HomeMy WebLinkAboutHARMONY CROSSING PUD - Filed SER-SUBSURFACE EXPLORATION REPORT -SUBSURFACE EXPLORATION REPORT
PROPOSED HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
EEC PROJECT 1932043
1
C
aJ
EARTH ENGINEERING
CONSULTANTS, INC.
December 1, 1993
Richland Homes, Inc.
8791 Wolff Court, Suite 200
Westminster, Colorado 80030
Attn: Mr. Jerry Rolhfs
Re: Subsurface Exploration Report
Proposed Harmony Crossing P.U.D.
Fort Collins, Colorado
EEC Project No. 1932048
Mr. Rolhfs:
Enclosed, herewith, are the results of the subsurface exploration
you requested for the referenced project. In summary, the soils
encountered in the test borings performed at this site consisted of
low plasticity cohesive materials with interbedded zones of fine
and fine to coarse grained essentially granular soils. Based on
the results of our field borings and laboratory testing, it is our
opinion the site materials could be used for direct support of
footing foundations for the proposed lightly loaded residences.
Those soils could also be used for direct support of floor slabs
and pavements.
Softer/looser zones were occasionally encountered in the overburden
soils so that care will be needed to see that footings are
supported on suitable strength materials. Also, apparent
groundwater was encountered at relatively shallow depths over a
portion of site and those groundwater conditions should be
considered during design of the development. Geotechnical
recommendations concerning design and construction of foundations
and support of floor slabs and pavements are presented in the text
of the attached report.
2600 Canton Ct, Suite A Fort Collins, CO 80525
303) 224-1522 FAX 224-4564
Harmony Crossing
December 1, 1993
Page 2
Earth Iinginis:ing consultants, Inc.
We appreciate the opportunity to be of service to you on this
project. If you have any questions concerning the enclosed report,
or if we can be of further service to you in any other way, please
do not hesitate to contact us.
Very truly yours,
Earth Engineering consultants, Inc.
Principal Engineer
Curti ss'"L°1." a1in, P.E.
Principal Engineer
SUBSURFACE EXPLORATION REPORT
PROPOSED HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
EEC PROJECT 1932048
December 1, 1993
INTRODUCTION
The subsurface exploration for the proposed Harmony Crossing P.U.D.
in Fort Collins, Colorado, has been completed. Thirty-three (33)
soil borings extending to depths ranging from approximately 5 to 15
feet below present site grades were advanced to develop information
on existing subsurface conditions in the proposed development area.
Individual boring logs and a diagram indicating the approximate
boring locations are included with this report.
We understand the proposed Harmony Crossing P.U.D. will include 216
single family residential lots on an approximate 80-acre parcel.
It is expected the proposed residences will be one or two story,
wood frame buildings. We understand the lower levels of the
structures will extend to depths on the order of 5 feet below
existing site grades. Foundations loads for the proposed single
family houses are expected to be light with continuous wall loads
less than 2 kips per lineal foot and column loads less than 30
kips. Floor loads will be less than 100 psf. Maximum cuts and
fills (outside the building areas) of 3 feet are expected to
develop the site grades. New site roadways will be constructed and
underground utilities will be installed as a part of the
development.
The purpose of this report is to describe the subsurface conditions
encountered in the borings, analyze and evaluate the test data and
provide geotechnical recommendations concerning design and
construction of the foundations and support of floor slabs and
pavements.
1
Frrlh Enginecring Consultants, Inc.
Harmony Crossing P.U.D.
December 1, 1993
Page 2
EXPLORATION AND TESTING PROCEDURES
The boring locations were selected and established in the field by
Earth Engineering Consultants, Inc. personnel. The field locations
were established by pacing and estimating angles relative to
observable site features. Surface elevations were not determined
by EEC personnel. The locations and elevations of the borings
should be considered accurate only the degree implied by the method
used to establish that information.
The borings were performed with a truck mounted, Dietrich D-50
drill rig. The boreholes were advanced using 4-inch nominal
diameter continuous flight augers and samples of the subsurface
materials encountered were obtained using thin -walled tube and
split -barrel sampling procedures in general accordance with ASTM
Specifications D-1587 and D-1586, respectively. In the thin -walled
tube sampling procedure, a seamless steel tube with a sharpened
cutting edge is pushed into the soil with hydraulic pressure to
obtain a relatively undisturbed sample of cohesive or moderately
cohesive material. In the split -barrel procedure, a standard 2-
inch O.D. split -barrel sampling spoon is driven into the ground by
means of a 140-pound hammer falling a distance of 30 inches. The
number of blows required to advance the split -barrel sampler is
recorded and is used to estimate the in -situ relative density of
cohesionless soils and, to a lesser degree of accuracy, the
consistency of cohesive soils. All samples obtained in the field
were sealed and returned to the laboratory for further examination,
I classification and testing.
Laboratory testing on the recovered samples included moisture content
tests for both thin -walled tube and split -barrel samples. The thin -
walled tube samples were tested additionally for unconfined compressive
strength, Atterberg limits, swell/consolidation, percent fines and dry
density. The unconfined strength of appropriate split -barrel samples
Firth Engineering Consultants, Inc.
Harmony Crossing P.U.D.
December 1, 1993
Page 3
was estimated using a calibrated hand penetrometer and washed sieve
analysis and atterberg limits tests were performed on selected samples.
Remolded swell tests were also completed on a portion of these samples.
Two Hveem IIRII values are being performed on representative samples of
near surface cohesive materials. Results of the outlined tests are
shown on the attached boring logs; results of the R-value tests will be
forwarded at a later date.
As a part of the testing program, all samples were examined in the
laboratory by an engineer and classified in accordance with the attached
General Notes and the Unified Soil Classification. System, based on the
soil's texture and plasticity. The estimated group symbol for the
Unified Soil Classification System is shown on the boring logs and a
brief description of that classification system is included with this
report.
SITE AND SUBSURFACE CONDITIONS
The proposed Harmony Crossing P.U.D. will be located approximately 1/2
mile south of Harmony Road and west of Timberline Road in Fort Collins.
The project site is currently irrigated farm land. Existing site
drainage is towards the south and east with maximum difference in
surface elevations across the site on the order of 5 to 10 feet.
Evidence of prior building construction was not observed at the site by
EEC personnel.
A EEC field engineer was on site during drilling to observe and log the
materials encountered and adjust the sampling program as necessary to
obtain appropriate samples for those materials. The EEC field engineer
developed written logs of the materials encountered based on visual and
tactual observations. The boring logs included with this report may
contain modifications to those field logs based on results of laboratory
testing and evaluation. Based on the results of the field and
I laboratory testing, subsurface conditions can be generalized as follows.
Girth Engineering ConsulunU, Inc.
Harmony Crossing P.U.D.
December 1, 1993
Page 4
Approximately eight to ten inches of vegetation and/or topsoil was
encountered at the surface at the boring locations. The topsoil
and/or vegetation was underlain by brown, light brown, and reddish
brown lean clay with varying amounts of sand and/or silty sand with
varying amounts of clay. The lean clay was stiff to soft and the
essentially granular materials were loose to medium dense. Those
materials generally extended to the bottom of borings at depths of
5 to 15 feet below present grades.
At boring locations B-28 and B-29, the granular soils were
underlain below depths of approximately 12 to 14 feet by highly
weathered sandstone and/or apparent shale bedrock. The bedrock was
colored gray or brown and was poorly cemented or stiff. Those
materials extended to the bottom of these borings at depths of
approximately 15 feet below present site grades.
The stratification boundaries shown on the boring logs represent
the approximate location of changes in soil and rock types; in -
situ., the transition of materials may be gradual and indistinct.
Classification of the bedrock was based on visual and tactual
observation of disturbed samples and auger cuttings. Coring and/or
petrographic analysis may reveal other rock types.
IWATER LEVEL OBSERVATIONS
Observations were made while drilling and after completion of the
borings to detect the presence and level of apparent groundwater.
