HomeMy WebLinkAboutHARMONY MARKET PUD TENTH FILING LEE'S CYCLERY - Filed GR-GEOTECHNICAL REPORT/SOILS REPORT -GEOTECHNICAL ENGINEERING REPORT
LEE'S CYCLERY & OUTSPOST SUNSPORT
HARMONY MARKET TENTH FILING
FORT COLLINS, COLORADO
ELI PROJECT NO. 20945180
Prepared for:
LEE'S CYCLERY & OUTPOST SUNSPORT
c/o LEE'S CYCLERY
202 WEST LAUREL STREET
FORT COLLINS, COLORADO 80521
ATTN: MR. ARCHIE SOLSKY AND MR. RANDALL MORGAN
Empire Laboratories, Inc.
A Division of the Terracon Companies, Inc.
1
Empire Laboratories, Inc.
A Division of The Terracon Companies, Inc.
P.O. Box 503 • 301 No. Howes
Fort Collins, Colorado 80522
303) 484-0359
FAX No. (303) 484-0454
Chester C. Smith, P.E.
Neil R. Sherrod, C.P.G.
August 22, 1994
Lee's Cyclery & Outpost Sunsport
202 West Laurel Street
Fort Collins, Colorado 80521
Attn: Mr. Archie Solsky and Mr. Randall Morgan
Re: Geotechnical Engineering Report, Lee's Cyclery & Outpost Sunsport Building
Harmony Market 10th Filing
Fort Collins, Colorado
ELI Project No. 20945180
Empire Laboratories, Inc. (ELI) has completed the geotechnical engineering exploration for the
proposed Lee's Cyclery & Outpost Sunsport building located Harmony Market at the southwest
corner of Harmony Road and Lemay Avenue, Fort Collins, Colorado. This study was performed
in general accordance with our proposal number D2094292 dated August 15, 1994.
The results of our engineering study, including the boring location diagram, laboratory test results,
test boring records, and the geotechnical recommendations needed to aid in the design and
construction of foundations and other earth connected phases of this project are attached.
The subsurface soils consisted of fill material consisting of sandy lean clay underlain by natural
sandy lean clay and well -graded sand with gravel. The information obtained by the results of field
exploration and laboratory testing completed for this study indicates the soils have low expansive
potential and moderate bearing characteristics.
Based on the geotechnical engineering analysis, subsurface exploration and laboratory test results,
we recommend that the proposed building be supported on a spread footing and/or grade beam
foundation system. Slab -on -grade may be utilized for the interior floor system provided the
existing fill is removed and replaced. Due to the relatively, shallow depth to groundwater, a
complete dewatering system and possibly raising of finished grades will be required for basement
construction.
Other design and construction details, based upon geotechnical conditions, are presented in the
report.
Offices of The Terracon Companies, Inc. Geotechnical, Environmental and Materials Engineers
Arizona: Tucson Colorado: Colorado Springs, Denver, Ft. Collins, Greeley, Longmont 0 Idaho: Boise 0 Illinois: Bloomington,
Chicago, Rock Island Iowa: Cedar Falls, Cedar Rapids, Davenport, Des Moines, Storm Lake 0 Kansas: Lenexa, Topeka,
Wichita Minnesota: St. Paul Missouri: Kansas City Nebraska: Lincoln, Omaha 0 Nevada: Las Vegas
Oklahoma: Oklahoma City, Tulsa Texas. Dallas Utah: Salt Lake City Wyoming: Cheyenne
QUALITY ENGINEERING SINCE 1965
Lee's Cyclery & Outpost Sunsport
ELI Project No. 20945180
Terracon
We have appreciated being of service to you during the geotechnical engineering phase of this
project and are prepared to assist you during the construction phases as well. If you have any
questions concerning this report or any of our testing, inspection, design and consulting services,
please do not hesitate to contact us.
Sincerely,
EMPIRE LABORATORIES, INC.
A Division of The Terracon Companies, Inc.
Neil R. Sherrod
Senior Engineering Geologist
Reviewed by:
dai-ti A ctc q
Larry G. O'Dell, P.E.
Office Manager
NRS/LGO/cic
Copies to: Addressee ('L)
I
J E.pf PROFS
AIPG ...?
N
SHE P
Lee's Cyclery & Outpost Sunsport
ELI Project No. 20945180
TABLE OF CONTENTS
Terracon
Page No.
Letter of Transmittal................................................... ii
INTRODUCTION..................................................... 1
PROPOSED CONSTRUCTION ........................................... 1
SITE EXPLORATION .................................................. 2
Field Exploration ............................................... 2
Laboratory Testing .............................................. 2
SITE CONDITIONS ................................................... 3
SUBSURFACE CONDITIONS ............................................ 3
Geology..................................................... 3
Soil and Bedrock Conditions ....................................... 4
Laboratory Test Results .......................................... 4
Groundwater Conditions .......................................... 4
CONCLUSIONS AND RECOMMENDATIONS ................................. 5
Site Development Considerations .................................... 5
Foundation Systems ............................................. 5
Basement Construction ........................................... 6
Lateral Earth Pressures ........................................... 6
Seismic Considerations ........................................... 7
Floor Slab Design and Construction .................................. 7
Pavement Design and Construction .................................. 8
Earthwork................................................... 11
Site Clearing ............................................ 11
Excavation............................................. 12
Slab Subgrade Preparation ................................... 12
Pavement Subgrade Preparation ............................... 12
Fill Materials ............................................ 13
Placement and Compaction .................................. 14
Shrinkage .............................................. 15
Compliance............................................. 15
Excavation and Trench Construction ............................ 15
Drainage.................................................... 16
Surface Drainage ......................................... 16
Additional Design and Construction Considerations ...................... 16
Exterior Slab Design and Construction .......................... 16
Underground Utility Systems ................................. 17
Corrosion Protection ....................................... 17
GENERAL COMMENTS ............................................... 17
Lee's Cyclery & Outpost Sunsport
Terracon
ELI Project No. 20945180
TABLE OF CONTENTS (Cont'd)
Page No.
APPENDIX A
Figure No.
SitePlan ...................................................... 1
Logs of Borings .......................................... Al thru A5
APPENDIX B
Consolidation Test .............................................. B1
Summary of Test Results ......................................... B2
APPENDIX C: GENERAL NOTES
Drilling & Exploration ............................................ C1
Unified Soil Classification ......................................... C2
Bedrock Classification, Sedimentary Bedrock ............................ C3
Laboratory Testing, Significance and Purpose ........................... C4
Report Terminology ............................................. C5
APPENDIX D
Recommended Preventative Maintenance -Asphalt Concrete Pavements ......... D1
Recommended Preventative Maintenance -Jointed Concrete Pavements ......... D2
Terracon
GEOTECHNICAL ENGINEERING REPORT
LEE'S CYCLERY & OUTSPOST SUNSPORT
HARMONY MARKET TENTH FILING
FORT COLLINS, COLORADO
ELI Project No. 20945180
August 22, 1994
INTRODUCTION
This report contains the results of our geotechnical engineering exploration for the proposed
project to be located at Harmony Market 10th Filing at the southwest corner of Harmony Road and
Lemay Avenue in southwest Fort Collins, Colorado. The site is located in the Northeast 1 /4 of
Section 1, Township 7 North, Range 69 West of the 6th Principal Meridian.
The purpose of these services is to provide information and geotechnical engineering
recommendations relative to:
subsurface soil conditions
groundwater conditions
foundation design and construction
basement construction
lateral earth pressures
floor slab design and construction
pavement design and construction
earthwork
drainage
The conclusions and recommendations in this report are based upon the results of field and
laboratory testing, engineering analysis, and experience with similar soil and structural conditions.
PROPOSED CONSTRUCTION
The proposed project as we understand is to construct a 114,000 square foot retail building
housing both Lee's Cyclery and Outpost Sunsport. The north half of the building will have
conventional basement construction that will be approximately 1 1'h feet below the finished first
floor. Grading indicates approximately 1 to 3'/2 feet of cut is proposed below the building. A
parking area is planned adjacent to the east and west sides of the building. It is anticipated the
structure will exhibit light structural loads.
