HomeMy WebLinkAboutHOME INSTEAD PLAZA - Filed GR-GEOTECHNICAL REPORT/SOILS REPORT -41
GEOTECHNICAL EXPLORATION REPORT
PROPOSED TWO-STORY OFFICE BUILDING
JFK PARKWAY AND EAST BOARDWALK DRIVE
FORT COLLINS, COLORADO
EEC PROJECT NO. 1132068
Prepared for:
Doberstein Lemburg Commercial, Inc.
1401 Riverside Avenue
Fort Collins, Colorado 80524
Attn: Mr. Dan Bernth(danbernth@frii.com)
Prepared by:
Earth Engineering Consultants, LLC
4396 Greenfield Drive
Windsor, Colorado 80550
EEC
EE C
EARTH ENGINEERING
CONSULTANTS,LLC
September 27, 2013
Doberstein Lemburg Commercial, Inc.
1401 Riverside Avenue
Fort Collins, Colorado 80524
Attn: Mr. Dan Bernth(danbernth@frii.com)
Re: Geotechnical Exploration Report
Proposed Two-Story Office Building
JFK Parkway and East Boardwalk Drive
Fort Collins, Colorado
EEC Project No. 1132068
Mr. Bernth:
Enclosed, herewith, are the results of the geotechnical subsurface exploration completed
by Earth Engineering Consultants, LLC (EEC) personnel for the referenced project. In
general, this project involves construction of a two-story office building on a vacant
parcel located at the southeast corner of JFK Parkway and East Boardwalk Drive in Fort
Collins. To develop subsurface information for the proposed office building and
associated site improvements, EEC personnel advanced five (5) soil borings on the site
extending to depths of approximately 10 to 30 feet below present site grades. This
exploration was completed in general accordance with our proposal dated August 20,
2013.
In summary, subsurface conditions observed at the boring locations included mixed fill
materials to depths of approximately 2 to 5 feet below existing site grades underlain by a
thin sandy lean clay zones in two of the borings and by highly weathered to weathered
sandstone/siltstone/claystone bedrock. The siltstone/sandstone/claystone bedrock
extended to the bottom of the borings at depths of approximately 10 to 30 feet below
present site grades. Free groundwater was not observed in the test borings at the time of
completion.
4396 GREENFIELD DRIVE
WINDSOR, COLORADO 80550
970) 545-3908 FAX (970) 663-0282
www.earth-enaineering.com
Earth Engineering Consultants,LLC
EEC Project No. 1132068
September 27,2013
Page 2
Based on materials observed at the boring locations, we believe the lightly to moderately
loaded office building could be supported on conventional footing foundations extending
to bear on the highly to weathered sandstone/siltstone/claystone bedrock. The overlying
fill soils were of mixed composition, consistency and swell potential. As such, we
recommend those materials be removed and replaced as controlled fills to develop
support for floor slabs, pavements and site flatwork. Care will be needed at the time of
construction to further evaluate/monitor the fill materials for reuse in the building floor
slabs and site pavement/flatwork subgrades.
Geotechnical recommendations concerning design and construction of the foundations
and support of floor slabs, pavements and flatwork are provided in the attached report. If
you have any questions concerning this report, or if we can be of further service to you in
any other way,please do not hesitate to contact us.
Very truly yours,
Earth Engineering Consultants, LLC
70cial)
Lester L. Litton, P.E.
Principal Engineer
Reviewed by: Ethan P. Wiechert, P.E.
Senior Project Engineer
GEOTECHNICAL EXPLORATION REPORT
PROPOSED TWO-STORY OFFICE BUILDING
JFK PARKWAY AND EAST BOARDWALK DRIVE
FORT COLLINS, COLORADO
EEC PROJECT NO. 1132068
September 27, 2013
INTRODUCTION
The geotechnical subsurface exploration for the proposed two-story office building at the
southeast corner of JFK Parkway and East Boardwalk Drive in Fort Collins,Colorado,has been
completed. Two(2)soil borings extended to depths of approximately 15 to 30 feet below present
site grades were advanced within the proposal building area to develop information on existing
subsurface conditions. One(1)additional boring extending to a depth of approximately 15 feet
was advanced in the area of a possible drive thru coffee kiosk and two (2)borings to depths of
approximately 10 feet were completed in site drive and parking areas. Individual boring logs and
diagram indicating the approximate boring locations are included with this report.
We understand this project involves the construction of a two-story, slab-on-grade (non-
basement)office building at the approximate location indicated on the attached boring location
diagram. We expect foundation loads for that structure will be light with continuous wall loads
less than 4 kips per lineal foot and individual column loads less than 100 kips. Floor loads are
also expected to be light. Paved drive and parking areas will be constructed as a part of the site
improvements. A small drive thru coffee kiosk is planned for the site; that building will be
designed and constructed by others. We anticipate small grade changes from existing grades will
be required to develop the finish site grades for the proposed construction.
The purpose of this report is to describe the subsurface conditions encountered in the test borings,
analyze and evaluate developed data on site subsurface conditions and provide geotechnical
recommendations concerning design and construction of the foundations and support of floor
slabs,pavements and flatwork.
EXPLORATION AND TESTING PROCEDURES
The test boring locations were selected and established in the field by Earth Engineering
Consultants, LLC (EEC) personnel by pacing and estimating angles from identifiable site
features. The approximate boring locations are indicated on the attached boring location
diagram. Those locations should be considered accurate only to the degree implied by the
methods used to make the field measurements.
Earth Engineering Consultants,LLC
EEC Project No. 1132068
September 27,2013
Page 2
The field borings were completed using a truck-mounted, CME-55 drill rig equipped with a
hydraulic head employed in drilling and sampling operations. The boreholes were advanced
using 4-inch nominal diameter continuous flight augers and samples of the subsurface materials
encountered were obtained using split barrel and California barrel sampling procedures in general
accordance with ASTM Specifications D1586 and D3550.
In the split barrel and California barrel sampling procedures,standard sampling spoons are driven
into the ground by means of a 140-pound hammer falling a distance of 30 inches. The number of
blows required to advance the split barrel and California barrel samplers is recorded and is used
to estimate the in-situ relative density of cohesionless soils and, to a lesser degree of accuracy,
the consistency of cohesive soils and hardness of weathered bedrock. All samples obtained in the
field were sealed and returned to our laboratory for further examination, classification, and
testing. In the California barrel sampling procedure,relatively undisturbed samples are obtained
in brass sampling sleeves.
