HomeMy WebLinkAboutINDIAN HILLS WEST PUD - Filed GR-GEOTECHNICAL REPORT/SOILS REPORT - (2)Empire Laboratories, hia, $ranch Offices
1242 Bramwood Place
MATERIALS AND FOUNDATION ENGINEERS Longmont, Colorado 80501
P.O. Box 1135
214 No. Howes Fort Collins, Colorado•,80522 (303> 776-3921
P;O. Box 429 (303) 484-0359
3151 Nation WayFe6wxtrVt$o 1979 Cheyenne, Wyoming 82001
P.O. Box 16076
307) 632.9224
d d Lo Siva +rd Ae.6oa4e
F04 C * Cott 5#534
We ed t u&ate R -ad a .SULU 'Fdr uu a/ mWGeotatnse6tdgatton m 60A the p40¢,d Uwtd
4A . 4#4ut Fob Coo , Co do. Wed -
upon oux RaddV4 U the A' Uh zgc dev va Jed 4kt the 4"
t4U {ea a wutudt,4on, - pA6WA&4 the da64a a ka 6a&
ad aa$ Q NE1L
SHERRDD 10
2575
NRSdawtad ® .` RiWaftId
bys 1r;
a11u egyrr Ce
ftfoi- F. Q
480
a o o
N OOCI. q O % : • rs
4 0 p®oa
FNt? & Poo o -,
A oe000000
P 04ar
MEMBER
OF CONSULTING ENGINEERS COUNCIL
REPORT '
Of A
SOILS ANO FOUNDATION AND
ttOLOGIC .° HVESTIGATIOPi
SCOPE
This report presents the results ®f a soils and foundation and
geologic investigat on.prepared for the.Indian Hills West Subdivision., "
located one Stuart Street in northeast Fort Col -lies, Colorado.. The
investigation was carried out by means of test borings.and laboratory
testing of samples obtained from.these borings.
The obJectives of this investigation were to (1) determine the*
suitability of the. :site. for construction 'purposes, (2) make ream ndaft
tions regarding''the design of the ,substructures, (3) recommend certain
precautions.which; should=be taken because of adverse soil and/or ground-
water conditions, and (4)°.determine the 06.Iogic:`chir'acteristics-of the
site.
SITE INVESTIGATION
The 'field' investigation carried out ;on February 14, 19790, consisted
og.drilling, logging, and sampling eight (8) test borings. The locations
of the .test borings are shown on the Test Boring location. Plan included
in -Appendix A of this'report. Baring logs prepared from the field logs
are shown.in Appendix.A. 'These logs show soils encountered, location of
sampling;., and groundwater at'tile time of the, investigation. .
All borings were advanced with -a four -inch diameter, continuous`,.
type, power -flight. , auger drill. During tine dri t ,l i rng operations, an.
engineering geologist from Empire.Labor atories, Inc. was present.snd
made a.coatinuous visual -inspection of -the soils encountered.
SIT> 4 TION 0 RIPTiON
The' proposed sits is boated 'on. Stuart' Street. east.'of Bush Court
end west; of. -S ver :street in Fort Collihss Colorado. More particelariy
the site is desariied as Indian -Hills West a.subdiVision situate in'the
no hWest ll4'.`of Section Zap Township•9 North, Range 89 West of the
Sixth P.M.'j °fort Collins, Colorado.
The majoelty pf the site ,consists of the Sunset drive-in Theater.
The .theater ''consisti-of a. large 4ravel -parking area a large timber
screen.structurmp'a masonry block concession stand, and a'sm$11 ticket
booth. Much,of the crest and.east-property,lines are bordered with trees
andshrubs The Arthur Ditch form the south property line. The south one-
third (1/3) of the property consists of an open, grass -covered field.
