GEOTECHNICAL AND MATERIALS ENGINEERS
GEOTECHNICAL REPORT
PROPOSED AIR CARE FACILITY
LOT 16 — INTERCHANGE BUSINESS PARK
FORT COLLINS, COLORADO
Prepared for:
Brian 0jala
Entasis Group
12365 Huron St., Suite #40
Westminster, CO 80234
Job No. 09-050 September 2, 2009
DENVER: 12364 West Alameda Prkny., Suite 115, Lakewood, CO 80228 (303) 989-1223
GRAND JUNCTION: 529 25 I/2 Rd &Suite 201 • Grand Junction, CO 81505 (970) 241-7700
AVONISILVERTHORNE. (970) 949-6009
September 2, 2009 %OECSLEIN CONSULTING ENGINEERS, INC
Job No.09-050 Geotechnical and Materials Engineers
TABLE OF CONTENTS
SCOPE
EXECUTIVE SUMMARY
SITE CONDITIONS
PROPOSED CONSTRUCTION
SUBSURFACE EXPLORATION
SUBSURFACE CONDITIONS
RADON
MOLD
EXISTING FILL
GROUND WATER
EXCAVATIONS
SEISMICITY
FOUNDATIONS
SLABS -ON -GRADE
FOUNDATION DRAINAGE
LATERAL WALL LOADS
SURFACE DRAINAGE
IRRIGATION
COMPACTED FILL
LIMITATIONS
VICINITY MAP
LOCATIONS OF EXPLORATORY BORINGS
LOGS OF EXPLORATORY BORINGS
LEGEND OF EXPLORATORY BORINGS
GRADATION TEST RESULTS
SWELL -CONSOLIDATION TEST RESULTS
FOUNDATION EXCAVATION RECOMMENDATIONS
SUMMARY OF LABORATORY TEST RESULTS
1.
1
3
3
4
5
S
6
6
7
7
8
9
10
11
12
12.
13
14
15
Fig. 1
Fig. 2
Fig. 3
Fig. 4
Figs. 5 and 6
Figs. 7 and 8
Fig. 9
Table I
September 2, 2009 %OECHLEIN CONSULTING ENGINEERS; INC.
Job No.09-050 Geotechnical and Materials Engineers
SCOPE
This report presents the results of a geotechnical subsurface exploration for the
proposed Air Care facility to be constructed on Lot 16 in the Interchange Business Park in
Fort Collins, Colorado. The approximate site location is shown on the Vicinity Map, Fig.
1. The purpose of this report is to present our evaluation of the subsurface conditions at
the site and to provide geotechnical recommendations for the proposed facility..
This report includes descriptions of subsurface soil and ground water conditions
encountered in the exploratory borings, recommended floor and foundation systems,
allowable soil bearing pressure; and recommended foundation design and construction
criteria. This report was prepared from data developed during our subsurface exploration
and our experience with similar projects and subsurface conditions in the area.
The recommendations presented in this report are based on a single=story
commercial building being constructed in the location shown on the Locations of
Exploratory Borings, Fig. 2. We should be contacted by the contractor and/or owner to
review our recommendations when final plans for the structure have been completed. A
summary of our findings and conclusions is presented in the following paragraphs.
EXECUTIVE SUMMARY
1. Subsurface conditions encountered in the exploratory borings were
generally similar. The subsurface conditions generally consisted of 3.0 to
3.5 feet of existing fill underlain by a medium stiff, sandy clay to varying
depths of 6.5 to 8.0 feet. The existing fill was characterized by a medium
September 2, 2009 KOECRLEIN CONSULTING ENGINEERS, INC.
Job No.09-0.50 Geotechnical and Materials Engineers
stiff, sandy clay with scattered gravels. Below the sandy clay, to the
maximum depth explored of 20.0 feet, the subsurface conditions consisted
of a loose to medium dense, gravelly sand. Refer to the SUBSURFACE
CONDITIONS section of this report for additional information.
2. At the time of drilling; ground water was encountered at a depth of 6.5 feet
in exploratory boring TH-1, 6.5 feet in TH-2, and 7.0 feet in TH-3. Refer
to the GROUND WATER section of this report for additional details.