Moisture content tests were completed on each of the recovered samples along with dry density
determination of appropriate California barrel samples. The unconfined strength of appropriate
samples was estimated using a calibrated hand penetrometer. Washed sieve analysis and
Atterberg limits tests were completed on selected samples to determine the quantity and plasticity
of the fines in the subgrade materials. Swell/consolidation tests were also completed on select
samples to evaluate the soil and bedrock tendency to change volume with variation in moisture
content and load. Soluble sulfate tests were completed to evaluate possible sulfate attack on site
cast concrete. Results of the outlined tests are indicated on the attached boring logs and summary
sheets.
As part of the testing program, all samples were examined in the laboratory and classified in
accordance with the attached General Notes and the Unified Soil Classification System,based on
the soil's texture and plasticity. The estimated group symbol for the Unified Soil Classification
System is indicated on the boring logs and a brief description of that classification system is
included with this report. Classification of the bedrock was based on visual and tactual
observation of disturbed samples and auger cuttings. Coring and/or petrographic analysis may
reveal other rock types.
Earth Engineering Consultants,LLC
EEC Project No. 1132068
September 27,2013
Page 3
SITE AND SUBSURFACE CONDITIONS
The proposed development site is located on a triangular parcel of land at the southeast corner of
JFK Parkway and East Boardwalk Drive in Fort Collins. A post office is located to the south and
east of this building site with the post office drive areas running parallel to the site drives.
Apparent cuts have been completed on the site to lower site grades below the grade of adjacent
JFK Parkway and Boardwalk Drive. At present, the site is relatively flat with slight surface
drainage to the east.
Based on results of the field borings and laboratory testing, subsurface conditions can be
generalized as follows. Sparse vegetation was observed at the ground surface at the boring
locations. In the building areas, the vegetation was underlain by fill and apparent fill soils
consisting of sandy lean clay in borings B-1 and B-3 and mixed sandstone/siltstone bedrock in
boring B-2. The fill materials extended to depths ranging from approximately 2 feet in boring B-
2 to 5 feet in boring B-1. In boring B-3, the apparent fill soils were underlain by clayey sand,
sandy lean clay to depths of approximately 9'h feet. The cohesive soils were stiff to very stiff and
relatively dry. The sandy lean clay in boring B-3 and the fill soils in borings B-1 and B-2 were
underlain by siltstone/sandstone bedrock. Some claystone layering was observed in boring B-3.
The bedrock materials were generally moderately hard with low swell potential. Those materials
extended to the bottom of the borings at depths of approximately 15 to 30 feet.
Similar subgrade materials were observed in the pavement related borings,borings B-4 and B-5.
Apparent fill material extended to a depth of approximately 4 feet in boring B-4;no apparent fill
was encountered in boring B-5. Silty sandy lean clay extended to a depth of approximately 2'/2
feet in boring B-5 and from the bottom of the fill to a depth of approximately 51/2 feet in boring B-
4. Sandstone/siltstone/claystone bedrock was observed beneath the lean clay soils and extended
to the bottom of both borings at depths of approximately 10 feet.
The stratification boundaries indicated on the boring logs represent the approximate locations of
changes in soil and rock types;in-situ,the transition of materials may be gradual and indistinct.
GROUNDWATER CONDITIONS
Observations were made while drilling and after completion of the borings,to detect the presence
and depth to the hydrostatic groundwater table. Free water was not observed in any of the test
Earth Engineering Consultants,LLC
EEC Project No. 1132068
September 27,2013
Page 4
borings at the time of drilling. The boreholes were backfilled upon completion of drilling and
additional groundwater measurements were not obtained.
Fluctuations in groundwater levels can occur over time depending on variations in hydrologic
conditions, and other conditions not apparent at the time of this report. In addition, zones of
perched and/or trapped water can be encountered in more permeable zones in the subgrade soils
or in fractured or highly permeability zones interbedded within the bedrock. Perched water is
commonly encountered in soils immediately above a low permeability bedrock layer. The
location and amount of perched/trapped water can also vary over time dependent on variations in
hydrologic conditions and other conditions not apparent at the time of this report.
ANALYSIS AND RECOMMENDATIONS
Swell—Consolidation Test Results
The swell-consolidation test is performed to evaluate the swell or collapse potential of soils to help
in determining foundation, floor slab and/or pavement design criteria. In this test, relatively
undisturbed samples obtained directly from the California barrel sampler are placed in a laboratory
apparatus and inundated with water under a predetermined load. The swell-index is the resulting
amount of swell or collapse after the inundation period expressed as a percent of the sample's
preload/initial thickness. After the inundation period, additional incremental loads are applied to
evaluate the swell pressure and/or consolidation.
For this assessment,we conducted six(6) swell-consolidation tests on relatively undisturbed soil
samples obtained at various intervals/depths. Based on the laboratory test results, the in-situ
samples analyzed for this project showed moderate swell for the dryer,higher density apparent fill
soils and little to no swell for higher moisture, lower density materials.
Site Preparation
Preliminary grading plans were not provided to us prior to preparation of this subsurface
exploration report. However,based on observed site conditions,it appears that small cuts or fills
will be needed to achieve final site grades.
Earth Engineering Consultants,LLC
EEC Project No. 1132068
September 27,2013
Page 5
All existing vegetation and/or topsoil should be removed from within the building and pavement
foot prints or within site fill areas. In addition,close evaluation of the in-place materials will be
required at the time of construction to monitor for unacceptable in-place fill materials,
construction debris, and/or suitability of the in-place materials for reuse as engineered fill.
Unacceptable materials, soft/loose fill materials, and/or the in-situ near surface dry and dense
apparent fill soils should be removed from the building,pavement and flatwork areas. Based on
the results of the test borings, we expect the in-place fill materials will need to be
removed/reworked to depths of 2 to 4 feet depending on site location.
After removal of all topsoil/vegetation or any other unacceptable materials within the planned
development areas, including the in-place fill materials, and prior to fill placement and/or site
improvements, the exposed subgrades should be scarified to a minimum depth of 9-inches,
adjusted in moisture content to within+/-2%of standard Proctor optimum moisture content and
compacted to at least 95%of the material's standard Proctor maximum dry density as determined
in accordance with ASTM Specification D698.
