 121 227 - 29 85 - - - - - - -
Stage 2 279 84 - 457 226 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 43 5 352 21 5 185 279 - - 105 - -
Mov Cap-2 Maneuver 43 5 - 21 5 - - - - - - -
Stage 1 116 214 - 28 82 - - - - - - -
Stage 2 260 81 - 417 213 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 46.3 136 0.1 0.2
HCM LOS E F
Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR
Capacity (veh/h) 279 - - 104 38 105 - -
HCM Lane V/C Ratio 0.041 - - 0.164 0.299 0.054 - -
HCM Control Delay (s) 18.4 - - 46.3 136 41.2 - -
HCM Lane LOS C - - E F E - -
HCM 95th %tile Q(veh) 0.1 - - 0.6 1 0.2 - -
Traffic Impact Study Appendix
ATTACHMENT 12 to
Staff Report to P&Z
HCM 2010 TWSC 2: College (US 287) & Arthur
long background pm
City of Fort Collins Signal Timing 4:30 pm 08/09/2012 Synchro 9 Light Report
Page 1
Intersection
Int Delay, s/veh 6.2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 5 0 30 5 0 5 10 2005 5 5 2805 5
Future Vol, veh/h 5 0 30 5 0 5 10 2005 5 5 2805 5
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - 50 - - 50 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 97 97 97 97 97 97 97 97 97 97 97 97
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 5 0 31 5 0 5 10 2067 5 5 2892 5
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 3752 4998 1448 3257 4997 1036 2897 0 0 2072 0 0
Stage 1 2905 2905 - 2090 2090 - - - - - - -
Stage 2 847 2093 - 1167 2907 - - - - - - -
Critical Hdwy 6.44 6.54 7.14 6.44 6.54 7.14 5.34 - - 5.34 - -
Critical Hdwy Stg 1 7.34 5.54 - 7.34 5.54 - - - - - - -
Critical Hdwy Stg 2 6.74 5.54 - 6.74 5.54 - - - - - - -
Follow-up Hdwy 3.82 4.02 3.92 3.82 4.02 3.92 3.12 - - 3.12 - -
Pot Cap-1 Maneuver ~ 5 1 103 10 1 196 43 - - 115 - -
Stage 1 8 35 - 33 93 - - - - - - -
Stage 2 293 92 - 185 35 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver ~ 4 1 103 6 1 196 43 - - 115 - -
Mov Cap-2 Maneuver ~ 4 1 - 6 1 - - - - - - -
Stage 1 6 33 - 25 71 - - - - - - -
Stage 2 219 71 - 124 33 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s $ 645.7 $ 615.3 0.6 0.1
HCM LOS F F
Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR
Capacity (veh/h) 43 - - 23 12 115 - -
HCM Lane V/C Ratio 0.24 - - 1.569 0.859 0.045 - -
HCM Control Delay (s) 113.3 - -$ 645.7$ 615.3 37.8 - -
HCM Lane LOS F - - F F E - -
HCM 95th %tile Q(veh) 0.8 - - 4.6 1.9 0.1 - -
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
Traffic Impact Study Appendix
ATTACHMENT 12 to
Staff Report to P&Z
APPENDIX F
Traffic Impact Study Appendix
ATTACHMENT 12 to
Staff Report to P&Z
HCM 2010 Signalized Intersection Summary 8: College (US 287) & Johnson/Spring Park
short total am
City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 9 Light Report
Page 3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 57 0 21 25 1 68 15 1637 18 15 983 19
Future Volume (veh/h) 57 0 21 25 1 68 15 1637 18 15 983 19
Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.99 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1824 1863 1824 1863 1937 1824 1863 1863 1824 1863 1863 1824
Adj Flow Rate, veh/h 65 0 0 28 1 2 17 1860 19 17 1117 21
Adj No. of Lanes 010110130130
Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88
Percent Heavy Veh, % 222222222222
Cap, veh/h 99 0 0 57 19 37 416 4024 41 222 3985 75
Arrive On Green 0.06 0.00 0.00 0.03 0.03 0.03 0.78 0.78 0.78 0.78 0.78 0.78
Sat Flow, veh/h 1774 0 0 1774 574 1149 492 5190 53 241 5139 97
Grp Volume(v), veh/h 65 0 0 28 0 3 17 1215 664 17 737 401
Grp Sat Flow(s),veh/h/ln 1774 0 0 1774 0 1723 492 1695 1853 241 1695 1845
Q Serve(g_s), s 3.9 0.0 0.0 1.7 0.0 0.2 1.1 13.8 13.8 2.9 6.9 6.9
Cycle Q Clear(g_c), s 3.9 0.0 0.0 1.7 0.0 0.2 8.0 13.8 13.8 16.7 6.9 6.9
Prop In Lane 1.00 0.00 1.00 0.67 1.00 0.03 1.00 0.05
Lane Grp Cap(c), veh/h 99 0 0 57 0 56 416 2629 1437 222 2629 1431
V/C Ratio(X) 0.65 0.00 0.00 0.49 0.00 0.05 0.04 0.46 0.46 0.08 0.28 0.28
Avail Cap(c_a), veh/h 161 0 0 161 0 157 416 2629 1437 222 2629 1431
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 50.9 0.0 0.0 52.3 0.0 51.6 4.7 4.3 4.3 7.3 3.5 3.5
Incr Delay (d2), s/veh 7.1 0.0 0.0 6.3 0.0 0.4 0.2 0.6 1.1 0.7 0.3 0.5
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 2.1 0.0 0.0 0.9 0.0 0.1 0.2 6.6 7.4 0.2 3.3 3.6
LnGrp Delay(d),s/veh 58.0 0.0 0.0 58.7 0.0 52.0 4.9 4.9 5.4 7.9 3.8 4.0
LnGrp LOS E E D AAAAAA
Approach Vol, veh/h 65 31 1896 1155
Approach Delay, s/veh 58.0 58.0 5.1 4.0
Approach LOS EEAA
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 90.3 11.2 90.3 8.6
Change Period (Y+Rc), s 6.0 6.0 6.0 6.0
Max Green Setting (Gmax), s 74.0 9.0 74.0 9.0
Max Q Clear Time (g_c+I1), s 15.8 5.9 18.7 3.7
Green Ext Time (p_c), s 24.1 0.0 23.7 0.0
Intersection Summary
HCM 2010 Ctrl Delay 6.3
HCM 2010 LOS A
Notes
Traffic Impact Study Appendix
ATTACHMENT 12 to
Staff Report to P&Z
Timing Report, Sorted By Phase 8: College (US 287) & Johnson/Spring Park
short total am
City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 9 Light Report
Page 5
Phase Number 2468
Movement NBTL EBTL SBTL WBTL
Lead/Lag
Lead-Lag Optimize
Recall Mode C-Max None Max None
Maximum Split (s) 80 15 80 15
Maximum Split (%) 72.7% 13.6% 72.7% 13.6%
Minimum Split (s) 23.5 10 23.5 31
Yellow Time (s) 4343
All-Red Time (s) 2323
Minimum Initial (s) 10 4 10 4
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7 7 7
Flash Dont Walk (s) 10 10 18
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 40 10 40 25
End Time (s) 10 25 10 40
Yield/Force Off (s) 4 19 4 34
Yield/Force Off 170(s) 104 19 104 16
Local Start Time (s) 30 0 30 15
Local Yield (s) 104 9 104 24
Local Yield 170(s) 94 9 94 6
Intersection Summary
Cycle Length 110
Control Type Actuated-Coordinated
Natural Cycle 80
Offset: 10 (9%), Referenced to phase 2:NBTL, Start of Red
Splits and Phases: 8: College (US 287) & Johnson/Spring Park
Traffic Impact Study Appendix
ATTACHMENT 12 to
Staff Report to P&Z
Queues 8: College (US 287) & Johnson/Spring Park
short total am
City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 9 Light Report
Page 2
Lane Group EBT WBL WBT NBL NBT SBL SBT
Lane Group Flow (vph) 89 28 78 17 1880 17 1139
v/c Ratio 0.44 0.21 0.42 0.06 0.50 0.14 0.30
Control Delay 17.3 51.2 20.5 5.8 6.9 8.9 5.4
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 17.3 51.2 20.5 5.8 6.9 8.9 5.4
Queue Length 50th (ft) 0 19 5 3 182 3 88
Queue Length 95th (ft) 46 47 48 11 251 14 127
Internal Link Dist (ft) 516 684 725 859
Turn Bay Length (ft) 275 90 75
Base Capacity (vph) 237 160 213 303 3784 121 3780
Starvation Cap Reductn 0000000
Spillback Cap Reductn 0000000
Storage Cap Reductn 0000000
Reduced v/c Ratio 0.38 0.17 0.37 0.06 0.50 0.14 0.30
Intersection Summary
Traffic Impact Study Appendix
ATTACHMENT 12 to
Staff Report to P&Z
HCM 2010 Signalized Intersection Summary 8: College (US 287) & Johnson/Spring Park
short total pm
City of Fort Collins Signal Timing 4:30 pm 08/09/2012 Synchro 9 Light Report
Page 3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 79 0 27 102 3 70 57 1725 28 39 2367 90
Future Volume (veh/h) 79 0 27 102 3 70 57 1725 28 39 2367 90
Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.99 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1824 1863 1824 1863 1937 1824 1863 1863 1824 1863 1863 1824
Adj Flow Rate, veh/h 81 0 0 105 3 19 59 1778 28 40 2440 90
Adj No. of Lanes 010110130130
Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97
Percent Heavy Veh, % 222222222222
Cap, veh/h 116 0 0 146 19 118 118 3727 59 209 3639 133
Arrive On Green 0.07 0.00 0.00 0.08 0.08 0.08 0.72 0.72 0.72 0.72 0.72 0.72
Sat Flow, veh/h 1774 0 0 1774 227 1438 127 5157 81 259 5035 185
Grp Volume(v), veh/h 81 0 0 105 0 22 59 1169 637 40 1638 892
Grp Sat Flow(s),veh/h/ln 1774 0 0 1774 0 1665 127 1695 1848 259 1695 1829
Q Serve(g_s), s 5.4 0.0 0.0 6.9 0.0 1.5 55.1 17.5 17.5 9.3 31.1 31.7
Cycle Q Clear(g_c), s 5.4 0.0 0.0 6.9 0.0 1.5 86.7 17.5 17.5 26.8 31.1 31.7
Prop In Lane 1.00 0.00 1.00 0.86 1.00 0.04 1.00 0.10