Water level measurements were also completed in selected open
boring holes approximately two days after drilling. At the time of
the outlined measurements, free water was observed at depths of
approximately 8 to 10 feet below present ground surface.
Based on results of the ground water measurements and observed
moisture contents in the subsurface materials, it is our opinion
Harmony Crossing P.U.D.
Earth Engineering Consultants, Inc.
December 1, 1993
Page 5
groundwater was on the order of 8 feet below ground surface at the
time of boring. Fluctuations in groundwater levels can occur over
time depending on variations in hydrologic conditions and other
conditions not apparent at the time of this report. Areas of
perched water may also be encountered in more permeable zones in
the subsurface soils at times throughout the year.
ANALYSIS AND RECOMMENDATIONS
FOUNDATIONS
Based on the materials observed at the borings locations, it is our
opinion the proposed single family residences could be supported on
conventional footing foundations. We recommend those foundations
extend through all existing vegetation and/or topsoil and bear in
the natural, stiff lean clay with varying amounts of sand or loose
to medium dense silty sand. For design of footing foundations
bearing in the natural, stiff to very stiff cohesive materials or
loose to medium dense granular soils, we recommend using a net
allowable total load soil bearing pressure not to exceed 1,500 psf.
The net bearing pressure refers to the pressure at foundation
bearing level in excess of the minimum surrounding overburden
pressure; the "total load" refers to full dead and live loads. A
minimum dead load pressure of 500 psf should be maintained to help
offset the potential for movement which could occur through wetting
I and drying cycles of the cohesive bearing materials.
Zones of softer cohesive soils or looser granular soils were
occasionally encountered in the test borings. Care should be taken
during construction to closely evaluate all anticipated bearing
soils. If unacceptable soils or loose zones are encountered, the
foundation should be extended to bear below those materials or
overexcavation and backfilling procedures used to develop suitable
bearing. Recommendations concerning those procedures should be
based on the actual conditions encountered.
Earth Engineering Consultants, Inc.
Harmony Crossing P.U.D.
December 1, 1993
Page 6
Exterior perimeter foundations and foundations in unheated areas
should be located a minimum of 30 inches below adjacent exterior
grade to provide frost protection. We recommend formed continuous
footings have a minimum width of 16 inches and isolated column
foundations have a minimum width of 30 inches. Trenched
foundations (grade beam foundations) could be used in the near
surface cohesive materials. If used, we recommend those trenched
foundations have a minimum width of 12 inches.
Care should be taken to avoid disturbing the bearing materials. A
portion of the site soils have high silt contents and may be easily
disturbed, especially if wetted. Materials which are loosened or
disturbed by the construction activities or soils which are wet and
softened or dry and dessicated should be removed from the
foundation excavations prior to placement of reinforcing steel and
foundation concrete.
The long term settlement of footing foundations designed and
constructed as recommended above should be small, less than 3/4
inch.
FLOOR SLAB AND PAVEMENT SUBGRADES
All existing vegetation and/or topsoil should be removed from
beneath the floor slabs and pavements. After stripping and
completing all cuts and prior to placement of any fill, floor slabs
or pavements, we recommend the exposed soils be scarified to a
minimum depth of 9 inches, adjusted in moisture content and
compacted to at least 95% of the material's maximum dry density as
determined in accordance with ASTM Specification D-698, the
standard Proctor procedure. The moisture content of the scarified
soils should normally be adjusted to be within the range of plus or
minus 2% of standard Proctor optimum moisture. A portion of the
near surface materials at this site contain relatively high
Earth Engineering Consultants, Inc.
Harmony Crossing P.U.D.
December 1, 1993
Page 7
of silt. The moisture context of those soilspercentages should be
lowered to develop stable subgrades. Lower moisture contents would
also be appropriate for the essentially granular soils.
Fill soils required to develop the slab or pavement subgrades
should consist of approved, low -volume change materials, free from
organic matter and debris. Based on our observation of the site
materials, it is our opinion the near surface cohesive and
essentially granular materials could be used as low -volume change
fill. If off -site materials are used, those materials should have
a liquid limit less than 40 and a plasticity index less than 18 and
should contain a minimum of 15% fines, material passing the number
200 sieve. Fill soils belcw floor slabs and pavements should be
placed in loose lifts not exceeding 9 inches thick, adjusted in
moisture content as recommended for the scarified materials and
compacted to at least 95% of standard Proctor maximum dry density.
Care should be taken after construction to avoid disturbing the
prepared subgrades. Subgrades which are disturbed by the
construction activity should be removed and replaced or reworked
in -place prior to placement of overlying pavements or floor slabs.
In addition, care should be taken to maintain the recommended
moisture contents in cohesive soil subgrades. Materials which are
allowed to become dry and dessicated or wet and softened, should be
reworked prior to placement of the overlying floor slabs or
pavements.
PAVEMENTS
A Hveem Stabilometer R-value of 5 has been estimated for the site
soils. Laboratory testing is being performed to more accurately
determine that value. That R-value was used for preliminary design
of the pavement sections. After laboratory testing is completed,
the preliminary pavement recommendations provided in this report
will be adjusted as appropriate.
FJ
Earth Engineering Consultants, Inc.
Harmony Crossing P.U.D.
December 1, 1993
Page 8
We estimate the traffic loading on the roadways would be
approximately 5 and 7 equivalent daily load axles (EDLA)for the
local streets and collector drives, respectively. The traffic
loads will need to be verified with City of Fort Collins
Engineering; that verification has been requested.
The 1986 AASHTO "Guide For Design of Pavements Structures" was used
to help evaluate alternative pavement sections for this project.
A 20 year design life
the
was evaluated for the pavements. Based on
outlined analyses and soil and traffic parameters, recommended
pavement sections for the development roadways are provided below
in Table I.
TABLE I: RECOMMENDED PAVEMENT SECTIONS
Pavement Sections Collector Local
Streets Streets
EDLA = 7) EDLA = 5)
PCC Concrete
i
6" 5"
HBP with Aggregate (Composite)
HBP 311 311
Aggregate Base 12" 8"
Composite with Stabilized Subgrade
HBP 3" 3"
Aggregate Base 4" 4"
Stabilized Subgrade 12" 12"
Asphaltic concrete for use in the pavements should be compatible
with the City of Fort Collins requirements for 11SC-1" or 11SC-2"
blends. Aggregate base for use in the pavement sections should be
compatible with Colorado Department of Transportation (CDOT)
requirements for Class 5 or Class 6 base. The aggregate base
Harmony Crossing P.U.D.
December 1, 1993
Page 9
Earth Enginccring Consultants, Inc.
1
should be placed beneath the pavements. Portland cement concrete
for use in the pavements, if used, should have a minimum
compressive strength of 3500 psi at 28 days and should be air
entrained.
Concerning stabilization of the pavement subgrades, we recommend
consideration be given to stabilizing the soil subgrades with
addition of Class t1C11 fly ash. We estimate 13 to 15 percent fly
ash by dry weight would be needed; laboratory verification should
be completed prior to construction. The stabilized subgrade would
help reduce the needed aggregate/HBP section as well as help
develop a stable subgrade for placement of those materials. We
would be pleased to provide additional recommendations concerning
stabilization of the subgrades, if desired.
Positive drainage should be developed across the roadways and away
from the roadway edges to reduce the potential for wetting of the
pavement subgrades. Subgrades which are allowed to become wetted
subsequent to construction could cause premature failure of the
pavement section.
BELOW GRADE AREAS
Below grade areas for the new residences should be designed with a
perimeter drain system to eliminate hydrostatic pressures on the
below grade walls or those walls should be designed to resist
hydrostatic loads and prevent intrusion of water into below grade
areas. A perimeter drain system would generally consist of
perforated metal or plastic pipe placed at approximate foundation
bearing level around the perimeter of the structure and sloped to
drain water to a sump area where it can be removed without reverse
flow into the system. The drain line should be surrounded by a
minimum of 6 inches of appropriately sized granular filter
material. Either the filter material or the drainline should be
wrapped in filter fabric to reduce the potential for an influx of
fines into the system.