Fill soils required for developing the building subgrades, including areas overexcavated to
remove unacceptable in-place fill materials, should consist of approved, low-volume-change
materials, which are free from organic matter and debris. Based on the testing completed, it
appears the on-site lean clay apparent fill and native soils could be used as general site fill
provided adequate moisture treatment and compaction procedures are followed. Claystone
bedrock materials should not be used for fill below site improvement areas. Import materials
similar to the site lean clay or consisting of granular structural fill with sufficient fines to prevent
ponding of water in the fill materials could be used. The site fill materials should be placed in
loose lifts not to exceed 9 inches thick,adjusted in moisture content to±2%of optimum moisture
content and compacted to at least 95% of the materials maximum dry density as determined in
accordance with ASTM Specification D698,the standard Proctor procedure.
Care will be needed after preparation of the subgrades to avoid disturbing the subgrade materials.
Positive drainage should be developed away from site structures to avoid wetting of subgrade
materials. Subgrade materials becoming wet subsequent to construction of the site improvements
could result in unacceptable performance.
Earth Engineering Consultants,LLC
EEC Project No. 1132068
September 27,2013
Page 6
Office Building Foundations
Based on the results of our field borings and laboratory testing as outlined in this report,it is our
opinion the proposed two-story, lightly loaded office building could be supported on
conventional footing foundations bearing on the moderately hard weathered sandstone/siltstone
bedrock. For design of footing foundations bearing on the native bedrock materials, we
recommend using a net allowable total load soil bearing pressure not to exceed 4,000 psf. The
net bearing pressure refers to the pressure at foundation bearing level in excess of the minimum
surrounding overburden pressure. The foundations should all bear on the underlying bedrock to
reduce the potential for differential movement of dissimilar bearing materials. Close evaluation
of the foundation bearing strata will be necessary during the construction phase.
Exterior foundations and foundations in unheated areas should be located a minimum of 30
inches below adjacent exterior grade to provide frost protection. We recommend formed
continuous footings have a minimum width of 12 inches and isolated column foundations have a
minimum width of 24 inches. Trenched and/or grade beam foundations should not be used in the
near surface soils to allow for close observation of the bearing strata.
Care should be taken during construction to see that the footing foundations as well as all floor
slabs are supported on suitable strength subsoils and/or approved engineered fill materials. In
areas of the site where former fill/backfill soils were placed,unacceptable materials will likely be
encountered. Extra care should be taken in evaluating the in-place soils in these areas as the
fill/backfill materials do not generally appear acceptable for future support of floor slabs and/or
pavements.
No unusual problems are anticipated in completing the excavations required for construction of
the footing foundations. Care should be taken during construction to avoid disturbing the
foundation bearing materials. Materials which are loosened or disturbed by the construction
activities or materials which become dry and desiccated or wet and softened should be removed
and replaced prior to placement of foundation concrete.
We anticipate settlement of the footing foundations designed and constructed as outlined above
would be less than 1 inch.
Earth Engineering Consultants,LLC
EEC Project No. 1132068
September 27,2013
Page 7
Coffee Shop Foundations
A small drive through coffee shop will be located east of the new office. The foundation loads
for the drive through building are expected to be very light. Subgrade soils in this area included
approximately 3 feet of in-place fill soils over natural sandy lean clays.
We believe the very lightly loaded coffee shop could likely be supported on conventional
footings supported on the natural sandy lean clays. Support of the building area post-tension
slab-on-grade foundation could also be considered.
Specific recommendations for support of this building can be provided after more specific
information concerning this structure is available.
Floor Slab Design and Construction
All existing vegetation and/or topsoil should be removed from beneath the new floor slabs. Soft
or loose in-place fill/backfill,any wet and softened or dry and desiccated soils encountered within
the proposed building areas or any unacceptable in-place fill soils should be removed from the
floor areas. After stripping, completing all cuts and removal of any unacceptable materials and
prior to placement of any new fill or floor slabs, the in-place soils should be scarified to a
minimum depth of 9 inches, adjusted in moisture content and compacted to at least 95% of
maximum dry density as determined in accordance with ASTM Specification D698,the standard
Proctor procedure. The moisture content of the scarified materials should be adjusted to be
within the range of±2% of standard Proctor optimum moisture at the time of compaction.
Fill materials required to develop the floor slab subgrades should consist of approved, low-.
volume change materials which are free from organic matter and debris. We recommend the fill
materials contain sufficient fines to prevent ponding of water in the subgrade subsequent to
construction. The on-site sandy clay/clayey sand materials are acceptable for use as fill in the
floor slab subgrade areas; the claystone bedrock should not be used for fill.
Fill materials beneath the floor slabs should be placed in loose lifts not to exceed 9 inches thick,
adjusted in moisture content as recommended for the scarified materials and compacted to at least
95% of the material's standard Proctor maximum dry density.
Earth Engineering Consultants,LLC
EEC Project No. 1132068
September 27,2013
Page 8
After preparation of the subgrades, care should be taken to avoid disturbing the subgrade
materials. Materials which are loosened or disturbed by the construction activities will require
removal and replacement or reworking in place prior to placement of the overlying floor slabs.
Positive drainage should be developed away from the proposed building to avoid wetting the
subgrade or bearing materials. Subgrade or bearing materials allowed to become wetted
subsequent to construction could result in unacceptable performance of the improvements.
Pavements
We expect the site pavements will include areas designated for low volume automobile
traffic/parking and areas of heavier/higher volume traffic. For heavier traffic areas,we are using
an assumed equivalent daily load axle(EDLA)rating of 15 and in automobile/parking areas we
are using an EDLA of 5.
Proofrolling and recompacting the subgrade is recommended immediately prior to placement of
the pavements. Soft or weak areas delineated by the proofrolling operations should be undercut
or stabilized in-place to achieve the appropriate subgrade support. Based on the subsurface
conditions encountered at the site and the results of the laboratory testing,it is recommended the
on-site private drives and parking areas be designed using an R-value of 5.
Due to the moderately expansive characteristics of the overburden site fill soils,a swell mitigation
plan will be necessary to reduce the potential for movement within the pavement section. As
presented in the"Site Preparation"section of this report,we recommended overexcavating the in-
place fill soils and the replacement of these soils as moisture conditioned/engineered fill material
beneath pavement areas. Pumping conditions could develop within a moisture treatment process of
on-site cohesive soils. Subgrade stabilization may be needed to develop a stable subgrade for
paving. If needed,stabilization could include incorporating at least 12 percent(by weight)Class C
fly ash into the upper 12 inches of subgrade.
Eliminating the risk of movement within the proposed pavement section may not be feasible due to
the characteristics of the subsurface materials; but it may be possible to further reduce the risk of
movement if more extensive subgrade stabilization measures are used during construction. We
would be pleased to discuss other construction alternatives with you upon request.