A row of high juniper trees is located near.the west property line
fin the southeast corner of the —site. The southern portion of the property
slopes gently to moderately to the northwest. The minder of the
site is relatively flat -and has minor drainage to the.north. Spring
Creek is located west and north of the site, and the flood plain of
the stream.crosses._th.e northern portion of the tract. The property is
surrounded by.rresidential housing. LABORATORY
TESTS AND EXAMINATION samples
obtained from the test borings were subjected to testing_ and
inspection in the laboratory to provide a sound basis for determining the
physical properties of the soils encountered.. Moisture contents, dry
unit weights, unconfined compressive strengths, water soluble sulfates, swelling
potentials, and the Atterberg limits were determined. A summary
of the test results is included in Appendix B. Consolidation characteristics
were also determined, and curves showing this data are included.
in.Appehdix S.
1) Silty Topsoil and Fill Material: The southern portion -of the
site is overlain by .:a. one (1) .foot layer of sil-ty topsoil.
The upper six (6) inches of the topsoil have been penetrated
by plant roots and organic matter and -should not be.used as
bearing soil or as backfial material. One and one -half OAO
to three and one-half -(3) feet of fill was encountered in
Borings 1, 2, and 3. The fill consists -of a mixture of silty
clay, sandy silty clay, and gravel and has been placed during
site grading of the theater area..
2) Sander Silty Clay: The clay stratum underlies the topsoil and
fill. and extends to depths.five (5} to greater than fourteen
and one-half 0%) feet below the. surface The silty clay is,
plastic, contains varying.amounts of sand'and traces of gravel,.
and exhibits moderate bearing characteristics in its damp to
moist natural state. When wetted,'the.clay exhibits slight
swelling potarrtials,.and upon. loading, .,consolidation occurs.
3) Sand and gravel:- The gravel stratum was encountered below the
clay in Borings 1, 2, 3,.and 4 and extends to.depths thirteen
13) to greater than fourteen and one-half ('94) feet below
the.surface. The sand and gravel contains. minor amounts of'
silt,,.is poorly graded, and exhibits moderate to high bearing
characteristics in its medium dense to dense in situ con-
dition,
4) ,Siltstone.(Bedrock): The bedrock was encountered.in Boring l
at a depth thirteen.(13) feet below the surface and extends to
greater depths. The upper one (1) foot of. -the siltstone is
w 4a
highly weathered; !waver, the underlying rock is firm and
exhibits. very high bearing characteristics.
S) fr2gag tat!er: At the time of the investigation. free grounch ter
was encountered in Borings 1, 2. and 3 at depths five (6) to
eight (R) feet below the surface. No free groundtiater was
encountered in, the remfmiming test borings. hater levels In
this area are subject to change due to seasonal variations,
irrigation -demands on and adjacent to the site, and the flan
i n Spri ng a Greet, c ti ch . i s adjacent to the property.
REC ENDATIONS AND DISCUSSION
It is our understanding that single-family toWn houses are -proposed
for the site. Tennis courts are proposed along,the west property line
in the enter of the property. In viers of the topography,, a moderate
amount of site grading is anticipated.
Gee., l
The proposed development is located within the Colorado piedmont
section of the Groat .Plains physiographic.provinee. The Colorado Piedmont,
formed during late Tertiary and Early quaternary time (approximately 66
million years ago), is.a broad, erosional trench which separates the
Southern Rocky Mountains from the High Plains. Structurally, the project
area lies.along the western flank of the Denver Basin. During the Late
sozoic 'end Early. Cenozoic Periods (approximately 70 millon years ago),
intense tectonic.'apti-vity occurred, causing the. uplifting of to Front
Range and the associated dommarping of the Denver Basin to the east.
Relatively flat uplands and broad valleys characterize the present-day
topography of the Colorado Pies nt in this region. The site is under-..
lain by the Cretaceous Pierre Formation. The bedrock is overlain by
alluvial grants and pediment deposits of Pleistocene and Rat Age.
d
116 bedrock outcrops were encountered at the site. Bedrock was
ncvuntsred 3n the northwest canner of the proIMrq' at a depth thirteen
13) feet, below the surfues and 7t is anticipated that it underlies the
reminder ..of the site approximately fifteen (16) to, twenty-five (25).
