Loading...
HomeMy WebLinkAboutHARMONY RIDGE PUD PHASE ONE - Filed SER-SUBSURFACE EXPLORATION REPORT -SUBSURFACE EXPLORATION REPORT HARMONY RIDGE PHASE I - PAVEMENTS FORT COLLINS, COLORADO EEC PROJECT NO. 1994067 EEC EARTH ENGINEERING CONSULTANTS, INC. February 1, 2000 Empire Management, Inc. P.O. Box 7447 Loveland, Colorado 80537-0447 Attn: Mr. Dwayne Walker Re: Subsurface Exploration Report Harmony Ridge Phase I - Pavements Fort Collins, Colorado EEC Project No. 1994067 Mr. Walker: Enclosed, herewith, are the results of the geotechnical subsurface exploration completed by Earth Engineering Consultants, Inc. personnel for the roadways in the Harmony Ridge Phase I development in Fort Collins: The structural pavement design for the roadway will be completed - after we receive traffic load information from City of Fort Collins Engineering Department. We appreciate the opportunity to be of service to you on this project. If you have any questions concerning the enclosed report, or if we can be of further service to you in any other way, please do not hesitate to contact us. XTAr r t „l xr vnnre Lester L. Litton, P.E. Principal Engineer LLL/dmf cc: Rick Richter - City of Fort Collins (2) CENTRE FOR ADVANCED TECHNOLOGY 2301 RESEARCH BOULEVARD, SUITE 1 04 FORT COLLINS, COLORADO 80526 970) 224- 1 522 (FAx) 224-4564 SUBSURFACE EXPLORATION REPORT HARMONY RIDGE PHASE I - PAVEMENTS FORT COLLINS, COLORADO EEC PROJECT NO. 1994067 INTRODUCTION February 1, 2000 The subsurface exploration for roadway subgrades in the Harmony Ridge Phase I development in Fort Collins, Colorado, has been completed. Seventeen (17) soil borings were advanced in the right-of-ways of the new streets to develop information on existing subsurface conditions. At the time of our exploration, the sanitary sewer and water had been installed in the roadway right-of- ways. Individual boring logs and a diagram indicating the approximate boring locations are included with this report. The Harmony Ridge development is located south of Harmony Road and east of Overland Trail in Fort Collins. At the time of our exploration, the street subgrades were at approximate final grade and the underground utilities had been installed in the street right-of-ways. The purpose of our exploration was to define the existing subsurface conditions in the street areas and provide remolded subgrade strength characteristics of the subgrade soils for use in the pavement structure design. EXPLORATION AND TESTING PROCEDURES The boring locations were selected and established in the field by Earth Engineering Consultants, Inc. (EEC) personnel. The field locations were established by approximating locations relative to identifiable site features. The locations of the field borings should be considered accurate only to the degree implied by the methods used to make the field measurements. Earth Engineering Consultants, Inc. EEC Project No. 1994067 February 1, 2000 Page 2 The borings were performed with a CME 45 drill rig using 4-inch nominal diameter continuous flight augers. Samples of the subgrade materials were obtained using split -barrel and California barrel sampling procedures and from the auger cuttings. Field density testing has previously been completed in the overlot fill and utility backfill areas. Moisture content tests were completed in the laboratory on each of the recovered samples. In addition, washed sieve analysis and Atterberg limits tests were performed on samples representing the different subgrade soil groups encountered. Swell/consolidation tests were performed on selected California barrel samples. Two Hveem stabilometer R-value tests were completed on composite samples of near surface subgrade materials. Results of the outlined tests are shown on the attached boring logs and summary sheets. As a part of the testing program, all samples were examined in the