J
I
Fxnh L•nginecring Consultants, Inc.
Harmony Crossing P.U.D.
December 1, 1993
Page 10
1
Backfill placed adjacent to the below grade walls should be placed
and compacted as recommended for fill beneath the floor slabs and
pavements except that the degree of compaction of those materials
could generally be reduced to 900 of standard Proctor maximum dry
density. Settlements of 1 to 2 inches could occur in the backfill
with the reduced compaction. Areas beneath patios, steps, and
driveways or any other overlying structures should be compacted to
at least 950 of standard Proctor maximum dry density. Backfilling
should be accomplished using light -weight hand -operated equipment
to avoid placing excessive lateral load on the below grade walls.
Puddling should not be used to consolidate backfill.
For design of the below grade walls with perimeter drain systems,
we recommend using a lateral equivalent fluid pressure of 60 pounds
per cubic foot. That lateral pressure is based on an "at -rest"
stress distribution and does not include an allowance for surcharge
loads. The recommended lateral pressure also does not include a
factor of safety. Surcharge loads adjacent to the walls would add
to the lateral pressures.
I
GENERAL
We estimate side slopes of 2 horizontal to 1 vertical would be
stable on shallow trenches excavated for short term construction
activities. Deeper trenches or trenches of a longer term nature
should be analyzed on a individual basis. When trenching, all
applicable OSHA requirements should be followed.
While the site cohesive materials are not highly expansive,
fluctuations in moisture content could cause some shrink -swell
movements of those materials. That movement may be minimized by
maintaining a consistent moisture content in the cohesive
materials. Care should be taken to avoid plantings which can use
large quantities of water adjacent to the structures. Also,
positive drainage should be developed away from the structures to
avoid ponding of water adjacent to the foundations.
1
Earth Engincering Consultants, Inc.
Harmony Crossing P.U.D.
December 1, 1993
Page 11
GENERAL COMMENTS
The analysis and recommendations presented in this report are based
upon the data obtained from the soil borings performed at the
indicated locations and from any other information discussed in
this report. This report does not reflect any variations which may
occur between borings or across the site. The nature and extent of
such variations may not become evident until construction. If
variations appear evident, it will be necessary to re-evaluate the
recommendations of this report.
It is recommended that the geotechnical engineer be retained to
review the plans and specifications so that comments can be made
regarding the interpretation and implementation of our geotechnical
recommendations in the design and specifications. It is further
recommended that the geotechnical engineer be retained for testing
and observations during earthwork and foundation construction
phases to help determine that the design requirements are
fulfilled.
This report has been prepared for the exclusive use of Richland
Homes, Inc. for specific application to the project discussed and
has been prepared in accordance with generally accepted
geotechnical engineering
implied, is made. In the
practices.
event that
No warranty, express or
any changes in the nature,
design or location of the project as outlined in this report are
planned, the conclusions and recommendations contained in this
report shall not be considered valid unless the changes are
reviewed and the conclusions of this report modified or verified in
writing by the geotechnical engineer.
0
p A
z
C
C) 0
cn
lz---------
IMMUNE ROAD C" Z
T
Boring Location Diagram
HARMONY CROSSING PUD
Fort Collins, Colorado
Drawn: LLL Scale: None
DDn7rrm Mn. 1Q1')nAR Earth Engineering Consultants
HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
PROJECT NO: 1932048 DATE: NOVEMBER 1993
LOG OF BORING B-1 SHEET 1 OF 1
RIG TYPE: DIETRICH D-50 WATER DEPTH
FOREMAN: RLD START DATE 11/26/93 WHILE DRILLING 8'
AUGER TYPE: 4" CFA FINISH DATE 1 1 /26/93 JAFTER DRILLING 8'
SPT HAMMER: MANUAL SURFACE ELEV N/A 24 HOUR N/A
SOIL DESCRIPTION
TYPE
D
Iran
N
MLMIS,rTI
QU
srl
MC
i
DD
urn
A -LIMITS 200
itiI
SWELL
irsnit
8 INCHES TOPSOIWEGETATION
LEAN CLAY WITH TRACE
OF GRAVEL
Light brown
Stiff
Fss 5 -_ 6 2500 19.3 33 1 17 43.6 100
10
SILTY SAND WITH GRAVEL
Light brown
Medium dense
SS 7 22.3
SILTY LEAN CLAY L
Light brown
Stiff
SS
6 2000 26.2
15 15 4000 26.1
20
BOTTOM OF BORING
Calibrated Hand Penetrometer
Remolded Sample 25
Earth Engineering Consultants
HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
PROJECT NO:1932048 DATE: NOVEMBER 1993
LOG OF BORING B-2 SHEET 1 OF 1
RIG TYPE: DIETRICH D-50 i_ WATER DEPTH
FOREMAN: RLD START DATE 1 1 /26/93 WHILE DRILLING 9.
AUGER TYPE: 4" CFA FINISH DATE 1 1 /26/93 AFTER DRILLING 9'
SPT HAMMER: MANUAL SURFACE ELEV N/A 24 HOUR NIA
SOIL DESCRIPTION
TYPE
D
uEETI
N
niows rtl
QU
ff5P1
MC DD
1PCFI
AuMITS 200
1
SWELL
irsE7Lih
9 INCHES TOPSOIWEGETATION
SILTY LEAN CLAY ss
Dark brown
Stiff 5
9
3000 25.1 SILTY
LEAN CLAY Brown
SS Soft
8
3000 22.8 31 18 48.8 100 10
LEAN
CLAY WITH TRACE GRAVEL
Brown
SS Stiff
5
2000 17.5 15
CLAYEY
SILTY SAND Brown
Medium
dense SS
14 21.7 20
BOTTOM
OF BORING Calibrated
Hand Penetrometer Remolded
Sample 25 Earth
Engineering Consultants
11
I
HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
PROJECT NO:1932048 DATE: NOVEMBER 1993
LOG OF BORING B-3 SHEET 1 OF 1
RIG TYPE: DIETRICH D-50 WATER DEPTH
FOREMAN: RLD START DATE 1 i %26193 WHILE DRILLING 12'
AUGER TYPE: 4" CFA FINISH DATE 11 /26193 AFTER DRILLING 11.5'
SPT HAMMER: MANUAL SURFACE ELEV N/A 24 HOUR N/A
SOIL DESCRIPTION
TYPE
D
FEET)
N
BLOWS'fTI
QU
11,11
MC
x)
DO
IrCFI
A-UMITS 200
1
SWELL
II^,'FIEEn
8 INCHES TOPSOIWEGETATION
SILTY LEAN CLAY
Brown
Stiff
Ess 5 5 2000 24.7
10
CLAYEY SAND ss
Brown
Loose
ESS
3 32.0
4 18.0
15
SILTY MEDIUM TO COARSE SAND
Brown
Medium dense
SS 21 18.2
20
BOTTOM OF BORING
Calibrated Hand Penetrometer 25
Earth Engineering Consultants
1
HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
PROJECT NO: 1932048 1 DATE: NOVEMBER 1993
LOG OF BORING B-4 SHEET 1 OF 1
RIG TYPE: DIETRICH D-50 WATER DEPTH
FOREMAN: RLD START DATE 1 1 /26/93 WHILE DRILLING 9'
AUGER TYPE: 4" CFA FINISH DATE 1 1 /26/93 AFTER DRILLING 8'
SPT HAMMER: MANUAL SURFACE ELEV NIA 24 HOUR NIA
SOIL DESCRIPTION
TYPE
D
IIIITI
N
taiowsm)
QU
rt'sR
MC
f l
DD
ncFl
A-uMITS 200
1
SWELL
irsFlIL
8 INCHES TOPSOIWEGETATION
SILTY LEAN CLAY ss
Brown
Stiff
5
6 22.8
SILTY SAND TRACE CLAY
Light tan SS
Loose to medium dense
LESS SILT AND CLAY WITH DEPTH
ISS
5 30.3
10 22 16.9
15
SILTY LEAN CLAY
Brown
Very stiff
SS 18 6000 24.6
20
BOTTOM OF BORING
Calibrated Hand Penetrometer 25
HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
PROJECT NO:1932048 1 DATE: NOVEMBER1993
LOG OF BORING B-5 SHEET 1 OF 1
RIG TYPE: DIETRICH D-50 WATER DEPTH
FOREMAN: RLD START DATE 1 1 /27/93 WHILE DRILLING NONE
AUGER TYPE: 4" CFA FINISH DATE 1 1 /27/93 AFTER DRILLING NONE
SPT HAMMER: MANUAL j SURFACE ELEV N/A 24 HOUR NONE
SOIL DESCRIPTION
IYPE
D
IFEFT)
N
ml0lvsJT)
QU
F'SF)
MC
I%)
DD
WCF)
A -LIMITS 200
1
SWELL
IPSFlLLPI1.