feet flow the surface. 1e "regional dip of tM bedrock In this'arm is
a few .degrdes to the east, ON to the relatively flat to gently .sloping
tqwgraphy of the site® no geologic hazards caused by mass covement due
to gravity are anticipated. The northern portion of the site lies
Within 03 dn3 haftdM6 year flood plain of Spring C kg and the extreme
nortMmst cernar of the site lies within the flood waY Of the aka lb
construction should be undertaken.in the,flood,ways, and the finished
first 00006 of, al l structures built within the ' ono hundred year food
plain of the steam should be elevated eighteen. (18) inches above the
one hundred year flood plain elevation.. with proper site grading around
all structures, no erosioml problum we anticipated. it is suggested
that site grading be done such that theme is only liwAted cutting along
the south prop3rty lie ad a pt to the Arthur Ditch. This will help
prevveant-seepage through tjwdifthe
Sim jEadins'and Utilities
Proposed grading of the site i ndi tes that foaunftti ons and/or
slabs on grade in portions of the site will ' W founded an eight (8)
inches or more of fill. Since tyre will ba building ?oundations
resting an filled orowtd &_ Wor th6 septa of M11 lulu floor slabs in
portions of the site tjJ11' exceed that permitted by the Minim ftgMCjX
n s , fill Pl4cennt.should to . oarri ed out In accordance with FRA
130ata Shoat 796.1 speefflettions pertaining to site grading are Included
below and in Appendix C of this reporte
it is rewmmWad that -the upper six (6) inns of all topsoil
telow filled and paw arms tag stripped and stockpi 1 ed for rem 4n
pleated areas. Alt,t s,,.limbs, brushe existing structures• and other
debris should also be rewad&
r.
The Upper six (B) ' inches of all subgrade
below filled areas should be scarified and recompacted two percent (2S)
wet of optima moisture to at least ninety-five percent (95S) of Standard
Proctor Density ASTM D.698-70. (See Appendix C.) The upper one -(I)
foot of existing fill should.be scarified and recompacted two percent
2S) wet of optimum moisture to -at least ninety-five percent (90.) of
Standard Proctor Density ASTM.D.698-70. All fill should consist of the
on -site soils or imported material. approved by the soils engineer. The
fill should be placed in uniform st-k (6) to eight (8) inch lifts:
Because of the expansive nature of the subsoils., all'fill-.should be
compacted two percent (2S) wet.of optima moisture to at least ninety-
five -percent (95%) of Standard-Proctor.Densily ASTM D.698-70 for stability.
All cut and fill slopes should -be designed on grades no steeper than
3t10 it is recommended that cutting along the south property line
adjacent to the Arthur'Ditch not exceed one (i).to two (2) feet so that
seepage from the ditch will be minimized.
All utility trenches excavated four (4) or more feet in depth
should be placed on,shopes no steeper than 10'.' If this is not practical,
shoring of the excavation will be .required. All utility trenches dug..
below groundwater should be dewatered during construction to insure
proper placement of piping and' backfilLL. All piping should _be bedded to
insure proper load distribution and to eliminate breakage during back -
filling operations.
All backfill placed in utility trenches in open and planted areas
should be compacted in uniform rifts at optimum moisture to at least
ninety percent (90%) of Standard Proctor Density ASTM D 698770 the full
depth of the trench. The"upper four (4)-feet of backfill placed in
uti1l.ty trenches under roadways. and paved areas should be compacted at
or near optimum moisture to it least ninety-five percent (95%) of Standard
Proctor Density ASTM D-698-70,.and the_lowe.r portion of.these trenches
should be compacted to at least ninety.percent (90%) of Standard Proctor
Density..ASTM V 698-70. Addition. ofr Moisture and/or drying of the
subsoils may be required to assure proper compaction.
All stripping, grubbing,subgrade preparation, and fill placement
should be done under continuous,observetion of the soils engineer.,
Field density tests should be taken daily in the compacted subgrad®,
fill, and backfill under thedir tion'of the soils engineer.