laboratory by an engineer and classified in accordance with the attached General Notes and the Unified Soil Classification System, based on the soil's texture and plasticity. The estimated group symbol for the Unified Soil Classification System is shown on the boring logs and a brief description of that classification system is included with this report. SITE AND SUBSURFACE CONDITIONS The Harmony Ridge development is located south of Harmony Road and east of Overland Trail. The approximate roadway configuration within the development is indicated on the attached boring location diagram. At this time, overlot grading and utility installations have been completed in the roadway areas. Field density tests have been completed on the overlot fill and utility backfill. Based on results of the subsurface exploration, subsurface conditions can be generalized as follows. Subsurface soils encountered in the test borings consisted predominately of light brown sandy lean clays and/or silty clayey sand. Those materials were generally very similar with the percent minus 200 material ranging from 40 to 60 % . A portion of material encountered in the test borings was overlot fill material or utility backfill. The site materials are slightly plastic as Earth Engineering Consultants, Inc. EEC Project No. 1994067 February 1, 2000 Page 3 indicated from the Atterberg limits tests. The lean clay and clayey sand shows low swell potential in their in -situ moisture and density conditions. The subsurface soils have low to moderate remolded strength. The stratification boundaries indicated on the boring logs represent the approximate locations of changes in soil types; in -situ, the transition of materials may be gradual and indistinct. Observations were made while drilling and after completion of the borings to detect the presence and depth to free water. Free water was not observed in any of the borings at the time of drilling. The depth to groundwater at the time of drilling is shown in the upper right hand corner of the boring logs. Fluctuations in groundwater levels can occur over time depending on variations in hydrologic conditions and other conditions not apparent at the time of this report. ANALYSIS AND RECOMMENDATIONS The subgrades for the roadways have been prepared in general accordance with City of Fort Collins criteria. Utilities have also been installed within the roadway right-of-way in accordance with City requirements. Field density tests have been completed on the utility backfill materials within the roadway areas. The test results indicate the site fill and backfill materials were compacted to at least 95 % of standard Proctor maximum dry density. The subgrade soils in the pavement areas consist of sandy lean clay/clayey sand with low swell potential. We expect those subgrades could be used for direct support of composite or full -depth asphalt concrete pavement sections. Those pavement sections will be designed after traffic loadings are provided by City of Fort Collins Engineering Department. Hveem R-values of 8 and 16 were determined in laboratory testing of the subgrade soils. An R- value of 8 will be used to design the pavement sections for the development streets. Earth Engineering Consultants, Inc. EEC Project No. 1994067 February 1, 2000 Page 4 II GENERAL COMMENTS The preliminary analysis and recommendations presented in this report are based upon the data obtained from the soil borings performed at the indicated locations and from any other information discussed in this report. This report does not reflect any variations which may occur between borings or across the site. The nature and extent of such variations may not become evident until further exploration or construction. If variations appear evident, it will be necessary to re- evaluate the recommendations of this report. It is recommended