8 INCHES TOPSOIWEGETATION
SILTY LEAN CLAY ss
Brown
Stiff
AS 5
10 3000 24.6
19.0
BOTTOM OF BORING
Calibrated Hand Penetrometer
10
15
20
25
Earth Engineering Consultants
J
I
1
n
HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
PROJECT NO:1932048 DATE: NOVEMBER 1993
LOG OF BORING B-6 SHEET 1 OF 1
RIG TYPE: DIETRICH D-50 WATER DEPTH
FOREMAN: RLD START DATE 11127193 WHILE DRILLING NONE
AUGER TYPE: 4- CFA FINISH DATE 1 1 /27/93 AFTER DRILLING NONE
SPT HAMMER: MANUAL SURFACE ELEV N/A 24 HOUR NONE
SOIL DESCRIPTION
TYPE
D
FEET)
N
MLOWS/VT)
QU
Wsr)
MC DD
0-c F)
A -LIMITS 200 SWELL
LL
8 INCHES TOPSOIUVEGETATION
SILTY LEAN CLAY ss
Brown
Stiff
AS 5
9 3000 22.6
21.3
BOTTOM OF BORING
Calibrated Hand Penetrometer
10
15
20
25
Earth Engineering Consultants
I
d
1
1
1
HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
PROJECT NO:1932048 DATE: NOVEMBER 1993
LOG OF BORING B-7 SHEET 1 OF 1
RIG TYPE: DIETRICH D-50 WATER DEPTH_
FOREMAN: RLD START DATE 11/27/93 WHILE DRILLING NONE
AUGER TYPE: 4" CFA FINISH DATE 11 /27/93 AFTER DRILLING NONE
SPT HAMMER: MANUAL SURFACE ELEV N/A 24 HOUR NONE
SOIL DESCRIPTION
TYPE
D
rrrT)
N
MCMSirn
QU
WS0
MC
1)
DD
awn
A -LIMITS 200 SWELL
Iesna
8 INCHES TOPSOILVEGETATION
SILTY LEAN CLAY ss
Brown
Stiff
AS 5
14 4000 19.6
18.3
BOTTOM OF BORING
Calibrated Hand Penetrometer
10
15
20
25
Earth Engineering Consultants
1
HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
PROJECT NO:1932048 1 DATE: NOVEMBER 1993
LOG OF BORING B-8 SHEET 1 OF 1
RIG TYPE: DIETRICH D-50 WATER DEPTH
FOREMAN: RLD START DATE 1 1 /27/93 WHILE DRILLING NONE
AUGER TYPE: 4" CFA FINISH DATE 11 /27/93 AFTER DRILLING NONE
SPT HAMMER: MANUAL SURFACE ELEV N/A 24 HOUR NONE
SOIL DESCRIPTION
i TYPE
D
cEEETI
N
DlayslFT)
QU
j"SI)
MC
I
DD
ncn
A -LIMITS 200
i%I
SWELL
msnupi
8 INCHES TOPSOIWEGETATION
SILTY LEAN CLAY ss
Brown
Stif f
AS 5
12 3000 21.4
19.4
BOTTOM OF BORING
I
I
Calibrated Hand Penetrometer
10
15
20
25
Earth Engineering Consultants
I
HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
PROJECT NO:1932048 DATE: NOVEMBER 1993
LOG OF BORING B-9 SHEET 1 OF 1
RIG TYPE: DIETRI CHD5 0 WATER DEPTH
FOREMAN: RLD START DATE 1 1 /26/93 WHILE DRILLING 10'
AUGER TYPE: 4" CFA FINISH DATE 1 1 /26/93 AFTER DRILLING 9'
SPT HAMMER: MANUAL SURFACE ELEV NIA 24 HOUR N/A
SOIL DESCRIPTION
TYPE
D
uFM
N
11110"S!nl
QU
Psn
MC DD
ir'cn
A-U.ITS 200 SWELL
IPSna
8 INCHES TOPSOI WEGETATION
SILTY LEAN CLAY
Light brown
Stiff
ESS 5 9 2000 28.2
10
SILTY SAND TRACE CLAY
Brown
Loose
SS 7 22.2
SS
SILTY SAND AND GRAVEL
Brown
Medium dense
16 17.0
15
SILTY SAND WITH TRACE
OF CLAY
Greenish brown
Medium dense FSS 11 26.5
20
BOTTOM OF BORING
Calibrated Hand Penetrometer 25
tarm tnglneenng consultants
I
HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
PROJECT NO:1932048 DATE: NOVEMBER 1993
LOG OF BORING B-10 SHEET 1 OF 1
RIG TYPE: DIETRICH D-50
i;PE:ia;:<:;>;is6>:>?i:;`•;;> WATER DEPTH
FOREMAN: RLD START DATE 1 1 /26/93 WHILE DRILLING 10.5'
AUGER TYPE: 4" CFA FINISH DATE 1 1126/93 AFTER DRILLING 9.5'
SPT HAMMER: MANUAL SURFACE ELEV N/A 24 HOUR N/A
SOIL DESCRIPTION
TYPE
D
ir[ETl
N
ieiexs.:Tl
QU
i^SFl
MC
Ml
DD
IxFl
A-LIMII'S 200 SWELL
IisFlii
8 INCHES TOPSOIWEGETATION
SILTY LEAN CLAY ss•3000
Brown
Stiff
5
19.0
SILTY SAND WITH TRACE
OF CLAY ss
Brown
Loose to medium dense
9 25.6
10Ess
SILTY SAND WITH CLAY
Brown
Loose
SS
6 19.9
15 9 26.1
20
BOTTOM OF BORING
Calibrated Hand Penetrometer 25
Earth Engineering Consultants
HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
PROJECT NO: 1932048 DATE: NOVEMBER 1993
LOG OF BORING B-11 SHEET 1 OF 1
5RIGTYPE: DIETRICH D 0 WATER D PETH
FOREMAN: RLD START DATE 1 1 /27/93 WHILE DRILLING 6.5'
AUGER TYPE: 4- CFA FINISH DATE 11 /27/93 AFTER DRILLING 7.5'
SPT HAMMER: MANUAL SURFACE ELEV N/A 48 HOUR 7.8'
SOIL DESCRIPTION
TYPE
D
FEET)
N
BLOWS/FT)
QU
IPSF)
MC DD
PCF)
A -LIMITS zoo
ti)
SWELL
OSF) LL R
8 INCHES TOPSOILVEGEfATION
SILTY SAND
Light ten
Medium dense
ESS 5 10 27.2 31 6 22.8
10
SILTY SAND WITH GRAVEL
Brown
Medium dense
SS 16 20.5
SS 14 21.1
15
SILTY SAND WITH GRAVEL
AND TRACE OF CLAY
Brown
Medium dense
FSS 16 13.4
20
BOTTOM OF BOPJNG
25
Earth Engineering Consultants
HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
PROJECT NO:1932048
DATE: NOVEMBER 1993
LOG OF BORING B-12 SHEET 1 OF 1
RIG TYPE: DIETRICH D-50
W AT ER DEPTH
FOREMAN: RLD START DATE 1 1 /27/93 WHILE DRILLING 8'
AUGER TYPE: 4" CFA FINISH DATE 1 1 /27/93 AFTER DRILLING 8.5'
SPT HAMMER: MANUAL SURFACE ELEV NIA 24 HOUR N/q
SOIL DESCRIPTION
TYPE
D
FEET)
N
IBLOW&TTI
QU
IISFl
MC
1^cl
DO
orcq
A -LIMITS 200
I 1
SWELL
NSFluh
8 INCHES OF TOPSOIL/VEGETATION
SILTY LEAN CLAY
Brown
Stiff
5
ss 3500 22.4
1SS 5 1 -2000 29.7
10
SILTY LEAN CLAY
Light brown
stiff SS 6 3000 22.9
SS
SILTY SAND AND GRAVEL,
TRACE CLAY
Brown
Medium dense
Ss
8 25.2
15 24 17.5
20
BOTTOM OF BORING
Calibrated Hand Penetrometer 25
Earth Engineering Consultants
HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
PROJECT N0:1932048
DATE: NOVEMBER 1993
LOG OF BORING B-13 SHEET 1 OF 1
RIG TYPE: DIETRICH D-50