3. Existing fill was encountered in all of the exploratory borings to varying
depths of 3.0 to 3.5 feet. The existing fill is characterized by a dark
brown, tan, mottled, slightly moist to moist, medium stiff, sandy clay with
scattered gravel. We believe that the existing fill is a controlled fill;
however, we recommend that the owner obtain all records regarding the
placement of the existing fill in order to verify that it was. controlled
during development. Refer to the EXISTING FILL section of this report
for additional information.
4. We anticipate that the subsurface conditions at the foundation elevation
for the proposed Air Care building will consist of the natural sandy clay or
existing fill.. Due to the presence of existing fill at the foundation
elevation, special considerations should be taken into account when
constructing the foundation system for the proposed building. Refer to the
FOUNDATIONS section of this report for more details.
5. We anticipate that the subsurface conditions at the proposed slabs -on- .
grade elevation will consist of existing fill. Due to the presence of
existing fill, special considerations should be taken into account when
constructing slabs -on -grade -at this site. Refer to the SLABS -ON -GRADE
section of this report for more details.
6. Based on the conditions encountered in the exploratory borings, we
anticipate that conventional construction equipment will be capable of
completing the required excavations. Refer to the EXCAVATIONS
section of this report for more details.
7. Based on the subsurface - soil profile, this site has a seismic site
classification of Site Class D. Refer to the SEISMICITY section of this
report for additional details.
2
September 2, 2009
Job No. 09-050
KOECHLEIN CONSULTING ENGINEERS, INC.
Geotechnical and Materials Engineers
8. Drainage around the facility should be designed and constructed to
provide for rapid removal of surface runoff and avoid concentration of
water adjacent to foundation walls. Refer to the SURFACE DRAINAGE
section of this report for details.
9. The potential for radon gas is a concern in the area. However, because we
do not anticipate that a below grade area will be constructed for the
proposed building, the risk of radon will be low. Refer to the RADON
section of this report for additional details.
10. Mold has become a concern with new construction. Refer to the MOLD
section of this report for additional details.
SITE CONDITIONS
The proposed Air Care facility will be located on Lot 16 in the Interchange
Business. Park in Fort Collins, Colorado. The lot is accessed by the Southeast Frontage
Road, which borders the south side of the.lot. The north side of the lot is bordered by the
off ramp from I-25 to East Mulberry Street. The east side of the lot is bordered by the
Mulberry Inn while the west side of the lot is bordered by a vacant lot: At the time of our
subsurface exploration, Lot 16 was vacant. The lot is generally level with a slight slope
down towards the south at an approximate grade of 1 to 2 percent. Vegetation on the lot
consists of weeds.
PROPOSED CONSTRUCTION
Prior .to the start of our subsurface exploration, a site plan of the proposed Air .
Care facility was provided by Entasis Group. We anticipate that the proposed Air Care
3
September 2, 2009
Job No. 09-050
KOECHLEIN CONSULTING ENGINEERS, INC. .
Geotechnical and Materials Engineers
facility will consist of one single -story structure with no below grade area. The proposed
building will have a 20,000 square foot footprint. We anticipate that the Air Care
building will be constructed of cast -in -place concrete, masonry, and structural steel
construction with slabs -on -grade. We anticipate that excavations for the proposed
building will be approximately 3 feet.
SUBSURFACE EXPLORATION
Subsurface conditions were explored at this site on August 28, 2009 by drilling
three exploratory borings (TH-1 thru TH-3) with a 4-inch diameter continuous flight
auger mounted on.a truck drill rig at the locations shown on the Locations of Exploratory
Borings, Fig. 2. An engineer from our office was on site during the subsurface
exploration to supervise the drilling of the exploratory borings and to visually classify and
document the subsurface soils and ground water conditions. Graphical logs of the
subsurface conditions encountered in the exploratory borings are presented on the Logs of
Exploratory Borings, Fig. 3; and on the Legend of Exploratory Borings, Fig. 4.