Lane Grp Cap(c), veh/h 116 0 0 146 0 137 118 2450 1336 209 2450 1322
V/C Ratio(X) 0.70 0.00 0.00 0.72 0.00 0.16 0.50 0.48 0.48 0.19 0.67 0.67
Avail Cap(c_a), veh/h 133 0 0 163 0 153 118 2450 1336 209 2450 1322
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 54.9 0.0 0.0 53.7 0.0 51.2 32.8 7.0 7.0 12.7 8.9 9.0
Incr Delay (d2), s/veh 12.5 0.0 0.0 12.7 0.0 0.5 14.3 0.7 1.2 2.0 1.5 2.8
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 3.0 0.0 0.0 3.9 0.0 0.7 2.4 8.3 9.3 0.8 14.8 16.9
LnGrp Delay(d),s/veh 67.4 0.0 0.0 66.4 0.0 51.7 47.1 7.7 8.3 14.7 10.4 11.8
LnGrp LOS E E D D AABBB
Approach Vol, veh/h 81 127 1865 2570
Approach Delay, s/veh 67.4 63.8 9.1 10.9
Approach LOS EEAB
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 92.2 12.9 92.2 14.9
Change Period (Y+Rc), s 6.5 6.0 6.5 6.0
Max Green Setting (Gmax), s 83.5 8.0 83.5 10.0
Max Q Clear Time (g_c+I1), s 88.7 7.4 33.7 8.9
Green Ext Time (p_c), s 0.0 0.0 43.0 0.0
Intersection Summary
HCM 2010 Ctrl Delay 12.6
HCM 2010 LOS B
Notes
Traffic Impact Study Appendix
ATTACHMENT 12 to
Staff Report to P&Z
Timing Report, Sorted By Phase 8: College (US 287) & Johnson/Spring Park
short total pm
City of Fort Collins Signal Timing 4:30 pm 08/09/2012 Synchro 9 Light Report
Page 5
Phase Number 2468
Movement NBTL EBTL SBTL WBTL
Lead/Lag
Lead-Lag Optimize
Recall Mode C-Max None Max None
Maximum Split (s) 90 14 90 16
Maximum Split (%) 75.0% 11.7% 75.0% 13.3%
Minimum Split (s) 23.5 10 23.5 31
Yellow Time (s) 4.5 3 4.5 3
All-Red Time (s) 2323
Minimum Initial (s) 10 4 10 4
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7 7 7
Flash Dont Walk (s) 10 10 18
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 114.5 84.5 114.5 98.5
End Time (s) 84.5 98.5 84.5 114.5
Yield/Force Off (s) 78 92.5 78 108.5
Yield/Force Off 170(s) 68 92.5 68 90.5
Local Start Time (s) 36.5 6.5 36.5 20.5
Local Yield (s) 0 14.5 0 30.5
Local Yield 170(s) 110 14.5 110 12.5
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 90
Offset: 78 (65%), Referenced to phase 2:NBTL, Start of Yellow
Splits and Phases: 8: College (US 287) & Johnson/Spring Park
Traffic Impact Study Appendix
ATTACHMENT 12 to
Staff Report to P&Z
Queues 8: College (US 287) & Johnson/Spring Park
short total pm
City of Fort Collins Signal Timing 4:30 pm 08/09/2012 Synchro 9 Light Report
Page 2
Lane Group EBT WBL WBT NBL NBT SBL SBT
Lane Group Flow (vph) 109 105 75 59 1807 40 2533
v/c Ratio 0.57 0.66 0.38 1.02 0.52 0.33 0.73
Control Delay 28.6 72.2 24.9 151.6 8.5 15.7 11.8
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 28.6 72.2 24.9 151.6 8.5 15.7 11.8
Queue Length 50th (ft) 17 79 14 ~47 213 11 393
Queue Length 95th (ft) 75 #155 62 #95 246 37 446
Internal Link Dist (ft) 413 682 592 1570
Turn Bay Length (ft) 275 90 75
Base Capacity (vph) 208 167 205 58 3506 121 3491
Starvation Cap Reductn 0000000
Spillback Cap Reductn 0000000
Storage Cap Reductn 0000000
Reduced v/c Ratio 0.52 0.63 0.37 1.02 0.52 0.33 0.73
Intersection Summary
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Traffic Impact Study Appendix
ATTACHMENT 12 to
Staff Report to P&Z
HCM 2010 Signalized Intersection Summary 8: College (US 287) & Johnson/Spring Park
eb lt short total am
City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 9 Light Report
Page 2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 57 0 21 25 1 68 15 1637 18 15 983 19
Future Volume (veh/h) 57 0 21 25 1 68 15 1637 18 15 983 19
Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.99 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1788 1863 1824 1863 1937 1824 1863 1863 1824 1863 1863 1824
Adj Flow Rate, veh/h 65 0 0 28 1 2 17 1860 19 17 1117 21
Adj No. of Lanes 110110130130
Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88
Percent Heavy Veh, % 222222222222
Cap, veh/h 98 107 0 57 19 37 416 4018 41 222 3978 75
Arrive On Green 0.06 0.00 0.00 0.03 0.03 0.03 0.77 0.77 0.77 0.77 0.77 0.77
Sat Flow, veh/h 1703 1863 0 1774 574 1149 492 5190 53 241 5139 97
Grp Volume(v), veh/h 65 0 0 28 0 3 17 1215 664 17 737 401
Grp Sat Flow(s),veh/h/ln 1703 1863 0 1774 0 1723 492 1695 1853 241 1695 1845
Q Serve(g_s), s 4.1 0.0 0.0 1.7 0.0 0.2 1.1 13.9 13.9 2.9 6.9 6.9
Cycle Q Clear(g_c), s 4.1 0.0 0.0 1.7 0.0 0.2 8.0 13.9 13.9 16.8 6.9 6.9
Prop In Lane 1.00 0.00 1.00 0.67 1.00 0.03 1.00 0.05
Lane Grp Cap(c), veh/h 98 107 0 57 0 56 416 2624 1435 222 2624 1428
V/C Ratio(X) 0.67 0.00 0.00 0.49 0.00 0.05 0.04 0.46 0.46 0.08 0.28 0.28
Avail Cap(c_a), veh/h 155 169 0 161 0 157 416 2624 1435 222 2624 1428
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 50.8 0.0 0.0 52.3 0.0 51.6 4.7 4.4 4.4 7.3 3.6 3.6
Incr Delay (d2), s/veh 7.6 0.0 0.0 6.3 0.0 0.4 0.2 0.6 1.1 0.7 0.3 0.5
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 2.1 0.0 0.0 0.9 0.0 0.1 0.2 6.6 7.4 0.2 3.3 3.7
LnGrp Delay(d),s/veh 58.4 0.0 0.0 58.7 0.0 52.0 4.9 5.0 5.5 8.0 3.9 4.1
LnGrp LOS E E D AAAAAA
Approach Vol, veh/h 65 31 1896 1155
Approach Delay, s/veh 58.4 58.0 5.1 4.0
Approach LOS EEAA
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 90.1 11.3 90.1 8.6
Change Period (Y+Rc), s 6.0 6.0 6.0 6.0
Max Green Setting (Gmax), s 74.0 9.0 74.0 9.0
Max Q Clear Time (g_c+I1), s 15.9 6.1 18.8 3.7
Green Ext Time (p_c), s 24.1 0.0 23.7 0.0
Intersection Summary
HCM 2010 Ctrl Delay 6.3
HCM 2010 LOS A
Notes
Traffic Impact Study Appendix
ATTACHMENT 12 to
Staff Report to P&Z
Timing Report, Sorted By Phase 8: College (US 287) & Johnson/Spring Park
eb lt short total am
City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 9 Light Report
Page 4
Phase Number 2468
Movement NBTL EBTL SBTL WBTL
Lead/Lag
Lead-Lag Optimize
Recall Mode C-Max None Max None
Maximum Split (s) 80 15 80 15
Maximum Split (%) 72.7% 13.6% 72.7% 13.6%
Minimum Split (s) 23.5 10 23.5 31
Yellow Time (s) 4343
All-Red Time (s) 2323
Minimum Initial (s) 10 4 10 4
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7 7 7
Flash Dont Walk (s) 10 10 18
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 40 10 40 25
End Time (s) 10 25 10 40
Yield/Force Off (s) 4 19 4 34
Yield/Force Off 170(s) 104 19 104 16
Local Start Time (s) 30 0 30 15
Local Yield (s) 104 9 104 24
Local Yield 170(s) 94 9 94 6
Intersection Summary
Cycle Length 110
Control Type Actuated-Coordinated
Natural Cycle 80
Offset: 10 (9%), Referenced to phase 2:NBTL, Start of Red
Splits and Phases: 8: College (US 287) & Johnson/Spring Park
Traffic Impact Study Appendix
ATTACHMENT 12 to
Staff Report to P&Z
Queues 8: College (US 287) & Johnson/Spring Park
eb lt short total am
City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 9 Light Report
Page 1
Lane Group EBL EBT WBL WBT NBL NBT SBL SBT
Lane Group Flow (vph) 65 24 28 78 17 1880 17 1139
v/c Ratio 0.51 0.08 0.21 0.42 0.06 0.51 0.15 0.31
Control Delay 62.0 0.5 51.2 20.5 6.2 7.7 9.5 5.9
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 62.0 0.5 51.2 20.5 6.2 7.7 9.5 5.9
Queue Length 50th (ft) 44 0 19 5 3 209 4 101
Queue Length 95th (ft) 88 0 47 48 11 251 14 127
Internal Link Dist (ft) 516 684 725 859
Turn Bay Length (ft) 50 275 90 75
Base Capacity (vph) 139 314 160 213 295 3713 117 3708
Starvation Cap Reductn 00000000
Spillback Cap Reductn 00000000
Storage Cap Reductn 00000000
Reduced v/c Ratio 0.47 0.08 0.17 0.37 0.06 0.51 0.15 0.31
Intersection Summary
Traffic Impact Study Appendix
ATTACHMENT 12 to
Staff Report to P&Z
HCM 2010 Signalized Intersection Summary 8: College (US 287) & Johnson/Spring Park
eb lt short total pm
City of Fort Collins Signal Timing 4:30 pm 08/09/2012 Synchro 9 Light Report
Page 3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 79 0 27 102 3 70 57 1725 28 39 2367 90
Future Volume (veh/h) 79 0 27 102 3 70 57 1725 28 39 2367 90
Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.99 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1788 1863 1824 1863 1937 1824 1863 1863 1824 1863 1863 1824
Adj Flow Rate, veh/h 81 0 0 105 3 19 59 1778 28 40 2440 90