Earth Engineering Consultants,LLC
EEC Project No. 1132068
September 27,2013
Page 9
Pavement design methods are intended to provide structural sections with adequate thickness
over a particular subgrade such that wheel loads are reduced to a level the subgrade can support.
The support characteristics of the subgrade for pavement design do not account for shrink/swell
movements of an expansive clay subgrade or consolidation of a wetted subgrade. Thus, the
pavement may be adequate from a structural standpoint, yet still experience cracking and
deformation due to shrink/swell related movement of the subgrade. It is,therefore,important to
minimize moisture changes in the subgrade to reduce shrink/swell movements.
Recommended pavement sections are provided below in Table 1. If selected, Portland cement
concrete should be an exterior pavement design mix with a minimum 28-day compressive
strength of 4,000 psi and should be air entrained. Hot bituminous pavement should consist of S-
75 or SX-75 with performance graded PG 58-28 or 64-22 binder, compacted to be within the
range of 92 to 96% of maximum theoretical specific gravity (Rice). In the drive lanes for the
coffee kiosk and/or areas subject to heavier truck loads or truck turning movements, (including
trash truck routes and load/unload areas)consideration should be given to use of Portland cement
concrete for the pavements. The recommended pavement sections are minimums and periodic
maintenance should be expected.
Table 1. Recommended Minimum Pavement Sections
Automobile Parking Heavy Duty Areas
18-kip EDLA 5 15
18-kip ESAL's 36,500 109,500
Reliability 75% 85%
Resilient Modulus 3025 psi 3025 psi
PSI Loss 2.5 2.0
Design Structure Number 2.47 3.09
A)Composite
Hot Bituminous Pavement 4" 5"
Aggregate Base 6" 8"
Design Structural Number) 2.42) 3.08)
B)Composite with Fly Ash Treated Subgrade
Hot Bituminous Pavement 3" 4"
Aggregate Base 6" 7"
Fly Ash Treated Subgrade 12" 12"
Design Structure Number) 2.58) 3.13)
C)PCC(Non-reinforced) 5" 6"
Longitudinal and transverse joints should be provided as needed in concrete pavements for
expansion/contraction and isolation. The location and extent of joints should be based upon the
final pavement geometry. Sawed joints should be cut in accordance with ACPA or ACI
recommendations. All joints should be sealed to prevent entry of foreign material and dowelled or
tied where necessary and appropriate for load transfer.
Earth Engineering Consultants,LLC
EEC Project No. 1132068
September 27,2013
Page 10
Since the cohesive soils on the site have some shrink/swell potential,pavements could crack in the
future primarily because of the volume change of the soils when subjected to an increase in
moisture content to the subgrade. The cracking,while not desirable,does not necessarily constitute
structural failure of the pavement.
The collection and diversion of surface drainage away from paved areas is critical to the
satisfactory performance of the pavement. Drainage design should provide for the removal of
water from paved areas in order to reduce the potential for wetting of the subgrade soils.
Long-term pavement performance will be dependent upon several factors,including maintaining
subgrade moisture levels and providing for preventive maintenance. The following
recommendations should be considered the minimum:
The subgrade and the pavement surface should be adequately sloped to promote proper surface
drainage.
Install pavement drainage surrounding areas anticipated for frequent wetting (e.g. garden
centers, landscaped islands)
Install joint sealant and seal cracks immediately.
Seal all landscaped areas in, or adjacent to pavements to minimize or prevent moisture
migration to subgrade soils.
Place compacted, low permeability backfill against the exterior side of curb and gutter; and
place curb, gutter, and/or sidewalk directly on approved proof rolled subgrade soils.
Preventive maintenance should be planned and provided for an on-going pavement management
program. Preventive maintenance activities are intended to slow the rate of pavement deterioration
and to preserve the pavement investment. Preventive maintenance consists of both localized
maintenance (e.g. crack and joint sealing and patching) and global maintenance (e.g. surface
sealing). Preventive maintenance is usually the first priority when implementing a planned
pavement maintenance program and provides the highest return on investment for pavements. Prior
to implementing any maintenance,additional engineering observation is recommended to determine
the type and extent of preventive maintenance.
Site grading is generally accomplished early in the construction phase. However as construction
proceeds,the subgrade may be disturbed due to utility excavations,construction traffic,desiccation,
Earth Engineering Consultants,LLC
EEC Project No. 1132068
September 27,2013
Page 11
or rainfall. As a result,the pavement subgrade may not be suitable for pavement construction and
corrective action will be required. The subgrade should be carefully evaluated at the time of
pavement construction for signs of disturbance, such as but not limited to drying, or excessive
rutting. If disturbance has occurred, pavement subgrade areas should be reworked, moisture
conditioned, and properly compacted to the recommendations in this report immediately prior to
paving.
Note that if during or after placement of the stabilization or initial lift of pavement, the area is
observed to be yielding under vehicle traffic or construction equipment, it is recommended that
EEC be contacted for additional alternative methods of stabilization,or a change in the pavement
section.
Other Considerations
Positive drainage should be developed away from the structure and pavement areas with a
minimum slope of 1 inch per foot for the first 10 feet away from the improvements in landscape
areas. Care should be taken in planning of landscaping adjacent to the building and parking and
drive areas to avoid features which would pond water adjacent to the pavement, foundations or
stemwalls.
Placement of plants which require irrigation systems or could result in fluctuations of the
moisture content of the subgrade material should be avoided adjacent to site improvements.
Lawn watering systems should not be placed within 5 feet of the perimeter of the building and
parking areas. Spray heads should be designed not to spray water on or immediately adjacent to
the structure or site pavements. Roof drains should be designed to discharge at least 5 feet away
from the structure and away from the pavement areas.
Excavations into the on-site lean clay subsoils should be relatively stable for short term
construction activities depending, in part, upon the depth of excavation and excavation side
slopes. The individual contractor(s)should be made responsible for designing and constructing
stable,temporary excavations as required to maintain stability of both the excavation sides and
bottom. All excavations should be sloped or shored following local and federal regulations,
including current OSHA excavation and trench safety standards.
Earth Engineering Consultants,LLC
EEC Project No. 1132068
September 27,2013
Page 12
GENERAL COMMENTS
The analysis and recommendations presented in this report are based upon the data obtained from
the soil borings performed at the indicated locations and from any other information discussed in
this report. This report does not reflect any variations, which may occur between borings or
across the site. The nature and extent of such variations may not become evident until
construction. If variations appear evident, it will be necessary to re-evaluate the
recommendations of this report.