Selected samples were tested in our laboratory to determine their natural moisture
content, natural dry density, gradation properties, Atterberg limits, and swell -
consolidation potential. Results of the laboratory testing are presented on the Logs of
Exploratory Borings, Fig. 3; on the Gradation Test Results, Figs. 5 and 6; on the Swell-
4
September 2, 2009
Job No. 09-050
OECIILEIN CONSULTING ENGINEERS, INC.
Geotechnical and Materials Engineers
Consolidation Test Results,. Figs. 7 and 8; and on the Summary of Laboratory Test
Results; Table I.
SUBSURFACE CONDITIONS
Subsurface conditions encountered in the exploratory borings were generally
similar. The subsurface conditions generally consisted of 3.0 to 3.5 feet of existing fill
underlain by a dark brown to brown, dry to slightly moist, medium stiff, sandy clay to
varying depths of 6.5. to 8.0 feet. The existing fill was characterized by a dark brown, tan,
mottled, slightly moist to moist, medium stiff, sandy clay with scattered gravel. Below
the .sandy clay, to the maximum depth explored of 20.0 feet, the subsurface conditions
consisted of a multi -colored, moist to wet, loose to medium dense; clayey to silty,
gravelly sand.
At the time of drilling, ground water was. encountered at a depth of 6.5 feet in
exploratory boring TH-1, 6.5 feet in TH-2, and 7.0 feet in TH-3
RADON
In recent years, radon gas has become a concern. Radon gas is a colorless,
odorless gas that is produced by the decay of minerals in soil and rock. The potential for
radon gas in the subsurface strata is likely. Because we do not anticipate that the building
Will be constructed with a below grade, the risk of radon gas occurring in the building
5
September 2, 2009
Job No. 09-050 OECHLEINCONSULTING ENGINEERS, INC. Geotechnical
and Materials Engineers will
be low. If plans change and a below grade area is constructed this area should be ventilated
to prevent the buildup of radon gas. MOLD
Mold
has become a concern with new construction. Mold tends to develop in dark
ordamp areas such as below grade levels, under floor spaces, or bathrooms. Recommendations for
the prevention, remediation, and/or mitigation of mold is outside . the scope
of this. report. We recommend that the owner. contact: a Professional Industrial Hygienist for
recommendations for the prevention, remediation; and/or mitigation of mold. EXISTING
FILL
Existing fill
was encountered at this site to varying depths of 3.0 to 3.5 feet. Greater depths
of existing fill could be encountered across the site. The existing fill was characterized by
a dark brown, tan, mottled, slightly moist to moist, medium stiff, sandy clay with
scattered gravel. Laboratory testing indicated that the existing fill is non - expansive. Based
on the results of our laboratory testing and on the drilling characteristics of
the existing fill, we believe that the existing fill was placed in a controlled manner.
We recommend that the owner contact the developer and obtain 2
September 2, 2009
Job No, 09-050
OECHLEIN CONSULTING ENGINEERS, INC.
Geotechnica! and Materials Engineers
records regarding the existing fill in order to verify that the existing fill was placed
in it controlled manner.
If the existing fill was not placed in a controlled manner, the existing fill should
be removed and replaced with properly moisture treated and compacted new structural fill
below the area of proposed construction. Refer to the COMPACTED FILL section of
this report for additional information.
In our opinion, the existing fill may be suitable for use as structural fill provided
any, organics observed in the fill be removed prior to use. However, because the fill may
vary acrossthe site, a representative of our office should observe the excavated fill to confirm
its suitability for reuse on this project, prior to placement. GROUND
WATER At
the time of drilling, ground water was encountered at a depth of 6.5 feet in exploratory
boring TH-1, 6.5 feet in TH-2, and 7.0 feet in TH-3. Based on the conditions encountered
during drilling, we anticipate that ground water will not influence the construction
of the proposed building. EXCAVATIONS
Due
to the presence of existing fill, we anticipate that excavations of up to 3.5 feet will
be required for construction of the proposed building. Based on the subsurface 7
September 2; 2009
Job No. 09-050
SOECHLEIN CONSULTING ENGINEERS, INC.