Adj No. of Lanes 110110130130
Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97
Percent Heavy Veh, % 222222222222
Cap, veh/h 115 125 0 146 19 118 118 3719 59 209 3631 133
Arrive On Green 0.07 0.00 0.00 0.08 0.08 0.08 0.72 0.72 0.72 0.72 0.72 0.72
Sat Flow, veh/h 1703 1863 0 1774 227 1438 127 5157 81 259 5035 185
Grp Volume(v), veh/h 81 0 0 105 0 22 59 1169 637 40 1638 892
Grp Sat Flow(s),veh/h/ln 1703 1863 0 1774 0 1665 127 1695 1848 259 1695 1829
Q Serve(g_s), s 5.6 0.0 0.0 6.9 0.0 1.5 54.7 17.6 17.6 9.3 31.3 31.9
Cycle Q Clear(g_c), s 5.6 0.0 0.0 6.9 0.0 1.5 86.5 17.6 17.6 26.9 31.3 31.9
Prop In Lane 1.00 0.00 1.00 0.86 1.00 0.04 1.00 0.10
Lane Grp Cap(c), veh/h 115 125 0 146 0 137 118 2444 1333 209 2444 1319
V/C Ratio(X) 0.71 0.00 0.00 0.72 0.00 0.16 0.50 0.48 0.48 0.19 0.67 0.68
Avail Cap(c_a), veh/h 128 140 0 163 0 153 118 2444 1333 209 2444 1319
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 54.8 0.0 0.0 53.7 0.0 51.2 33.2 7.1 7.1 12.9 9.0 9.1
Incr Delay (d2), s/veh 14.5 0.0 0.0 12.7 0.0 0.5 14.4 0.7 1.2 2.0 1.5 2.8
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 3.1 0.0 0.0 3.9 0.0 0.7 2.4 8.3 9.3 0.8 14.8 16.9
LnGrp Delay(d),s/veh 69.3 0.0 0.0 66.4 0.0 51.7 47.7 7.8 8.4 14.9 10.5 11.9
LnGrp LOS E E D D AABBB
Approach Vol, veh/h 81 127 1865 2570
Approach Delay, s/veh 69.3 63.8 9.3 11.1
Approach LOS EEAB
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 92.0 13.1 92.0 14.9
Change Period (Y+Rc), s 6.5 6.0 6.5 6.0
Max Green Setting (Gmax), s 83.5 8.0 83.5 10.0
Max Q Clear Time (g_c+I1), s 88.5 7.6 33.9 8.9
Green Ext Time (p_c), s 0.0 0.0 42.8 0.0
Intersection Summary
HCM 2010 Ctrl Delay 12.8
HCM 2010 LOS B
Notes
Traffic Impact Study Appendix
ATTACHMENT 12 to
Staff Report to P&Z
Timing Report, Sorted By Phase 8: College (US 287) & Johnson/Spring Park
eb lt short total pm
City of Fort Collins Signal Timing 4:30 pm 08/09/2012 Synchro 9 Light Report
Page 5
Phase Number 2468
Movement NBTL EBTL SBTL WBTL
Lead/Lag
Lead-Lag Optimize
Recall Mode C-Max None Max None
Maximum Split (s) 90 14 90 16
Maximum Split (%) 75.0% 11.7% 75.0% 13.3%
Minimum Split (s) 23.5 10 23.5 31
Yellow Time (s) 4.5 3 4.5 3
All-Red Time (s) 2323
Minimum Initial (s) 10 4 10 4
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7 7 7
Flash Dont Walk (s) 10 10 18
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 114.5 84.5 114.5 98.5
End Time (s) 84.5 98.5 84.5 114.5
Yield/Force Off (s) 78 92.5 78 108.5
Yield/Force Off 170(s) 68 92.5 68 90.5
Local Start Time (s) 36.5 6.5 36.5 20.5
Local Yield (s) 0 14.5 0 30.5
Local Yield 170(s) 110 14.5 110 12.5
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 100
Offset: 78 (65%), Referenced to phase 2:NBTL, Start of Yellow
Splits and Phases: 8: College (US 287) & Johnson/Spring Park
Traffic Impact Study Appendix
ATTACHMENT 12 to
Staff Report to P&Z
Queues 8: College (US 287) & Johnson/Spring Park
eb lt short total pm
City of Fort Collins Signal Timing 4:30 pm 08/09/2012 Synchro 9 Light Report
Page 2
Lane Group EBL EBT WBL WBT NBL NBT SBL SBT
Lane Group Flow (vph) 81 28 105 75 59 1807 40 2533
v/c Ratio 0.72 0.14 0.67 0.38 1.04 0.52 0.34 0.73
Control Delay 86.8 1.6 74.4 25.2 154.1 8.8 16.3 12.2
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 86.8 1.6 74.4 25.2 154.1 8.8 16.3 12.2
Queue Length 50th (ft) 62 0 80 14 ~47 213 11 393
Queue Length 95th (ft) #143 0 #155 62 #95 246 37 446
Internal Link Dist (ft) 413 682 592 1570
Turn Bay Length (ft) 50 275 90 75
Base Capacity (vph) 115 195 162 201 57 3476 118 3461
Starvation Cap Reductn 00000000
Spillback Cap Reductn 00000000
Storage Cap Reductn 00000000
Reduced v/c Ratio 0.70 0.14 0.65 0.37 1.04 0.52 0.34 0.73
Intersection Summary
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Traffic Impact Study Appendix
ATTACHMENT 12 to
Staff Report to P&Z
HCM 2010 Signalized Intersection Summary 8: College (US 287) & Johnson/Spring Park
NB Arrow short total am
City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 9 Light Report
Page 2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 57 0 21 25 1 68 15 1637 18 15 983 19
Future Volume (veh/h) 57 0 21 25 1 68 15 1637 18 15 983 19
Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.99 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1824 1863 1824 1863 1937 1824 1863 1863 1824 1863 1863 1824
Adj Flow Rate, veh/h 65 0 0 28 1 2 17 1860 19 17 1117 21
Adj No. of Lanes 010110130130
Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88
Percent Heavy Veh, % 222222222222
Cap, veh/h 99 0 0 57 19 37 421 4024 41 222 3675 69
Arrive On Green 0.06 0.00 0.00 0.03 0.03 0.03 0.02 0.78 0.78 0.72 0.72 0.72
Sat Flow, veh/h 1774 0 0 1774 574 1149 1774 5190 53 241 5139 97
Grp Volume(v), veh/h 65 0 0 28 0 3 17 1215 664 17 737 401
Grp Sat Flow(s),veh/h/ln 1774 0 0 1774 0 1723 1774 1695 1853 241 1695 1845
Q Serve(g_s), s 3.9 0.0 0.0 1.7 0.0 0.2 0.3 13.8 13.8 2.9 8.7 8.7
Cycle Q Clear(g_c), s 3.9 0.0 0.0 1.7 0.0 0.2 0.3 13.8 13.8 10.1 8.7 8.7
Prop In Lane 1.00 0.00 1.00 0.67 1.00 0.03 1.00 0.05
Lane Grp Cap(c), veh/h 99 0 0 57 0 56 421 2629 1437 222 2425 1320
V/C Ratio(X) 0.65 0.00 0.00 0.49 0.00 0.05 0.04 0.46 0.46 0.08 0.30 0.30
Avail Cap(c_a), veh/h 161 0 0 161 0 157 492 2629 1437 222 2425 1320
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 50.9 0.0 0.0 52.3 0.0 51.6 3.8 4.3 4.3 7.3 5.7 5.7
Incr Delay (d2), s/veh 7.1 0.0 0.0 6.3 0.0 0.4 0.0 0.6 1.1 0.7 0.3 0.6
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 2.1 0.0 0.0 0.9 0.0 0.1 0.1 6.6 7.4 0.2 4.1 4.6
LnGrp Delay(d),s/veh 58.0 0.0 0.0 58.7 0.0 52.0 3.9 4.9 5.4 7.9 6.0 6.3
LnGrp LOS E E D AAAAAA
Approach Vol, veh/h 65 31 1896 1155
Approach Delay, s/veh 58.0 58.0 5.1 6.1
Approach LOS EEAA
Timer 12345678
Assigned Phs 2 4 5 6 8
Phs Duration (G+Y+Rc), s 90.3 11.2 6.6 83.7 8.6
Change Period (Y+Rc), s 6.0 6.0 5.0 6.0 6.0
Max Green Setting (Gmax), s 74.0 9.0 6.0 63.0 9.0
Max Q Clear Time (g_c+I1), s 15.8 5.9 2.3 12.1 3.7
Green Ext Time (p_c), s 23.5 0.0 0.0 22.4 0.0
Intersection Summary
HCM 2010 Ctrl Delay 7.1
HCM 2010 LOS A
Notes
Traffic Impact Study Appendix
ATTACHMENT 12 to
Staff Report to P&Z
Timing Report, Sorted By Phase 8: College (US 287) & Johnson/Spring Park
NB Arrow short total am
City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 9 Light Report
Page 4
Phase Number 24568
Movement NBTL EBTL NBL SBTL WBTL
Lead/Lag Lead Lag
Lead-Lag Optimize
Recall Mode C-Max None None Max None
Maximum Split (s) 80 15 11 69 15
Maximum Split (%) 72.7% 13.6% 10.0% 62.7% 13.6%
Minimum Split (s) 23.5 10 11 23.5 31
Yellow Time (s) 43343
All-Red Time (s) 23223
Minimum Initial (s) 10 4 4 10 4
Vehicle Extension (s) 33333
Minimum Gap (s) 33333
Time Before Reduce (s) 00000
Time To Reduce (s) 00000
Walk Time (s) 7 7 7
Flash Dont Walk (s) 10 10 18
Dual Entry Yes Yes No Yes Yes
Inhibit Max Yes Yes Yes Yes Yes
Start Time (s) 30 0 30 41 15
End Time (s) 0 15 41 0 30
Yield/Force Off (s) 104 9 36 104 24
Yield/Force Off 170(s) 94 9 36 94 6
Local Start Time (s) 30 0 30 41 15
Local Yield (s) 104 9 36 104 24
Local Yield 170(s) 94 9 36 94 6
Intersection Summary
Cycle Length 110
Control Type Actuated-Coordinated
Natural Cycle 80
Offset: 0 (0%), Referenced to phase 2:NBTL, Start of Red
Splits and Phases: 8: College (US 287) & Johnson/Spring Park
Traffic Impact Study Appendix
ATTACHMENT 12 to
Staff Report to P&Z
Queues 8: College (US 287) & Johnson/Spring Park
NB Arrow short total am
City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 9 Light Report
Page 1
Lane Group EBT WBL WBT NBL NBT SBL SBT
Lane Group Flow (vph) 89 28 78 17 1880 17 1139
v/c Ratio 0.38 0.20 0.40 0.05 0.49 0.13 0.32
Control Delay 6.6 49.8 18.2 4.9 6.7 12.1 7.7
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 6.6 49.8 18.2 4.9 6.7 12.1 7.7
Queue Length 50th (ft) 0 19 3 3 182 3 88
Queue Length 95th (ft) 12 46 45 10 251 19 176
Internal Link Dist (ft) 516 684 725 859
Turn Bay Length (ft) 275 90 75