that the geotechnical engineer be retained to review the plans and specifications so that comments can be made regarding the interpretation and implementation of our geotechnical recommendations in the design and specifications. It is further recommended that the geotechnical engineer be retained for testing and observations during earthwork and foundation construction phases to help determine that the design requirements are fulfilled. This report has been prepared for the exclusive use of Empire Management, Inc. for specific application to the project discussed and has been prepared in accordance with generally accepted geotechnical engineering practices. No warranty, express or implied, is made. In the event that any changes in the nature, design or location of the project as outlined in this report are planned, the conclusions and recommendations contained in this report shall not be considered valid unless the changes are reviewed and the conclusions of this report modified or verified in writing by the geotechnical engineer. DRILLING AND EXPLORATION DRILLING & SAMPLING SYMBOLS: SS: Split Spoon - 13/8" I.D., 2" O.D., unless otherwise noted PS: Piston Sample ST: Thin -Walled Tube - 2" O.D., unless otherwise noted WS: Wash Sample R: Ring Barrel Sampler - 2.42" I.D., 3" O.D. unless otherwise noted PA: Power Auger FT: Fish Tail Bit HA: Hand Auger RB: Rock Bit DB: Diamond Bit = 4", N, B BS: Bulk Sample AS: Auger Sample PM: Pressure Meter HS: Hollow Stem Auger WB: Wash Bore Standard "N" Penetration: Blows per foot of a 140 pound hammer falling 30 inches on a 2-inch O.D. split spoon, except where WATER LEVEL MEASUREMENT SYMBOLS: WL : Water Level WS While Sampling WCI: Wet Cave in WD : While Drilling DCI: Dry Cave in BCR: Before Casing Removal AB : After Boring ACR: After Casting Removal Water levels indicated on the boring logs are the levels measured in the borings at the time indicated. In pervious soils, the indic levels may reflect the location of ground water. In low permeability soils, the accurate determination of ground water levels is possible with only short term observations. DESCRIPTIVE SOIL CLASSIFICATION Soil Classification is based on the Unified Soil Classification system and the ASTM Designations D-2488. Coarse Grained Soils have move than 50% of their dry weight retained on a 200 sieve; they are described as: boulders, cobbles, gravel or sand. Fine Grained Soils have less than 50% of their dry weight retained on a #200 sieve; they are described as : clays, if they are plastic, and silts if they are slightly plastic or non -plastic. Major constituents may be added as modifiers and minor constituents may be added according to the relative proportions based on grain size. In addition to gradation, coarse grained soils are defined on the basis of their relative in -place density and fine grained soils on the basis of their consistency. Example: Lean clay with sand, trace gravel, stiff (CL); silty sand, trace gravel, medium dense (SM). CONSISTENCY OF FINE-GRAINED SOILS Unconfined Compressive Strength, Qu, psf Consistency 500 Very Soft 500 - 1,000 Soft 1,001 - 2,000 Medium 2,001 - 4,000 Stiff 4,001 - 8,000 Very Stiff 8,001 - 16,000 Very Hard RELATIVE DENSITY OF COARSE -GRAINED SOILS: N-Blows/ft Relative Density 0-3 Very Loose 4-9 Loose 10-29 Medium Dense 30-49 Dense 50-80 Very Dense 80 + Extremely Dense PHYSICAL PROPERTIES OF BEDROCK DEGREE OF WEATHERING: Slight Slight decomposition of parent material joints. May be color change. Moderate Some decomposition and color char throughout. High Rock highly decomposed, may be extreme broken. HARDNESS AND DEGREE OF CEMENTATION: Limestone and Dolomite: Hard Difficult to scratch with knife. Moderately Can be scratched easily with knife. Hard Cannot be scratched with fingernail. Soft Can be scratched with fingernail. Shale, Siltstone and Claystone: Hard