Lee's Cyclery & Outpost Sunsport
ELI Project No. 20945180
SITE EXPLORATION
Terracon
The scope of the services performed for this project included a site reconnaissance by an
engineering geologist, a subsurface exploration program, laboratory testing and engineering
analysis.
Field Exploration: A total of five test borings were drilled on August 16, 1994 to depths of 10 to
15 feet at the locations shown on the Site Plan, Figure 1. Four borings were drilled within the
footprint of the proposed building, and one boring was drilled in the area of the proposed
pavements. All borings were advanced with a truck -mounted drilling rig, utilizing 4-inch diameter
solid stem auger.
The borings were located in the field by measurements from existing property corners and site
features. Elevations were taken at each boring location by measurements with an engineer's level
from a temporary bench mark (TBM) shown on the Site Plan. The accuracy of boring locations
and elevations should only be assumed to the level implied by the methods used to determine
each.
Continuous lithologic logs were recorded by the engineering geologist during the drilling
operations. At selected intervals, samples of the subsurface materials were taken by means of
pushing thin -walled Shelby tubes, or driving split -spoon samplers.
Penetration resistance measurements were obtained by driving the split -spoon into the subsurface
materials with a 140-pound hammer falling 30 inches. The penetration value is a useful index to
the consistency, relative density or hardness of the materials encountered.
Groundwater measurements were made in each boring at the time of site exploration, and one day
after drilling.
Laboratory Testing: All samples retrieved during the field exploration were returned to the
laboratory for observation by the project geotechnical engineer and were classified in accordance
with the Unified Soil Classification System described in Appendix C. At that time, the field
descriptions were confirmed or modified as necessary, an applicable laboratory testing program
was formulated to determine engineering properties of the subsurface materials.
Selected soil samples were tested for the following engineering properties:
Ul
Lee's Cyclery & Outpost Sunsport
Terracon
ELI Project No. 20945180
Water content • Expansion
Dry density • Plasticity
Consolidation • Soluble sulfate content
Compressive strength
The significance and purpose of each laboratory test is described in Appendix C. Laboratory test
results are presented in Appendix B, and were used for the geotechnical engineering analysis, and
the development of foundation and earthwork recommendations. All laboratory tests were
performed in general accordance with the applicable ASTM, local or other accepted standards.
SITE CONDITIONS
The site is a vacant area sparsely vegetated with weeds and grass. The area is relatively flat and
has minor drainage to the south. The property is bordered on the north by a greenbelt and
Harmony Road, on the east by Bank One, on the south by paved parking lot and on the west by
an open area. The greenbelt is bordered by a sidewalk and is planted with grass and trees. It
appears the site has been previously filled. Debris consisting of grass clippings, sod, asphalt and
concrete were noted along the east edge of the site.
I SUBSURFACE CONDITIONS
Geology: The project area is located within the Colorado Piedmont section of the Great Plains
physiographic province. The Colorado Piedmont, formed during Late Tertiary and Early quaternary
time (approximately 2,000,000 years ago), is a broad, erosional trench which separates the
Southern Rocky Mountains from the High Plains. Structurally, the site lies along the western flank
of the Denver Basin. During the Late Mesozoic and Early Cenozoic Periods (approximately
70,000,000 years ago), intense tectonic activity occurred, causing the uplifting of the Front Range
and associated downwarping of the Denver Basin to the east. Relatively flat uplands and broad
valleys characterize the present-day topography of the Colorado Piedmont in this region. The site
is underlain by the Cretaceous Pierre formation. The Pierre shale underlies the site at estimated
depths of 20 to 25 feet below the surface. The Pierre shale is overlain by residual and colluvial
soils of Pleistocene and/or Recent Age.
11
1
1
Lee's Cyclery & Outpost Sunsport Terracon
ELI Project No. 20945180
Mapping completed by the Colorado Geological Survey ('Hart, 1972), indicates the site in an area
of "Moderate Swell Potential". Potentially expansive materials mapped in this area include
bedrock, weathered bedrock and colluvium (surficial units).
Soil and Bedrock Conditions: As presented on the Logs of Boring, the subsurface soils were
encountered in order of increasing depths as follow:
Fill Material: The area tested is overlain by a 1'/2 to 5'h foot layer of fill material. The fill
consists of a mixture of brown and red sandy lean clay with minor amounts of gravel. It
is not known whether the fill has been uniformly or properly compacted. The fill is dry to
moist and medium to hard in consistency.
Sandy Lean Clay With Gravel: This stratum underlies the topsoil and extends to depths of
14 to greater than 15 feet below the surface. The sandy lean clay contains varying
amounts of gravel, is moist to wet and medium to stiff in consistency.
Well -Graded Sand With Gravel: This stratum was encountered in Boring 3 at a depth of
14 feet and extends to greater depths. The well -graded sand contains varying amounts
of gravel, is medium dense, and wet.
Laboratory Test Results: Laboratory test results indicate that the upper subsoils at shallow depth
have low expansive potential and moderate bearing characteristics.
Groundwater Conditions: Groundwater was observed at depths of 9'/2 to 12'/2 feet in Borings 1
through 4 at the time of field exploration. When checked one day after drilling, groundwater was
measured at depths of 9 % to 12'/2 feet. Boring 5 was dry at the time of drilling and when
checked one day after drilling. These observations represent only current groundwater conditions,
and may not be indicative of other times, or at other locations. Groundwater levels can be
expected to fluctuate with varying seasonal and weather conditions.
Based upon review of U.S. Geological Survey maps (2Hillier, et al, 1983), regional groundwater
is expected to be encountered in unconsolidated alluvial deposits on the site, at depths ranging
from 10 to 20 feet below the existing ground surface at the project site.
Hart, Stephen S., 1972, Potentially Swelling Soil and Rock in the Front Range Urban Corridor, Colorado, Colorado
Geological Survey, Environmental Geology No. 7.
2Hillier, Donald E.; Schneider, Paul A., Jr.; and Hutchinson, E. Carter, 1983, Depth to Water Table (1979) in the Boulder -Fort
Colin -Greeley Area, Front Range Urban Corridor Colorado, United States Geological Survey, Map 1-855-I.
4
Lee's C cler & Outpost Sunsport Terracon
Y
Y P P ELI
Project No. 20945180 Fluctuations
in groundwater levels can best be determined by implementation of a groundwater tmonitoring
plan. Such a plan would include installation of groundwater monitoring wells, and periodic
measurement of groundwater levels over a sufficient period of time. The
possibility of groundwater fluctuations should be considered when developing design and construction
plans for the project. CONCLUSIONS
AND RECOMMENDATIONS Site
Development Considerations: The site appears suitable for the proposed construction. Potentially
expansive soils, fill and high groundwater will require particular attention in the design and
construction. In
view of the foundation bearing levels, anticipated structural loads, and proposed grades, the following
foundation systems were evaluated for use on the site: spread
footings and/or grade beams bearing on undisturbed soils; and, spread
footings and/or grade beams bearing on engineered fill. Slab -
on -grade construction is considered acceptable for use when subgrade soils consist of the on -
site natural soils provided that design and construction recommendations are followed. Foundations
or slabs should not be placed on existing fill. In view of the shallow depth to groundwater,
raising of the basement floor elevation and/or construction of a complete dewatering system
will be required. Foundation
Systems: Due to the presence of low -swelling soils on the site, spread footing and/or grade
beams foundations bearing upon undisturbed subsoils and/or engineered fill are recommended
for support for the proposed structure. The footings may be designed for a maximum
bearing pressure of 1,500 psf (dead load plus '/2 live load). In addition, the footings should
be sized to maintain a minimum dead -load pressure of 500 psf. Exterior footings should be
placed a minimum of 30 inches below finished grade for frost protection. Existing
fill on the site should not be used for support of foundations without removal and recompaction.
Finished
grade is the lowest adjacent grade for perimeter footings and floor level for interior footings.
The design bearing capacities apply to dead load plus one-half design live load y
I
Lee's C clerY & Outpost Sunsport Terracon
ELI
Project No. 20945180 conditions.