Base Capacity (vph) 283 167 223 362 3800 129 3600
Starvation Cap Reductn 0000000
Spillback Cap Reductn 0000000
Storage Cap Reductn 0000000
Reduced v/c Ratio 0.31 0.17 0.35 0.05 0.49 0.13 0.32
Intersection Summary
Traffic Impact Study Appendix
ATTACHMENT 12 to
Staff Report to P&Z
HCM 2010 Signalized Intersection Summary 8: College (US 287) & Johnson/Spring Park
NB Arrow short total pm
City of Fort Collins Signal Timing 4:30 pm 08/09/2012 Synchro 9 Light Report
Page 2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 79 0 27 102 3 70 57 1725 28 39 2367 90
Future Volume (veh/h) 79 0 27 102 3 70 57 1725 28 39 2367 90
Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.99 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1824 1863 1824 1863 1937 1824 1863 1863 1824 1863 1863 1824
Adj Flow Rate, veh/h 81 0 0 105 3 19 59 1778 28 40 2440 90
Adj No. of Lanes 010110130130
Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97
Percent Heavy Veh, % 222222222222
Cap, veh/h 116 0 0 146 19 118 166 3727 59 209 3285 120
Arrive On Green 0.07 0.00 0.00 0.08 0.08 0.08 0.04 0.72 0.72 0.65 0.65 0.65
Sat Flow, veh/h 1774 0 0 1774 227 1438 1774 5157 81 259 5035 185
Grp Volume(v), veh/h 81 0 0 105 0 22 59 1169 637 40 1638 892
Grp Sat Flow(s),veh/h/ln 1774 0 0 1774 0 1665 1774 1695 1848 259 1695 1829
Q Serve(g_s), s 5.4 0.0 0.0 6.9 0.0 1.5 1.2 17.5 17.5 9.3 39.0 39.7
Cycle Q Clear(g_c), s 5.4 0.0 0.0 6.9 0.0 1.5 1.2 17.5 17.5 18.3 39.0 39.7
Prop In Lane 1.00 0.00 1.00 0.86 1.00 0.04 1.00 0.10
Lane Grp Cap(c), veh/h 116 0 0 146 0 137 166 2450 1336 209 2212 1194
V/C Ratio(X) 0.70 0.00 0.00 0.72 0.00 0.16 0.35 0.48 0.48 0.19 0.74 0.75
Avail Cap(c_a), veh/h 133 0 0 163 0 153 204 2450 1336 209 2212 1194
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 54.9 0.0 0.0 53.7 0.0 51.2 18.9 7.0 7.0 12.7 14.0 14.2
Incr Delay (d2), s/veh 12.5 0.0 0.0 12.7 0.0 0.5 1.3 0.7 1.2 2.0 2.3 4.3
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 3.0 0.0 0.0 3.9 0.0 0.7 1.3 8.3 9.3 0.8 18.7 21.3
LnGrp Delay(d),s/veh 67.4 0.0 0.0 66.4 0.0 51.7 20.2 7.7 8.3 14.7 16.3 18.5
LnGrp LOS E E D C AABBB
Approach Vol, veh/h 81 127 1865 2570
Approach Delay, s/veh 67.4 63.8 8.3 17.0
Approach LOS EEAB
Timer 12345678
Assigned Phs 2 4 5 6 8
Phs Duration (G+Y+Rc), s 92.2 12.9 8.4 83.8 14.9
Change Period (Y+Rc), s 6.5 6.0 5.0 6.5 6.0
Max Green Setting (Gmax), s 83.5 8.0 6.0 72.5 10.0
Max Q Clear Time (g_c+I1), s 19.5 7.4 3.2 41.7 8.9
Green Ext Time (p_c), s 47.7 0.0 0.0 26.5 0.0
Intersection Summary
HCM 2010 Ctrl Delay 15.7
HCM 2010 LOS B
Notes
Traffic Impact Study Appendix
ATTACHMENT 12 to
Staff Report to P&Z
Timing Report, Sorted By Phase 8: College (US 287) & Johnson/Spring Park
NB Arrow short total pm
City of Fort Collins Signal Timing 4:30 pm 08/09/2012 Synchro 9 Light Report
Page 4
Phase Number 24568
Movement NBTL EBTL NBL SBTL WBTL
Lead/Lag Lead Lag
Lead-Lag Optimize
Recall Mode C-Max None None Max None
Maximum Split (s) 90 14 11 79 16
Maximum Split (%) 75.0% 11.7% 9.2% 65.8% 13.3%
Minimum Split (s) 23.5 10 11 23.5 31
Yellow Time (s) 4.5 3 3 4.5 3
All-Red Time (s) 23223
Minimum Initial (s) 10 4 4 10 4
Vehicle Extension (s) 33333
Minimum Gap (s) 33333
Time Before Reduce (s) 00000
Time To Reduce (s) 00000
Walk Time (s) 7 7 7
Flash Dont Walk (s) 10 10 18
Dual Entry Yes Yes No Yes Yes
Inhibit Max Yes Yes Yes Yes Yes
Start Time (s) 36.5 6.5 36.5 47.5 20.5
End Time (s) 6.5 20.5 47.5 6.5 36.5
Yield/Force Off (s) 0 14.5 42.5 0 30.5
Yield/Force Off 170(s) 110 14.5 42.5 110 12.5
Local Start Time (s) 36.5 6.5 36.5 47.5 20.5
Local Yield (s) 0 14.5 42.5 0 30.5
Local Yield 170(s) 110 14.5 42.5 110 12.5
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 120
Offset: 0 (0%), Referenced to phase 2:NBTL, Start of Yellow
Splits and Phases: 8: College (US 287) & Johnson/Spring Park
Traffic Impact Study Appendix
ATTACHMENT 12 to
Staff Report to P&Z
Queues 8: College (US 287) & Johnson/Spring Park
NB Arrow short total pm
City of Fort Collins Signal Timing 4:30 pm 08/09/2012 Synchro 9 Light Report
Page 1
Lane Group EBT WBL WBT NBL NBT SBL SBT
Lane Group Flow (vph) 109 105 75 59 1807 40 2533
v/c Ratio 0.48 0.61 0.36 0.39 0.52 0.33 0.81
Control Delay 12.8 67.8 23.5 16.6 8.5 20.6 19.6
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 12.8 67.8 23.5 16.6 8.5 20.6 19.6
Queue Length 50th (ft) 0 78 13 12 213 14 541
Queue Length 95th (ft) 38 #155 61 41 246 45 614
Internal Link Dist (ft) 413 682 592 1570
Turn Bay Length (ft) 275 90 75
Base Capacity (vph) 251 177 216 154 3506 122 3132
Starvation Cap Reductn 0000000
Spillback Cap Reductn 0000000
Storage Cap Reductn 0000000
Reduced v/c Ratio 0.43 0.59 0.35 0.38 0.52 0.33 0.81
Intersection Summary
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Traffic Impact Study Appendix
ATTACHMENT 12 to
Staff Report to P&Z
HCM 2010 TWSC 3: College (US 287) & Arthur
short total am
City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 9 Light Report
Page 1
Intersection
Int Delay, s/veh 0.2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 1 0 14 0 0 0 11 1669 1 0 1026 3
Future Vol, veh/h 1 0 14 0 0 0 11 1669 1 0 1026 3
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - 50 - - 50 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 88 88 88 88 88 88 88 88 88 88 88 88
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 1 0 16 0 0 0 13 1897 1 0 1166 3
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 1952 3091 585 2388 3091 949 1169 0 0 1898 0 0
Stage 1 1168 1168 - 1922 1922 - - - - - - -
Stage 2 784 1923 - 466 1169 - - - - - - -
Critical Hdwy 6.44 6.54 7.14 6.44 6.54 7.14 5.34 - - 5.34 - -
Critical Hdwy Stg 1 7.34 5.54 - 7.34 5.54 - - - - - - -
Critical Hdwy Stg 2 6.74 5.54 - 6.74 5.54 - - - - - - -
Follow-up Hdwy 3.82 4.02 3.92 3.82 4.02 3.92 3.12 - - 3.12 - -
Pot Cap-1 Maneuver 68 12 389 36 12 224 324 - - 141 - -
Stage 1 152 266 - 44 113 - - - - - - -
Stage 2 320 113 - 499 265 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 66 12 389 33 12 224 324 - - 141 - -
Mov Cap-2 Maneuver 66 12 - 33 12 - - - - - - -
Stage 1 146 266 - 42 108 - - - - - - -
Stage 2 307 108 - 479 265 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 18 0 0.1 0
HCM LOS C A
Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR
Capacity (veh/h) 324 - - 293 - 141 - -
HCM Lane V/C Ratio 0.039 - - 0.058 ----
HCM Control Delay (s) 16.6 - - 18 0 0 - -
HCM Lane LOS C - - C A A - -
HCM 95th %tile Q(veh) 0.1 - - 0.2 - 0 - -
Traffic Impact Study Appendix
ATTACHMENT 12 to
Staff Report to P&Z
HCM 2010 TWSC 2: College (US 287) & Arthur
short total pm
City of Fort Collins Signal Timing 4:30 pm 08/09/2012 Synchro 9 Light Report
Page 1
Intersection
Int Delay, s/veh 0.8
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 1 0 34 0 0 1 14 1808 1 1 2489 6
Future Vol, veh/h 1 0 34 0 0 1 14 1808 1 1 2489 6
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - 50 - - 50 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 97 97 97 97 97 97 97 97 97 97 97 97
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 1 0 35 0 0 1 14 1864 1 1 2566 6
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 3345 4465 1286 2921 4467 932 2572 0 0 1865 0 0
Stage 1 2571 2571 - 1893 1893 - - - - - - -
Stage 2 774 1894 - 1028 2574 - - - - - - -
Critical Hdwy 6.44 6.54 7.14 6.44 6.54 7.14 5.34 - - 5.34 - -
Critical Hdwy Stg 1 7.34 5.54 - 7.34 5.54 - - - - - - -
Critical Hdwy Stg 2 6.74 5.54 - 6.74 5.54 - - - - - - -
Follow-up Hdwy 3.82 4.02 3.92 3.82 4.02 3.92 3.12 - - 3.12 - -
Pot Cap-1 Maneuver 9 1 133 16 1 230 64 - - 146 - -
Stage 1 15 52 - 46 117 - - - - - - -
Stage 2 324 117 - 226 52 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 7 1 133 10 1 230 64 - - 146 - -
Mov Cap-2 Maneuver 7 1 - 10 1 - - - - - - -
Stage 1 12 52 - 36 91 - - - - - - -
Stage 2 252 91 - 165 52 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 71.8 20.7 0.6 0
HCM LOS F C
Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR
