HomeMy WebLinkAboutALPINE BANK - Filed DCP-DEV. CONSTRUCTION PERMIT - Page 1 of 6 City of Fort Collins, Colorado DEVELOPMENT CONSTRUCTION PERMIT Permit Number: 21- 18 Issuance Date: 10/20/2021 Project Name: Alpine Bank Project AKA: Project Location: SEC of S. College & Prospect Road: 1608,1610,1618 S. College Avenue Permittee: Glenn Davis/ Alpine Bank City and developer contacts: See attached Exhibit ‘A’ for names and phone numbers of all contact persons for this project. Fees: Permit Application Fee check#787747 $ 400.00 Construction Inspection Fee check#787747 $ 8,412.68 Pavement Impact Fee – excavation permit check#787747 $ 45.00 Total amount due $ 8,857.68 Development Bond or other approved security: Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. $ 139,250.28 Form of security deposited with the City: LOC #:1 PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design drawings and specifications the certification of all materials testing by an Engineer. The Permittee shall have an Engineer prepare revised design drawings and secure City approval for all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required by the City in the Development Agreement, that the improvements are constructed in conformance with the approved Utility Plans and the standards and specifications of the City. The Permittee shall provide “as-constructed” plans prepared by an Engineer prior to the City’s acceptance of the constructed public improvements. (All references above to the terms “Project Engineer” and “Engineer” shall mean a Professional Engineer licensed in Colorado.) 2. All contractors who perform work on this project must be bonded and licensed in conformance with City requirements. 3. Construction time restrictions: N/A DocuSign Envelope ID: 0BCB5A82-6F06-40ED-9B94-1046355F8D4F Page 2 of 6 4. The applicant understands that additional permits may be required for this development project and the applicant shall secure those permits directly from the issuing departments. 5. This permit, along with a complete set of all approved plans and documents for this project (utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic study, drainage report, plat easements and any other official documents), shall be kept on the development site available for use by City staff doing inspections. 6. Permit Expiration (in accordance with Section 2.6.3(K) of the Land Use Code, whichever is applicable): a. If construction has not begun within sixty (60) days from the date of issuance of this permit, this permit shall expire and the applicant will forfeit the permit fee paid for this permit, whereupon the applicant must re-apply for a new permit. b. In addition, this permit shall expire one year from the date of issuance. The applicant may apply for an extension by reapplication at least two weeks prior to the expiration date. Such application shall contain information sufficient to justify the granting of the extension. An extension may be granted for up to six months. 7. Building permits and certificates of occupancy will only be issued when all conditions contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code are met. If the Development Agreement does not specify times for completion of public improvements, or if there is no Development Agreement, then the improvement requirements specified in Section 24-95 of the City Code shall apply, which provides that construction of all improvements shall be required prior to the time of issuance of the first building permit. 8. Acceptance by the City of the public improvements shall be after (1) final inspection has been conducted by the City; (2) punch list items from the final inspection are completed and accepted by the City; and (3) required certifications from the licensed professional engineer that improvements are completed to City standards, specifications and approved Utility Plans; and the “as-constructed” plans have been received and accepted by the City. 9. The warranty on street improvements is for five (5) years from the date of acceptance by the City of the completed improvements, in accordance with Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use Code, as applicable. 