The design bearing capacity may be increased by one-third when considering total loads
that include wind or seismic conditions. Footings
should be proportioned to minimize differential foundation movement. Proportioning on the
basis of equal total settlement is recommended; however, proportioning to relative constant dead -
load pressure will also reduce differential settlement between adjacent footings. Total or I
differential settlement resulting from the assumed structural loads are estimated to be on the order of
3/4 inch(es) or less, provided that foundations are constructed as recommended. Additional
foundation movements could occur if water from any source infiltrates the foundation soils;
therefore, proper drainage should be provided in the final design and during construction. Basement
Construction: Groundwater was encountered on the site at depths of 9 %2 to 12'/2 feet below
existing grade. Full -depth basement construction is considered feasible on the site provided groundwater
conditions are taken into account. To
reduce the potential for groundwater to enter the basement of the structure, installation of a dewatering
system is recommended. The dewatering system should, at a minimum, include a perimeter
drainage system and underslab gravel. The drainage system should be constructed I'
around the exterior perimeter of the basement foundation, and sloped at a minimum 1 /8 inch per foot
to a suitable outlet, such as a sump and pump system. The
drainage system should consist of a properly sized perforated pipe, embedded in free -draining gravel,
placed in a trench at least 12-inches in width. Gravel should extend a minimum of 3-inches beneath
the bottom of the pipe, and at least 2 feet above the bottom of the foundation wall. The gravel
should be covered with drainage fabric prior to placement of foundation backfill. Sizing
of drainage pipe will be dependent upon groundwater flow into the dewatering system. Groundwater
flow rates will fluctuate with permeability of the soils to be dewatered and the depth to
which groundwater may rise in the future. Pump tests to determine groundwater flow rates are
recommended in order to properly design the system. If
the basement is constructed within 1 foot of groundwater level, consideration should be given to
including alternating pumps and a backup generator to minimize the potential of wetting the basement
due to a mechanical or electrical failure. Temporary dewatering will be required if the basement
is excavated below groundwater. Lateral
Earth Pressures: For soils above any free water surface, recommended equivalent fluid pressures
for unrestrained foundation elements are: 6
Lee's Cyclery & Outpost Sunsport
ELI Project No. 20945180
Terracon
Active:
Cohesive soil backfill (on -site clay) .......................... 40 psf/ft
Passive:
Cohesive soil backfill (on -site clay) ......................... 360 psf/ft
Where the design includes restrained elements, the following equivalent fluid pressures are
recommended:
At rest:
Cohesive soil backfill (on -site clay) .......................... 60 psf/ft
In addition, hydrostatic pressures below groundwater should be taken into account in the design
of the foundation walls.
Fill against grade beams and retaining walls should be compacted to densities specified in
Earthwork". Compaction of each lift adjacent to walls should be accomplished with hand -
operated tampers or other lightweight compactors. Overcompaction may cause excessive lateral
earth pressures which could result in wall movement.
Seismic Considerations: The project site is located in Seismic Risk Zone I, of the Seismic Zone
Map of the United States as indicated by the Uniform Building Code. Based upon the nature of
the subsurface materials, a seismic site coefficient, "s" of 1.0 should be used for the design of
structures for the proposed project (Uniform Building Code, Table No. 23-J).
Floor Slab Design and Construction: Low -swelling natural soils or engineered fill will support the
floor slab. Some differential movement of a slab -on -grade floor system is possible should the
subgrade soils become elevated in moisture content. Such movements are considered within
general tolerance for normal slab -on -grade construction. To reduce any potential slab movements,
the subgrade soils should be prepared as outlined in the "Earthwork" section of this report.
Additional floor slab design and construction recommendations are as follows:
Positive separations and/or isolation joints should be provided between slabs and
all foundations, columns or utility lines to allow independent movement.
Contraction joints should be provided in slabs to control the location and extent of
cracking. Maximum joint spacing of 15 to 20 feet in each direction is
recommended.
7
Lee's Cyclery & Outpost Sunsport
ELI Project No. 20945180
Terracon
Interior trench backfill paced beneath slabs should be compacted in accordance with
recommended specifications outlined below.
In areas subjected to normal loading, a minimum 4-inch layer of clean -graded gravel
should be placed beneath interior slabs.
A minimum 8-inch layer of free -draining gravel should be placed beneath basement
floor slabs in conjunction with the underslab drainage system.
If moisture sensitive floor coverings are used on interior slabs, consideration should
be given to the use of barriers to minimize potential vapor rise through the slab.
Floor slabs should not be constructed on frozen subgrade.
Other design and construction considerations, as outlined in the ACI Design Manual,
Section 302.1 R are recommended.
Pavement Design and Construction: The required total thickness for the pavement structure is
dependent primarily upon the foundation soil or subgrade and upon traffic conditions. Based on
the soil conditions encountered at the site, the type and volume of traffic and using a group index
of 11 as the criterion for pavement design, the following minimum pavement thicknesses are
recommended:
Recommended Pavement Section Thickness
Inches)
Traffic Area
Alterna-
tive Asphalt
Concrete
Aggregate
Base
Plant Mix
Bituminous
Portland
Cement TOTAL
LI Surface Course Base Course Concrete
A 3" 6" 9"
B 2" 3" 5" Automobile
Parking
C 5 5„
A 3" 101, 13„
B 2" 4'/2 " 6'/z " Drive Areas
C 6" 6„
Each alternative should be investigated with respect to current material availability and economic
conditions.
E3
Lee's Cyclery & Outpost Sunsport
Terracon
ELI Project No. 20945180
Aggregate base course (if used on the site) should consist of a blend of sand and gravel which
meets strict specifications for quality and gradation. Use of materials meeting Colorado
Department of Transportation Class 5 or 6 specifications is recommended.
Aggregate base course should be placed in lifts not exceeding six inches and should be compacted
to a minimum of 95 % Standard Proctor density (ASTM D698).
Asphalt concrete should be obtained from an approved mix design stating the Hveem properties,
optimum asphalt content, job mix formula, and recommended mixing and placing temperatures.
Aggregate used in asphalt concrete should meet a particular gradation. Use of materials meeting
Colorado Department of Transportation Grading C or CX specification is recommended. The mix
design should be submitted prior to construction to verify its adequacy. The asphalt materials
should be placed in maximum 3-inch lifts and should be compacted to a minimum of 95 % Hveem
density (ASTM D1561).
Plant -mixed bituminous base course should be composed of a mixture of aggregate, filler and
additives if required and approved bituminous material. The bituminous base should conform to
an approved mix design stating the Marshall or Hveem properties, optimum asphalt content, job
mix formula, and recommended mixing and placing temperatures. Aggregate used in plant -mixed
bituminous base course should meet a particular gradation. Use of aggregates meeting Colorado
Department of Transforation Grading G or C specifications is recommended. The mix design
should be submitted prior to construction to verify it adequacy. The asphalt material should be
placed in maximum 3-inch lifts, and should be compacted to a minimum of 95% Hveem density
ASTM D1561).
Where rigid pavements are used, the concrete should be obtained from an approved mix design
with the following minimum properties:
Modulus of Rupture @ 28 days ........................ 650 minimum
Strength Requirements ................................ ASTM C94
Minimum Cement Content ......................... 6.5 sacks/cu. yd.
Cement Type .................................... Type I Portland
Entrained Air Content ................................... 6 to 8%
Concrete Aggregate ................. ASTM C33 and CDOT Section 703
Aggregate Size ................................. 1 inch maximum
Maximum Water Content ....................... 0.49 lb/lb of cement
0 Maximum Allowable Slump ............................... 4 inches
Lee's Cyclery & Outpost Sunsport Terracon
ELI Project No. 20945180
Concrete should be deposited by truck mixers or agitators and placed a maximum of 90 minutes
from time the water is added to the mix. Other specifications outlined by the Colorado
Department of Transportation should be followed.