WATER DEPTH
FOREMAN: RLD START DATE 11/27/93 WHILE DRILLING 10'
AUGER TYPE: 4" CFA FINISH DATE 1 1 /27/93 AFTER DRILLING 9.5'
SPT HAMMER: MANUAL SURFACE ELEV NIA 24 HOUR N/A
SOIL DESCRIPTION
TYPE
D
IFEET)
N
I.I.ST I,
QU
PSFI
MC
1
DO
tl'C(1
A-LMITS zoo WELL
tt N
8 INCHES TOPSOIL/VEGETATION
LEAN CLAY WITH SILT ss
Brown
Stiff
ESS 5
3000 19.4
4 2000 27.3
10
SILTY SAND WITH GRAVEL
Brown
Medium dense SS 27 27.3
15
CLAYEY FINE SAND WITH SILT
Goldish brown
Medium dense
SSF 28 22.1
20
BOTTOM OF BORING
Calibrated Hand Penetrometer 25
Earth Engineering Consultants
I
I
HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
PROJECT NO:1932048 1 DATE: NOVEMBER 1993
LOG OF BORING B-14 SHEET 1 OF 1
RIG YT PE: DIETRICH RIHD-50 WAT ER DEPTH_ FOREMAN:
RLD START DATE 1 1 /27/93 WHILE DRILLING NONE AUGER
TYPE: 4" CFA FINISH DATE 11/27/93 AFTER DRILLING NONE SPT
HAMMER: MANUAL SURFACE ELEV NIA 24 HOUR NONE SOIL
DESCRIPTION TYPE
D
FEET)
N
BLOW'
ST) OU
IISFl
MC
1%)
DID
rcn
A -
LIMITS 200 SWELL eSFl
LLR8
INCHES TOPSOIWEGETATION SILTY
LEAN CLAY ss Dark
brown Stiff
AS
5 8
3000 26.3 19.
4 BOTTOM
OF BORING Calibrated
Hand Penetrometer 10
15
20
25
Earth
Engineering Consultants
I
J
HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
PROJECT NO:1932048 1 DATE: NOVEMBER 1993
LOG OF BORING B-1 5 SHEET 1 OF 1
RIG TYPE: DIETRICH D-50 WATER DEPTH
FOREMAN: RLD START DATE 1 1 /26/93 WHILE DRILLING 11'
AUGER TYPE: 4" CFA FINISH DATE 1 1 /26/93 AFTER DRILLING 9'
SPT HAMMER: MANUAL SURFACE ELEV NIA 24 HOUR N/A
SOIL DESCRIPTION
TYPE
D
FFFT)
N
BLOWSln)
QU
IPSF)
MC DD
IPCF)
A -LIMITS 200 SWELL
PSFIun
8 INCHES TOPSOIWEGETATION
SILTY SAND
Light tan
Loose to medium dense
ESS 5 7 25.6
10
SILTY LEAN CLAY WITH TRACE
OF GRAVEL
Brown SS
Stiff
9 3000 22.3
SILTY SAND WITH GRAVEL ss
Brown
Medium dense
SS
22 16.1
15 22 15.4
20
BOTTOM OF BORING
Calibrated Hand Penetrometer 25
Earth Engineering Consultants
Pi
7
L
HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
PROJECT NO:1932048 DATE: NOVEMBER 1993
LOG OF BORING B-1 6 SHEET 1 OF 1
RIG TYPE: DIETRICH D-50 WATER DEPTH
FOREMAN: RLD START DATE 11/26/93 WHILE DRILLING NONE
AUGER TYPE: 4" CFA FINISH DATE 1 1 /26/93 AFTER DRILLING NONE
SPT HAMMER: MANUAL SURFACE ELEV N/A 24 HOUR NONE
SOIL DESCRIPTION
YFE
D
IT)
N
IM MJSIFT)
QU
PSF)
MC
f'wl
DID
PCFl
A -LIMITS 200
m)
SWELL
IPSnLLr'I
8INCHES TOPSOIWEGETATION
SILTY LEAN CLAY ss
Brown
Stiff
AS 5
12 3000 18.6
28.6
BOTTOM OF BORING
Calibrated Hand Penetrometer
10
15
20
25
Earth Engineering Consultants
HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
PROJECT NO:1932048 DATE: NOVEMBER 1993
LOG OF BORING B-17 SHEET 1 OF 1
IR G TYPE: DIETRICH D-50 WATER DEPTH
FOREMAN: RLD START DATE 11/26/93 WHILE DRILLING 6.5'
AUGER TYPE: 4" CFA FINISH DATE 1 1 /26/93 AFTER DRILLING 7.5'
SPT HAMMER: MANUAL SURFACE ELEV NIA 24 HOUR 8.2-
SOIL DESCRIPTION
TYPE
D
IrEErr
N
IULONSIFTI
QU
IPS9
MC
t%1
DD
IPCri
A -LIMITS 200
I%I
SWELL
PSF) a P1
8 INCHES TOPSOIWEGETATION
SILTY SAND
Reddish brown
Medium dense
E
SS
5 8 22.4
10
11 21.1
SS
SILTY LEAN CLAY
Light brown
Stiff
6 2000 23.7
15
FINE TO COARSE SAND AND
GRAVEL
Brown
Medium dense
SS 14 16.1
20
BOTTOM OF BORING
Calibrated Hand Penetrometer 25
Earth Engineering Consultants
HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
PROJECT NO: 1932048 1 DATE: NOVEMBER 1993
LOG OF BORING B-18 SHEET 1 OF 1
RIG TYPE: DI TRICH D-5E 0 WATERAER DEPTH
FOREMAN: RLD START DATE 11/27/93 WHILE DRILLING 11'
AUGER TYPE: 4" CFA FINISH DATE 1 1 /27/93 AFTER DRILLING 11'
SPT HAMMER: MANUAL SURFACE ELEV N/A 24 HOUR N/A
SOIL DESCRIPTION
TYPE
D
FEET)
N
BLOWS/FT)
OU
PSF)
MC
1%)
DD
uCFl
A-UMITS zoo SWELL
11'SF) LL 11
8 INCHES TOPSOIL/VEGETATION
SILTY SAND WITH CLAY
Reddish brown
Medium dense to loose
ESS
SS
5 12 15.4
10
6 1 18.6
SILTY SAND WITH CLAY
Reddish brown SS
Loose
3 24.9
15
CLAYEY SILT WITH SAND
Reddish brown
Stiff to soft FSS 6 24.1
20
BOTTOM OF BOPoNG
25
Earth Engineering Consultants
H
H
HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
PROJECT NO:1932048 1 DATE: NOVEMBER 1993
LOG OF BORING B-19 SHEET 1 OF 1
1 P -5RIGTYPE: DIETRICH D 0 WA TER DEPTHT
FOREMAN: RLD START DATE 11 /27/93 WHILE DRILLING 14'
AUGER TYPE: 4" CFA FINISH DATE 11 /27/93 AFTER DRILLING 13'
SPT HAMMER: MANUAL SURFACE ELEV N/A 24 HOUR NIA
SOIL DESCRIPTION
TYPE
D
FEET)
N
9tOWSiFT)
QU
R"..n
MC DD
Pcn
A -LIMITS 200
I%1
SWELL
psnLL1PI
8 INCHES TOPSOIWEGETATiON
SILTY LEAN CLAY ss
Dark brown
Stiff
5
10 3000 22.0
CLAYEY SILT
Reddish brown SS
Stiff to very stiff
13 4000 11.7 29 14 51.6 NONE
10
SILTY FINE SAND WITH GRAVEL
AND TRACE OF CLAY
Goldish brown
Medium dense SS 23 20.2
15
LEAN CLAY WITH SILT
Goldish brown
Stiff
SS 11 3000 30.0
20
BOTTOM OF BORING
Calibrated Hand Penetrometer
Remolded Sample 25
Earth Engineering Consultants
d
HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
PROJECT NO: 1932048 1 DATE: NOVEMBER 1993
LOG OF BORING B-20 SHEET 1 OF 1
RIG TYPE: DIETRICH D-50 WATER DEPTH
FOREMAN: RLD START DATE 11/27/93 WHILE DRILLING 12.5'
AUGER TYPE: 4" CFA FINISH DATE 1 1 /27/93 AFTER DRILLING 14.5'