It is recommended that the geotechnical engineer be retained to review the plans and
specifications so comments can be made regarding the interpretation and implementation of our
geotechnical recommendations in the design and specifications. It is further recommended that
the geotechnical engineer be retained for testing and observations during earthwork and
foundation construction phases to help determine that the design requirements are fulfilled.
This report has been prepared for the exclusive use of Doberstein Lemburg Commercial,Inc.for
specific application to the project discussed and has been prepared in accordance with generally
accepted geotechnical engineering practices. No warranty, express or implied, is made. In the
event that any changes in the nature, design, or location of the project as outlined in this report
are planned, the conclusions and recommendations contained in this report shall not be
considered valid unless the changes are reviewed and the conclusions of this report are modified
or verified in writing by the geotechnical engineer.
DRILLING AND EXPLORATION
DRILLING&SAMPLING SYMBOLS:
SS: Split Spoon- 13/8"I.D.,2"O.D.,unless otherwise noted PS: Piston Sample
ST: Thin-Walled Tube-2"O.D.,unless otherwise noted WS: Wash Sample
R: Ring Barrel Sampler-2.42"I.D.,3"O.D.unless otherwise noted
PA: Power Auger FT: Fish Tail Bit
HA: Hand Auger RB: Rock Bit
DB: Diamond Bit=4",N,B BS: Bulk Sample
AS: Auger Sample PM: Pressure Meter
HS: Hollow Stem Auger WB: Wash Bore
Standard"N"Penetration: Blows per foot of a 140 pound hammer falling 30 inches on a 2-inch O.D.split spoon,except where noted.
WATER LEVEL MEASUREMENT SYMBOLS:
WL : Water Level WS : While Sampling
WCI: Wet Cave in WD : While Drilling
DCI: Dry Cave in BCR: Before Casing Removal
AB : After Boring ACR: After Casting Removal
Water levels indicated on the boring logs are the levels measured in the borings at the time indicated. In pervious soils,the indicated
levels may reflect the location of ground water. In low permeability soils,the accurate determination of ground water levels is not
possible with only short term observations.
DESCRIPTIVE SOIL CLASSIFICATION
DEGREE OF WEATHERING:
Soil Classification is based on the Unified Soil Classification Slight Slight decomposition of parent material on
system and the ASTM Designations D-2488. Coarse Grained joints. May be color change.
Soils have move than 50%of their dry weight retained on a#200 Moderate Some decomposition and color change
sieve;they are described as: boulders,cobbles,gravel or sand.throughout.
Fine Grained Soils have less than 50% of their dry weight High Rock highly decomposed,may be extremely
retained on a#200 sieve;they are described as: clays, if they broken.
are plastic, and silts if they are slightly plastic or non-plastic. HARDNESS AND DEGREE OF CEMENTATION:
Major constituents may be added as modifiers and minor Limestone and Dolomite:
constituents may be added according to the relative proportions Hard Difficult to scratch with knife.
based on grain size. In addition to gradation, coarse grained Moderately Can be scratched easily with knife.
soils are defined on the basis of their relative in-place density
and fine grained soils on the basis of their consistency. Hard Cannot be scratched with fingernail.
Example: Lean clay with sand, trace gravel, stiff(CL); silty Soft Can be scratched with fingernail.
sand,trace gravel,medium dense(SM).
Shale,Siltstone and Claystone:
CONSISTENCY OF FINE-GRAINED SOILS
Hard Can be scratched easily with knife,cannot be
scratched with fingernail.
Unconfined Compressive Moderately Can be scratched with fingernail.
Strength,Qu,psf Consistency Hard
Soft Can be easily dented but not molded with
500 Very Soft fingers.
500- 1,000 Soft Sandstone and Conglomerate:
1,001 - 2,000 Medium Well Capable of scratching a knife blade.
2,001 - 4,000 Stiff Cemented
4,001 - 8,000 Very Stiff
Cemented Can be scratched with knife.
8,001 - 16,000 Very Hard
Poorly Can be broken apart easily with fingers.
RELATIVE DENSITY OF COARSE-GRAINED SOILS: Cemented
N-Blows/ft Relative Density
0-3 Very Loose
4-9 Loose
10-29 Medium Dense E Ec30-49 Dense
50-80 Very Dense
80+ Extremely Dense
PHYSICAL PROPERTIES OF BEDROCK
UN.LIHI ED SOUL CLAS S iF1CA'flON SYSTEM
Soil Classification
Group Group Name
Criteria for Assigning Group Symbols and Group names Using Laboratory Tests Symbol
Coarse-Grained Grovels more than Clean Grovels Less
Soils more than 50% of coarse than 5% fines Cu>4 and <Qc<3E GW Well-graded grovel`
50% retained on fraction retained
Na. 200 sieve on No. 4 sieve Cu<4 and/or 1>Cc>3E GP Poorly-graded grovel`
Gravels with Fines Fines classify as ML or MH GM Silty gravel, G,H
more than 12%
fines Fines classify as CL or CH GC Clayey Gravel`'`'°
Sands 50% or Clean Sands Less Cu>_5 and 1«c<3E sw Well-graded sand'
more coarse than 5% fines
fraction passes Cu<5 and/or 1>Cc>3E SP Poorly-graded sand'
No. 4 sieve
Sands with Fines Fines classify as ML or MH SM Silty sand°''a
more than 12%
fines Fines classify as CL or CH SC Clayey sandy'"
Fine-Grained Silts and Clays inorganic PI>7 and plots on or above 'A"Line' CL Lean cloy'
Soils 50% or Liquid Limit less
more posses the than 50 PI<4 or plots below °A"Line ML Silt"
No. 200 sieve
organic Liquid Limit - oven dried Organic cloy 1
0.75 OL
Liquid Limit - not dried Organic silt'
Silts and Clays inorganic PI plots on or above "Aline CH Fat cloy e'-"
Liquid Limit 50 or
more PI plots below "A'Line MH Elastic Sit
organic Liquid Limit - oven dried Organic cloy"'
0.75 OH
Liquid Limit - not dried Organic silt° ° 1
Highly organic soils Primarily organic matter, dark in color, and organic odor PT Peat
Abased on the moteriol passing the 3-in. (75- 1: IJn)ell sot contains 15 to 29%plus No. 200. add
mot) sieve
Cu=0sn/01 Cc=
x with sond' or 'with grave!", whichever is
If Field sample contained cobbles or boulders. predominanL
or both, odd with cobbles or boulders, or bath' tIf sal contoins 2 30" plus Na. 200
to group name. r predominantly sand. odd 'sandy to group
Grovels with 5 to 12% fines required dual
1f sail contoins 215% sonC, odd"withsond'to
name.
symbols-.
group name.