Longitudinal and transverse joints should be provided as needed in concrete pavements for
expansion/contraction and isolation. The location and extent of joints should be based upon the
final pavement geometry and should be placed (in feet), at roughly twice the slab thickness (in
inches), on center in either direction. Sawed joints should be cut within 24-hours of concrete
placement, and should be a minimum of 25% of slab thickness plus 1/4 inch. All joints should
be sealed to prevent entry of foreign material and dowelled where necessary for load transfer.
Where dowels cannot be used at joints accessible to wheel loads, pavement thickness should be
increased by 25 percent at the joints and tapered to regular thickness in 5 feet.
Future performance of pavements constructed on the clay soils at this site will be dependent upon
several factors, including:
maintaining stable moisture content of the subgrade soils; and,
providing for a planned program of preventative maintenance.
Since the clay soils on the site have shrink/swell characteristics, pavements could crack in the
future primarily because of expansion of the soils when subjected to an increase in moisture
content to the subgrade. The cracking, while not desirable, does not necessarily constitute
structural failure of the pavement.
The performance of all pavements, but in particular the recommended asphalt sections, can be
enhanced by minimizing excess moisture which can reach the subgrade soils. The following
recommendations should be considered at minimum:
Site grading at a minimum 2% grade away from the pavements;
I' • Compaction of any utility trenches for landscaped areas to the same criteria as the
pavement subgrade;
Sealing all landscaped areas in or adjacent to pavements to minimize or prevent
moisture migration to subgrade soils;
0 Placing compacted backfill against the exterior side of curb and gutter; and,
Lee's Cyclery & Outpost Sunsport
ELI Project No. 20945180
Terracon
Placing curb, gutter and/or sidewalk directly on subgrade soils without the use of
base course materials.
Preventative maintenance should be planned and provided for through an on -going pavement
management program in order to enhance future pavement performance. Preventative
maintenance activities are intended to slow the rate of pavement deterioration, and to preserve
the pavement investment.
Preventative maintenance consists of both localized maintenance (e.g. crack sealing and patching)
and global maintenance (e.g. surface sealing). Preventative maintenance is usually the first priority
when implementing a planned pavement maintenance program and provides the highest return on
investment for pavements.
Recommended preventative maintenance policies for asphalt and jointed concrete pavements,
based upon type and severity of distress, are provided in Appendix D. Prior to implementing any
maintenance, additional engineering observation is recommended to determine the type and extent
of preventative maintenance.
Earthwork:
Site Clearing:
1. Strip and remove existing vegetation, debris, and other deleterious materials from
proposed building and pavement areas. All exposed surfaces should be free of
mounds and depressions which could prevent uniform compaction.
2. If additional unexpected fills or underground facilities are encountered during site
clearing, such features should be removed and the excavation thoroughly cleaned
prior to backfill placement and/or construction. All excavations should be observed
by the geotechnical engineer prior to backfill placement.
3. Stripped materials consisting of vegetation and organic materials should be wasted
from the site, or used to revegetate exposed slopes after completion of grading
operations. If it is necessary to dispose of organic materials on -site, they should be
placed in non-structural areas, and in fill sections not exceeding 5 feet in height.
4. The site should be initially graded to create a relatively level surface to receive fill,
and to provide for a relatively uniform thickness of fill beneath proposed building
structures.
11
Lee's Cyclery & Outpost Sunsport
ELI Project No. 20945180
Terracon
5. All exposed areas which will receive fill, once properly cleared and benched where
necessary, should be scarified to a minimum depth of eight inches, conditioned to
near optimum moisture content, and compacted.
Excavation:
1. It is anticipated that excavations for the proposed construction can be accomplished
with conventional earthmoving equipment.
2. Depending upon depth of excavation and seasonal conditions, groundwater may be
encountered in excavations on the site. Pumping from sumps may be utilized to
control water within excavations. Well points may be required for significant
groundwater flow, or where excavations penetrate groundwater to a significant
depth.
Slab Subgrade Preparation:
1. Existing fill should be removed from below slabs on grade.
2. Where existing natural soils will support floor slab, the soils should be scarified,
moisture conditioned and compacted to a minimum depth of 8 inches.
3. A minimum 4-inch layer of clean -graded gravel should be placed beneath slabs.
4. A minimum 8-inch layer of free -draining gravel should be placed beneath basement
floor slabs in conjunction with the underslab drainage system.
0 Pavement Sub -grade Preparation:
1. The upper 2 feet of existing fill should be removed from below paved areas.
2. The subgrade should be scarified, moistened as required, and recompacted for a
minimum depth of 8 inches prior to placement of fill and pavement materials. If
subgrade compaction cannot be obtained in additional fill below pavement,
additional fill should be removed until the required compaction can be obtained.
12
Lee's Cyclery & Outpost Sunsport
ELI Project No. 20945180
Terracon
3. On -site clay soils may pump or become unstable or unworkable at high water
contents. Workability may be improved by scarifying and drying. Overexcavation
of wet zones and replacement with granular materials may be necessary.
Lightweight excavation equipment may be required to reduce subgrade pumping.
Use of lime, fly ash, kiln dust, cement or geotextiles could also be considered as a
stabilization technique. Laboratory evaluation is recommended to determine the
effect of chemical stabilization on subgrade soils prior to construction.
Fill Materials:
1. Clean on -site soils or approved imported materials may be used as fill material for
the following:
general site grading • exterior slab areas
foundation areas • pavement areas
interior floor slab areas • foundation backfill
2. On -site fill may be reused beneath slabs or as backfill providing all debris is removed
from it prior to its reuse.
3. Frozen soils should not be used as fill or backfill.
4. Imported soils (if required) should conform to the following:
Gradation (ASTM C136):
percent finer by weight
61, ................................................... 100
3"................................................ 70-100
No.4 Sieve ........................................... 50-70
No. 200 Sieve ....................................... 35 (max)
Liquid Limit ......................................... 35 (max)
Plasticity Index ...................................... 15 (max)
13
Lee's Cyclery & Outpost Sunsport
ELI Project No. 20945180
Terracon
5. Aggregate base should conform to Colorado Department of Transportation Class 5
or 6 specifications.
Placement and Compaction:
1. Place and compact fill in horizontal lifts, using equipment and procedures that will
produce recommended moisture contents and densities throughout the lift.
2. Uncompacted fill lifts should not exceed 10 inches loose thickness.
3. No fill should be placed over frozen ground.
4. Materials should be compacted to the following:
Minimum Percent
Material Compaction (ASTM D698)
On -site soils:
Beneath foundations ............................ yIb
Beneath slabs ................................ 95
Beneath pavements ............................ 95
Imported fill:
Beneath foundations ............................ 98
Beneath slabs ................................ 95
Beneath pavements ............................ 95
Aggregate base (beneath slabs) ......................... 95
Miscellaneous backfill................................ 90
5. If a well defined maximum density curve cannot be generated by impact compaction
in the laboratory for any fill type, engineered fill should be compacted to a minimum
of 80 percent relative density by determined by ASTM D4253.
6. On -site clay soils should be compacted within a moisture content range of optimum
moisture to 2 percent above optimum below building areas. On -site clay soils below
14
I
Lee's Cyclery & Outpost Sunsport
Terracon
ELI Project No. 20945180
paved areas and imported soils should be compacted within a moisture range of 2
percent below to 2 percent above optimum.
Shrinkage: For balancing grading plans, estimated shrink or swell of soils and bedrock
when used as compacted fill following recommendations in this report are as follows:
I' Estimated Shrink(-) Swell (+)
Material Based on ASTM D698
I' On -site soils: .................................... .
Clays .15 to -20%
Compliance: Recommendations for slabs -on -grade, foundations and pavement elements
supported on compacted fills or prepared subgrade depend upon compliance with
Earthwork" recommendations. To assess compliance, observation and testing should be
performed under the direction of the geotechnical engineer.
Excavation and Trench Construction: Excavations into the on -site soils will encounter a
variety of conditions. Excavations into the clays can be expected to stand on relatively
steep temporary slopes during construction. However, caving soils and groundwater may
also be encountered. The individual contractor(s) should be made responsible for designing
and constructing stable, temporary excavations as required to maintain stability of both the
excavation sides and bottom. All excavations should be sloped or shored in the interest
of safety following local, and federal regulations, including current OSHA excavation and
trench safety standards.