Capacity (veh/h) 64 - - 88 230 146 - -
HCM Lane V/C Ratio 0.226 - - 0.41 0.004 0.007 - -
HCM Control Delay (s) 76.9 - - 71.8 20.7 29.8 - -
HCM Lane LOS F - - F C D - -
HCM 95th %tile Q(veh) 0.8 - - 1.7 0 0 - -
Traffic Impact Study Appendix
ATTACHMENT 12 to
Staff Report to P&Z
APPENDIX G
Traffic Impact Study Appendix
ATTACHMENT 12 to
Staff Report to P&Z
HCM 2010 Signalized Intersection Summary 8: College (US 287) & Johnson/Spring Park
long total am
City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 9 Light Report
Page 3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 60 5 20 30 5 80 15 1865 20 15 1115 20
Future Volume (veh/h) 60 5 20 30 5 80 15 1865 20 15 1115 20
Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.99 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1824 1863 1824 1863 1937 1824 1863 1863 1824 1863 1863 1824
Adj Flow Rate, veh/h 68 6 0 34 6 16 17 2119 22 17 1267 22
Adj No. of Lanes 010110130130
Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88
Percent Heavy Veh, % 222222222222
Cap, veh/h 102 9 0 72 19 50 357 3950 41 177 3918 68
Arrive On Green 0.06 0.06 0.00 0.04 0.04 0.04 0.76 0.76 0.76 0.76 0.76 0.76
Sat Flow, veh/h 1637 144 0 1774 466 1242 426 5189 54 187 5148 89
Grp Volume(v), veh/h 74 0 0 34 0 22 17 1384 757 17 834 455
Grp Sat Flow(s),veh/h/ln 1781 0 0 1774 0 1707 426 1695 1853 187 1695 1847
Q Serve(g_s), s 4.5 0.0 0.0 2.1 0.0 1.4 1.4 18.1 18.2 4.5 8.6 8.6
Cycle Q Clear(g_c), s 4.5 0.0 0.0 2.1 0.0 1.4 10.0 18.1 18.2 22.6 8.6 8.6
Prop In Lane 0.92 0.00 1.00 0.73 1.00 0.03 1.00 0.05
Lane Grp Cap(c), veh/h 111 0 0 72 0 69 357 2580 1410 177 2580 1406
V/C Ratio(X) 0.67 0.00 0.00 0.47 0.00 0.32 0.05 0.54 0.54 0.10 0.32 0.32
Avail Cap(c_a), veh/h 162 0 0 161 0 155 357 2580 1410 177 2580 1406
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 50.5 0.0 0.0 51.6 0.0 51.3 5.8 5.3 5.3 9.9 4.2 4.2
Incr Delay (d2), s/veh 6.8 0.0 0.0 4.8 0.0 2.6 0.3 0.8 1.5 1.1 0.3 0.6
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 2.4 0.0 0.0 1.1 0.0 0.7 0.2 8.6 9.6 0.3 4.1 4.5
LnGrp Delay(d),s/veh 57.3 0.0 0.0 56.4 0.0 53.9 6.0 6.1 6.8 11.0 4.5 4.8
LnGrp LOS E E D AAABAA
Approach Vol, veh/h 74 56 2158 1306
Approach Delay, s/veh 57.3 55.4 6.3 4.7
Approach LOS EEAA
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 88.7 11.8 88.7 9.4
Change Period (Y+Rc), s 6.0 6.0 6.0 6.0
Max Green Setting (Gmax), s 74.0 9.0 74.0 9.0
Max Q Clear Time (g_c+I1), s 20.2 6.5 24.6 4.1
Green Ext Time (p_c), s 30.0 0.0 28.6 0.0
Intersection Summary
HCM 2010 Ctrl Delay 7.5
HCM 2010 LOS A
Notes
Traffic Impact Study Appendix
ATTACHMENT 12 to
Staff Report to P&Z
Timing Report, Sorted By Phase 8: College (US 287) & Johnson/Spring Park
long total am
City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 9 Light Report
Page 5
Phase Number 2468
Movement NBTL EBTL SBTL WBTL
Lead/Lag
Lead-Lag Optimize
Recall Mode C-Max None Max None
Maximum Split (s) 80 15 80 15
Maximum Split (%) 72.7% 13.6% 72.7% 13.6%
Minimum Split (s) 23.5 10 23.5 31
Yellow Time (s) 4343
All-Red Time (s) 2323
Minimum Initial (s) 10 4 10 4
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7 7 7
Flash Dont Walk (s) 10 10 18
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 40 10 40 25
End Time (s) 10 25 10 40
Yield/Force Off (s) 4 19 4 34
Yield/Force Off 170(s) 104 19 104 16
Local Start Time (s) 30 0 30 15
Local Yield (s) 104 9 104 24
Local Yield 170(s) 94 9 94 6
Intersection Summary
Cycle Length 110
Control Type Actuated-Coordinated
Natural Cycle 90
Offset: 10 (9%), Referenced to phase 2:NBTL, Start of Red
Splits and Phases: 8: College (US 287) & Johnson/Spring Park
Traffic Impact Study Appendix
ATTACHMENT 12 to
Staff Report to P&Z
Queues 8: College (US 287) & Johnson/Spring Park
long total am
City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 9 Light Report
Page 2
Lane Group EBT WBL WBT NBL NBT SBL SBT
Lane Group Flow (vph) 97 34 97 17 2142 17 1290
v/c Ratio 0.61 0.25 0.53 0.08 0.62 0.24 0.38
Control Delay 59.5 51.6 32.8 6.8 10.1 16.2 7.3
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 59.5 51.6 32.8 6.8 10.1 16.2 7.3
Queue Length 50th (ft) 59 23 26 4 270 4 124
Queue Length 95th (ft) 112 53 76 12 310 19 149
Internal Link Dist (ft) 516 684 725 859
Turn Bay Length (ft) 275 90 75
Base Capacity (vph) 167 160 203 224 3431 72 3427
Starvation Cap Reductn 0000000
Spillback Cap Reductn 0000000
Storage Cap Reductn 0000000
Reduced v/c Ratio 0.58 0.21 0.48 0.08 0.62 0.24 0.38
Intersection Summary
Traffic Impact Study Appendix
ATTACHMENT 12 to
Staff Report to P&Z
HCM 2010 Signalized Intersection Summary 8: College (US 287) & Johnson/Spring Park
long total pm
City of Fort Collins Signal Timing 4:30 pm 08/09/2012 Synchro 9 Light Report
Page 3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 80 5 25 115 5 80 55 1960 30 45 2690 90
Future Volume (veh/h) 80 5 25 115 5 80 55 1960 30 45 2690 90
Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.99 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1824 1863 1824 1863 1937 1824 1863 1863 1824 1863 1863 1824
Adj Flow Rate, veh/h 82 5 0 119 5 42 57 2021 30 46 2773 90
Adj No. of Lanes 010110130130
Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97
Percent Heavy Veh, % 222222222222
Cap, veh/h 116 7 0 160 16 134 92 3672 54 167 3600 116
Arrive On Green 0.07 0.07 0.00 0.09 0.09 0.09 0.71 0.71 0.71 0.71 0.71 0.71
Sat Flow, veh/h 1677 102 0 1774 176 1482 91 5163 77 204 5061 163
Grp Volume(v), veh/h 87 0 0 119 0 47 57 1327 724 46 1849 1014
Grp Sat Flow(s),veh/h/ln 1779 0 0 1774 0 1658 91 1695 1849 204 1695 1833
Q Serve(g_s), s 5.7 0.0 0.0 7.8 0.0 3.2 42.4 22.3 22.3 16.6 41.5 42.9
Cycle Q Clear(g_c), s 5.7 0.0 0.0 7.8 0.0 3.2 85.4 22.3 22.3 38.9 41.5 42.9
Prop In Lane 0.94 0.00 1.00 0.89 1.00 0.04 1.00 0.09
Lane Grp Cap(c), veh/h 123 0 0 160 0 150 92 2411 1315 167 2411 1304
V/C Ratio(X) 0.71 0.00 0.00 0.74 0.00 0.31 0.62 0.55 0.55 0.28 0.77 0.78
Avail Cap(c_a), veh/h 133 0 0 163 0 152 92 2411 1315 167 2411 1304
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 54.6 0.0 0.0 53.2 0.0 51.1 48.1 8.2 8.2 17.5 11.0 11.2
Incr Delay (d2), s/veh 14.3 0.0 0.0 16.5 0.0 1.2 27.4 0.9 1.7 4.0 2.4 4.6
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 3.3 0.0 0.0 4.6 0.0 1.5 2.6 10.6 11.9 1.1 20.1 23.1
LnGrp Delay(d),s/veh 69.0 0.0 0.0 69.7 0.0 52.3 75.4 9.1 9.9 21.5 13.4 15.8
LnGrp LOS E E D E A A C B B
Approach Vol, veh/h 87 166 2108 2909
Approach Delay, s/veh 69.0 64.8 11.2 14.4
Approach LOS EEBB
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 90.9 13.3 90.9 15.8
Change Period (Y+Rc), s 6.5 6.0 6.5 6.0
Max Green Setting (Gmax), s 83.5 8.0 83.5 10.0
Max Q Clear Time (g_c+I1), s 87.4 7.7 44.9 9.8
Green Ext Time (p_c), s 0.0 0.0 36.5 0.0
Intersection Summary
HCM 2010 Ctrl Delay 15.6
HCM 2010 LOS B
Notes
Traffic Impact Study Appendix
ATTACHMENT 12 to
Staff Report to P&Z
Timing Report, Sorted By Phase 8: College (US 287) & Johnson/Spring Park
long total pm
City of Fort Collins Signal Timing 4:30 pm 08/09/2012 Synchro 9 Light Report
Page 5
Phase Number 2468
Movement NBTL EBTL SBTL WBTL
Lead/Lag
Lead-Lag Optimize
Recall Mode C-Max None Max None
Maximum Split (s) 90 14 90 16
Maximum Split (%) 75.0% 11.7% 75.0% 13.3%
Minimum Split (s) 23.5 10 23.5 31
Yellow Time (s) 4.5 3 4.5 3
All-Red Time (s) 2323
Minimum Initial (s) 10 4 10 4
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7 7 7
Flash Dont Walk (s) 10 10 18
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 114.5 84.5 114.5 98.5
End Time (s) 84.5 98.5 84.5 114.5
Yield/Force Off (s) 78 92.5 78 108.5
Yield/Force Off 170(s) 68 92.5 68 90.5
Local Start Time (s) 36.5 6.5 36.5 20.5
Local Yield (s) 0 14.5 0 30.5
Local Yield 170(s) 110 14.5 110 12.5
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 110
Offset: 78 (65%), Referenced to phase 2:NBTL, Start of Yellow
Splits and Phases: 8: College (US 287) & Johnson/Spring Park
Traffic Impact Study Appendix
ATTACHMENT 12 to