It sot contoins 2 30% plus Na. 200
GW-GM wellgraded gravel with silt
If fines claSsify gs CL-ML, use dual symbol
predominantly grovel, "gravely'GC-CM, or ssify
o redominontl odd ravel ' to group
GW-GC well-graded grovel with cloy name.
If Fines ore organic, add"with organic fines'lo
GP-GM poorly-graded grovel with silt P124 and plots an or above "A" line.
group norne
CP-GC poorly-graded grovel with day If sot contains >15 ravel, add"with rove(' 1pl or plots below "A' line.
Sonds with 5 to 12% fines require dual 9 PI plots on or above 'A' line.
nam
symbols: aI1 Artterberg
oup Gaits plots shooed area, sot is a
PI plots below 'A line.
SW-SM well-graded sand with silt
CL-ML, cilty cloy.SW-SC well-graded sand with cloy
SP-SM poorly graded sand with slit i
SP-5C poorly graded sand with cloy
60
nor Classification of Mrgrolned soils I/
and rna-grained traction of morse-
grei,ed soil. e
50
Equation of'A'-fine
Hurimnld of P1-4 to LL+25.5,
r
men PI-573(LL-20) tiri
e
dEquation of v"-line Z.
40_ Vertical of LL-I6 to PI"7, F
X then Pl..0.9(LL-6)
Jr/'
Z
G
30
I-
t
5
Oin20-
z, MH as OHJir\v0_
10-
e'
f/.i iri' ML IR OL
0 0 i0 20 30 '0 50 60 70 60 90 100 110
LIQUID LIMIT (LL)
JJ
O o N
12-2
m o Z
fa N .0 I 7
0.
Q
a
a
M
CL O y0
Z
v ao CD r ° ir 4 r\-J Q J V1
O
Z
Wi ;le W
Ztill3
W
K7 e . ' w
il
O
O
t. \ ,,
kt
01
I lOg rvit
i t
it,Th u CO
5u A
tTri
1:
g/i-vautssvi
IA 1 IliMAMPAi,„, R,i.., . ,.
I . ...ori:.ti.11110!), t \ :-.-
i A
4%,,,vV 1111`:1^11;1.11 0 C m O+-,
111.tr ..I.11,,1 I O i p
1
4...f `'11<<,^1114.S row U
I44Z,`—1 I Iv14!; w
t ,/.'.11,.'1.1. `
00I
I+
v%% O rG
1* Ilt .1 t%'A N11;j . r
lipt 1 Nrziii . , .,,
k,, 1.:
1;:r1.
4%04,-.46,-- ,,,:. \ )
1/4,\:,::,‘,"•,,\'‘...,,,,‘,__i j L.
VI
O
1 \ *.c.:.-- ig1414iiimilmmti%••1111111111111111111%42/ k Li, .4 ---,Axial
nmegurallik,le " --74"41411111114,
Y.
T ZS
go
r. •
I
14.4" r-..
f-1.._--- _- "
nlimit----- "7:- --",a—
ft.
r••••-4 ' ,-;
ar----
ip• 1 iii- . It .•
7..••....1. 4100., ... A.-
0.7,•-• ,,,,r2 1'
1,- •- i, ,,,,-.
II
7: 44‘, ',.
A..A....L -,-
t., .. ,,.... - V.-'''''' •4itiek^,.. r'- • • 4*•
10•- 'ylagehr --.4WMPT"----''- '...•-. ""` - •
4,,,, 4,„,,,,,,.. 4'1447;,-+!,••••••••••••ce4.-,-•-. , -.4•,•- C -",_`.
4'• ' - '
7'•;,-,.* ,re,*„.",.',,SS•.%,•4 • aes- A'441,-•*•-.- -,
e-' . - -•-• p • --. ••„ :,,'$.••40 ,. ,Arw,oftr• ' ,,•1 - ".7. ...
4 •
e,',,` 1.,
4 .4,
4,•••• ,„,,,,Agr„'•.,'
44*-.
4.••'".,,,'''' " ', ,'•'. •-•e ., "-,%, ' ' -... ri•:' ' ''' ' .st7' ,•• , ; 4010tirAliii4:4:•.t.::••••••':^4',••••
0"4413. • ''L. 4 :t i.• - ' . • '
4'' ' ,•.. 1- •;,.
4 4.r,„4„,..? •:,...-• •.. , , ,. ,' , -,-4-, cl, x,,.• ...r . •• 6..; ..401rr"-: :*- 1„.r."re
c7" t• .44•,„„ .1.4•. .—.*, .pit•-,,P-4,114.741- ..'''' -' 4'':.f.,•-'IA.yr•v3 ,-i.V "-,
44' ''
ViP114-4r. '''4.( •.''.•"'+4.' ' 7./n:,- .444.Pt4414,
44,t...."•;i" ,, 0
1.-Te.0-1104.4..r:',.-___Y-4,-ix,. --; -",.. --.. ',. .'''.r.-,'Itl'elfoi15.fr ilL 2 '
4. ' '
404.0?c_
PHOTO # 1
r"rrk,:: ', ,t• ,,..,,_
r .., -'''. - _ ;.0k-.0. '
44% -,k-
1,
I
t' •
A..
ti 0 141tiAA VAt Mg-1..
e ••••ig
1, ....,1 1 I
0 _,
AkI.• ,
i411 111-4
7'
44
i •11---____ 11
WeriliNiehoW4.0.e - ...goli;,r,..-All,
a
i•t
It
W.
PHOTO # 2
JFK PARKWAY AND EAST BOARDWALK DRIVE
FORT COLLINS,COLORADO
E ECEECPROJECTNo.1132068
SEPTEMBER 2013
N"-------_______---- .