The soils to be penetrated by the proposed excavations may vary significantly across the
site. The preliminary soil classifications are based solely on the materials encountered in
widely spaced exploratory test borings. The contractor should verify that similar conditions
exist throughout the proposed area of excavation. If different subsurface conditions are
encountered at the time of construction, the actual conditions should be evaluated to
determine any excavation modifications necessary to maintain safe conditions.
As a safety measure, it is recommended that all vehicles and soil piles be kept to a
minimum lateral distance from the crest of the slope equal to no less than the slope height.
The exposed slope face should be protected against the elements.
15
Lee's Cyclery & Outpost Sunsport
ELI Project No. 20945180
Drainage:
Surface Drainage:
Terracon
1. Positive drainage should be provided during construction and maintained throughout
the life of the proposed facility. Infiltration of water into utility or foundation
excavations must be prevented during construction. Planters and other surface
features which could retain water in areas adjacent to the building or pavements
should be sealed or eliminated.
2. In areas where sidewalks or paving do not immediately adjoin the structure, we
recommend that protective slopes be provided with a minimum grade of
approximately 10 percent for at least 10 feet from perimeter walls. Backfill against
footings, exterior walls, and in utility and sprinkler line trenches should be well
compacted and free of all construction debris to reduce the possibility of moisture
infiltration.
3. Downspouts, roof drains or scuppers should discharge into splash blocks or
extensions when the ground surface beneath such features is not protected by
exterior slabs or paving.
4. Sprinkler systems should not be installed within 5 feet of foundation walls.
Landscaped irrigation adjacent to the foundation system should be minimized or
eliminated.
Additional Design and Construction Considerations:
Exterior Slab Design and Construction: Exterior slabs -on -grade, exterior architectural
features, and utilities founded on, or in backfill may experience some movement due to the
volume change of the backfill. Potential movement could be reduced by:
minimizing moisture increases in the backfill
controlling moisture -density during placement of backfill
using designs which allow vertical movement between the exterior features
and adjoining structural elements
placing effective control joints on relatively close centers
allowing vertical movements in utility connections
16
Lee's Cyclery & Outpost Sunsport
Terracon
ELI Project No. 20945180
Underground Utility Systems: All piping should be adequately bedded for proper load
distribution. Where utilities are located below groundwater, temporary dewatering will be
required during placement of pipe and backfilling for proper construction.
Corrosion Protection: Results of soluble sulfate testing indicate that ASTM Type 1-II
Portland cement is suitable for all concrete on and below grade. Foundation concrete
should be designed in accordance with the provisions of the ACI Design Manual, Section
318, Chapter 4.
GENERAL COMMENTS
It is recommended the Geotechnical Engineer be retained to provide a general review of final
design plans and specifications in order to confirm that grading and foundation recommendations
have been interpreted and implemented. In the event that any changes of the proposed project
are planned, the conclusions and recommendations contained in this report should be reviewed
and the report modified or supplemented as necessary.
The Geotechnical Engineer should also be retained to provide services during the excavation,
grading, foundation and construction phases of the work. Observation of footing excavations
should be performed prior to placement of reinforcing and concrete to confirm that satisfactory
bearing materials are present and is considered a necessary part of continuing geotechnical
engineering services for the project. Construction testing, including field and laboratory evaluation
of fill, backfill, pavement materials, concrete and steel, should be performed to determine whether
applicable project requirements have been met. It would be logical for Empire Laboratories, Inc.
to provide these additional services to determine consistency of field conditions with those data
used in our analyses.
The analyses and recommendations in this report are based in part upon data obtained from the
field exploration. The nature and extent of variations beyond the location of test borings may not
become evident until construction. If variations then appear evident, it may be necessary to
reevaluate the recommendations of this report.
Our professional services were performed using the degree of care and skill ordinarily exercised,
under similar circumstances, by reputable geotechnical engineers practicing in this or similar
localities. No warranty, express or implied, is made. We prepared the report as an aid in design
of the proposed project. This report is not a bidding document. Any contractor reviewing this
report must draw his own conclusions regarding site conditions and specific construction
techniques to be used on this project.
17
Lee's Cyclery & Outpost Sunsport
ELI Project No. 20945180 Terracon
This report is for the exclusive purpose of providing geotechnical engineering and/or testing
information and recommendations. The scope of services for this project does not include, either
specifically or by implication, any environmental assessment of the site or identification of
contaminated or hazardous materials or conditions. If the owner is concerned about the potential
for such contamination, other studies should be undertaken.
18
1
LOG OF BORING No. 1 Page 1 of I
CLIENT ARCHITECT/ENGINEER
Lee's Cyclery & Outpost Sunsport Vaught Frye Arch./RBD Inc./RNF Consultants
SITE Harmony Market 10 Filing PROJECT
Fort Collins, Colorado Proposed Building
SAMPLES TESTS
Q:
m
z
z
z
W
CL
r
Y
0:
W
O
U
W
X
F-
W
z \
3
Ho
Q-.c
cnao
W
Q_
U
H
o
H
z
W
O
LL
0 U
o
C3
Z 2
H F-
LL CD
OW
U X LL
z F-
a. mono_
D
O
J
U
Q
LDD
DESCRIPTION
Approx. Surface Elev.: 102.1 ft.
Li-
Q-
W
o
J
O
E
fA
U
U
N
1 SS 12" 3 21.3
FILL -Sandy lean CL 2 SS 12" 4
cry with gravel
Brown/red, dry to moist, medium
4.5 97.6
5--
CL
3 ST 12" 10.7 112 7290
4 SS 12" 7 13.2
SANDY LEAN
CLAY WITH GRAVEL
Red/tan, moist to wet, medium
5 ST 12" 18.9 106 1340
10 6 SS 12" 4 23.1
1
7 SS 12" 5 123.0
15.0 87.1
15
BOTTOM OF BORING
THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES
BETWEEN SOIL AND ROCK TYPES: IN -SITU, THE TRANSITION MAY BE GRADUAL.
WATER LEVEL OBSERVATIONS
Empire Laboratories
Incorporated
BORING STARTED 8-16-94
L 11.9, W.D. 1 11.9' A.B. BORING COMPLETED 8-16-94
RIG CME-55 FOREMAN DML
wL
Division of Terracon APPROVED NRS JOB # 20945180
LW- Water checked 1 day A.B.
LOG OF BORING No. 2 Page 1 of 1
CLIENT ARCHITECT/ENGINEER
Lee's Cyclery & Outpost Sunsport Vaught Frye Arch./RBD Inc./RNF Consultants
SITE Harmony Market 10 Filing PROJECT
Fort Collins, Colorado Proposed Building
SAMPLES TESTS
rJ
O O F- H O
J F- O LL. H W
H DESCRIPTION w z\ W_ HLL w
W
OU
cn F- o z z
OUQa.
Wo
U z
z
L F- O H LL Ck: LL
LD Approx. Surface Elev.: 101.4 ft. W n in o C D a
1 SS 12" 11 15.3
FILL -Sandy lean CL 2 SS 12" 13
clay with gravel
Brown/red, dry to moist, stiff
3 ST 12" 13.7
4 SS 12" 19 12.9
5
5.5 95.9
CL
SANDY LEAN
CLAY WITH GRAVEL
Red/tan, moist to wet, medium
5 ST 12" 16.3 111 3250
10
6 SS 12" 4 26.4
i
7 SS 12" 5 19.7
15.0 86'4
15
BOTTOM OF BORING
THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES
BETWEEN SOIL AND ROCK TYPES: IN -SITU, THE TRANSITION MAY BE GRADUAL.
WATER LEVEL OBSERVATIONS
Empire Laboratories
Incorporated
Division of Terracon
BORING STARTED 8-16-94
WL g 12.3' W.D. 12.8' A.B. BORING COMPLETED 8-16-94
WL RIG CME-55 FOREMAN DML
WL Water checked 1 day A.B.