Staff Report to P&Z
Queues 8: College (US 287) & Johnson/Spring Park
long total pm
City of Fort Collins Signal Timing 4:30 pm 08/09/2012 Synchro 9 Light Report
Page 2
Lane Group EBT WBL WBT NBL NBT SBL SBT
Lane Group Flow (vph) 113 119 87 57 2052 46 2866
v/c Ratio 0.81 0.75 0.47 1.00 0.59 0.55 0.83
Control Delay 89.0 81.4 37.6 145.3 9.8 37.8 15.3
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 89.0 81.4 37.6 145.3 9.8 37.8 15.3
Queue Length 50th (ft) 80 91 33 38 264 15 519
Queue Length 95th (ft) #185 #184 86 #91 302 #87 589
Internal Link Dist (ft) 413 682 592 1570
Turn Bay Length (ft) 275 90 75
Base Capacity (vph) 139 162 189 57 3463 84 3452
Starvation Cap Reductn 0000000
Spillback Cap Reductn 0000000
Storage Cap Reductn 0000000
Reduced v/c Ratio 0.81 0.73 0.46 1.00 0.59 0.55 0.83
Intersection Summary
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Traffic Impact Study Appendix
ATTACHMENT 12 to
Staff Report to P&Z
HCM 2010 Signalized Intersection Summary 8: College (US 287) & Johnson/Spring Park
EB LT long total am
City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 9 Light Report
Page 2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 60 5 20 30 5 80 15 1865 20 15 1115 20
Future Volume (veh/h) 60 5 20 30 5 80 15 1865 20 15 1115 20
Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.99 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1788 1863 1824 1863 1937 1824 1863 1863 1824 1863 1863 1824
Adj Flow Rate, veh/h 68 6 0 34 6 16 17 2119 22 17 1267 22
Adj No. of Lanes 110110130130
Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88
Percent Heavy Veh, % 222222222222
Cap, veh/h 103 113 0 72 19 50 358 3957 41 177 3925 68
Arrive On Green 0.06 0.06 0.00 0.04 0.04 0.04 0.76 0.76 0.76 0.76 0.76 0.76
Sat Flow, veh/h 1703 1863 0 1774 466 1242 426 5189 54 187 5148 89
Grp Volume(v), veh/h 68 6 0 34 0 22 17 1384 757 17 834 455
Grp Sat Flow(s),veh/h/ln 1703 1863 0 1774 0 1707 426 1695 1853 187 1695 1847
Q Serve(g_s), s 4.3 0.3 0.0 2.1 0.0 1.4 1.4 18.0 18.0 4.4 8.5 8.5
Cycle Q Clear(g_c), s 4.3 0.3 0.0 2.1 0.0 1.4 10.0 18.0 18.0 22.5 8.5 8.5
Prop In Lane 1.00 0.00 1.00 0.73 1.00 0.03 1.00 0.05
Lane Grp Cap(c), veh/h 103 113 0 72 0 69 358 2585 1413 177 2585 1408
V/C Ratio(X) 0.66 0.05 0.00 0.47 0.00 0.32 0.05 0.54 0.54 0.10 0.32 0.32
Avail Cap(c_a), veh/h 155 169 0 161 0 155 358 2585 1413 177 2585 1408
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 50.5 48.7 0.0 51.6 0.0 51.3 5.7 5.2 5.2 9.8 4.1 4.1
Incr Delay (d2), s/veh 6.9 0.2 0.0 4.8 0.0 2.6 0.3 0.8 1.5 1.1 0.3 0.6
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 2.2 0.2 0.0 1.1 0.0 0.7 0.2 8.6 9.6 0.3 4.1 4.5
LnGrp Delay(d),s/veh 57.5 48.9 0.0 56.4 0.0 53.9 5.9 6.0 6.7 10.8 4.4 4.7
LnGrp LOS E D E D AAABAA
Approach Vol, veh/h 74 56 2158 1306
Approach Delay, s/veh 56.8 55.4 6.3 4.6
Approach LOS EEAA
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 88.9 11.7 88.9 9.4
Change Period (Y+Rc), s 6.0 6.0 6.0 6.0
Max Green Setting (Gmax), s 74.0 9.0 74.0 9.0
Max Q Clear Time (g_c+I1), s 20.0 6.3 24.5 4.1
Green Ext Time (p_c), s 30.0 0.0 28.7 0.0
Intersection Summary
HCM 2010 Ctrl Delay 7.5
HCM 2010 LOS A
Notes
Traffic Impact Study Appendix
ATTACHMENT 12 to
Staff Report to P&Z
Timing Report, Sorted By Phase 8: College (US 287) & Johnson/Spring Park
EB LT long total am
City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 9 Light Report
Page 4
Phase Number 2468
Movement NBTL EBTL SBTL WBTL
Lead/Lag
Lead-Lag Optimize
Recall Mode C-Max None Max None
Maximum Split (s) 80 15 80 15
Maximum Split (%) 72.7% 13.6% 72.7% 13.6%
Minimum Split (s) 23.5 10 23.5 31
Yellow Time (s) 4343
All-Red Time (s) 2323
Minimum Initial (s) 10 4 10 4
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7 7 7
Flash Dont Walk (s) 10 10 18
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 30 0 30 15
End Time (s) 0 15 0 30
Yield/Force Off (s) 104 9 104 24
Yield/Force Off 170(s) 94 9 94 6
Local Start Time (s) 30 0 30 15
Local Yield (s) 104 9 104 24
Local Yield 170(s) 94 9 94 6
Intersection Summary
Cycle Length 110
Control Type Actuated-Coordinated
Natural Cycle 90
Offset: 0 (0%), Referenced to phase 2:NBTL, Start of Red
Splits and Phases: 8: College (US 287) & Johnson/Spring Park
Traffic Impact Study Appendix
ATTACHMENT 12 to
Staff Report to P&Z
Queues 8: College (US 287) & Johnson/Spring Park
EB LT long total am
City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 9 Light Report
Page 1
Lane Group EBL EBT WBL WBT NBL NBT SBL SBT
Lane Group Flow (vph) 68 29 34 97 17 2142 17 1290
v/c Ratio 0.53 0.18 0.25 0.53 0.07 0.60 0.22 0.36
Control Delay 63.0 24.4 51.6 32.8 6.7 9.2 15.0 6.7
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 63.0 24.4 51.6 32.8 6.7 9.2 15.0 6.7
Queue Length 50th (ft) 46 4 23 26 4 270 4 124
Queue Length 95th (ft) 91 32 53 76 12 310 18 149
Internal Link Dist (ft) 516 684 725 859
Turn Bay Length (ft) 50 275 90 75
Base Capacity (vph) 139 168 160 203 233 3546 76 3542
Starvation Cap Reductn 00000000
Spillback Cap Reductn 00000000
Storage Cap Reductn 00000000
Reduced v/c Ratio 0.49 0.17 0.21 0.48 0.07 0.60 0.22 0.36
Intersection Summary
Traffic Impact Study Appendix
ATTACHMENT 12 to
Staff Report to P&Z
HCM 2010 Signalized Intersection Summary 8: College (US 287) & Johnson/Spring Park
EB LT long total pm
City of Fort Collins Signal Timing 4:30 pm 08/09/2012 Synchro 9 Light Report
Page 2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 80 5 25 115 5 80 55 1960 30 45 2690 90
Future Volume (veh/h) 80 5 25 115 5 80 55 1960 30 45 2690 90
Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.99 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1788 1863 1824 1863 1937 1824 1863 1863 1824 1863 1863 1824
Adj Flow Rate, veh/h 82 5 0 119 5 42 57 2021 30 46 2773 90
Adj No. of Lanes 110110130130
Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97
Percent Heavy Veh, % 222222222222
Cap, veh/h 117 128 0 160 16 134 92 3675 55 167 3603 116
Arrive On Green 0.07 0.07 0.00 0.09 0.09 0.09 0.71 0.71 0.71 0.71 0.71 0.71
Sat Flow, veh/h 1703 1863 0 1774 176 1482 91 5163 77 204 5061 163
Grp Volume(v), veh/h 82 5 0 119 0 47 57 1327 724 46 1849 1014
Grp Sat Flow(s),veh/h/ln 1703 1863 0 1774 0 1658 91 1695 1849 204 1695 1833
Q Serve(g_s), s 5.7 0.3 0.0 7.8 0.0 3.2 42.6 22.2 22.3 16.6 41.4 42.8
Cycle Q Clear(g_c), s 5.7 0.3 0.0 7.8 0.0 3.2 85.4 22.2 22.3 38.8 41.4 42.8
Prop In Lane 1.00 0.00 1.00 0.89 1.00 0.04 1.00 0.09
Lane Grp Cap(c), veh/h 117 128 0 160 0 150 92 2414 1316 167 2414 1305
V/C Ratio(X) 0.70 0.04 0.00 0.74 0.00 0.31 0.62 0.55 0.55 0.27 0.77 0.78
Avail Cap(c_a), veh/h 128 140 0 163 0 152 92 2414 1316 167 2414 1305
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 54.7 52.2 0.0 53.2 0.0 51.1 47.9 8.2 8.2 17.4 10.9 11.1
Incr Delay (d2), s/veh 14.3 0.1 0.0 16.5 0.0 1.2 27.3 0.9 1.7 4.0 2.4 4.6
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 3.1 0.2 0.0 4.6 0.0 1.5 2.6 10.6 11.9 1.1 19.8 23.1
LnGrp Delay(d),s/veh 69.0 52.3 0.0 69.7 0.0 52.3 75.2 9.1 9.8 21.4 13.3 15.7
LnGrp LOS E D E D E A A C B B
Approach Vol, veh/h 87 166 2108 2909
Approach Delay, s/veh 68.0 64.8 11.1 14.3
Approach LOS EEBB
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 90.9 13.2 90.9 15.8
Change Period (Y+Rc), s 6.5 6.0 6.5 6.0
Max Green Setting (Gmax), s 83.5 8.0 83.5 10.0
Max Q Clear Time (g_c+I1), s 87.4 7.7 44.8 9.8
Green Ext Time (p_c), s 0.0 0.0 36.6 0.0
Intersection Summary
HCM 2010 Ctrl Delay 15.5
HCM 2010 LOS B
Notes
Traffic Impact Study Appendix
ATTACHMENT 12 to
Staff Report to P&Z
Timing Report, Sorted By Phase 8: College (US 287) & Johnson/Spring Park
EB LT long total pm
City of Fort Collins Signal Timing 4:30 pm 08/09/2012 Synchro 9 Light Report
Page 4
Phase Number 2468
Movement NBTL EBTL SBTL WBTL
Lead/Lag
Lead-Lag Optimize
Recall Mode C-Max None Max None
Maximum Split (s) 90 14 90 16
Maximum Split (%) 75.0% 11.7% 75.0% 13.3%
Minimum Split (s) 23.5 10 23.5 31