Foundations
In view of the loads. transmitted by the proposed construction and
the soil conditions encountered at the site, it is recommended that the
structures -be supported by conventional -type spread footings and/or
continuous grade beams. All footings -and/or continuous grade beam
should be founded on the original undisturbed soil or on the structural
fill placed in accordance with- the recommendations discussed in the
Site Grading" section of this report. The identification and undis-
turbed nature of the soil as well as the structural integrity of the
fill should be -verified by'an experienced soils engineer prior to place,"
went of any foundation concrete .It is recommended that.density tests
be tzken'under the direction of the -soils engineer in all footing excava-
tions founded on fill to insure a minimum compaction of ninety-five
percent (95%) of Standard Proctor Density. ASV 0 698-70: Footings
and/or grade beams founded at.the above level May be designed for a
maximum allowable bearing capacity of two thousand (20000) pounds per
square foot (dead load plus maxi n live load). 10 counteract swelling
pressures, which will develop 1 f the subsoils become wetted., all footings
and/or grade beams should be designed for a minimum dead load of five
hundred (500) pounds per square foot.
The predicted settlement under the above maximum loading, as
determined by-.;labbratory consolidation tests, should be less than 0.50
Inch, generally considered to be within acceptable tolerances.
Basements and Slabs on Grade
Basement.construction is feasible over the majority of the site*
providing the finished basement oo slabs.ara placed a minimum of
three (3) feet, above ,existing' groundwator. Due to the shallow depth to
groundwater in the northern portion of the site in the area of Borings l
and 2, basement construction is not feasible in this area. 'It is recow
mended that garden -level, crawl -spaces or slab -on -grade construction be
w9..
utilized in this area. All 'lower garden -level slabss.lower crawl -space
elevations, and slabs on grade should be placed a minimum of three (3),
feet above existing groundwater..levels. The finished first floor eleva-
tions in this arda should be placed a,minimum of eighteen (18) inches
above the one hundred year flood plain elevation of Spring Creek, as is
discussed in the "Geology" section of this report.
The existing,solls encountered near the surface at the site are
adequate for supporting, normal floor loads., The upper six (6) inches of
topsoil should be:.removed from within the limits of the structures.
Fill material supporting slabs on grade should be constructed in accordance
with the recommendations discussed in the "Site Grading" section,
All slabs on grade should be underlain by a minimum of four (4)
inches of gravel or crushed rock devoid of fines. The gravel layer will
act as a,capillary break and will.help.to distribute floor loads.
It 1s.recommended that all -slabs on grade be.'designed structurally
independent of all bearing members. To minimize and control shrinkage
cracks which will develop in slabs on grade, it is suggested.that con-
trol joints be placed every fifteen (15) to twenty (20) feet and that
the total area contained within these joints be no greater than four
hundred (400) square feet.
Tennis Courts and Paved Areas.
All grading for the proposed tennis courts should be done in accordance
with the recommendations set forth in this report in the "Site Grading°
section. All fill should be placed in uniform lifts compacted two
percent (2%).wet of optimum.moisture to at least*nine.tyfive percent
95%) of Stand ard.Pro ctor Density'ASTM D 69840. (See Appendix C.) The
upper six (6) inches'of the subgrade below the paved courts in cut
sections should be scarified and recompacted slightly wet of optimum
moisture to at least ninety-five percent (95%) of Standard Proctor
Density'ASTM D 698-70. The paved -courts should be underlain by at least
six (6) Inches of crushed gravel base course meeting the specifications
discussed below in the section.entitled "Paved Areas,." The gravel base
course will act as a capillary -break -and leveling course. The base
r w
course -should be compacted at'optimum moisture to at least ninety-five
percent (gat) of Standard Proctor.0ensity ASTH 0 698-70. It is suggested
that the tennis courts be paved with a six (6) inch thick reinforced
Concrete slab.or equivalent asphalticconcrete surface.: Good positive. drainage
should be provided on the court surfaces. Positive drainage should
also -be provided away from the courts on all sides, it is recommended•
that len percent (10%) for the -first ten (10) feet away from. the
courts be provided. Paved
Areas The
soils were classified and group indexes Were determined at various
locations within the site.for the purpose of developing criteria for
pavement design. Group indexes of the upper clay soils at the site grange
from 3;S to 9.5. Using these as criteria for pavement design,, it is
recommended that pavement thicknesses for the project be as follows: Passenger
Car Parking and'DriVeways; Select
Gravel Base Course 4" Asphaltic
Concrete 2" Total
Pavement Thickness 6" Streets
Select
Gravel Base .Course, 5" Asphaltic
Concrete 2i' Total
Pavement Thickness 7" All
topsoil, organic matter, and other unsuitable material should be
removed from the parking and. street areas. All subgrade should be scarified -
a minimum of six (6) inches and recompacted to at least ninety percent (
90%) of Standard Proctor Density ASTM. D.'698-70 (See Appendix
Additional fill material placed in the parking and street areas
should bean approved, granular -type material compacted at or near
optimum moisture to at least ninety-five percent (95t).'of Standard
Proctor Density AS'11<1 0 6.98-70. The surface of the subgrade should be
hard, vniform,'smooth,, and true to grade. To prevent the growth of
weeds, '.it, is suggested that all subgrade under parking areas be treated
with a soil sterilant.