Can be scratched easily with knife, cannot scratched with fingemail. Moderately Can be scratched with fingernail. Hard Soft Can be easily dented but not molded w fingers. Sandstone and Conglomerate: e ap' ableor scratching a knife blade. Cemented Cemented Can be scratched with knife. Poorly Can be broken apart easily with fingers. Cemented UNIFIED SOIDL CLASSMCATION SYSTEM Soil Classification Group Group NameCriteriaforAssigningGroupSymbolsandGroupnamesUsingLaboratoryTestsSymbol Coarse —Grained Gravels more than Clean Gravels Less Soils more than 50% of coarse than 5% fines Cu>4 and <,c<3E GW Well —graded gravel` 50% retained on fraction retained No. 200 sieve on No. 4 sieve Cu<4 and/or 1>Cc>3E GP Poorly —graded gravel' Gravels with Fines Fines classify as ML or MH GM Silty gravel, G,H more than 12% fines Fines classify as CL or CH GC Clayey Gravel ra" Sands 50% or Clean Sands Less Cu>6 and 1<C.c<3E SW Well —graded sand' more coarse than 5% fines fraction posses Cu<6 and/or 1>Cc>3E SP Poorly —graded sand' No. 4 sieve Sands with Fines Fines classify as ML or MH SM Silty sand"' more than 12% fines Fines classify as CL or CH SC Clayey sand"' Fine —Grained Silts and Clays inorganic PI>7 and plots on or above "A"Line CL Leon clayK`" Soils 50% or Liquid Limit less more passes the than 50 PI<4 or plots below "Aline' ML SiltK'`" No. 200 sieve organic Liquid Limit — oven dried Organic clay" U.75 OL Liquid Limit — not dried Organic silt Silts and Clays inorganic PI plots on or above "A"Line CH Fat clay'" Liquid Limit 50 or more PI plots below "Aline MH Elastic Silt"-" organic Liquid Limit — oven dried Organic ClayK•`"•" 0.75 OH Liquid Limit — not dried Organic siltK'"-' Highly organic soils Primarily organic matter, dark in color, and organic odor PT Peat Based on the material passing the 3-in. (75- e (D-)Klf Cu=D/D, Cc= soil contains 15 to 29%plus No. 200. add with "withmm) sieve D x D sand" or gravel", whichever is Blf field sample contained cobbles or boulders, predominant. or both, add "with cobbles or boulders, or both" if soil contains 2 30" plus No. 200 sandytogroupname. if soil contains 215% sand, add"with sand"to predominantly sand. add to group CGrovels with 5 to 12% fines required dual symbols: group1f name. If soil contains 2 30% plus No. 200 GW-GM well graded gravel with silt fines classify as CL-ML, use dual symbol GC -CM, or SC-SM. predominantly gravel, add gravely to group GW-GC well-groded grovel with cloy If fines are organic, add"with organic fines "togg name. PI24 and plots on or above "A" line. GP -GM poorly -graded gravel with silt GP -GC poorly -graded gravel with clay group name If soil contains >15%grovel, add"with grovel" PPIS4 or plots below "A" line. Sands with 5 to 12% fines require dual to group name. oPl plats be A" line. low or above A" line. PI plots besymbols: SW-SM well -graded sand with silt 4If Atterberg limits plots shaded area, soil is o CL-ML, silty clay. SW -SC well -graded sand with clay SP-SM poorly graded sand with silt SP—SC poorly graded sand with cloy 8C 5C d IP 0 0 I For Classification of fine—grained solls and fine—grained fraction of coorse— grained soils, i Equation of "A' —line Horizontal at PI-4 to LL-25.5. then PI-0.73 (ILL-20) Equation of a PVerticalatLL=16 to PI-7, ol . then P1.0.9 (ILL-8) G MH 0R OH CL-ML M L OR 0 L II 10 20 30 40 50 6o 70 80 90 100 110 LIQUID LIMIT (LL) a o v N O l O C z o 0 Q i pao 0 0 Ow oN O iE o m U N f U m cn U Q m Of N u' Q O m m LL- W( Q I Q aAIJ a6 I auloi 0 U7) c 0 O Z LLJ ca Q i ' U W m 0 0 Ln cn i m c m U Q0 o` Z_ O a O W O o m Q 7UO U Ln s 00 C) Z m 0 n U WI o o °- U Z O O rz oj E d I 0, m Q o m N 7 O o_ I m HARMONY RIDGE PHASE I - PAVEMENTS FORT COLLINS, COLORADO PROJECT NO: 1994067 DATE: JANUARY 2000 LOG OF BORING B-1 RIG TYPE: CME45 SHEET 1 OF 1 WATER DEPTH FOREMAN: WVC START DATE 01/1012000 WHILE DRILLING None AUGER TYPE: 