SPT HAMMER: MANUAL SURFACE ELEV NIA 24 HOUR N/A
SOIL DESCRIPTION
TYPE
D N QU MC I DID A -LIMITS 200 SWELL
1PSRL
8 INCHES TOPSOIWEGETATION
SANDY LEAN CLAY WITH SILT ss
Dark brown
Stiff
5
11 3000 20.2 45 22 55.0 NONE
SILTY SAND, TRACE CLAY
Tan SS
Medium dense
12 25.1
10
SILTY FINE SAND
Greenish brown
ESS
SS
10 24.1
15 8 24.6
20
BOTTOM OF BORING
Calibrated Hand Penetrometer
Remolded Sample 25
Earth Engineering Consultants
1
1
HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
PROJECT NO:1932048 DATE: NOVEMBER 1993
LOG OF BORING B-21 SHEET 1 OF 1
RIG TYPE: DIETRICH D-50 WATER DEPTH
FOREMAN: RLD START DATE 1 1 /27/93 WHILE DRILLING NONE
AUGER TYPE: 4" CFA FINISH DATE 1 1 /27193 AFTER DRILLING NONE
SPT HAMMER: MANUAL SURFACE ELEV NIA 24 HOUR NONE
SOIL DESCRIPTION
TYPE
D
IFCTI N 101OWS11TI
QU
n'
SFl
MC I
DD
PCFl
A -
OMITS
200 n( SWELL
usFl
i
n8INCHES
TOPSOIWEGETATION SILTY LEAN
CLAY ss Brown Stiff
FA
S
5 12 3000
20.5 19.4
BOTTOM OF
BORING Calibrated Hand
Penetrometer 10 15
20
25
I
HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
PROJECT NO: 1932048 1 DATE: NOVEMBER 1993
LOG OF BORING B-22 SHEET 1 OF 1
RIG TYPE: DIETRICH D-50 WATER DEPTH
FOREMAN: RLD START DATE 11/27/93 WHILE DRILLING NONE
AUGER TYPE: 4" CFA FINISH DATE 11 /27/93 AFTER DRILLING NONE
SPT HAMMER: MANUAL SURFACE ELEV N/A 24 HOUR N/A
SOIL DESCRIPTION
TYPE
D
IFCETI
N
f9L.SlF .
QU
115n
MC
11,
DID
PCq
A -OMITS 200 SWELL
IISFlLLfY
8 INCHES TOPSOIWEGETATION
SILTY SAND TRACE GRAVEL
AND CLAY
Brown
Medium dense
ESS 5 18 12.7 32 17 35.6
10
SILTY FINE SAND WITH TRACE
OF CLAY E- Goldish brown
Medium dense
8 24.8
SS
LEAN SILTY CLAY
Brown
Stiff
SS
11 3000 22.3
15 15 4000 22.0
20
BOTTOM OF BORING
Calibrated Hand Penetrometer 25
J
I
H
HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
PROJECT NO:1932048 1 DATE: NOVEMBER 1993
LOG OF BORING B-23 SHEET 1 OF 1
RIG TYPE: DIETRICH D-50 WATER CEPTH
FOREMAN: RLD START DATE 11/27/93 WHILE DRILLING 10'
AUGER TYPE: 4" CFA FINISH DATE 1 1 /27/93 AFTER DRILLING 11'
SPT HAMMER: MANUAL SURFACE ELEV N/A 24 HOUR NIA
SOIL DESCRIPTION
TYPE
D
WHT)
N
IBI.11FTI
QU
u5F)
MC DD
IPCFILLP-LIMITS 200
1%)
SWELL
PSF) PI
8 INCHES TOPSOIWEGETATION
SILTY LEAN CLAY ss
Dark brown
Stiff to very stiff
5
13 4000 22.3
CLAYEY SILT
Reddish brown SS
Stiff
CALCAREOUS DEPOSITS BELOW 10 FEET Fss
9 3000 15.0
10 8 2000 25.7
15
CLAYEY SAND WITH TRACE
OF GRAVEL
Goldish brown
Medium dense FSS 14 25.0
20
BOTTOM OF BORING
Calibrated Hand Penetrometer 25
Earth Engineering Consultants
1
HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
PROJECT NO:1932048 1 DATE: NOVEMBER 1993
LOG OF BORING B-24 SHEET 1 OF 1
RIG TYPE: DIETRICH D-50 WATER DEPTH
FOREMAN: RLD START DATE 11/27/93 WHILE DRILLING NONE
AUGER TYPE: 4" CFA FINISH DATE 11127/93 AFTER DRILLING NONE
SPT HAMMER: MANUAL SURFACE ELEV NIA 24 HOUR NONE
SOIL DESCRIPTION
TYPE
D
FCFT)
N
BLOWSIFT)
QU
115n
MC I1%)
DD
PCF)
A -LIMITS 200
A)
SWELL
psnaer
8 INCHES TOPSOIWEGETATION
SILTY LEAN CLAY ss
Brown
Stiff
AS 5
16 3500 19.6
16.8
BOTTOM OF BORING
Calibrated Hand Penetrometer
10
15
20
25
Earth Engineering Consultants
HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
PROJECT NO:1932048 DATE: NOVEMBER 1993
LOG OF BORING B-25 SHEET 1 OF 1
RIG TYPE: DIETRICH D-50 WATER DEPTH
FOREMAN: RLD START DATE 1 1 /27193 WHILE DRILLING 10,
AUGER TYPE: 4" CFA FINISH DATE 1 1 /27/93 AFTER DRILLING 11'
SPT HAMMER: MANUAL SURFACE ELEV N/A 24 HOUR N/A
SOIL DESCRIPTION
TYPE
D
Fr FT)
N
0 ('h'S.'(T)
QU
r F)
MC
M) I DD
vcFl
A -LIMITS 200
1
SWELL
1PsFlLlI'I
8 INCHES TOPSOILNEGETATION
SILTY FINE SAND
Reddish brown
Loose
ESS 5 6 15.1
10
CLAYEY SILT
Reddish brown and goluish brown
Stiff SS
SSE
8 2000 27.0
10 2000 26.0
15
SILTY FINE SAND
Brown
Loose to medium dense SS 8 23.8
20
BOTTOM OF BORING
25
Earth Engineering Consultants
11
HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
PROJECT NO:1932048 1 DATE: NOVEMBER 1993
LOG OF BORING B-26 SHEET 1 OF 1
RIG TYPE: DIETRICH D-50 WATERI DEPTH
FOREMAN: RLD START DATE 1 1 /27/93 WHILE DRILLING 12'
AUGER TYPE: 4" CFA FINISH DATE 11 /27/93 AFTER DRILLING 11,51
SPT HAMMER: MANUAL SURFACE ELEV NIA 24 HOUR N/A
SOIL DESCRIPTION
TYf E
D N
Id-.W IT
QU
IlSn
MC
111
DID
1111
A -LIMITS 200 SWELL
rSV) L PI
8 INCHES TOPSOIWEGETATION
SANDY LEAN CLAY
Reddish brown
Stiff
ESS
FSS
5 9 3000 23.4 35 19 53.8
10
9 3000 31.1
CLAYEY SILT
Light brown SS
Stiff
10 3000 20.9
15
SILTY SAND AND GRAVEL
Goldish brown
Medium dense
SS 18 20.4
20
BOTTOM OF BORING
Calibrated Hand Penetrometer 25
Earth Engineering Consultants
7
L
HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
PROJECT NO:1932048 1 DATE: NOVEMBER 1993
LOG OF BORING B-27 SHEET 1 OF 1
RIG TYPE: DIETRICH D-50 WATER 1 DEPTH
FOREMAN: RLD START DATE 1 1 /27/93 WHILE DRILLING NONE
AUGER TYPE: 4" CFA FINISH DATE 1 1 /27/93 AFTER DRILLING NONE
SPT HAMMER: MANUAL SURFACE ELEV N/A 124 HOUR NONE
SOIL DESCRIPTION
TYPE
D
IrEET)
N
MWSTT) QU
IPSn
MC
DO 01CFl
A -
LIMITS zoo SWELL Mr)
LLN81NCHES
TOPSOIWEGETATION SILTY
LEAN CLAY ss Brown
Stiff
AS
5 10
3000 22.4 18.