Geotechnical and Materials Engineers
conditions encountered in the exploratory borings, it is our opinion that conventional
construction equipment will be capable of completing the required excavations.
Existing fill was encountered to a depth of 3.5 feet; however, greater depths of
existing fill could be encountered across the site. Based on the results of our laboratory. .
testing and on the drilling characteristics of the existingfill, we. believe that the existing fill
was placed in a controlled manner. If the existing fill was not placed in a controlled manner,
we recommend that the existing fill be removed and replaced with properly moisture
treated and compacted fill from below the proposed Air Care building prior to construction:
Care
needs to be exercised during construction so that the excavation slopes remain
stable. In our opinion, the existing fill and the natural clayey sand classify as Type
B soils in accordance with OSHA regulations. OSHA regulations should be followed
in all excavations and cuts SEISMICITY
The
subsurface soil conditions encountered within the exploratory borings indicate
that the soil profile classifies as stiff soil in accordance with the 2006 International
Building Code (IBC). Based on this classification, it is our opinion that the subject
site has a seismic site classification of Site Class D.
September 2, 2009 %OECSLEIN CONSULTING ENGINEERS, INC.
Job No.09-050 Geotechnical and Materials Engineers
FOUNDATIONS
We anticipate that the subsurface conditions at the foundation elevation for the
proposed building will consist of the natural sandy clay or existing fill. Although we
believe the existing fill was placed in a controlled manner, it is our opinion that
foundation systems constructed on the existing fill will have a moderate risk of
movement. We recommend that the proposed building be supported by a spread footing
foundation system bearing on the natural soils or new structural fill. A spread footing
foundation system supported by the natural soils or new structural fill will have a low risk
of movement. We recommend that spread footings be designed and constructed to meet
the following criteria:
1. Footings should be supported by either the natural sandy clay or properly
moisture conditioned and compacted new structural fill: All existing fill
below foundations should be removed and replaced with a properly
moisture conditioned and compacted non -expansive structural fill.
2. We recommend footings constructed on the natural clayey sand or properly
moisture conditioned and compacted new fill be designed for a maximum
allowable soil bearing pressure of 2,000 psf.
3. To resist external lateral loads, an earth passive equivalent fluid pressure of
250 pcf and a coefficient of friction of 0.3 between the base of the footings
and the natural soils or new structural fill may be used for design:
4: Spread footings .constructed on the natural clayey sand and/or properly
moisture conditioned and compacted new fill may experience up to 1 inch
of differential movement between foundation elements. Because the soils
are granular, we anticipate that the majority of the differential movement
will occur during construction.
E
September 2, 2009 %OECHLEIN CONSULTING ENGINEERS, INC.
Job No.09-050 Geotechnical and Materials Engineers
5. Compacted fill placed beneath spread footings should extend at a 1 to 1
Horizontal to Vertical) slope from the outside edge of the footings.
Excavation recommendations beneath spread footings are shown in the
Foundation Excavation Recommendations, Fig. 9.
6. Foundation systems should be designed to span a distance of at least 10.0
feet in order to account for anomalies in the soil or fill.
7. The base of the exterior footings should be established at a minimum
depth below the exterior ground surface, as required by the local building
code. We believe that the depth for frost protection in this area is 3 feet.
8. Column footings should, have a minimum dimension of 24 inches square
and continuous wall footings should have a minimum width of 16 inches,
Footing widths maybe greater to accommodate structural design loads.
9. Fill should be placed and compacted as outlined in the COMPACTED
FILL section of this report. We recommend that a representative of our
office observe and test the placement and compaction of structural fill
used in foundation construction. It has been our experience that without
engineering quality control, inappropriate construction techniques can
occur which result in unsatisfactory foundation performance.
10. A representative of our office must observe the completed foundation
excavations. Variations from the conditions described in this report,
which were not indicated by our borings, can occur. The representative
can observe the excavations to evaluate the exposed subsurface conditions
and make any additional recommendations.