4" CFA FINISH DATE 01110/2000 AFTER DRILLING None SPT HAMMER: MANUAL SURFACE ELEV NIA 124 HOUR N/A SOIL DESCRIPTION D N OU MC DD A -LIMITS 200 SWELL LL PI PRESSURE is 100 PSF TYPE FEET) BLOWS/FT) PSF) PCF) CLAYEY SAND WITH SCATTERED GRAVEL 1 red/brown 2 SS 3 35 9000+ 13.8 4 5 SS 25 9000+ 13.9 CLAYSTONE brown 6 soft to moderately hard calcareous 7 8 9 9' BOTTOM OF BORING 10 11 12 13 14 15 16 27 18 19 20 21 22 23 24 25 Earth Engineering U0115unalILS I I I I I HARMONY RIDGE PHASE I - PAVEMENTS FORT COLLINS, COLORADO PROJECT NO: 1994067 DATE: JANUARY 2000 LOG OF BORING B-2 RIG TYPE: CME45 SHEET 1 OF 1 WATER DEPTH FOREMAN: WVC START DATE 01/10/2000 WHILE DRILLING None AUGER TYPE: 4" CFA FINISH DATE 01110/2000 AFTER DRILLING None SPT HAMMER: MANUAL SURFACE ELEV NIA 24 HOUR N/A SOIL DESCRIPTION D N OU MC DO A -LIMITS 200 SWELL LL PI PRESSURE ii 100 PSF TYPE FEET) BLOWS/FT) PSF) I%) IPCFj I%) CLAYEY SAND (SC) 1 brown/red medium dense S 2 FC 3 10 9000+ 12.9 4 ES, 5 8 9000+ 11.8 scattered gravel with depth 6 7 8 9 9' BOTTOM OF BORING 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 ram......... u....+.. Ca1L11 -" au I I HARMONY RIDGE PHASE I - PAVEMENTS FORT COLLINS, COLORADO PROJECT NO: 1994067 DATE: JANUARY 2000 LOG OF BORING B-3 RIG TYPE: CME45 SHEET 1 OF 1 WATER DEPTH FOREMAN: WVC START DATE 01/10/2000 WHILE DRILLING None AUGER TYPE: 4" CFA FINISH DATE 01/10/2000 AFTER DRILLING None SIFT HAMMER: MANUAL SURFACE ELEV NIA 24 HOUR NIA SOIL DESCRIPTION D N QU me DD A -LIMITS 200 SWELL PI ;(%I PRESSURE a 100 PSFTYPEFEET) BLOW51FT) PSF) 1%I PCF) ILL SANDY LEAN CLAY (CL) 1 red/brown very stiff 2 with scattered gravel 26 9000+ 14.0SS3 s 4 FC 28 9000+ 13.6 118.2 37 20 50.8 1000 psf 1.71. 5 6 7 8 9 9' BOTTOM OF BORING 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 r.aiul nyuicci u y vv ou cc I I I I I I I r HARMONY RIDGE PHASE I - PAVEMENTS FORT COLLINS, COLORADO PROJECT NO: 1994067 DATE: JANUARY 2000 LOG OF BORING B-4 RIG TYPE: CME45 SHEET 1 OF 1 WATER DEPTH FOREMAN: WVC START DATE 01/10/2000 WHILE DRILLING None AUGER TYPE: 4" CFA FINISH DATE 01/10/2000 AFTER DRILLING None SPT HAMMER: MANUAL SURFACE ELEV NIA 24 HOUR NIA SOIL DESCRIPTION D N OUU MC DO ILL A -LIMITS 101, SWELL PI PRESSURE 100 PSTTYPEFEET) BLOWSIFT) PCF) CLAYEY SAND (SC) 1 red/brown medium dense to dense 2 with scattered gravel 39 9000+ 6.8SS3 4 SS 5 18 2.3 6 7 8 9 9' BOTTOM OF BORING 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cal LII Clly luccn.y vvnc I HARMONY RIDGE PHASE I - PAVEMENTS FORT COLLINS, COLORADO PROJECT NO: 1994067 DATE: JANUARY 2000 LOG OF BORING B-4 RIG TYPE: CME45 SHEET 1 OF 1 WATER DEPTH FOREMAN: WVC START DATE 01/10/2000 WHILE DRILLING None AUGER TYPE: 4" CFA FINISH DATE 01/1012000 AFTER DRILLING None SPT HAMMER: MANUAL SURFACE ELEV NIA 24 HOUR WA SOIL DESCRIPTION D N ou Mc DD A -LIMITS 200 SWELL LL PI PRESSURE X, 100 PSF TYPE FEET) BLOWS/FT) PSF) li) PCF) CLAYEY SAND ( SC) 1 red/brown medium dense to dense 2 with scattered gravel 39 9000+ 6.8 SS 34E 5 18 2.3 6 7 8 9 9' BOTTOM OF BORING 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 HARMONY RIDGE PHASE I - PAVEMENTS FORT COLLINS, COLORADO PROJECT NO: 1994067 DATE: JANUARY 2000 LOG OF BORING B-5 RIG TYPE: CME45 SHEET 1 OF 1 WATER DEPTH FOREMAN: WVC START DATE 01/1012000 WHILE DRILLING None AUGER TYPE: 4" CFA FINISH DATE 01/10/2000 AFTER DRILLING None SPT HAMMER: MANUAL SURFACE EL NIA 24 HOUR NIA SOIL DESCRIPTION 0 N OU MC DO A -LIMITS 200 SWELL LL PI PRESSURE 1. 