6 BOTTOM
OF BORING Calibrated
Hand Penetrometer 10
15
20
25
Earth
Engineering Consultants
I
HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
PROJECT NO:1932048 1 DATE: NOVEMBER 1993
LOG OF BORING B-28 SHEET 1 OF 1
RIG TYPE: DIETRICH D-50 WATER DEPTH
FOREMAN: RLD START DATE 1 1 /27193 WHILE DRILLING 12'
AUGER TYPE: 4" CFA FINISH DATE 1 1 /27/93 AFTER DRILLING 11'
SPT HAMMER: MANUAL SURFACE ELEV NIA 24 HOUR N/A
SOIL DESCRIPTION
TYPE
D
ir[[rl
N QU
09 MC
DO cn
A-
uMITS zoo tYv1
SWELL
WSF)
arti1
FOOT TOPSOIL SILTY
LEAN CLAY ss Dark
brown Stiff
5
11
3000 24.1 38 21 62.3 100 SILTY
SAND WITH CLAY Reddish
brown Medium
dense SS 8 21.9 10
CLAYEY
SILT WITH SAND Reddish
brown SS Stiff
9
3000 22.2 15
FAT
CLAY (POSSIBLE HIGHLY WEATHERED
SHALE) Gray &
Stiff ss
8 3000 29.3 20
BOTTOM
OF BORING Calibrated
Hand Penetrometer 25 Earth
Engineering Consultants
i
HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
PROJECT NO:1932048 1 DATE: NOVEMBER 1993
LOG OF BORING B-29 SHEET 1 OF 1
RIG TYPE: DIETRICH D-50 WATER DEPTH
FOREMAN: RLD START DATE 11 /26/93 WHILE DRILLING 11'
AUGER TYPE: 4" CFA FINISH DATE 11 /26/93 AFTER DRILLING 11'
SPT HAMMER: MANUAL SURFACE ELEV NIA 24 HOUR N/A
SOIL DESCRIPTION
TYPE
D
Free
N
IDLOWSmn
QU
fsn
MC
1%I
DD
WCF)
A4JMITS 200
I
SWELL
u'snIL
8 INCHES TOPSOIWEGETATION
SILTY FINE SAND ss
Reddish brown
Loose to medium dense
Ess 5
6 28.6
10 21.9
10
SILTY SAND WITH TRACE
OF CLAY
Reddish brown SS
Medium dense
12 22.4
15
SILTSTONE/SANDSTONE
Brown
Poorly concentrated
SS 49 23.4
20
BOTTOM OF BORING
25
Earth Engineering Consultants
1
1
I
HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
PROJECT NO: 1932048 DATE: NOVEMBER 1993
LOG OF BORING B-30 SHEET 1 OF 1
RIG TYPE: DIETRICH D-50 WATER DEPTH
FOREMAN: RLD START DATE 1 1 /26/93 WHILE DRILLING 11'
AUGER TYPE: 4" CFA FINISH DATE 11 /26193 AFTER DRILLING 13'
SPT HAMMER: MANUAL SURFACE ELEV N!A 24 HOUR 9.4'
SOIL DESCRIPTION
TYPE
D N QU MC DD
0'CT)
A-UMIT5 200 SWELL
trsFlIL
8 INCHES TOPSOIWEGETATION
SILTY LEAN CLAY
Reddish brown
Stiff
ESS
SS
Ss
5 7 3000 20.9
10
9 3000 26.3 39 20 76.9
6 22.3
15
SILTY LEAN CLAY WITH TRACE
OF SAND AND GRAVEL
Reddish brown
Stiff to very Stiff
SS 32 30.7
20
BOTTOM OF BORING
Calibrated Hand Penetrometer 25
Earth Engineering Consultants
1
HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
PROJECT NO:1932048 DATE: NOVEMBER1993
LOG OF BORING B-31 SHEET 1 OF 1
RIG TYPE: DIETRICH D-50 WATER DEPTH
FOREMAN: RLD START DATE 11 /27/93 WHILE DRILLING 12'
AUGER TYPE: 4" CFA I FINISH DATE 11 /27/93 AFTER DRILLING 12'
SPT HAMMER: MANUAL SURFACE ELEV N/A 24 HOUR N/A
SOIL DESCRIPTION
TYPE
D
ucF"
N
WLcWS/FT)
QU
ii'sn
MC DD
1111
A -LIMITS 200 SWELL
0sna
8 INCHES TOPSOIL/VEGETATION
CLAYEY SAND
Reddish brown
Medium dense to loose
Ess
SS
5 11 20.5
10
4 27.4
SILTY SAND WITH CLAY T
Reddish brown
Loose
6 26.5
15
SILTY SAND AND GRAVEL WITH
TRACE OF CLAY
Goldlsh brown SS
Medium dense
14 19.4
20
BOTTOM OF BOPoNG
I
25
Earth Engineering Gonsultants
I
HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
PROJECT NO:1932048 1 DATE: NOVEMBER 1993
LOG OF BORING B-32 SHEET 1 OF 1
RIG TYPE: DIETRICH D-50 WATER DEPTH
FOREMAN: RLD START DATE 1 1 /27/93 WHILE DRILLING ONE
AUGER TYPE: 4" CFA FINISH DATE 1 1 /27/93 AFTER DRILLING NONE
SPT HAMMER: MANUAL SURFACE ELEV N/A 124 HOUR NONE
SOIL DESCRIPTION
TVPE
D
err rT)
N
m,011 S;ni
QU
ors Fl
MC
tom)
DID
ircn
A -LIMITS 200 SWELL
r'SnLL
8 INCHES TOPSOIWEGETATION
SILTY LEAN CLAY ss
Brown
Stiff
AS 5
11 3000 21.9
19.2
BOTTOM OF BORING
Calibrated Hand Penetrometer
10
15
20
25
Earth Engineering Consultants
HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
PROJECT NO:1932048 1 DATE: NOVEMBER 1993
LOG OF BORING B-33 SHEET 1 OF 1
RIG TYPE: DIETRICH D-50 WATER DEPTH
FOREMAN: RLD START DATE 1 1 /27/93 WHILE DRILLING NONE
AUGER TYPE: 4" CFA FINISH DATE 1 1 /27/93 AFTER DRILLING NONE
SPT HAMMER: MANUAL SURFACE ELEV N/A 24 HOUR NONE
SOIL DESCRIPTION
TYPE
D
IFCETI
N
BLOWS/FT)
QU
Psn
MC
M)
DD
ircFl
A -LIMITS 200
1%)
SWELL
WSF) a I1
8 INCHES TOPSOILNEGETATION
SILTY LEAN CLAY ss
Brown
Stiff
AS 5
a 3000 22.7
21.3
BOTTOM OF BORING
Colibrated Hand Penetrometer
10
15
20
25
Earth Engineering Consultants
UNIFIED SOIL CLASSIFICATION SYSTEM
Soil Classification
Criteria for Assigning Group Symbols and Group Names Using Laboratory Test
Group
Symbol Group Name'
Coarse -Grained Gravels more than Clean Gravels Less
Soils more than 50% of coarse than 5% fines' Cu > 4 and 1 < Cc <3' GW Well -graded gravel'
50% retained on fraction retained on
No. 200 sieve No. 4 sieve Cu < 4 and/or 1 > Cc > 3E GP Poorly graded gravel'
Gravels with '
sfinesines Fines classify as ML or MH morethan12hcGM Silt ravel,G,H Y9Fines
classify as CL or CH GC Clayey gravelF'-" Sands
50% or more Clean Sands Less Cu > 6 and 1 < Cc < 3' SW Well -graded sand' of
coarse fraction than 5% fines' passes
No. 4 sieve Cu < B and/or 1 > Cc > 3E SP Poorly graded sand' Sands
with Fines Fines classify as ML or MH SM Silty sand°•"•1 more
than 12% fines° Fines
Classify as CL or CH SC Clayey sand',".' Fine -
Grained Soils Silts and Clays inorganic PI > 7 and plots on or above A line' CL Lean clayKL'" 50%
or more Liquid limit less passes
the than 50 PI < 4 or plots below "A" line' ML SiltK.u' No.