SLABS-ON=GRADE
We anticipate that the subsurface conditions at the floor slab elevations for the
proposed building will consist of the existing fill. Because we believe that the existing
fill was controlled during the construction of the development, it is our opinion that slabs -
on -grade constructed on the existing fill will have a low to moderate risk of movement. If
10
September 2, 2009
Job No. 09-050
KOECHLEIN CONSULTING ENGINEERS, INC.
Geotechnical and Materials Engineers
the owner is willing to accept a low to moderate risk of movement, then slabs -on -grade
may be constructed on the existing fill. If the owner would like to reduce the risk of
movement to a low level, we recommend removing all of the existing fill and replacing it
with properly moisture conditioned and compacted new structural fill. We recommend.
the following precautions for the construction of slab -on -grade floors:
1. If the owner is willing to accept a low to moderate risk of movement, slab-.
on -grade floors may be constructed on the existing fill.
2. If the owner would like to reduce the risk of slab movement, slab -on -grade
floors could be constructed on properly moisture treated and compacted
new structural fill.
3. Slabs may be placed on the properly scarified and moisture treated natural
soils or structural fill.
4. Slabs -on -grade may be designed using a modulus of subgrade reaction of
100 psi.
5; Slabs should be separated from exterior walls and interior bearing
members. Vertical movement of the slabs should not be restricted.
6. Frequent control joints should be provided in all slabs to reduce problems
associated with shrinkage of the concrete..
T Fill beneath slabs -on -grade may consist of approved on -site soils or
approved fill. Fill should be placed and compacted as recommended in the
COMPACTED FILL section of this report., Placement and compaction of
fill beneath slabs should be observed and tested by a representative of our
office.
FOUNDATION DRAINAGE
Surface water, especially that originating from rain or snowmelt, tends to flow
11
September 2, 2009
Job No. 09-050
OECIILEIN CONSULTING ENGINEERS, INC.
Geotechnical and Materials Engineers
through relatively permeable backfill typically found adjacent to foundations. The water
that flows through the fill collects on the surface of relatively impermeable soils
occurring at the foundation elevation. Both this surface water and possible ground water
1. can cause wet or moist below grade conditions after construction. Because the proposed
building will not be constructed with a below grade area, it is our opinion that a
foundation drain will not be necessary.
LATERAL WALL LOADS
We do not anticipa..te that below grade walls, which require lateral earth pressures,
will be constructed for this project. However, if plans change, we should be contacted to
provide lateral earth pressures for design of the walls.
Backfill placed behind or adjacent to foundation walls should be placed and
compacted as recommended in the COMPACTED FILL section of this report. Placement
and compaction of the fill should be observed and tested by a representative of our office
SURFACE DRAINAGE
Reducing the wetting of structural soils can be achieved by carefully planned and
maintained surface drainage. We recommend the following precautions be observed
during construction and maintained at all times after the Air Care facility is completed.
1. Wetting or drying of the open excavation should be minimized during
construction.
12
September 2, 2009
Job No. 09-050
gOECSLEIN CONSULTING ENGINEERS, INC.
Geotechnical and Materials Engineers
2. All surface water should be directed away from the top and sides of the
excavation during construction.
3. The ground surface surrounding the exterior of the building should be
sloped to drain away from the building in all directions. We recommend a
slope of at least 12 inches in the first 10 feet.
4. Hardscape (concrete and asphalt) should be sloped to drain away .from the
building. We recommend a slope of at least 2 percent for all hardscape
within 10 feet of the .building.
5. Backfill, especially around foundation walls, should be placed and
compacted as recommended in the COMPACTED FILL section of this
report:
6. Roof drains should discharge at least 10 feet away from foundation walls
with drainage directed away from the building.
7; Surface drainage for this site should be designed by a Professional Civil
Engineer.
IRRIGATION
Irrigation systems installed next to foundation walls or sidewalks could cause
consolidation of backfill below and adjacent to these areas. This can result in settling of
exterior steps, patios, and/or sidewalks constructed on these soils. We recommend the
following precautions be followed:
1. Do not install an irrigation system next to foundation walls. The irrigation
system should be at least 10 feet away from the Air Care building.
2. Irrigation heads should be pointed away from the structure or in a manner
that does not allow the spray to come within 5 feet of the building.