The base course overlying the subgrade should consist of a hard,
durables -crushed reef or stone and filler and should have a minimum
C.B.R. value of.80,. The composite base coarse material should be free
from vegetable matter and lumps or balls of clay and should meet the
City of Fort Collins Specification Class-6.Aggragate Base Course which
follows:~
Sieve Size % Passing
90-100
3/4" r7tY'L
4 30-65
10 20-55'
20t? 50:1
Liquid Limit • 25, Maximum
Plasticity'Index 5 Maximum
The'base course should be placed on the sabgrade at or near optimum
moisture and compacted to at least ninety. -five percent (95%) of Standard
Proctor Wnsfty AS174 0 698-70. It is.important that the base course be
shaped -to grade so that proper drainage of the -parking area 1s obtained,
GENERAL -RECOMENDATIONS
1) laboratory test results indicate that rater soluble sulfates
in.the soil are positive. A Type II cement should.,be used in
all, concrete exposed to subsoils
10-
2) Finished grade should be -sloped away from'the structures on
all sides.to giveoposl Live drainage. Ten percent (10%) for
the first ten'(10) feet away from the structures is the suggested
slope,
3) Backfill around the outside perimeter of the structures
should be mechanically compacted at optimum moisture to at
least ninety percent (90%) of Standard Proctor Density ASTM D
698-70. (See Appendix C.) Puddling should not be permitted:
as a method of compaction.
4). -Gutters and downspouts should be designed to carry roof runoff
water well beyond the backfill area.
5) Underground sprinkling systems should not be installed within
ten (10) feet of the structures, and this recommendation
should be taken into account in the landscape planning.
6} Footing and/or:'grade beam sixes should.be proportioned to
equalize the unit loads applied to.the soil and thus minimize'
differential settlements.
7). It is recommended that all compaction requirements specified
herein be verified in the field with density tests performed
under the supervision of an experienced.soils engineer.-
8) it is recommended that a registered professional' engineer
design the substructures and that he take into account the
findings and recommendations of this report.
GENERAL COMMENTS
This report has-been prepared to aid in the evaluation of the
puroperty'and to assist the architect and/or engineer in the design of
this project. In the event that any changes in the design of the-
struc.tures or,their1ocations..are. planneds the.conciusions.and recon-.
mendations contained'in this .report.will not bo:considered valid unless
said changes are reviewed and conclusions of this report modified or
approved in writing by Empire Laboratories, Inc., the soils engineer of
record.
Every effort was made to provide comprehensive site coverage
through careful locations of the test borings, while keeping the,site
investigationeconomically feasiblee,,Variat'ions in.soil .anO groundwater conditions
between tost borings.may be encountered during construction. In .
order to permit correlation., between the ,reported subsurface con- ditions
and the actual conditions encountered during construction and to aid
in carrying out the plans and specifications as originally con- templated,
it is recommended .that Empire Laboratories,.Inc. be retained to
perform continuous construction review'during the excavation and foundation
phases of the work. Empire Laboratories, Inc. assumes no responsibility
for compliance with the'rrecommendationsA ncluded in this report
unless they have been retained to -perform adequate ors -sate. construction
review oaring the.course of construction, 1
2-
APPENDIX A.