APPROVED NRS JOB N 20945180
LOG OF BORING No. 3 Page 1 of 1
CLIENT ARCHITECT/ENGINEER
Lee's Cyclery & Outpost Sunsport Vaught Frye Arch./RBD Inc./RNF Consultants
SITE Harmony Market 10 Filing PROJECT
Fort Collins, Colorado Proposed Building
SAMPLES TESTS
H F- OUr
O
J
O
LL
W
W U) z= W
DESCRIPTION r m z\ W z H f_ WHU
2 W I (A H O z z J to
CL H fn cc W O 3 A O W A
a. U E: a. U HO H LL UMLL WWLL
W UI O W a.J O WU zt--(n 3Cy- (n Approx.
Surface Elev.: 99.2 ft. O 3 z F- W U) ca s O a. 5 in a. U) a. a- 1
12" 18 13.7 FILL -
Sandy lean SS
clay
with gravel CL 2 SS 12" 20 Brown/
red, dry to moist, hard 2.
0 97.2 170
CL3ST12" 12.8 118 6880 4
SS 12" 7 13.0 SANDY
LEAN 5 C
AY WITH GRAVEL Red/
tan, moist to wet Stiff
to medium 5
ST 12" 11.9 115 1550 6
SS 12" 3 24.6 10
14.
0 85.2 WELL
GRADED SW 7 SS 12" 11 19.3 15.
0 SAND WITH GRAVEL 84_2 Red,
wet, medium dense 15 BOTTOM
OF BORING THE
STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN
SOIL AND ROCK TYPES: IN -SITU, THE TRANSITION MAY BE GRADUAL. WATER
LEVEL OBSERVATIONS Empire
Laboratories Incorporated
BORING
STARTED 8-16-94 WL
13 9.7' W.D. i 9.5' A.B. BORING COMPLETED 8-16-94 RIG
CME-55 FOREMAN DML WLDivision
of Terracon APPROVED NRS JOB # 20945180 WL
Water checked 1 day A.B.
LOG OF BORING No. 4 Page 1 of I
CLIENT ARCHITECT/ENGINEER
Lee's Cyclery & Outpost Sunsport Vaught Frye Arch./RBD Inc./RNF Consultants
SITE Harmony Market 10 Filing PROJECT
Fort Collins, Colorado Pro sed Building
SAMPLES TESTS
W
co
I-_
z
W
d
Q
O
U
W_
U_
U_
z\
i (n
3
H O
n in
W
o:
H
n
H
E
A
z
O
LL
o a-
Z 2
H_
zz
O W
U W LL
D ((nn CL
W
W
JN
J (n
W W LL
n CL CL
J
U
a.
Q
L9
DESCRIPTION
Approx. Surface Elev.: 98.6 ft.
2
H
L
o
z
O
n
U
1 SS 12" 13 15.6
FILL -Sandy lean CL 2 SS 12" 22
cry with gravel
Brown/red, dry to moist
Very stiff
3.5 95.1 3603ST12" 14.4 119 13330
CL 4 SS 12" 9 10.3
5
SANDY LEAN
CLAY WITH GRAVEL
Red/tan, moist to wet
Medium to stiff
5 ST 12" 24.2 106 1190
6 SS 12" 5 31.3
10
7 SS 12" 4 24.7
15.0 83.6
15
BOTTOM OF BORING
THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES
BETWEEN SOIL AND ROCK TYPES: IN -SITU, THE TRANSITION MAY BE GRADUAL.
WATER LEVEL OBSERVATIONS
Empire Laboratories
Incorporated
Division of Terracon
BORING STARTED 8-16-94
wL U 10.9, W.D. 10.0' A.B. BORING COMPLETED 8-16-94
WL RIG CME-55 FOREMAN DML
WL. Water checked 1 day A.B.
APPROVED NRS JOB H 2O945180
go
I
LOG OF BORING No. 5 Page 1 of 1
CLIENT ARCHITECT/ENGINEER
Lee's Cyclery & Outpost Sunsport Vaught Frye Arch./RBD Inc./RNF Consultants
SITE Harmony Market 10 Filing PROJECT
Fort Collins, Colorado Pro sed Building
SAMPLES TESTS
W
to
E
3>_
z
W
a.
H
a:
O
U
W
M
H
W
Z\
Ito
3
F_O
dJ
to ca
W
a:
H
to
H
O
E
H
O
z
0
LL
MUMCL
O
Z S
H
ZZCD
ow
UMLL
ZF-tn
m co iL¢_j-1
X H
W a.
F-J
W H
F_=\
F-HJ
0
j
H
2
0
DESCRIPTION
Approx. Surface Elev.: 99.5 ft.
U_
2
F-
CL
W
o
O
co
E
r
co
to
U
to
m
FILL -Sand, lean CL 1 SS 12" 10 18.1 38/19/19
clay with gravel
1.5
Brown/red, dry 98.0 2 SS 12" 17
SANDY LEAN
CLAY WITH GRAVEL CL 3 SS 12" 7 10.5
Red/tan, moist, stiff to medium
5
4 SS 12" 3 23.4
10.0 89.5
10
BOTTOM OF BORING
THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES
BETWEEN SOIL AND ROCK TYPES: IN -SITU, THE TRANSITION MAY BE GRADUAL.
WATER LEVEL OBSERVATIONS
ARTED 8-16-94
Empire Laboratories
Incorporated
MPLETED 8-16-94FRIGCNffi-55
WL Q None W.D. None A.B.
FOREMAN DML
WL
Division of Terracon APPROVED NRS JOB # 20945180Z'I- Water checked 1 day A.B.
4.e
c-
CONSOLIDATION TEST F F'---j . 2 Q 3 4 51 L ::-:: 11
E: F.'l t--1 11 N
El EF'7H : 9 0
EiEr-,lS17Y.l[l0.'f F',--F
MOISTURE: 21.e
0.25 0.5 0
APPLIED PRESSURE - T'SF
0 .22 5 e.5
APPLIED PRESSURE - T'= F
EMPIRE LFISORRTORIES It -,.IC.
5 1 C,
1
CO
of C N N
N• N" N'
Nr N. N Nr N-N.
N Cq
a
U
a Z
a: O
O
N
Q a
U
a
o v
C7 =
x
a
a
a
a.
a
0
w 000
y N M
cn
O
U
O
U
00
y
r. O M 00 M enW)
N m N M
O N
3C4~
Ll
oq
O
z
N
M
C
C
3
c f1
CU
U
Oc4
p U
z U
cn
U
o o
C7
x v
a
z
a
Ci y
c
nV] (J]
u
y a en
y Orn Q
QJ a M
no
U
O
U
A O
aci
A
a it
M M Cl! Cl![ r Vi
c oo O M
C
DRILLING AND EXPLORATION
DRILLING & SAMPLING SYMBOLS:
R : Ring Barrell - 2.42" I.D., 3" O.D., unless otherwise noted
SS : Split Spoon - VYs" I.D., 2" O.D., unless otherwise noted PS : Piston Sample
ST : Thin -Walled Tube - 2" O.D., unless otherwise noted WS : Wash Sample
PA: Power Auger FT : Fish Tail Bit
HA : Hand Auger RB : Rock Bit
DB : Diamond Bit = 4", N, B BS : Bulk Sample
AS : Auger Sample PM : Pressure Meter
HS : Hollow Stem Auger DC : Dutch Cone
WB : Wash Bore
Penetration Test: Blows per foot of a 140 pound hammer falling 30 inches on a 2-inch O.D. split spoon, except where
noted.
WATER LEVEL MEASUREMENT SYMBOLS:
WL : Water Level WS :While Sampling
WCI : Wet Cave in WD : While Drilling
DCI : Dry Cave in BCR : Before Casing Removal
AB : After Boring ACR : After Casting Removal
Water levels indicated on the boring logs are the levels measured in the borings at the time indicated. In pervious soils,
the indicated levels may reflect the location of groundwater. In low permeability soils, the accurate determination of
groundwater levels is not possible with only short term observations.
DESCRIPTIVE SOIL CLASSIFICATION:
Soil Classification is based on the Unified Soil Classification system and the ASTM Designations D-2487 and D-2488.