13
September 2, 2009
Job No. 09.-050
OECHLEIN CONSULTING ENGINEERS, INC.
Geoteehnical and Materials Engineers
3. The landscape around the irrigation system should be sloped so that no
ponding occurs at the irrigation heads.
4. Install landscaping geotextile fabrics to inhibit growth of weeds and to
allow normal moisture evaporation. We do not recommend the use of a
plastic membrane to inhibit the growth of weeds.
5. Control valve boxes for automatic irrigation systems should be located at
least 10 feet away from the structure and periodically checked for leaks
and flooding.
COMPACTED FILL
Structural fill for this project may consist of approved existing fill free of
deleterious materials, the natural sandy clay, or imported granular fill. The imported fill
may consist of non -expansive silty or clayey sands or gravels, with up to 30 percent
passing the No. 200 sieve and a maximum plasticity index of 10. No cobbles or boulders
larger than 10 inches should be placed in fill areas. Fill areas should be stripped of all
vegetation and topsoil, scarified, and then compacted. Topsoil may be used in landscape
areas. Fill should be placed in thin loose lifts then moisture treated and compacted as
shown in the following table. The recommended compaction varies for the given use of
the fill.
14
September 2, 2009
Job No. 09-050
OECHLEIN CONSULTING ENGINEERS, INC.
Geotechnical and Materials Engineers
Recommended Compaction
Percentage of the Percentage of the
Use of Fill Standard Proctor Modified Proctor
Maximum Dry Density Maximum Dry Density
ASTM D-698) ASTM D-1557
Below Foundations 98 95
Below Slab -On -Grade Floors 95 90
Utility Trench Backfill 95 90
Backfill on -Structural 90 90
Notes:
1. The moisture content for the fill soils should be —2 to +2 percent of the optimum
moisture content.
We. recommend that a representative from our office observe and test the
Placement and compaction of each lift placed for structural fill. Fill placed beneath
foundations and slabs -on -grade is considered structural. It has been our experience .that
without engineering quality control, inappropriate construction techniques can occur
which result m unsatisfactory foundation and slab performance.
LIMITATIONS
Although the exploratory borings were located to obtain a reasonably accurate
determination of subsurface conditions, variations in the subsurface conditions are always
possible. Any variations that exist beneath the site generally become evident during
excavation for the Air Care building. Therefore, we should be contacted by the contractor
and/or owner so that a representative of our office can observe the completed excavation
to confirm that the soils are as indicated by the exploratory borings and to verify our
foundation and floor slab -on -grade recommendations.
15
September 2, 2009
Job No. 09-050
OECHLEIN CONSULTING ENGINEERS, INC.
Geotechnical and Materials Engineers
The placement and compaction of fill, as well as installation of foundations,
should also be observed and tested. The design criteria and subsurface data presented in
this report are valid for 3 years provided that a representative from our office observes the
site at that time and confirms that the site conditions are similar to the conditions
presented in the SITE CONDITIONS section of this report and that the recommendations
presented in this report are still applicable. We recommend that final plans and
specifications for proposed construction be submitted to our office for study, prior to
beginning construction, to determine compliance with the recommendations presented in
this report and that the recommendations presented in this report are still applicable.
16
September 2, 2009
Job No. 09-050
KOECHLEIN CONSULTING ENGINEERS, INC.
Geotechnical and Materials Engineers
We appreciate the opportunity to provide this service.. If we can be of further
assistance in discussing the contents of this report or in analyses of the proposed structure
from a geotechnical viewpoint, please contact our office.
KOECHLEIN CONSULTING ENGINEERS, INC.
Scott B. Myers, P.E..
Senior Engineer
Reviewed by:
William H. Koechlein, P.E.
President
4 copies sent)
17
v..
VICINITY MAP
XOECHLEIN CONSULTING ENGINEERS, INC.
Geotechnical and Materials Engineers
NOT TO 8CALE
JOB NO.09-050 FIG. 9
KOECNLEIN CONSULTING ENGINEERS, INC.