100 PSF TYPE FEET) BLOWSIFT) PSF) I ) PCF) I%) SANDY LEAN CLAY (CL) 1 red/brown very stiff 2 with scattered gravel 35 9000+ 9.7 CS 34E 5 32 9000+ 8.3 6 7 8 9 9' BOTTOM OF BORING 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Earth Mnymrcrlrly l UIIn 111LALitJ HARMONY RIDGE PHASEI- PAVEMENTS FORT COLLINS, COLORADO PROJECT NO: 1994067 DATE: JANUARY 2000 LOG OF BORING B-6 RIG TYPE: CME45 SHEET 1 OF 1 WATER DEPTH FOREMAN: WVC START DATE 01/10/2000 WHILE DRILLING None AUGER TYPE: 4" CFA FINISH DATE 01/10/2000 AFTER DRILLING None SPT HAMMER: MANUAL SURFACE ELEV NIA 5 DAYS AFTER DRILLING N/A SOIL DESCRIPTION o N ou Mc oo A -LIMITS 200 SWELL LL PI PRESSURE 100 PSFTYPEFEET) BLOWS/FT) PSF) PCF) SANDY LEAN CLAY (CL) 1 red/brown very stiff 2 with scattered gravel 11 9000+ 11.8SS3 4 ICS 5 13 8000 10.5 6 7 less sand with depth 8 9 9' BOTTOM OF BORING 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Earth Englneentty %,onbutaants HARMONY RIDGE PHASE I - PAVEMENTS FORT COLLINS, COLORADO PROJECT NO: 1994067 DATE: JANUARY 2000 LOG OF BORING B-7 RIG TYPE: CME45 SHEET 1 OF 1 WATER DEPTH FOREMAN: WVC START DATE 01/10/2000 WHILE DRILLING None AUGER TYPE: 4" CFA FINISH DATE 01/1012000 AFTER DRILLING NoneSPT HAMMER: MANUAL SURFACE ELEV N/A 24 HOUR N/A SOIL DESCRIPTION D N OU MC DD A -LIMITS 200 SWELL TYPE FEET) BLOWSIFT) PSF) I%) PCF) I%) LL PI PRESSURE fiii100PSF CLAYEY SAND (SC) 1 red/brown calcareous 2 medium dense ICS 28 9000+ 7.1 3 4 scattered gravelwith depth 22 9000+ 9.4 SS E 5 6789 CLAYSTONE, brown/ olive, highlyweatheredYBOTTOMOFBORING 10 11 12 13 14 15 16 17 18 19 20 21 22 23 i 24 25 Bann cnyuletanly %. VnauiLa1ILa HARMONY RIDGE PHASE I - PAVEMENTS FORT COLLINS, COLORADO PROJECT NO: 1994067 DATE: JANUARY 2000 LOG OF BORING 8-8 RIG TYPE: OME45 SHEET 1 OF 1 WATER DEPTH FOREMAN: WVC START DATE 01/1012000 WHILE DRILLING None AUGER TYPE: 4" CFA FINISH DATE 01/1012000 AFTER DRILLING None SPT HAMMER: MANUAL SURFACE ELEV N/ A 24 HOUR NIA SOIL DESCRIPTION D N au Mc 00 A -LIMITS 200 SWELL LL PI PRESSURE 100 PSF TYPE FEET) BLOWS/FT) PSF) PCF) SANDY LEAN CLAY (CL) 1 brown very stiff 2 calcareous 14 9000+ 14.2 SS 3 with scattered gravel s4Fc 5 30 9000+ 11. 0 115.8 36 21 60.1 1000 psi 1.2% 6 7 8 9 3' ROTTOM OF 90RING 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 tarin tngineenng L. Un5U1LdIIL5 HARMONY RIDGE PHASE I - PAVEMENTS FORT COLLINS, COLORADO PROJECT NO: 1994067 DATE: JANUARY 2000 LOG OF BORING B-9 PIG TYPE: CME45 SHEET 1 OF 1 WATER DEPTH FOREMAN: WVC START DATE 01/10/2000 WHILE DRILLING None AUGER TYPE: 4" CFA FINISH DATE 01/10/2000 AFTER DRILLING None SPT HAMMER: MANUAL SURFACE ELEV N/A 24 HOUR N/A SOIL DESCRIPTION D N QU MC DD A -LIMITS 200 SWELL LL PI PRESSURE d 100PSFTYPEFEET) BLOWSIFT) PSF) lil PCF) 1951 SANDY LEAN CLAY (CL) 1 red/brown calcareous 2 very stiff 24 9000+ 12.5withscatteredgravelSS3 S 4 FC 15 9000+ 15.65— 6 7 8 9 9' BOTTOM OF BORING 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 carm r-nymeenny %.U1Iau1La11w HARMONY RIDGE PHASE I - PAVEMENTS FORT COLLINS, COLORADO PROJECT NO: 1994067 DATE: JANUARY 2000 LOG OF BORING B-10 RIG TYPE: CME45 SHEET 1 OF 1 WATER DEPTH FOREMAN: WVC START DATE 01/10/2000 WHILE DRILLING None AUGER TYPE: 4" CFA FINISH DATE 01/10/2000 AFTER DRILLING None SPT HAMMER: MANUAL SURFACE ELEV NIA 124 HOUR N/A SOIL DESCRIPTION D N ou Mc DD A -LIMITS 200 SWELL LL PI PRESSURE 700 PSFTYPEFEET) BLOWSlFT) PSF) PCF) CLAYEY SAND (SC) - FILL MATERIAL 1 brownlred dense to very dense 2 with scattered gravel and cobbles 56110" 10.0SS3 4 E 6 50/11" 9000+ 11.3 6 7CLAYSTONE olive/grey highly weathered 8 moderately hard 9 9' BOTTOM OF BORING 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cd1LII C1111111CC11111J. VVIIJu11a111 1 1 HARMONY RIDGE PHASE I - PAVEMENTS FORT COLLINS, COLORADO PROJECT NO: 1994067 DATE: JANUARY 2000 LOG OF BORING B-11 RIG TYPE: CME45 SHEET 1 OF 1 WATER DEPTH FOREMAN: WVC START DATE 0111012000 WHILE DRILLING None AUGER TYPE: 4" CFA FINISH DATE 0111012000 AFTER DRILLING None SPT HAMMER: MANUAL SURFACE ELEV NIA 24 HOUR N/A SOIL DESCRIPTION D N DU MC DD A -LIMITS 200 SWELL PI PRESSURE 4 700 PSFTYPEFEET) BLOWS/FT) PS PCFI ILL e) SANDY LEAN CLAY (CL) 1 brown very stiff 2 with scattered gravel 19 9000+ 14.2SS3 4 Fc-sI5 20 9000+ 15.7 118.0 37 19 1 53.0 2000 