Yellow Time (s) 4.5 3 4.5 3
All-Red Time (s) 2323
Minimum Initial (s) 10 4 10 4
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7 7 7
Flash Dont Walk (s) 10 10 18
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 114.5 84.5 114.5 98.5
End Time (s) 84.5 98.5 84.5 114.5
Yield/Force Off (s) 78 92.5 78 108.5
Yield/Force Off 170(s) 68 92.5 68 90.5
Local Start Time (s) 36.5 6.5 36.5 20.5
Local Yield (s) 0 14.5 0 30.5
Local Yield 170(s) 110 14.5 110 12.5
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 110
Offset: 78 (65%), Referenced to phase 2:NBTL, Start of Yellow
Splits and Phases: 8: College (US 287) & Johnson/Spring Park
Traffic Impact Study Appendix
ATTACHMENT 12 to
Staff Report to P&Z
Queues 8: College (US 287) & Johnson/Spring Park
EB LT long total pm
City of Fort Collins Signal Timing 4:30 pm 08/09/2012 Synchro 9 Light Report
Page 1
Lane Group EBL EBT WBL WBT NBL NBT SBL SBT
Lane Group Flow (vph) 82 31 119 87 57 2052 46 2866
v/c Ratio 0.73 0.22 0.75 0.47 1.00 0.59 0.55 0.83
Control Delay 87.9 27.1 81.4 37.0 145.3 9.7 37.6 15.3
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 87.9 27.1 81.4 37.0 145.3 9.7 37.6 15.3
Queue Length 50th (ft) 63 4 91 32 38 264 15 519
Queue Length 95th (ft) #146 36 #184 86 #91 302 #87 589
Internal Link Dist (ft) 413 682 592 1570
Turn Bay Length (ft) 50 275 90 75
Base Capacity (vph) 115 142 162 190 57 3468 84 3457
Starvation Cap Reductn 00000000
Spillback Cap Reductn 00000000
Storage Cap Reductn 00000000
Reduced v/c Ratio 0.71 0.22 0.73 0.46 1.00 0.59 0.55 0.83
Intersection Summary
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Traffic Impact Study Appendix
ATTACHMENT 12 to
Staff Report to P&Z
HCM 2010 Signalized Intersection Summary 8: College (US 287) & Johnson/Spring Park
NB Arrow long total am
City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 9 Light Report
Page 2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 60 5 20 30 5 80 15 1865 20 15 1115 20
Future Volume (veh/h) 60 5 20 30 5 80 15 1865 20 15 1115 20
Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.99 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1824 1863 1824 1863 1937 1824 1863 1863 1824 1863 1863 1824
Adj Flow Rate, veh/h 68 6 0 34 6 16 17 2119 22 17 1267 22
Adj No. of Lanes 010110130130
Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88
Percent Heavy Veh, % 222222222222
Cap, veh/h 102 9 0 72 19 50 365 3950 41 177 3608 63
Arrive On Green 0.06 0.06 0.00 0.04 0.04 0.04 0.02 0.76 0.76 0.70 0.70 0.70
Sat Flow, veh/h 1637 144 0 1774 466 1242 1774 5189 54 187 5147 89
Grp Volume(v), veh/h 74 0 0 34 0 22 17 1384 757 17 834 455
Grp Sat Flow(s),veh/h/ln 1781 0 0 1774 0 1707 1774 1695 1853 187 1695 1847
Q Serve(g_s), s 4.5 0.0 0.0 2.1 0.0 1.4 0.3 18.1 18.2 4.5 10.7 10.7
Cycle Q Clear(g_c), s 4.5 0.0 0.0 2.1 0.0 1.4 0.3 18.1 18.2 16.0 10.7 10.7
Prop In Lane 0.92 0.00 1.00 0.73 1.00 0.03 1.00 0.05
Lane Grp Cap(c), veh/h 111 0 0 72 0 69 365 2580 1410 177 2376 1294
V/C Ratio(X) 0.67 0.00 0.00 0.47 0.00 0.32 0.05 0.54 0.54 0.10 0.35 0.35
Avail Cap(c_a), veh/h 162 0 0 161 0 155 436 2580 1410 177 2376 1294
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 50.5 0.0 0.0 51.6 0.0 51.3 4.4 5.3 5.3 9.9 6.5 6.5
Incr Delay (d2), s/veh 6.8 0.0 0.0 4.8 0.0 2.6 0.1 0.8 1.5 1.1 0.4 0.8
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 2.4 0.0 0.0 1.1 0.0 0.7 0.1 8.6 9.6 0.3 5.1 5.7
LnGrp Delay(d),s/veh 57.3 0.0 0.0 56.4 0.0 53.9 4.5 6.1 6.8 11.0 6.9 7.3
LnGrp LOS E E D AAABAA
Approach Vol, veh/h 74 56 2158 1306
Approach Delay, s/veh 57.3 55.4 6.3 7.1
Approach LOS EEAA
Timer 12345678
Assigned Phs 2 4 5 6 8
Phs Duration (G+Y+Rc), s 88.7 11.8 6.6 82.1 9.4
Change Period (Y+Rc), s 6.0 6.0 5.0 6.0 6.0
Max Green Setting (Gmax), s 74.0 9.0 6.0 63.0 9.0
Max Q Clear Time (g_c+I1), s 20.2 6.5 2.3 18.0 4.1
Green Ext Time (p_c), s 29.3 0.0 0.0 26.7 0.0
Intersection Summary
HCM 2010 Ctrl Delay 8.4
HCM 2010 LOS A
Notes
Traffic Impact Study Appendix
ATTACHMENT 12 to
Staff Report to P&Z
Timing Report, Sorted By Phase 8: College (US 287) & Johnson/Spring Park
NB Arrow long total am
City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 9 Light Report
Page 4
Phase Number 24568
Movement NBTL EBTL NBL SBTL WBTL
Lead/Lag Lead Lag
Lead-Lag Optimize
Recall Mode C-Max None None Max None
Maximum Split (s) 80 15 11 69 15
Maximum Split (%) 72.7% 13.6% 10.0% 62.7% 13.6%
Minimum Split (s) 23.5 10 11 23.5 31
Yellow Time (s) 43343
All-Red Time (s) 23223
Minimum Initial (s) 10 4 4 10 4
Vehicle Extension (s) 33333
Minimum Gap (s) 33333
Time Before Reduce (s) 00000
Time To Reduce (s) 00000
Walk Time (s) 7 7 7
Flash Dont Walk (s) 10 10 18
Dual Entry Yes Yes No Yes Yes
Inhibit Max Yes Yes Yes Yes Yes
Start Time (s) 30 0 30 41 15
End Time (s) 0 15 41 0 30
Yield/Force Off (s) 104 9 36 104 24
Yield/Force Off 170(s) 94 9 36 94 6
Local Start Time (s) 30 0 30 41 15
Local Yield (s) 104 9 36 104 24
Local Yield 170(s) 94 9 36 94 6
Intersection Summary
Cycle Length 110
Control Type Actuated-Coordinated
Natural Cycle 90
Offset: 0 (0%), Referenced to phase 2:NBTL, Start of Red
Splits and Phases: 8: College (US 287) & Johnson/Spring Park
Traffic Impact Study Appendix
ATTACHMENT 12 to
Staff Report to P&Z
Queues 8: College (US 287) & Johnson/Spring Park
NB Arrow long total am
City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 9 Light Report
Page 1
Lane Group EBT WBL WBT NBL NBT SBL SBT
Lane Group Flow (vph) 97 34 97 17 2142 17 1290
v/c Ratio 0.61 0.25 0.53 0.06 0.62 0.23 0.40
Control Delay 59.5 51.6 31.8 5.7 10.0 19.8 10.0
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 59.5 51.6 31.8 5.7 10.0 19.8 10.0
Queue Length 50th (ft) 59 23 24 3 269 4 123
Queue Length 95th (ft) 112 53 74 10 310 24 205
Internal Link Dist (ft) 516 684 725 859
Turn Bay Length (ft) 275 90 75
Base Capacity (vph) 167 160 205 290 3432 75 3232
Starvation Cap Reductn 0000000
Spillback Cap Reductn 0000000
Storage Cap Reductn 0000000
Reduced v/c Ratio 0.58 0.21 0.47 0.06 0.62 0.23 0.40
Intersection Summary
Traffic Impact Study Appendix
ATTACHMENT 12 to
Staff Report to P&Z
HCM 2010 Signalized Intersection Summary 8: College (US 287) & Johnson/Spring Park
NB Arrow long total pm
City of Fort Collins Signal Timing 4:30 pm 08/09/2012 Synchro 9 Light Report
Page 2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 80 5 25 115 5 80 55 1960 30 45 2690 90
Future Volume (veh/h) 80 5 25 115 5 80 55 1960 30 45 2690 90
Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.99 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1824 1863 1824 1863 1937 1824 1863 1863 1824 1863 1863 1824
Adj Flow Rate, veh/h 82 5 0 119 5 42 57 2021 30 46 2773 90
Adj No. of Lanes 010110130130
Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97
Percent Heavy Veh, % 222222222222
Cap, veh/h 116 7 0 160 16 134 143 3672 54 167 3245 104
Arrive On Green 0.07 0.07 0.00 0.09 0.09 0.09 0.04 0.71 0.71 0.64 0.64 0.64
Sat Flow, veh/h 1677 102 0 1774 176 1482 1774 5163 77 204 5061 163
Grp Volume(v), veh/h 87 0 0 119 0 47 57 1327 724 46 1849 1014
Grp Sat Flow(s),veh/h/ln 1779 0 0 1774 0 1658 1774 1695 1849 204 1695 1833
Q Serve(g_s), s 5.7 0.0 0.0 7.8 0.0 3.2 1.2 22.3 22.3 16.6 51.6 53.3
Cycle Q Clear(g_c), s 5.7 0.0 0.0 7.8 0.0 3.2 1.2 22.3 22.3 30.5 51.6 53.3
Prop In Lane 0.94 0.00 1.00 0.89 1.00 0.04 1.00 0.09
Lane Grp Cap(c), veh/h 123 0 0 160 0 150 143 2411 1315 167 2174 1176
V/C Ratio(X) 0.71 0.00 0.00 0.74 0.00 0.31 0.40 0.55 0.55 0.28 0.85 0.86
Avail Cap(c_a), veh/h 133 0 0 163 0 152 181 2411 1315 167 2174 1176
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 54.6 0.0 0.0 53.2 0.0 51.1 28.1 8.2 8.2 17.5 17.0 17.3
Incr Delay (d2), s/veh 14.3 0.0 0.0 16.5 0.0 1.2 1.8 0.9 1.7 4.0 4.4 8.5
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 3.3 0.0 0.0 4.6 0.0 1.5 1.3 10.6 11.9 1.1 25.2 29.5
LnGrp Delay(d),s/veh 69.0 0.0 0.0 69.7 0.0 52.3 29.8 9.1 9.9 21.5 21.4 25.8
LnGrp LOS E E D C A A C C C
Approach Vol, veh/h 87 166 2108 2909
