Loading...
HomeMy WebLinkAboutHARMONY VILLAGE ECKERD DRUG - Filed GC-GENERAL CORRESPONDENCE - (2)Katie Moore RE Boilerplate DA Ian uae Ccicc. d rvnpnt V II p,„ r.. P From: Bob McDonaugh" <bmcdonaugh@huntdouglas.com> To: Katie Moore" <kamoore@fcgov.com> Date: 12/30/03 12:42PM Subject: RE: Boilerplate DA language Katie; Welcome back! I hope that you have gotten over your cold. I faxed a sample of the easement document that I prepared, using your direction, to you last week. If it is acceptable to you, I will get the easement does out to the owners for execution. If you require changes to the document, please call me at(813)727-0203 or e-mail me your changes. Thank you Bob McDonaugh Original Message---- From: Katie Moore[mailto:kamoore@fcgov.com] Sent: Wednesday, November 12, 2003 2:46 PM To: Bob McDonaugh Cc: ssinn@bhadesign.com Subject: Boilerplate DA language Mr. McDonaugh, In response to a request from Scott Sinn at BHA, I've attached the City's boilerplate language for development agreements. The final DA for the project will be different than what is shown, especially in the areas of water/wastewater, stormwater, and streets. For your information, I am going to outline the process: The City doesn't begin working on project-specific language for DA's until the project has been approved at a public hearing, final compliance plans have been submitted for review, and all of the remaining questions on the plans have been answered. When that has occurred, and I have received the site-specific language from various City departments and incorporated it into the DA and I have received a completed DA information sheet from you, I will send you a copy of the DA for you and your attorneys to review. If there are concerns about the DA language, we will then work out any problems, and come to a final draft, which I will then give you 6 copies of for the appropriate developer/owner signatures. During this same time,the utility plans and site and landscape plans need to be finalized, with mylars submitted to the City for signatures. When the utility plan mylars have been signed by the City, and the City has received the DA copies signed by the developer/owner and any other items required for the development(such as deeds of dedication for easements or ROW), then the utility plan mylars will be released back to your engineer so that they can make copies for our files. Once we have received these copies, then that completes Engineering's requirements for having an approved development. Please contact the Current Planning department for the process for approval of the site and landscape plans. Construction onsite may only begin after a Development Construction Permit is issued, and I can fax you that information if you like. The Kati Moore- RE. Boilerplate DA language Pale 2 Development Construction Permit is a permit to start grading and utility installation work, which needs to occur before the building permit can be released. Please feel free to contact me if you need any further information, Katie Moore Development Review Engineer(El) City of Fort Collins 970)221-6605