Coarse Grained Soils have more than 50% of their dry weight retained on a #200 sieve; they are described as: boulders,
cobbles, gravel or sand. Fine Grained Soils have less than 50% of their dry weight retained on a #200 sieve; they are
described as: clays, if they are plastic, and silts if they are slightly plastic or non -plastic. Major constituents may be
added as modifiers and minor constituents may be added according to the relative proportions based on grain size. In
addition to gradation, coarse grained soils are defined on the basis of their relative in -place density and fine grained soils
on the basis of their consistency. Example: Lean clay with sand, trace gravel, stiff (CL); silty sand, trace gravel, medium
dense (SM).
CONSISTENCY OF FINE-GRAINED SOILS: RELATIVE DENSITY OF
Unconfined Compressive COARSE -GRAINED SOILS:
Strength, Qu, psf Consistency N-Blows/ft. Relative Density
500 Very Soft 0-3 Very Loose
500 - 1,000 Soft 4-9 Loose
1,001 - 2,000 Medium 10-29 Medium Dense
2,001 - 4,000 Stiff 30-49 Dense
4,001 - 8,000 Very Stiff 50-80 Very Dense
8,001-16,000 Very Hard 80+ Extremely Dense
RELATIVE PROPORTIONS OF
SAND AND GRAVEL GRAIN SIZE TERMINOLOGY
Descriptive Term(s) Major Component
of Components Also Percent of of Sample Size Range
Present in Sample) Dry Weight Boulders Over 12 in. (300mm)
Trace 15 Cobbles 12 in. to 3 in.
With 15 - 29 300mm to 75mm)
Modifier 30 Gravel 3 in. to #4 sieve
75mm to 4.75mm)
RELATIVE PROPORTIONS OF FINES Sand #4 to #200 sieve
4.75mm to 0.075mm)
Descriptive Term(s)
of Components Also Percent of Silt or Clay Passing #200 Sieve
Present in Sample) Dry Weight
0.075mm)
Trace 5
With 5 - 12
Modifier 12
Empire Laboratories, Inc.
A Division of The Terracon Companies, Inc. —
UNIFIED SOIL CLASSIFICATION SYSTEM
Criteria for Assigning Group Symbols and Group Names Using Laboratory Tests°
Coarse -Grained Gravels more than Clean Gravels Less
Cu > 4 and 1 < Cc <3E
Soils more than 50% of coarse than 5% finest — — —
50% retained on fraction retained on
No. 200 sieve No. 4 sieve Cu < 4 and/or 1 > Cc >
Sands 50% or more
of coarse fraction
passes No. 4 sieve
Fine -Grained Soils Silts and Clays
50% or more Liquid limit less
passes the than 50
No. 200 sieve
Silts and Clays
Liquid limit 50
or more
Highly organic soils Primarily
ABased on the material passing the 3-in.
75-mm) sieve
elf field sample contained cobbles or
boulders, or both, add "with cobbles or
boulders, or both" to group name.
Gravels with 5 to 12% fines require dual
symbols:
GW-GM well -graded gravel with silt
GW-GC well -graded gravel with clay
GP -GM poorly graded gravel with silt
GP -GC poorly graded gravel with clay
Sands with 5 to 12% fines require dual
symbols:
SW-SM well -graded sand with silt
SW -SC well -graded sand with clay
SP-SM poorly graded sand with silt
SP-SC poorly graded sand with clay
60
Gravels with Fines
more than 12% fines c Fines classify as ML or MH
Fines classify as CL or CH
Clean Sands Less Cu > 6 and 1 < Cc < 3E
than 5% fine SE
Cu < 6 and/or 1 > Cc >
Sands with Fines Fines classify as ML or MH
more than 12% fines°
Fines Classify as CL or CH
inorganic PI > 7 and plots on or abo
PI < 4 or plots below "A" I
organic Liquid limit - oven dried
Liquid limit - not dried
inorganic PI plots on or above "A" lin
PI lots below "A" line
organic Liquid limit oven dried
Liquid limit - not dried
orqanic matter, dark in color, and organic odor
a)s
D6oIDLo Cc - Dlo x D6o
If soil contains > 15% sand, add "with
sand" to group name.
If fines classify as CL-ML, use dual symbol
GC -GM, or SC-SM.
If fines are organic, add "with organic fines"
to group name.
hf soil contains > 15% gravel, add "with
gravel" to group name.
If Atterberg limits plot in shaded area, soil is
a CL-ML, silty clay.
Soil Classification
Group Group Name' Symbol
GW Well -graded gravel`
3E GP Poorly graded gravel`
GM Silty gravel,G,H
GC Clayey gravel","
SW Well -graded sand'
3E SP Poorly graded sand'
SM Silty sand'-`
SC Clayey sand °•"
ve "A line' CL Lean clayK4M
ine' ML SIItK,L.M
Organic clayL,M,N 0.
75 OL Organic
siltK•LM•° e
CH Fat clayK,L•M MH
Elastic SiltKL-M Organic
clayKLM,P 0.
75 OH Organic
silt""i'°
PT
Peat Klf
soil contains 15 to 29% plus No. 200, add with
sand" or "with gravel", whichever is predominant.
Llf
soil contains > 30% plus No. 200 predominantly
sand, add "sandy" to group name.
MY
soil contains > 30% plus No. 200, predominantly
gravel, add "gravelly" to group name.
PI >
4 and plots on or above "A" line. PI <
4 or plots below "A" line. PPI
plots on or above "A" line. PI
plots below "A" line. i
For
clas.ifi-0 n al f'ne-yroined wile and
flne rained lree of wane- grained
eels A -
6ro\!1 Equationo1Horizontal
at PI - 4 to LL " 25.5 I tt—
R-0J3(LL- 201 ine
of 16toPI - 7. LL -
6) i• i
V
Gi
C G
IEMH OR OH OR
OL eML0
0
10 16 20 30 40 50 60 70 60 90 100 lic LIQUID
UMIT (LL) Empire
Laboratories, Inc. A
Division of The Terracon Companies, Inc.
LABORATORY TESTS
SIGNIFICANCE AND PURPOSE
TEST SIGNIFICANCE PURPOSE
California Used to evaluate the potential strength of subgrade soil, subbase, Pavement
Bearing and base course material, including recycled materials for use in Thickness
Ratio road and airfield pavements. Design
Used to develop an estimate of both the rate and amount of both Foundation
Consolidation differential and total settlement of a structure. Design
Used to determine the consolidated drained shear strength of soil Bearing Capacity,
Direct or rock. Foundation Design &
Shear Slope Stability
Dry Used to determine the in -place density of natural, inorganic, fine- Index Property
Density grained soils. Soil Behavior
Used to measure the expansive potential of fine-grained soil and to Foundation & Slab
Expansion provide a basis for swell potential classification. Design
Used for the quantitative determination of the distribution of Soil
Gradation particle sizes in soil. Classification
Liquid & Used as an integral part of engineering classification systems to Soil
Plastic Limit, characterize the fine-grained fraction of soils, and to specify the Classification
Plasticity Index fine-grained fraction of construction materials.
Oxidation- Used to determine the tendency of the soil to donate or accept Corrosion
Reduction electrons through a change of the oxidation state within the soil. Potential
Potential
Used to determine the capacity of soil or rock to conduct a liquid Groundwater
Permeability
or gas.
Flow Analysis
Used to determine the degree of acidity or alkalinity of a soil. Corrosion
p H Potential
Used to indicate the relative ability of a soil medium to carry Corrosion
Resistivity electrical currents. Potential
Used to evaluate the potential strength of subgrade soil, subbase, Pavement
R-Value and base course material, including recycled materials for use in Thickness
road and airfield pavements. Design
Soluble Used to determine the quantitative amount of soluble sulfates Corrosion
Sulphate within a soil mass. Potential
Used to determine the quantitative amounts of sulfides within a Corrosion
Su/fide Content
soil mass.
Potential
To obtain the approximate compressive strength of soils that Bearing Capacity
Unconfined possess sufficient cohesion to permit testing in the unconfined Analysis for
Compression
state.