Approach Delay, s/veh 69.0 64.8 9.9 22.9
Approach LOS E E A C
Timer 12345678
Assigned Phs 2 4 5 6 8
Phs Duration (G+Y+Rc), s 90.9 13.3 8.4 82.4 15.8
Change Period (Y+Rc), s 6.5 6.0 5.0 6.5 6.0
Max Green Setting (Gmax), s 83.5 8.0 6.0 72.5 10.0
Max Q Clear Time (g_c+I1), s 24.3 7.7 3.2 55.3 9.8
Green Ext Time (p_c), s 51.6 0.0 0.0 16.4 0.0
Intersection Summary
HCM 2010 Ctrl Delay 19.8
HCM 2010 LOS B
Notes
Traffic Impact Study Appendix
ATTACHMENT 12 to
Staff Report to P&Z
Timing Report, Sorted By Phase 8: College (US 287) & Johnson/Spring Park
NB Arrow long total pm
City of Fort Collins Signal Timing 4:30 pm 08/09/2012 Synchro 9 Light Report
Page 4
Phase Number 24568
Movement NBTL EBTL NBL SBTL WBTL
Lead/Lag Lead Lag
Lead-Lag Optimize
Recall Mode C-Max None None Max None
Maximum Split (s) 90 14 11 79 16
Maximum Split (%) 75.0% 11.7% 9.2% 65.8% 13.3%
Minimum Split (s) 23.5 10 11 23.5 31
Yellow Time (s) 4.5 3 3 4.5 3
All-Red Time (s) 23223
Minimum Initial (s) 10 4 4 10 4
Vehicle Extension (s) 33333
Minimum Gap (s) 33333
Time Before Reduce (s) 00000
Time To Reduce (s) 00000
Walk Time (s) 7 7 7
Flash Dont Walk (s) 10 10 18
Dual Entry Yes Yes No Yes Yes
Inhibit Max Yes Yes Yes Yes Yes
Start Time (s) 36.5 6.5 36.5 47.5 20.5
End Time (s) 6.5 20.5 47.5 6.5 36.5
Yield/Force Off (s) 0 14.5 42.5 0 30.5
Yield/Force Off 170(s) 110 14.5 42.5 110 12.5
Local Start Time (s) 36.5 6.5 36.5 47.5 20.5
Local Yield (s) 0 14.5 42.5 0 30.5
Local Yield 170(s) 110 14.5 42.5 110 12.5
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 150
Offset: 0 (0%), Referenced to phase 2:NBTL, Start of Yellow
Splits and Phases: 8: College (US 287) & Johnson/Spring Park
Traffic Impact Study Appendix
ATTACHMENT 12 to
Staff Report to P&Z
Queues 8: College (US 287) & Johnson/Spring Park
NB Arrow long total pm
City of Fort Collins Signal Timing 4:30 pm 08/09/2012 Synchro 9 Light Report
Page 1
Lane Group EBT WBL WBT NBL NBT SBL SBT
Lane Group Flow (vph) 113 119 87 57 2052 46 2866
v/c Ratio 0.81 0.75 0.46 0.37 0.59 0.53 0.93
Control Delay 89.0 81.4 36.4 15.6 9.8 42.0 26.9
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 89.0 81.4 36.4 15.6 9.8 42.0 26.9
Queue Length 50th (ft) 80 91 32 12 264 20 713
Queue Length 95th (ft) #185 #184 85 38 302 #88 #822
Internal Link Dist (ft) 413 682 592 1570
Turn Bay Length (ft) 275 90 75
Base Capacity (vph) 139 162 191 154 3463 86 3094
Starvation Cap Reductn 0000000
Spillback Cap Reductn 0000000
Storage Cap Reductn 0000000
Reduced v/c Ratio 0.81 0.73 0.46 0.37 0.59 0.53 0.93
Intersection Summary
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Traffic Impact Study Appendix
ATTACHMENT 12 to
Staff Report to P&Z
HCM 2010 TWSC 3: College (US 287) & Arthur
long total am
City of Fort Collins Signal Timing 8:00 am 03/06/2008 Final Timings - 2009 Synchro 9 Light Report
Page 1
Intersection
Int Delay, s/veh 0.9
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 5 0 15 5 0 5 10 1890 5 5 1155 5
Future Vol, veh/h 5 0 15 5 0 5 10 1890 5 5 1155 5
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - 50 - - 50 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 88 88 88 88 88 88 88 88 88 88 88 88
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 6 0 17 6 0 6 11 2148 6 6 1313 6
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 2209 3503 659 2709 3503 1077 1318 0 0 2153 0 0
Stage 1 1327 1327 - 2173 2173 - - - - - - -
Stage 2 882 2176 - 536 1330 - - - - - - -
Critical Hdwy 6.44 6.54 7.14 6.44 6.54 7.14 5.34 - - 5.34 - -
Critical Hdwy Stg 1 7.34 5.54 - 7.34 5.54 - - - - - - -
Critical Hdwy Stg 2 6.74 5.54 - 6.74 5.54 - - - - - - -
Follow-up Hdwy 3.82 4.02 3.92 3.82 4.02 3.92 3.12 - - 3.12 - -
Pot Cap-1 Maneuver 47 6 348 23 6 184 274 - - 104 - -
Stage 1 117 223 - 29 84 - - - - - - -
Stage 2 278 84 - 453 222 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 42 5 348 20 5 184 274 - - 104 - -
Mov Cap-2 Maneuver 42 5 - 20 5 - - - - - - -
Stage 1 112 210 - 28 81 - - - - - - -
Stage 2 259 81 - 406 209 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 40.8 145.7 0.1 0.2
HCM LOS E F
Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR
Capacity (veh/h) 274 - - 123 36 104 - -
HCM Lane V/C Ratio 0.041 - - 0.185 0.316 0.055 - -
HCM Control Delay (s) 18.7 - - 40.8 145.7 41.6 - -
HCM Lane LOS C - - E F E - -
HCM 95th %tile Q(veh) 0.1 - - 0.6 1 0.2 - -
Traffic Impact Study Appendix
ATTACHMENT 12 to
Staff Report to P&Z
HCM 2010 TWSC 2: College (US 287) & Arthur
long total pm
City of Fort Collins Signal Timing 4:30 pm 08/09/2012 Synchro 9 Light Report
Page 1
Intersection
Int Delay, s/veh 9.8
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 5 0 35 5 0 5 15 2035 5 5 2820 5
Future Vol, veh/h 5 0 35 5 0 5 15 2035 5 5 2820 5
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - 50 - - 50 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 97 97 97 97 97 97 97 97 97 97 97 97
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 5 0 36 5 0 5 15 2098 5 5 2907 5
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 3790 5054 1456 3304 5054 1052 2912 0 0 2103 0 0
Stage 1 2920 2920 - 2131 2131 - - - - - - -
Stage 2 870 2134 - 1173 2923 - - - - - - -
Critical Hdwy 6.44 6.54 7.14 6.44 6.54 7.14 5.34 - - 5.34 - -
Critical Hdwy Stg 1 7.34 5.54 - 7.34 5.54 - - - - - - -
Critical Hdwy Stg 2 6.74 5.54 - 6.74 5.54 - - - - - - -
Follow-up Hdwy 3.82 4.02 3.92 3.82 4.02 3.92 3.12 - - 3.12 - -
Pot Cap-1 Maneuver ~ 4 1 102 9 1 191 42 - - 111 - -
Stage 1 8 34 - 31 88 - - - - - - -
Stage 2 283 88 - 183 34 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver ~ 3 1 102 ~ 4 1 191 42 - - 111 - -
Mov Cap-2 Maneuver ~ 3 1 - ~ 4 1 - - - - - - -
Stage 1 ~ 5 32 - 20 57 - - - - - - -
Stage 2 177 57 - 113 32 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s $ 897.3 $ 1034.9 1 0.1
HCM LOS F F
Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR
Capacity (veh/h) 42 - - 20 8 111 - -
HCM Lane V/C Ratio 0.368 - - 2.062 1.289 0.046 - -
HCM Control Delay (s) 134.1 - -$ 897.$3 1034.9 39 - -
HCM Lane LOS F - - F F E - -
HCM 95th %tile Q(veh) 1.3 - - 5.5 2.1 0.1 - -
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
Traffic Impact Study Appendix
ATTACHMENT 12 to
Staff Report to P&Z
APPENDIX H
Traffic Impact Study Appendix
ATTACHMENT 12 to
Staff Report to P&Z
Alternative Compliance Request - LUC 3.2.2 (K)(1)(a)1.a. -
Parking Demand Mitigation for Bike and Pedestrian LOS A
255 Johnson Drive
5/18/2017
This is a request that the decision maker approve an alternative compliance to allow a
total of a 5% parking reduction under the Bicycle and Pedestrian LOS A category. This is
based on a combination of factors including the site’s adjacency to the Spring
Creek/Mason Trails which are not permitted to be factored in Bicycle LOS determination,
meeting requirements of pedestrian LOS A, the inclusion of three car share spaces, and
the creation of an off-site pedestrian connection to the commercial area to the north.
Please refer to the attached Pedestrian and Bicycle Level of Service Evaluation by
Delich Associates Traffic Engineers for greater detail on evaluation methods.
Please see the text of Section 3.2.2 (K)(1)(a)1.a. below:
3.2.2 (K)(1)(a)1.a. - Parking Demand Mitigation
Multi-family dwellings and mixed-use dwellings within the TOD Overlay Zone my reduce
the required minimum number of parking spaces by providing demand mitigation
elements as shown in the following table:
Justification for alternative compliance
The proposed plan allows for a total parking mitigation quantity shown in the table below:
Required Parking
Total Beds 412 0.75 309
Mitigation Type Parking Spaces
Mitgation
Reduction Parking Mitigation Quantity
Transit Passes Each Tenant 309 10% 30
Bike Ped LOS A 309 5% 15
Car Share 3 5 15
Total Mitigation 60
Total Required Parking 249
Total Spaces Provided 252*
*excludes 3 car share spaces
Traffic Impact Study Appendix
ATTACHMENT 12 to
Staff Report to P&Z