200 sieve organic
Liquid limit - oven dried Organic clayK.u41 0.
75 OL Liquid
limit - not dried Organic siltKI-1.1 Silts
and Clays inorganic PI plots on or above "A" line CH Fat clayK.L' Liquid
limit 50 or
more PI lots below "A" line MH Elastic SIItK.L1a organic
Liquid limit - oven dried Organic Clay'-L.M.P 0.
75 OH Liquid
limit - not dried Organic siltK1.11 Highly
organic soils Primarily organic matter, dark in color, and organic odor PT Peat ABased
on the material passing the 3-in. If soil contains 15 to 29% plus No. 200, add 75-
mm) sieve if
Cu=
D /D Cc = (D's)1 with sand" or "with gravel", whichever is field
sample contained cobbles or so Lo D,
o x Dco predominant. boulders,
or both, add "with cobbles or Llf soil contains > 30% plus No. 200 boulders,
or both" to group name. predominantly sand, add "sandy" to group Gravelswith5to12% fines require dual FIf soil contains > 1 5% sand, add "with name. symbols:
sand" to group name. If soil contains > 30% plus No. 200, GW-
GM well -graded gravel with silt oif fines classify as CL-ML, use dual symbol predominantly gravel, add "gravelly" to group GW-
GC well -graded gravel with clay GC -GM, or SC-SM. name. GP -
GM poorly graded gravel with silt If fines are organic, add "with organic fines" PI > 4 and plots on or above "A" line. GP -
GC poorly graded gravel with clay to group name. oPl < 4 or plots below "A" line. Sands
with 5 to 12% fines require dual If soil contains > 15% gravel, add "with PPI plots on or above "A" line. symbols:
gravel" to group name. oPl plots below "A" line. SW-
SM well -graded sand with silt if Atterberg limits plot in shaded area, soil is SW -
SC well -graded sand with clay a CL-ML, silty clay. SP-
SM poorly graded sand with silt SP-
SC poorly graded sand with clay rA
5C
CL
x
40 LJ
Z
r
30 F-
U
a20
a.
10
7
4
0
0
For
olss Slllcallon of Iineglalned it. and
fine-grained fraction of coarse. grained .
its Z1111 tineEAa
I 73
ILL 20) r i
Q 1
1 P
E" •
line __ ______P-_Ve-
16 to PI 7,9
LL - 8) I ///
MH
OH G oa L
MLoaOL 10
16 20 30 40 50 60 70 80 90 100 110 LIQUID
LIMIT (LL)
DRILLING AND EXPLORATION
DRILLING & SAMPLING SYMBOLS:
SS : Split Spoon - 1?/a" I.D., 2" O.D., unless otherwise noted PS : Piston Sample
ST : Thin -Walled Tube - 2" O.D., unless otherwise noted WS : Wash Sample
R : Ring Barrel Sampler - 2.42" I.D., 3" O.D. unless otherwise noted.
PA : Power Auger
HA : Hand Auger
FT : Fish Tail Bit
RB : Rock Bit
DB : Diamond Bit = 4", N, B BS : Bulk Sample
AS : Auger Sample PM: Pressure Meter
HS : Hollow Stem Auger DC : Dutch Cone
WB : Wash Bore
Standard "N" Penetration: Blows per foot of a 140 pound hammer falling 30 inches on a 2-inch O.D. split spoon, except wherenoted.
WATER LEVEL MEASUREMENT SYMBOLS:
WL Water Level WS While Sampling
WC] Wet Cave in WD While Drilling
DCI Dry Cave in BCR : Before Casing Removal
AB After Boring ACR : After Casting Removal
Water levels indicated on the boring logs are the levels measured in the borings at the time indicated. In pervious soils, the
indicated levels may reflect the location of groundwater. In low permeability soils, the accurate determination of groundwater
levels is not possible with only short term observations.
DESCRIPTIVE SOIL CLASSIFICATION PHYSICAL PROPERTIES OF BEDROCK
Soil Classification is based on the Unified Soil Classification DEGREE OF WEATHERING:
system and the ASTM Designations D-2487 and D-2488.
Coarse Grained Soils have more than 50% of their dry Slight Slight decomposition of parent material on
weight retained on a #200 sieve; they are described as: joints. May be color change.
boulders, cobbles, gravel or sand. Fine Grained Soils have
less than 50% of their dry weight retained on a #200 sieve; Moderate Some decomposition and color change
they are described as: clays, if they are plastic, and silts if throughout.
they are slightly plastic or non -plastic. Major constituents
may be added as modifiers and minor constituents may be High Rock highly decomposed, may be extremelyaddedaccordingtotherelativeproportionsbasedongrainbroken.
size. In addition to gradation, coarse grained soils are
defined on the basis of their relative in -place density and HARDNESS AND DEGREE OF CEMENTATION:
fine grained soils on the basis of their consistency. Limestone and Dolomite:
Example: Lean clay with sand, trace gravel, stiff (CL); silty Hard Difficult to scratch with knife.
sand, trace gravel, medium dense (SM).
Moderately Can be scratched easily with knife,
CONSISTENCY OF FINE-GRAINED SOILS Hard Cannot be scratched with fingernail.
Unconfined Compressive Soft Can be scratched with fingernail.
Strength, Qu, psf Consistency
Shale, Siltstone and Claystone:
500 Very Soft Hard Can be scratched easily with knife, cannot
500 1,000 Soft be scratched with fingernail.
1,001 2,000 Medium
2,001 4,000 Stiff Moderately Can be scratched with fingernail.
4,001 8,000 Very Stiff Hard
8,001 - 16,000 Very Hard
Soft Can be easily dented but not molded with
RELATIVE DENSITY OF COARSE -GRAINED SOILS: fingers.
N-Blows/ft Relative Density
0-3 Very Loose Sandstone and Conglomerate:
4-9 Loose Well Capable of scratching a knife blade.
10-29 Medium Dense Cemented
30-49 Dense
50-80 Very Dense Cemented Can be scratched with knife.
80 + Extremely Dense
Poorly Can be broken apart easily with fingers.
Cemented
MOUNG O M1