KEY TO BORING LOGS
7 TOPSOIL GRAVEL
FILL SAND & GRAVEL
SILT ie SILTY SAND & GRAVEL
CLAYEY SILT 1s4 COBBLES
i . SANDY SILT SAND, GRAVEL & COBBLES
CLAY WEATHERED BEDROCK
i
SILTY CLAY SILTSTONE BEDROCK
SANDY CLAY CLAYSTONE BEDROCK
SAND SANDSTONE BEDROCK
i.'.
SILTY SAND LIMESTONE
CLAYEY SAND a x
tax
GRANITE
SANDY SILTY CLAY
SHELBY TUBE SAMPLE
STANDARD PENETRATION DRIVE SAMPLER
WATER TABLE 24 HOURS AFTER DRILLING
C HOLECAVE.D
T
5/12 Indicates that 5 blows of a 140 pound hammer failing 30 inches was required to penetrate 12 inches.
A-3
FMPIRF LARORATORIFS INC
65
e
e
o Q.
2 2
60
TgM SnikP in
Assume
tPlPnhnna,plP at cniithwps,t prnnart,v rnrnar_ - Plpvatinn
Inn-n'_ A4
EMPIRE
LABORATORIES, INC.
APPENDLX B.
11
I Mll
0
a-
0
48
45
U. I
to
APPLIED PRESSURE—TONS/SCE.. FT.
cm
W
Z
a
0
B-4
z=
U, N N cm N N N N N N_
Q'.Z
gm
ui
H
j
O Ch O O F-- to
W
LU
tflp
OW
f]C;Q
W
N
J W
V
N H Z
Ln
F— p
W
W Q C C) C)O
F• p C) Co . N Cil tCVp Q
O
Z Z
N N r r lC! Ix6LLL. O
ZN
r
m
uj
a
W
N co Imo.
WU. LJ CO co C) C)tD
as r- O r ON p r
a.
w
Ix
Ln M N M co M
p
LO LO
LO Ln Lo CD O O O O O O CD O O
aH N M co M cf- w m Cn U) LO Co M
I 1 1 1 1 11 1 i 1 1. 1 1 1 .
UJ - Ln Lf7 Lo O C> O O Lo O O C) O O C) LO
r N f'- N M f-' CO M lV M d Lo f_, CO M
pZ
m.
B=5
Z,W
px
U
Q.Z
N N N N N N
W3 O CM 01 n N
Z
0
N
W
am
I
W
to
gmW J.
3 N
N
J W
W u ti Z
CC . a Ui
IV2tA
W
CD_O O CD
Lfw M r N
U. ZW Q
OImZNN
O
ZN Q
cd
Q ul
W.
t O N O
ui
a N CD O
a
O
W
LO
I
Ln u i O O 1 C) Ln O O
In N Cl N f coMr—
W
0 O O 1.f') u'y lf) O
M 00 M t-- f 7
ZZ co
m
B-6
SUMMARY OF TEST RESULTS
Swelling Pressures_
Boring Depth. Moisture Dry Density Swelling
Number Ft..) Before. Test PCF Pressure PSF
4 1.5-2.5 9.5 112.4 875
6 2.0-3.0 9.4 87.8 160
7 7.0-8.0 5.9 115.7 520
8 1.5-2.5 6.3 95.8 500
Atterberg Summ4ry
Boring Number 1 @ 4 @ 8 @
and Depth_ 2.0-3.0 1.5-2.5 1.5-2.5
Liquid Limit 31.5. 29.0 25.6
Plastic Limit 17.8 16.5 16.0
Plasticity Index 13.7 12.5 9.7
Passing #200 Sieve. 78.2 52.7. 52.5
Group Index 9.5 4.5 3.5
Classification
Unified CL CL CL
AASHTO A-6(10) A-6(5) A-4(4)
B-7
APPENDIX C.
APPENDIX C.
Suggested Specifications for Placement of Compacted Earth Fill
and/or Backfills.