JFK PARKWAY AND EAST BOARDWALK DRIVE
FORT COLLINS,COLORADO
PROJECT NO: 1132068 LOG OF BORING B-1 DATE: SEPTEMBER 2013
RIG TYPE: CME55 SHEET 1 OF 1 WATER DEPTH
FOREMAN: DG START DATE 9/5/2013 WHILE DRILLING None
AUGER TYPE: 4"CFA FINISH DATE 9/5/2013 AFTER DRILLING N/A
SPT HAMMER: AUTOMATIC SURFACE ELEV NIA 24 HOUR N/A
SOIL DESCRIPTION D N OU MC DD A-LIMITS 200 SWELL
TVPE (FEET) (BLOWS/FT) (PSF)PCF) LL PI (%) PRESSURE I % 500 PSF
SPARSE VEGETATION
1
SANDY LEAN CLAY(CL)-FILL
brown 2
with sand/sandy zones
SS 3 6 9000+ 9.1
4
CS 5 19 3000 11.7 110.8 32 12 58.7 <500 psi 3.5%
SILTSTONE/CLAYSTONE/SANDSTONE
brown/grey/rust 6
moderately hard
7
8
9
SS 1-0 50/6" 3000 13.3
1-1
1-2
1-3
1-4
CS 15 50/2" 5000 8.2 101.1 600 psi 0.3%
1-6
1-7
1-8
1-9
SS 2-0 50/5" 5000 12.3
2-1
22
2-3
2-4
CS 25 50/4" 9000+ 11.4 99.1
Continued on Sheet 2 of 2
Earth Engineering Consultants,LLC
JFK PARKWAY AND EAST BOARDWALK DRIVE
FORT COLLINS,COLORADO
PROJECT NO: 1132068 LOG OF BORING B-1 DATE: SEPTEMBER 2013
RIG TYPE: CME55 SHEET 2 OF 2 WATER DEPTH
FOREMAN: DG START DATE 9/5/2013 WHILE DRILLING None
AUGER TYPE: 4"CFA FINISH DATE 9/5/2013 AFTER DRILLING_ NIA
SPT HAMMER: AUTOMATIC SURFACE ELEV N/A 24 HOUR NIA
SOIL DESCRIPTION D N CID MC DD A-LIMITS 250 SWELL
1.1I.E (FEET) (BLOWS/FT) (PSF)PCF) LL PI (%) PRESSURE %5 500 PSF
Continued from Sheet 1 of 2 26
SILTSTONE I CLAYSTONE/SANDSTONE 27
brown/grey/rust
moderately hard 28
2-9
SS 3-0 50/5" 3000 12.8
BOTTOM OF BORING DEPTH 30.5' 31
3-2
3-3
34
35
3-6
3-7
3-8
39
40
41
42
43
44
45
46
47
4-8
49
5-0
Earth Engineering Consultants
JFK PARKWAY AND EAST BOARDWALK DRIVE
FORT COLLINS,COLORADO
PROJECT NO: 1132068 LOG OF BORING B-2 DATE: SEPTEMBER 2013
RIG TYPE: CME55 SHEET 1 OF 1 WATER DEPTH
FOREMAN: DG START DATE 9/5/2013 WHILE DRILLING None
AUGER TYPE: 4"CFA FINISH DATE 9/5/2013 AFTER DRILLING N/A
SPT HAMMER: AUTOMATIC SURFACE ELEV N/A 24 HOUR N/A
SOIL DESCRIPTION D N OU MC DD A-LIMITS 200 SWELL
I TYPE (FEET) (BLOWS/FT) (PSF)PCF) LL PI (%) PRESSURE %@ 500 PSF
SPARSE VEGETATION
SANDSTONE/SILTSTONE-FILL 1
brown/grey/rust
2
SILTSTONE/SANDSTONE/CLAYSTONE CS -3 41 9000+ 7.1 121.1
brown/grey/rust
moderately hard 4
CS -5 50/6" 9000+ 7.3 116.5 2000 psf 2.4%
6
7
8
9
SS 10- 50/7" 9000+ 13.1
11
12
1-3
1-4
CS 1-5- 50/5" 7000 12.5 117.6 1200 psf 0.5%
BOTTOM OF BORING DEPTH 15.0'
16
1-7
1-8
1-9
2-0
21
2-2
2-3
2-4
2-5
Earth Engineering Consultants,LLC
JFK PARKWAY AND EAST BOARDWALK DRIVE
FORT COLLINS,COLORADO
PROJECT NO: 1132068 LOG OF BORING B-3 DATE: SEPTEMBER 2013
RIG TYPE: CME55 SHEET 1 OF 1 WATER DEPTH
FOREMAN: DG START DATE 9/5/2013 WHILE DRILLING None
AUGER TYPE: 4"CFA FINISH DATE 9/5/2013 AFTER DRILLING N/A
SPT HAMMER: AUTOMATIC SURFACE ELEV N/A 24 HOUR N/A
SOIL DESCRIPTION D N QU MC DO A-LIMITS 200 SWELL
TYPE (FEET) (BLOWS/FT) (PSF)PCF) LL PI (%) PRESSURE % 500 PSF
SANDY LEAN CLAY(CL)-FILL 1
mottled
2
CS 3 23 9000+ 8.4 127.6 33 16 54.1
CLAYEY SAND/SANDY LEAN CLAY(SC/CL) 4
brown/grey/rust
medium dense SS 5 18 3000 8.8
6
7
8
9
CS 1-0 50 8000 15.4 112.1 32 15 68.9 1300 psf 0.7%
SILTSTONE/CLAYSTONE/SANDSTONE
brown/rust/grey 11
moderately hard
12
1-3
14
SS 1-5 50/6"13.9
BOTTOM OF BORING DEPTH 15.5' 16
1-7
1-8
1-9
2-0
2-1
22
2-3
2-4
2-5
Earth Engineering Consultants,LLC
JFK PARKWAY AND EAST BOARDWALK DRIVE
FORT COLLINS,COLORADO
PROJECT NO: 1132068 LOG OF BORING B-4 DATE: SEPTEMBER 2013
RIG TYPE: CME55 SHEET 1 OF 1 WATER DEPTH
FOREMAN: DG START DATE 9/5/2013 WHILE DRILLING None
AUGER TYPE: 4"CFA FINISH DATE 9/5/2013 AFTER DRILLING N/A
SPT HAMMER: AUTOMATIC SURFACE ELEV N/A 24 HOUR N/A
SOIL DESCRIPTION D N OU MC DD A-LIMITS 200 SWELL
TYPE (FEET) (BLOWS/FT) (PSF)PCF) LL PI® (%) PRESSURE %/2;500 PSF
SPARSE VEGETATION
1
LEAN CLAY(CL)-FILL
brown 2
mottled xateopsf
CS 3 13 9000+ 9.4 1192 3200 psf 4.4%
4
SILTY SANDY LEAN CLAY(CL)
brown/grey/rust SS 5 13 8000 12.8
very stiff
6
SILTSTONE/CLAYSTONE/SANDTONE
brown/grey!rust 7
moderately hard
8
9
SS 1-0 50/6" 7000 13.2
BOTTOM OF BORING DEPTH 10 5' 1-1
12
1-3
1-4
1-5
16
1-7
1-8
19
20
21
2- 2
2-3
24
25