10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any construction activities on this project. All required perimeter silt fencing and other erosion/sediment control best management practices (BMPs) that can be installed prior to construction must be in place and inspected by the City Erosion Control Inspector before any land disturbing activity begins. The applicant also understands that at no time pollutants, especially dirt, are allowed to leave the construction site (either by drainage, wind, or track out) and that the applicant shall immediately address and correct the issue regardless of being formally directed by the City. DocuSign Envelope ID: 0BCB5A82-6F06-40ED-9B94-1046355F8D4F Page 3 of 6 11. City of Fort Collins Traffic Operations must be notified prior to the installation of permanent traffic signing, symbols and striping. The developer shall place temporary tabs or tape, and/or set up a field meeting for review and approval prior to installation. 12. A permit must be obtained from the City Forester before any trees or shrubs as noted on the approved plans are planted, pruned, or removed in public right-of-way. This includes the area between the sidewalk and curb, medians, and other city property. This permit from the City Forester shall approve the location and species to be planted. Failure to obtain this permit is a violation of the City of Fort Collins Municipal Code subject to citation (Section 27-31) and may also result in replacing or relocation trees and a hold on the issuance of a certificate of occupancy. 13. All tree pruning and removal on the Property must be done by an arborist licensed by the City of Fort Collins and the name of such arborist shall be provided to the City Forestry Division prior to any pruning or removal commencing. A list of licensed arborists is maintained by the City Forestry Division and is available upon request or at fcgov.com/forestry. The use of heavy construction equipment, including but not limited to excavators, backhoes, and bulldozers, to remove trees is not allowed without prior Forestry Division written permission. 14. Tree protection must be installed around all trees that are shown to be preserved and protected on the Final Development Plan Documents and an arborist licensed by the City of Fort Collins must provide written confirmation to the City that such tree protection has been installed. Required tree protection measures are set forth in City Code Section 3.2.1(G) and include, but are not limited to, the requirement that a minimum 4 foot high barrier be erected no closer than six (6) feet from the trunk or one-half (½) the length to the drip line (i.e. the canopy edge), whichever is greater. 14. Prior to landscape work commencing on the Property, the Developer shall schedule a meeting between City Forestry Division staff and the landscapers who will perform the work. 15. Tree protection must be maintained throughout the duration of construction activities on the Property. At any time during construction, and upon City Forestry Division written notice that tree protection is not adequate for one or more trees, the Developer shall cease construction activities adjacent to such tree or trees until required tree protection measures are in place to the satisfaction of the City Forestry Division. 16. No work (including grading) shall be started in State Highway right-of-way until a permit is issued by the Colorado Department of Transportation to allow such work to begin. 