Geotechnlcal and Materials Engineers
LOCATIONS OF EXPLORATORY BORINGS
JOB NO.09-050 FIG. 2
105
100
95
90
F
W
W
L-
v 85
z
0
Q
w
w 80
75
70
65
KOECHLEIN CONSULTING ENGINEERS, INC.
Geotechnical and Materials Engineers
105
TH-1 TH-2 TH-3APP.EL.100.4 APP.EL.100.2 APP.EL.100.0
WC=18
200=.78
LL=35
P1=17 11/12
11/12
7/12 i f. 11/12x c: 9/12WC=21
DD=99 Y WC=22
r is SW=0.2 x: r DD=105
r:r SW=-0.1
42/12 c 28/12 18/12
WC=1-2 WC=8
200=20 200=8
6/12 14/12 31/12
13/12 6/12 4/12
LOGS OF EXPLORATORY BORINGS
100
y i,
m
r
85 y
O
z
In
m
m
80
75
70
65
JOB NO.09-050 FIG. 3
KOECHLEIN CONSULTING ENGINEERS, INC:
Geotechnical and Materials Engineers
LEGEND:
FILL, Clay, Sandy, Scattered gravel, Slightly moist to
moist, Medium stiff, Dark brown, Tan, Mottled.
CLAYS Sandy,, Scattered gravel, Dry to slightly moist,
Medium stiff, Dark brown to brown.
SAND, Gravelly, Clayey, Silty, Moist to wet, Loose to
medium dense, Multi -colored.
WATER. Indicates depth of water encountered while
drilling.
BULK SAMPLE, Obtained from auger cuttings.
CALIFORNIA DRIVE SAMPLE. The symbol 11/12 _
indicates that,11 blows of a.140 pound hammer
falling 30 inches were required to drive a 2.5 inch
O.D. sampler 12 inches.
Notes:
1. Exploratory borings were drilled on August 28, 2009 using a 4-inch diameter continuous flight power auger mounted. on. a.
truck drill rig.
2. Ground water was encountered during drilling at a depth of 6.5 feet in exploratory boring TH-1, 6.5 feet in TH-2, and 7..0 feet.
in TH-3.
3. The Boring Logs are subject to the explanations, limitations, and conclusions as contained in this report.
4. Laboratory Test Results:
WC - Indicates natural moisture {%)
DD - Indicates dry density (pcf)
200 - Indicates percent passing the No. 200 sieve (%)
LL - Indicates liquid limit {%)
PI - Indicates plasticity index (%)
SW - Indicates percent swell (%)
5. Approximate elevations are based on elevation differences taken using a Stanley Compulevel Elevation Measurement
System; assigning TH-3 an elevation of 100.0.
LEGEND OF EXPLORATORY BORINGS
JOB NO.09-050 FIG. 4
KOECHLEIN CONSULTING ENGINEERS
fM ll l1 111®®IIIIII®
IIIIIII IIIIII®IIIIII`IIIIII IIIIII
IIIIII IIIIII ellllll II III IIIIII
IIIIII IIIIII IIIIII IIIIII SIIIIII
IIIIII®IIIIII IIIIII IIIIII IIIIII
IIIIIII IIIIII IIIIII®IIIIII IIIIII
IIIIII IIIIII IIIIII.IIIIII®IIIIII
IIIIII IIIIII SIIIIII IIIIII IIIIII
IIIIII IIIIII IIIIII IIIIII®IIIIII.,
IIIIiI IIIIII IIIIII IIIIII IIIIII
Sample of FILL, Clay, Sandy GRAVEL 4 % SAND 18 %
Source TH-1 Sample No. ElevJDepth 0.0 - 5.0 feet SILT & CLAY 78 % LIQUID LIMIT , .35 %