Earth Engineering Consultants,LLC
JFK PARKWAY AND EAST BOARDWALK DRIVE
FORT COLLINS,COLORADO
PROJECT NO: 1132068 LOG OF BORING B-5 DATE: SEPTEMBER 2013
RIG TYPE: CME55 SHEET 1 OF 1 WATER DEPTH
FOREMAN: DG START DATE 91512013 WHILE DRILLING None _
AUGER TYPE: 4"CFA FINISH DATE 9/512013 AFTER DRILLING N/A
SPT HAMMER: AUTOMATIC SURFACE ELEV N/A 24 HOUR N/A
SOIL DESCRIPTION D N CU MC DD A-LIMITS 200 SWELL
TYPE (FEET) (BLOWS/FT) (PSF)PCF) LL PI . I%I PRESSURE %a 500 PSF
SPARSE VEGETATION
1
CLAYEY SAND/SANDY LEAN CLAY(SC/CL)
brown/grey/rust 2
CS 3 25 5000 11.5 117.3
SILTSTONE/SANDSTONE/CLAYSTONE
brown/grey/rust 4
moderately hard
SS 5 50 3000 14.4
6
7
8
9
SS 1-0 5017" 5000 13.0
BOTTOM OF BORING DEPTH 10 5' 11
1-2
13
1-4
15
1-6
1-7
1-8
1-9
20
2-1
2-2
2-3
2-4
25
Earth Engineering Consultants,LLC
SWELL / CONSOLIDATION TEST RESULTS
Material Description: Brown Sandy Lean Clay(CL)- Fill
Sample Location:Boring 1, Sample 2, Depth 4'
Liquid Limit: 32 Plasticity Index: 12 Passing#200: 58.7%
Beginning Moisture: 11.7% Dry Density: 118.1 pcf Ending Moisture: 16.7%
Swell Pressure: <500 psf Swell @ 500: 3.5%
10.0
8.0
6.0
a)
4.0
2.0
d
E
0.0
dU
n.
2.0
Water Added
0
4.0
co
0
C
o -6.0
U
8.0
10.0
0.01 0.1 1 10
Load(TSF)
Project: JFK Parkway and East Boardwalk Drive
Location: Fort Collins, Colorado
EECProject#: 1132068
Date:September 2013
SWELL / CONSOLIDATION TEST RESULTS
Material Description: Brown/Grey/Rust Siltstone/Claystone/Sandstone
Sample Location:Boring 1, Sample 4, Depth 14'
Liquid Limit: -- Plasticity Index: -- Passing#200: --
Beginning Moisture: 8.2% Dry Density: 107.2 pcf Ending Moisture: 22.8%
Swell Pressure: 600 psf Swell @ 500: 0.3%
10.0
8.0
6.0
a
cn
4.0
2.0
d
E
d
E 0.0
c
a) J
a)"a
Water Added2.0
4.0
o
I)
a -6.0
U
8.0 -
10.0
0.01 0.1 1 10
Load(TSF)
Project: JFK Parkway and East Boardwalk Drive
Location: Fort Collins, Colorado
Project#: 1132068 EEC )
Date:September 2013
SWELL /CONSOLIDATION TEST RESULTS
Material Description: Claystone/Siltstone/Sandstone
Sample Location:Boring 2, Sample 2, Depth 4'
Liquid Limit: -- Plasticity Index: -- Passing#200: --
Beginning Moisture: 7.3% Dry Density: 109.6 pcf Ending Moisture: 20.2%
Swell Pressure: 2000 psf Swell @ 500: 2.4%
10.0
8.0
6.0
0D
4.0
2.0
d
2 0.0
a -
2.0 Water Added
4.0
0
Co
0
U)
o -6.0
U
8.0
10.0
0.01 0.1 1 10
Load(TSF)
Project: JFK Parkway and East Boardwalk Drive
Location: Fort Collins, Colorado
EEC )Project#: 1132068
Date:September 2013
SWELL / CONSOLIDATION TEST RESULTS
Material Description: Claystone/Siltstone/Sandstone
Sample Location:Boring 2, Sample 4, Depth 14'
Liquid Limit: -- Plasticity Index: -- Passing#200: --
Beginning Moisture: 12.5% Dry Density: 121 pcf Ending Moisture: 8.7%
Swell Pressure: 1200 psf Swell @ 500: 0.5%
10.0
8.0
6.0
cn
4.0
2.0
c
m
E
a)
100
a -
2.0 Water Added
4.0
a0
0
0
o -6.0
0
8.0
10.0
0.01 0.1 1 10
Load(TSF)
Project: JFK Parkway and East Boardwalk Drive
Location: Fort Collins, Colorado
E E C,Project#: 1132068
Date:September 2013
SWELL /CONSOLIDATION TEST RESULTS
Material Description: Brown I Rust I Grey Siltstone I Claystone I Sandstone
Sample Location:Boring 3, Sample 3, Depth 9'
Liquid Limit: 32 Plasticity Index: 15 Passing#200: 68.9%
Beginning Moisture: 15.4% Dry Density: 119.1 pcf Ending Moisture: 17.6%
Swell Pressure: 1300 psf Swell @ 500: 0.7%
10.0
8.0
6.0
a)
4.0
2.0
d
E
a)
E 0.0
cu
2.0 Water Added
4.0
0
0
o -6.0
U
8.0
10.0
0.01 0.1 1 10
Load(TSF)
Project: JFK Parkway and East Boardwalk Drive
Location: Fort Collins, Colorado
Project#: 1132068
Date:September 2013
r -
SWELL /CONSOLIDATION TEST RESULTS
Material Description: Brown Lean Clay(CL)
Sample Location:Boring 4, Sample 1, Depth 2'
Liquid Limit: -- Plasticity Index: -- Passing#200: --
Beginning Moisture: 9.4% Dry Density: 119.1 pcf Ending Moisture: 15.6%
Swell Pressure: 3200 psf Swell @ 150: 4.4%
10.0
8.0 -
6.0
4.0
2.0
I
d
0
E 0.0
c l
d
d Water Added
2.0
4.0
0
co
o -6.0
0
8.0
10.0
0.01 0.1 1 10
Load(TSF)
Project: JFK Parkway and East Boardwalk Drive
Location: Fort Collins, Colorado w
Project#: 1132068 1L--(v'
Date:September 2013