psf 1.3 6 7 8 9 9' BOTTOM OF BORING 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Earth Engineering Consultants HARMONY RIDGE PHASE I - PAVEMENTS FORT COLLINS, COLORADO PROJECT NO: 1994067 DATE: JANUARY 2000 LOG OF BORING B-12 RIG TYPE: CME45 SHEET 1 OF 1 WATER DEPTH FOREMAN: WVC START DATE 01110/2000 WHILE DRILLING None AUGER TYPE: 4" CFA FINISH DATE 01110/2000 AFTER DRILLING None SPT HAMMER: MANUAL SURFACE ELEV N/A 24 HOUR NIA SOIL DESCRIPTION D N QU MC DD A -LIMITS 200 SWELL LL PI PRESSURE lal 100 PSF TYPE FEET) BLOWS/FT) PSF) PCF) 1%I SANDY LEAN CLAY (CL) 1 brown/red very stiff 2 with scattered gravel 17 9000+ SS 3 4 12.6 FCS 5 19 9000+ 12.7 113.0 34 15 61.3 1000 psf 0.7 k 6 7 8 9 9' BOTTOM OF BORING 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 artn rnyuieenny %, UnaUILaIILa I I I I I 11 HARMONY RIDGE PHASE I - PAVEMENTS FORT COLLINS, COLORADO PROJECT NO: 1994067 DATE: JANUARY 2000 LOG OF BORING B-13 RIG TYPE: CME45 SHEET 1 OF 1 WATER DEPTH FOREMAN: WVC START DATE 01/10/2000 WHILE DRILLING None AUGER TYPE: 4" CFA FINISH DATE 01110/2000 AFTER DRILLING None SPT HAMMER: MANUAL SURFACE ELEV N/A 24 HOUR N/A SOIL DESCRIPTION D N cu MC oo A -LIMITS 100 SWELL LL PI PRESSURE @ 100 PSF TYPE FEET) BLOWSIFT) PSF) I%) PCF) SANDY LEAN CLAY (CL) 1 brown very stiff 2 calcareous ICS 24 9000+ 12.2 with scattered gravel 34SS519 9000+ 11.2 6 SAND AND GRAVEL ( SP- GP) red 7 medium dense 8 9 Y BOTTOM OF BORING 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cdith CIIIJIIICCIIIIIg. VclnsuLan' s HARMONY RIDGE PHASE I - PAVEMENTS FORT COLLINS, COLORADO PROJECT NO: 1994067 DATE: JANUARY 2000 LOG OF BORING B-14 RIG TYPE: CME45 SHEET 1 OF 1 WATER DEPTH FOREMAN: WVC START DATE 01/10/2000 WHILE DRILLING None AUGER TYPE: 4" CFA FINISH DATE 01/10/2000 AFTER DRILLING None SPT HAMMER: MANUAL SURFACE ELEV N/A 24 HOUR N/A SOIL DESCRIPTION D N OU MC DD A -LIMITS 200 SWELL TVPE FEET) BLOWS/FT) PSF) IPC FI LL IPI 6) PRESSURE RD 100 PSF SANDY LEAN CLAY (CL) 1 brown very stiff 2 calcareous 34 9000+ 12.7 108.8 36 19 51.6 1200 psf 1.5% with scattered gravel CS 3 4 S" 5 26 9000+ 11.4 6 7 8 9 9' BOTTOM OF BORING 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 r...-....I+-...+ EaFUI rEnynteernly -onauLa.— HARMONY RIDGE PHASE I - PAVEMENTS FORT COLLINS, COLORADO PROJECT NO: 1994067 DATE: JANUARY 2000 LOG OF BORING B•15 RIG TYPE: CME45 SHEET 1 OF 1 WATER DEPTH FOREMAN: WVC START DATE 01/10/2000 WHILE DRILLING None AUGER TYPE: 4" CFA FINISH DATE 01/1012000 AFTER DRILLING None SPT HAMMER: MANUAL SURFACE ELEV NIA 24 HOUR NIA SOIL DESCRIPTION D N ou Mc DD A -LIMITS ZOO SWELL LL PI PRESSURE @ 100 PSFTYPEFEET) BLOWSIFT) PSF) PCFI SANDY LEAN CLAY (CL) 1 brown 2 3SS 11 9000+ 8.6 CLAYEY SAND (SC) reddish brown 4 medium dense 18 9000+ 7.1calcareousCS5 with scattered gravel 6 7 8 9 9' BOTTOM OF BORING 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 C I tSEarthEnglneeringonsutan HARMONY RIDGE PHASE I - PAVEMENTS FORT COLLINS, COLORADO PROJECT NO: 1994067 DATE: JANUARY 2000 LOG OF BORING B•16 RIG TYPE: CME45 SHEET 1 OF 1 WATER DEPTH FOREMAN: WVC START DATE 01/10/2000 WHILE DRILLING None AUGER TYPE: 4" CFA FINISH DATE 01/10/2000 AFTER DRILLING None SPT HAMMER: MANUAL SURFACE ELEV N/A 124 HOUR N/A SOIL DESCRIPTION D N OU MC DD A -LIMITS 200 SWELL LL PI PRESSURE W 100 PSFTYPEFEET) BLOWSIFT) PSF) PCF) CLAYEY SAND (SC) 1 brown/red dense 2 with scattered gravel ICS 41 9000+ 7.83 4 SS 5 35 9000+ 9.9 6 7 8 9 9' BOTTOM OF BORING 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 IEarthEngineeringConsu tants I i HARMONY RIDGE PHASE I - PAVEMENTS FORT COLLINS, COLORADO PROJECT NO: 1994067 DATE: JANUARY 2000 LOG OF BORING 5-17 RIG TYPE: CME45 SHEET i OF 1 WATER DEPTH FOREMAN: WVC START DATE 01110/2000 WHILE DRILLING None AUGER TYPE: 4" CFA FINISH DATE 01/10/2000 AFTER DRILLING None SPT HAMMER: MANUAL i SURFACE ELEV N/A 24 HOUR NIA SOIL DESCRIPTION U N QU MC DO A -LIMITS 200 SWELL LL PI PRESSURE 700 PSF TYPE FEET) BLOWS/FT PSF) I%) IPGF) SANDY LEAN CLAY ( CL) 1 brown/red very stiff 2 calcareous, with scattered gravel ICS 18 9000+ 128 3 4 SAND (SP) red189000+ 3. 