Loading...
HomeMy WebLinkAbout2021CV30425 - Save The Poudre And No Pipe Dream Coporation V. Northern Colorado Water Conservancy District, Northern Integrated Supply Project Water Activity Enterprise, The City Of Fort Collins - 016H - Exhibit 8E MULBERRY STREET S LEMAY AVECACHE LA POUDRE RIVER R I V E R S I D E A V E MULBERRY WATER RECLAMATION FACILITY PROPERTY LINE(TYP) EA-B101 FLOW DIVERSION STRUCTURE LOCATION CITY OF FORT COLLINSI.D. 9712400974 CITY OF FORT COLLINSI.D. 9712410901 WOODWARD INCI.D. 9712415003 CITY OF FORT COLLINSI.D. 9712411901 CITY OF FORT COLLINSI.D. 9712415904 4934 4 9 3 0 4 9 3 2 4 9 3 0 4 9 3 2 4 9 3 2 49324930 4932 4934 49344928 4 9 3 0 4 9 3 2 49 3 4 D10000PROJECT  NO. SHEET OF 0 11/2 IF  THIS  BAR  DOES  NOT MEASURE  1"  THEN  DRAWING IS  NOT  TO  FULL  SCALE DATE: DESIGNED: APPROVED: CHECKED: DETAILED:REVISIONS  AND  RECORD  OF  USENO.BYCHKAPPDATEEXISTING CONDITIONS PLAN 0100 100 200 SCALE IN FEET PLOTTED:  4/28/2021  10:47  AM,  FILE:  M:\DCS\Projects\WTR\60649542_NISP_Glade_Dsgn\900_CAD_GIS\910_CAD\MULBERRY\20-­SHEETS\C-­EXISTING  CONDITIONS.dwg,  USERNAME:  ANDY.STEININGERFD9000APRELIMINARY  -­  NOT  FOR  CONSTRUCTIONNORTHERN  INTEGRATED  SUPPLY  PROJECTPOUDRE  RIVER  INTAKESTRUCTUREEXISTING  CONDITIONSC-­02 02 06 188754/60649542 APS PRH APS JHS 04/28/2021 EXISTING MAJOR CONTOUR (10' INTERVAL) EXISTING MINOR CONTOUR (2' INTERVAL) PROPOSED MAJOR CONTOUR (10' INTERVAL) PROPOSED MINOR CONTOUR (2' INTERVAL) LEGEND 5850 5850 5850 5850 PROPERTY LINE ORDINARY HIGH WATER LINE EXISTING BORINGEA-B101 DATE FILED: August 31, 2021 10:40 AM FILING ID: 631C0FDA58B55 CASE NUMBER: 2021CV30425 E MULBERRY STREET S LEMAY AVECACHE LA POUDRE RIVER R I V E R S I D E A V E WASTEWATER TREATMENT FACILITY FLOW WOODWARD WAY POUDRE TRAILCITY OF FORT COLLINSI.D. 9712411902WOODWARD INCI.D. 9712415003 CITY OF FORT COLLINSI.D. 9712411901 CITY OF FORT COLLINSI.D. 9712400974 CITY OF FORT COLLINSI.D. 9712410901 PROPERTY LINE(TYP) DIVERSION STRUCTURE LOCATION TEMPORARY LIMITS OF DISTURBANCE GRADE CONTROL STRUCTURE LOCATION INTAKE GATE STRUCTURECONTROL, PIPE CLEANOUT AND FLOWMEASUREMENT SUB-GRADE VAULTFINAL PLACEMENT TO BE DETERMINED 4 9 3 0 4930 4930 49 3 0 493049304940 4940 49 3 0 PIPE ALIGNMENT D10000PROJECT  NO. SHEET OF 0 11/2 IF  THIS  BAR  DOES  NOT MEASURE  1"  THEN  DRAWING IS  NOT  TO  FULL  SCALE DATE: DESIGNED: APPROVED: CHECKED: DETAILED:REVISIONS  AND  RECORD  OF  USENO.BYCHKAPPDATESITE PLAN 0100 100 200 SCALE IN FEET PLOTTED:  4/29/2021  12:45  PM,  FILE:  M:\DCS\Projects\WTR\60649542_NISP_Glade_Dsgn\900_CAD_GIS\910_CAD\MULBERRY\20-­SHEETS\C-­ACCESS  PLAN.dwg,  USERNAME:  ANDY.STEININGERFD9000APRELIMINARY  -­  NOT  FOR  CONSTRUCTIONNORTHERN  INTEGRATED  SUPPLY  PROJECTPOUDRE  RIVER  INTAKESTRUCTURESITE  PLANC-­03 03 06 188754/60649542 APS PRH APS JHS 04/28/2021 HJMERYJPLAN NOTES: 1.EXISTING GROUND SURFACE BASED ON GEOTIFF DATA PROVIDED BY THE CLIENT. EXISTING MAJOR CONTOUR (10' INTERVAL) EXISTING MINOR CONTOUR (2' INTERVAL) PROPOSED MAJOR CONTOUR (10' INTERVAL) PROPOSED MINOR CONTOUR (2' INTERVAL) LEGEND 5850 5850 5850 5850 ORDINARY HIGH WATER LINE WETLAND PROPERTY LINE LIMIT OF DISTURBANCE