GENERAL
A soils engineer shall be on -site to provide continuous observation
during filling and grading operations and shall be the owner's repre-
sentative to inspect placement of all compacted fill and/or backfill on
the project. The soils engineer shall approve all earth materials prior
to their use, the methods of placing,, and the degree of compaction
obtained.
MATERIALS
Souls used for all compacted fill and backfill shall be approved by the
soils engineer prior to their use. the upper two (2) feet.of compacted
earth backfill placed adjacent to exterior foundation walls.shall be an,
impervious, nonexpansive material. No material, including rock,.having
a maximum dimension greater than six inches shall be placed in any fill.
Any fill.containing rock should be carefully mixed to avoid nesting and
creation of voids. In no case shall frozen material be used as'a fill
and/or backfill material.
PREPARATION OF SUBGRADE
All topsoil, vegetation (including trees and..brush), timber, debris,
rubbish, and other unsuitable material shall be'removed to a depth
satisfactory to the soils engineer and disposed of by.suitable means
before beginning preparation of the subgrade. The subgrade surface of
the area to. be.filled shall be scarified a minimum depth of six inches,
moistened a's necessary, and compacted in a manner specified,below for
C-2
the subsequent layers of fill. Fill shall not be placed on frozen or
muddy ground.
PLACING FILL
No sod, brush, frozen or thawing material, or other unsuitable material
shall be placed in the fill, and .no fill shall be placed during unfavorable
weather conditions. All clods shall be broken into small pieces, and
distribution of material in the fill shall be such as to preclude the
formation of lenses of material differing from the surrounding material.
The materials shall be delivered to and spread on the fill surface in a
manner which will result in a uniformly compacted.fi'l.l Each layer-
shalT-be thoroughly blade mixed during spreading to insure uniformity of.. _
material and moisture in each layer. Prior to compacting, each layer
shall have a maximum thickness of eight inches, and its upper surface
shall be approximately horizontal. Each successive.6" to 8".lift of
fill being placed on slopes or hillsides should be benched into the .
existing slopes, providing good bond between the.fill and existing
ground.
MOISTURE CONTROL
While being compacted, the fill material in each.layer shal I as nearly
as practical contain the amount of moisture required for optimum com
paction or as specified, and the moisture.shall be uniform throughout
the fill. The contractor may be. required to add necessary moisture to
the fill.material and to uniformly mix the water with the fill material
if, in the opinion of the soils engineer, it is not possible to obtain
uniform moisture content by adding water on the fill surface.. If, in.
F
the opinion of the soils engineer; the material proposed for use in the, -
compacted.fill is too wet to permit adequate compaction, it shall be
dried in an acceptable manner prior to placement and compaction.
c_
COMPACTION
When an acceptable, uniform moisture content is obtained, each layer
shall be compacted by a method acceptable to the soils engineer and as
specified in the foregoing report as determined by applicable standards.
Compaction shall be performed by rolling with approved.tamping rollers,,
pneumatic -tired rollers, three -wheel power rollers, vibratory compactors,
or other approved equipment well -suited to the soil being compacted. If
a sheepfoot roller it used, it shall be provided with cleaner bars
attached in a manner which will prevent the accumulation of material
between the tamper feet. The rollers should be designed so. that effective
weight can be increased.
MOISTURE: -DENSITY DETERMINATION
Samples of representative fill materials to be placed shall be furnished
by the contractor -to the soils engineer for determination of maximum
density and optimum moisture or percent of Relative Density for these
materials. Tests for this determination will'be made using methods
conforming to requirements of ASTM D 698, ASTM D 1557, or ASTM D 2049.
Copies of the results of these tests will be furnished to the owner, the
project engineer, and the contractor. These test results shall be the
basis of control for all compaction effort.
DENSITY TESTS
The density and moisture content of each layer of compacted fill will be
determined by the -soils engineer in accordance with ASTM D 1556, ASTM V.
2167, or ASTM D 2922. Any material found not to comply with the minimum
specified density.=shall be recompacted until the required density is
obtained. Sufficient density tests shall be made and submitted to
support the soils engineer's recommendations. The results of density
tests will also be furnished to -the owner, the project engineer, and the
contractor by the soils engineer.
C-4