9 medium dense SS5calcareous, with scattered gravel 6 7 8 9 9' BOTTOM OF BORING 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 SWELL / CONSOLIDATION TEST RESULTS Material Description: Brown Sandy Lean Clay with Scattered Gravel (CL) Sample Location: B-3 S-2 @ 4-5' Liquid Limit: 37 IPlasticity Index: 20 Passing #200: 50.8% Beginning Moisture: 10.2% JDry Density: 118.2 pcf Ending Moisture: 14.0% Swell Pressure: 1400 psf Swell @ 100 psf: 1.7% 10 8 a 65 4 a+ 2 Qci C C0 0 CdV d Water Added o. -2 c -4 0 0 c -6 0 U 8 10 0.01 0.1 1 10 Load (TSF) Project: Harmony Ridge Phase I - Pavements Project Number: 1994067 Fort Collins, Colorado I Date: January 2000 2EEC SWELL / CONSOLIDATION TEST RESULTS Material Description: Sandy Lean Clay with Scattered Gravel (CL) Sample Location: B-8 S-2 @ 4-5- Liquid Limit: 36 IPlasticity Index: 21 Passing #200: 60.1 % Beginning Moisture: 12.4% JDry Density: 105.8 pcf lEnding Moisture: 17.0% Swell Pressure: 1000 psf Swell @ 100 psf: 1.2% 10 8 6 U) 4 2 c d E m 0 0 m Water Added a -2 c -4 0 m a_ 0 c -6 0 U 8 10 0.01 0.1 1 10 Load (TSF) Project: Harmony Ridge Phase I - Pavements Project Number: 1994067 Fort Collins, Colorado I Date: January 2000 E EC SWELL / CONSOLIDATION TEST RESULTS Material Description: Brown Sandy Lean Clay (CL) Sample Location: B-11 S-2 @ 4-5' Liquid Limit: 37 Plasticity Index: 19 Passing #200: 53.0% Beginning Moisture: 14.5% JDry Density: 118.0 pcf JEnding Moisture: 16.3% Swell Pressure: 2000 psf Swell @ 100 psf: 1.3% 9 06 U) 4 VA cm E m 0 0 m d Water Added a -2 c -4 0 1 72 0 c -6 0 0 m 10 0.01 0.1 Load (TSF) 1 10 Project: Harmony Ridge Phase I - Pavements Project Number: 1994067 Fort Collins, Colorado Date: January 2000 EE J SWELL / CONSOLIDATION TEST RESULTS Material Description: Brown Lean Clay with Sand (CL) Sample Location: B-12 S-2 @ 4-5' Liquid Limit: 34 IPlasticity Index: 15 Passing #200: 61.3% Beginning Moisture: 17.6% JDry Density: 113.0 pcf JEncling Moisture: 18.7% Swell Pressure: 1000 psf Swell @ 100 psf: 0.7% Project: Harmony Ridge Phase I - Pavements Project Number: 1994067 Fort Collins, Colorado Date: January 2000 EEEJ SWELL / CONSOLIDATION TEST RESULTS Material Description: Brown Sandy Lean Clay (CL) Sample Location: B-14 S-1 @ 2-3- Liquid Limit: 36 IPlasticity Index: 19 Passing #200: 51.6% Beginning Moisture: 12.7% JDry Density: 108.8 pcf JEnding Moisture: 16.8% Swell Pressure: 1200 psf Swell @ 100 psf: 1.5% 3 06 _ - 3 4 - - 2 m E d g 0 - - - -- cm d Water Added a -2 c: -4 MO a_ 0 6 0 0 10 - - 0.01 0.1 1 10 Load (TSF) Project: Harmony Ridge Phase I - Pavements Project Number: 1994067 Fort Collins, Colorado I Date: January 2000 30 20 a) CO 10 0! 0 Earth Engineering Consultants, Inc Summary of Hveem Stabilometer Test Results 100 200 300 400 500 600 Exudation Pressure Material Designation: West Side Sample Location: B-4, B-7 Material Description: tsrown Ulayey z5ana (au) Test No. 1 2 3 4 5 Moisture 16.0 15.0 14.0 Density (pcf) 114.6 117.6 120.4 Exudation Pressure 159 278 354 R-Value 8 15 20 Recommended Design R-Value: 16 Project: Harmony Ridge Phase I - Pavements Fort Collins, Colorado Project No: 1994067 Date January 2000 30 Q) cc 10 0 Earth Engineering Consultants, Inc Summary of Hveem Stabilometer Test Results 100 200 300 Exudation Pressure Material Designation: East Side Sample Location: B-11, B-12 400 500 Material Description: grown tianoy Lean aay tu) Test No. 1 2 3 4 5 Moisture 18.0 17.0 15.0 Density (pcf 110.9 113.2 121.4 Exudation Pressure 247 342 493 R-Value 7 9 18 Recommended Design R-Value: 8 Project: Harmony Ridge Phase I - Pavements Fort Collins, Colorado Project No: 1994067 Date January 2000 600 E EC