PLASTICITY INDEX IT, %
low- ME Illlr IYIIII r llrlll IIIIII
IIIIII ii lll IIIIII IIIIIII®IIIIII
IIIIII IIII!IIIIII IIIIII®IIIIIII®,
IIIIIII lIIIIII®IIIIII IIIIII®IIIIII
IIIIIII IIIIII tlIIIIII IIIIII IIIIII
IIIIII IIIIII\119III IIIIII IIIIII
IIIIII IIIIII IIII`\IIIIII IIIIII
IIIIII IIIIII IIIIII\`IIIIII®IIIIII
IIIIII IIIIII IIIIII IIIIII IIIIII
IIIIII IIIIII IIIIII IIIIII IIIIII
s
Sample of SAND, Gravelly, Clayey GRAVEL 29 %
Source TH-2 Sample No. ElevJDepth 9.0 feet SILT & CLAY 20 %
PLASTICITY INDEX
GRADATION TEST RESULTS
SAND 51 %
LIQUID LIMIT %
Job No. 09-050 FIG. 5
KOECHLEIN CONSULTING ENGINEERS
II I!IIIII IIIIII r ll lll OIIIIII
IIIIII!IIIII IIIIII IIIIII IIIIII
IIIIII II 111 IIIIII illlll IIIIII
IIIIII IIIIII.IIIIII IIIIII IIIIII®.,
IIIIII 111111 IIIIII.IIIIII®IIIIII
Illill IIIIII IIIIII IIIIII IIIIII
IIIIII IIIIII`IIIIII IIIIII SIIIIII
IIIIII IIIIII elll llllll IIIIII
IIIIII illllll IIIIII\IIIIII IIIIII
IIIIII®IIIIII®®IIIIII®Ilrlll®IIIIII®
Sample of SAND and GRAVEL, Silty GRAVEL 46 % SAND 46 . %
Source TH-3 Sample No. Elev./Depth 9.0 feet SILT`& CLAY 8 % LIQUID LIMIT %
PLASTICITY INDEX
Sample of GRAVEL % SAND %
Source Sample No. Elev./Depth SILT & CLAY % LIQUID LIMIT %
PLASTICITY INDEX QO
GRADATION TEST RESULTS
Job No. 09-050 FIG'. 6
KOECHLEIN. CONSULTING ENGINEERS
cn
a
Pressure, p, ksf
Sample of FILL, Clay, Sandy Natural Dry Unit Weight= 98.7 (pcf)
Source TH-i Sample No. ElevJDepth 4.0 feet Natural Moisture Content-- 21 %
SWELL -CONSOLIDATION TEST RESULTS
Job No. 09-050 FIG. 7
KOECHLEIN CONSULTING ENGINEERS
Pressure, p, ksf
Sample of FILL, Clay, Sandy Natural Dry Unit Weight= 105.4 (pcf)
Source TH-3 Sample No. ElevJDepth 4.0 feet Natural Moisture Content-- 22 %
SWELL -CONSOLIDATION TEST RESULTS
Job No. 09-050 FIG. 8
EXISTING \
FILL
KOECHLEIN CONSULTING ENGINEERS, INC.
Geotechnical and Materials Engineers
1.
9
I I
11
COMPACTED FILL
SEE REPORT FOR
COMPACTION RECOMMENDATIONS)
FIRM NATURAL SOIL
EDGE OF EXCAVATION -
EXCAVATE AS PER
OSHA REGULATIONS)
FOOTING
kr
17EXISTING
FILL
FOUNDATION EXCAVATION RECOMMENDATIONS
JOB NO.09-M FIG. 9
6
SUMMARY OF LABORATORY TEST RESULTS
TABLE
HOLE
SAMPLE
DEPTH
A
NATURAL
MOISTURE
CONTENT
N
NATURAL
DRY
DENSITY
Pcf)
ATTERBERG LIMITS _ PASSING
NO, 200
SIEVE
PERCENT
SWELL AT
1,000 PSF
N
SOIL TYPELIQUID
LIMIT
NO
PLASTICITY
INDEX
N
TH-1 U - 5.0 18 35 17 78 FILL, Clay, Sandy
TH-1 4.0 21 99 0.2 FILL, Clay, Sand
TH-2 9.0 12 20 SAND, Gravelly, Clayey
TH-3 4.0 22 105 0.1 FILL, Clay, Sand
TH-3 9.0 8 8 SAND and GRAVEL, Silty
JOB NO. 09=050 KOECHLEIN CONSULTING ENGINEERS, INC.