Foundations
Water Used to determine the quantitative amount of water in a soil mass. Index Property
Soil Behavior
Content
Empire Laboratories, Inc.
A Division of The Terracon Companies, Inc. --
I
REPORT TERMINOLOGY
Based on ASTM D653)
Allowable Soil The recommended maximum contact stress developed at the interface of the
Bearing Capacity foundation element and the supporting material.
Alluvium Soil, the constituents of which have been transported in suspension by flowing
water and subsequently deposited by sedimentation.
Aggregate Base A layer of specified material placed on a subgrade or subbase usually beneath
Course slabs or pavements.
Backfill A specified material placed and compacted in a confined area.
Bedrock A natural aggregate of mineral grains connected by strong and permanent
cohesive forces. Usually requires drilling, wedging, blasting or other methods of
extraordinary force for excavation.
Bench A horizontal surface in a sloped deposit.
Caisson (Drilled pier A concrete foundation element cast in a circular excavation which may have an
or Shaft) enlarged base. Sometimes referred to as a cast -in -place pier or drilled shaft.
Coefficient of A constant proportionality factor relating normal stress and the corresponding
Friction shear stress at which sliding starts between the two surfaces.
Coluuvium Soil, the constituents of which have been deposited chiefly by gravity such as
at the foot of a slope or cliff.
Compaction The densification of a soil by means of mechanical manipulation.
Concrete Slab -on- A concrete surface layer cast directly upon a base, subbase or subgrade, and
Grade typically used as a floor system.
Differential Unequal settlement or heave between, or within foundation elements of a
Movement structure.
Earth Pressure The pressure or force exerted by soil on any boundary such as a foundation
wall.
ESAL Equivalent Single Axle Load, a criteria used to convert traffic to a uniform
standard, (18,000 pound axle loads).
Engineered Fill Specified material placed and compacted to specified density and/or moisture
conditions under observations of a representative of a geotechnical engineer.
Equivalent Fluid A hypothetical fluid having a unit weight such that it will produce a pressure
against a lateral support presumed to be equivalent to that produced by the
actual soil. This simplified approach is valid only when deformation conditions
are such that the pressure increases linearly with depth and the wall friction is
neglected.
Existing Fill (or Materials deposited through the action of man prior to exploration of the site.
man-made fill)
Existing Grade The ground surface at the time of field exploration.
Empire Laboratories, Inc.
A Division of The Terracon Companies, Inc.
REPORT TERMINOLOGY
Based on ASTM D653)
Expansive Potential The potential of a soil to expand (increase in volume) due to absorption of
moisture.
Finished Grade The final grade created as a part of the project.
Footing A portion of the foundation of a structure that transmits loads directly to the
soil.
Foundation The lower part of a structure that transmits the loads to the soil or bedrock.
Frost Depth The depth of which the ground becomes frozen during the winter season.
Grade Beam A foundation element or wall, typically constructed of reinforced concrete,
used to span between other foundation elements such as drilled piers.
Groundwater Subsurface water found in the zone of saturation of soils, or within fractures
in bedrock.
Heave Upward movement.
Lithologic The characteristics which describe the composition and texture of soil and
rock by observation.
Native Grade The naturally occuring ground surface.
Native Soil Naturally occurring on -site soil, sometimes referred to as natural soil.
Optimum Moisture The water content at which a soil can be compacted to a maximum dry unit
Content weight by a given compactive effort.
Perched Water Groundwater, usually of limited area maintained above a normal water
elevation by the presence of an intervening relatively impervious continuing
stratum.
Scarify To mechanically loosen soil or break down existing soil structure.
Settlement Downward movement.
Skin Friction (Side The frictional resistance developed between soil and an element of structure
Shear) such as a drilled pier or shaft.
Soil (earth) Sediments or other unconsolidated accumulations of solid particles produced
by the physical and chemical disintegration of rocks, and which may or may
not contain organic matter.
Strain The change in length per unit of length in a given direction.
Stress The force per unit area acting within a soil mass.
Strip To remove from present location.
Subbase A layer of specified material in a pavement system between the subgrade and
base course.
Subgrade The soil prepared and compacted to support a structure, slab or pavement
system.
Empire Laboratories, Inc.
A Division of The Terracon Companies, Inc.
Distress
Type
Alligator
Cracking
Bleeding
Block
Cracking
Bumps &
Sags
Corrugation
Depression
Edge
Cracking
Joint
Reflection
Lane/Shoulder
Drop -Off
Longitudinal &
Transverse
Cracking
TABLE D1
RECOMMENDED PREVENTATIVE MAINTENANCE POLICY
FOR ASPHALT CONCRETE PAVEMENTS
Distress
Severity
Recommended
Maintenance
Distress
Type
Distress
Severity
Low None
Patching &
utility Cut
Patching
Low
Medium Full -Depth
Asphalt Concrete
Patch
Medium
High High
Low None
PolishedMedium
Aggregate
Low
Medium Surface Sanding
High Shallow AC Patch High
Low None
Potholes
Low
Medium Clean &
Seal
All Cracks
Medium
High High
Low None
RailroadMedium
Crossing
Low
Medium Shallow AC Patch
High Full -Depth Patch High
Low None
Rutting
Low
Medium Full -Depth
Asphalt Concrete
Patch
Medium
HighHigh
Low None
Shoving
Low
Medium Shallow AC Patch Medium
High Full -Depth Patch High
Low None
Slippage
Low
Medium Seal Cracks MediumCracking
High Full -Depth Patch High
Low Clean &
Seal
All Cracks Swell
Low
Medium
Medium
High
High Shallow AC Patch
Low None
Weathering
Ravelling
Low
Medium Regrade
Shoulder
Medium
High
High
Low None
Medium
Clean &
Recommended
Maintenance
None
Full -Depth
Asphalt Concrete
Patch
None
Fog Seal
Shallow AC Patch
Full -Depth
Asphalt Concrete
Patch
No Policy
for
This Project
None
Shallow AC Patch
Full -Depth Patch
None
Mill &
Shallow AC
Patch
None
Shallow
Asphalt Concrete
Patch
None
Shallow AC Patch
Full -Depth Patch
Fog
Seal
Seal Empire Laboratories, Inc.
High All Cracks
A Division of The Terracon Companies, Inc.
TABLE D2
RECOMMENDED PREVENTATIVE MAINTENANCE POLICY
FOR JOINTED CONCRETE PAVEMENTS
Distress Distress Recommended Distress Distress Recommended
Type Severity Maintenance Type Severity Maintenance
Low None No
Groove Surface
Blow-up Medium Full -Depth Polished Severity or
Concrete Patch/ Aggregate Levels
Overlay
High Slab Replacement
Defined
Low Seal Cracks No
Comer
Medium Full -Depth
Popouts
Severity
Levels
None
Break
High
Concrete Patch Defined
Low Seal Cracks No
Underseal,
Seal cracks/joints
Divided
Medium Slab
Pumping
Severity
Levels
and
Slab Restore
High
Replacement Defined
Load Transfer
Low None Low Seal Cracks
Durability Medium Full -Depth Patch Punchout Medium Full -Depth
Cracking Concrete
High Slab Replacement High Patch
Low None Low No
Railroad
Medium
Policy
Faulting Medium Crossing for this
Grind
High Project
High
Low None Scaling
Low None
Joint Medium
Map Cracking Medium Slab Replacement,
Seal Reseal Crazing Full -depth Patch,
High
Joints High or Overlay
Low Regrade and No
Lane/Shoulder Fill Shoulders Shrinkage Severity None
Drop-off
Medium to Match Cracks Levels
High Lane Height Defined
Linear Cracking Low Clean &
Low None
Longitudinal,
Transverse and Medium
Seal all Cracks Spalling
Comer)
Medium Partial -Depth
Diagonal High
Concrete Patch
Cracks High Full -Depth Patch
Low None Low None
Large Patching Spalling Medium Partial -Depth Patch
and Medium Seal Cracks or Joint)
uTril/ curs Replace Patch High Reconstruct Joint
High
Low None
Small Medium Replace
Patching Patch Empire Laboratories, Inc.
High i 11 — A Division of The Terracon Companies, Inc. --