17. Other conditions: N/A Permittee’s acknowledgment signature: By signing this permit, I acknowledge that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and DocuSign Envelope ID: 0BCB5A82-6F06-40ED-9B94-1046355F8D4F Page 4 of 6 authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. I also acknowledge that I have read this permit document with all its requirements and conditions, and I agree to all of the terms and conditions so stated in this permit. Applicant/Project Manager’s Signature: ____________________________ Date: ____________ Approval for issuance: City Engineer Approval: __________________________Date: __________________________ (Permit Issuance Date) DocuSign Envelope ID: 0BCB5A82-6F06-40ED-9B94-1046355F8D4F Chief Retail Officer 10/20/2021 10/20/2021 Page 5 of 6 EXHIBIT ‘A’ DEVELOPMENT PROJECT CONTACT PERSONS Project Name: Alpine Bank Name, address and numbers City Staff Contact Persons: Development Engineer: Spencer Smith 281 N. College Avenue, Fort Collins, CO 80524 (970) 221-6603 smsmith@fcgov.com Construction Inspector: Wayne Lenard 281 N. College Avenue, Fort Collins, CO 80524 (970) 222-6824 wlenard@fcgov.com Stormwater Engineering: Heidi Hansen 700 Wood Street, Fort Collins, CO 80521 (970) 221-6854 hhansen@fcgov.com Erosion Control Inspector: Jesse Schlam 700 Wood Street, Fort Collins, CO 80521 (970) 224-6700 jschlam@fcgov.com Natural Resources: Kelly Smith 281 N. College Ave., Fort Collins, CO 80521 970-224-6189 ksmith@fcgov.com Traffic Operations: Nicole Hahn 281 N. College Avenue, Fort Collins, CO 80524 (970) 224-6108 nhahn@fcgov.com Street closures: Tom Utech 626 Linden Street, Fort Collins, CO 80524 (970) 221-6815 tutech@fcgov.com Forestry: Molly Roche 413 S. Bryan Avenue, Fort Collins, CO 80521 (224) 616-1992 DocuSign Envelope ID: 0BCB5A82-6F06-40ED-9B94-1046355F8D4F Page 6 of 6 mroche@fcgov.om Light and Power: Austin Kreager 700 Wood Street, Fort Collins, CO 80521 (970) 224-6152 akreager@fcgov.com Developer’s Contact Persons: Project Manager/Owner: Todd Goulding/ Owner Rep Goulding Development Advisors PO Box 2308, Edwards, CO 81632 (970) 331-1732 (Cell) tgoulding@gda-co.com Developer: Glenn Davis/ Chief Retail Officer Alpine Bank 2200 Grand Avenue, Glenwood Springs, CO 81602 (970) 384-3209 (office), (970) 390-5105 (cell) glenndavis@alpinebank.com Project Engineer: Michael Alan Shaw Galloway & Company, Inc. 6162 S. Willow Dr. #320, Greenwood Village, CO 80111 (303) 770-3636 (office) mikeshae@gallowayus.com General Contractor: Sean Windsor Elder Construction 7380 Greendale Rd. Windsor, CO 80550 (970) 833-5368 (office), (970) 652-6047 (cell) Sean.windsor@elderconstruction.com DocuSign Envelope ID: 0BCB5A82-6F06-40ED-9B94-1046355F8D4F ID Task Name Duration Start Finish Predecessors 1 Abatement/Demo 71 days Mon 6/7/21 Mon 9/13/21 2 Mobilize Jobsite for Demo 7 days Tue 7/6/21 Wed 7/14/21 3 Ped/Traffic Protection 3 days Tue 7/6/21 Thu 7/8/21 4 UG/OH Utility Identification/Delineation 2 days Tue 7/6/21 Wed 7/7/21 3SS 5 Signage 2 days Tue 7/6/21 Wed 7/7/21 4SS 6 Delineate Historic Building 2 days Tue 7/6/21 Wed 7/7/21 5SS 7 Establish Haul Route 3 days Mon 7/12/21 Wed 7/14/21 8 8 Tree Removal 1 day Fri 7/9/21 Fri 7/9/21 3 9 Asbestos Abatement 1618 23 days Mon 6/7/21 Wed 7/7/21 10 Establish Containment 7 days Mon 6/7/21 Tue 6/15/21 11 Asbestos Removal 10 days Wed 6/16/21 Tue 6/29/21 10 12 Inspection 1 day Wed 6/30/21 Wed 6/30/21 11 13 Disposal 4 days Thu 6/17/21 Tue 6/22/21 11SS+1 day 14 Remove Containment/Final Clean 2 days Thu 7/1/21 Fri 7/2/21 12 15 Disconnect Utilities 1 day Mon 7/5/21 Mon 7/5/21 14 16 Asbestos Abatement 1610 6 days Mon 7/5/21 Mon 7/12/21 17 Establish Containment 2 days Mon 7/5/21 Tue 7/6/21 14 18 Asbestos Removal 1 day Wed 7/7/21 Wed 7/7/21 17 19 Inspection 1 day Thu 7/8/21 Thu 7/8/21 18 20 Disposal 1 day Thu 7/8/21 Thu 7/8/21 18SS+1 day 21 Remove Containment/Final Clean 1 day Fri 7/9/21 Fri 7/9/21 19 22 Disconnect Utilities 1 day Mon 7/12/21 Mon 7/12/21 21 23 Asbestos Abatement 1608 17 days Mon 7/12/21Tue 8/3/21 24 Establish Containment 7 days Mon 7/12/21 Tue 7/20/21 21 25 Asbestos Removal 9 days Wed 7/21/21 Mon 8/2/21 24 26 Inspection 1 day Tue 8/3/21 Tue 8/3/21 25 27 Disposal 4 days Thu 7/22/21 Tue 7/27/21 25SS+1 day 28 Remove Containment/Final Clean 3 days Wed 7/28/21 Fri 7/30/21 27 29 Disconnect Utilities 1 day Mon 8/2/21 Mon 8/2/21 28 30 Demo 40 days Tue 7/20/21 Mon 9/13/21 31 Stormwater Review Complete COFC 1 day Tue 7/20/21 Tue 7/20/21 32 Install BMP's 2 days Wed 7/21/21 Thu 7/22/21 31 33 Inspection 1 day Fri 7/23/21 Fri 7/23/21 32 34 Demo Permit Issued COFC 1 day Mon 7/26/21 Mon 7/26/21 33 35 Shoring FDN Wall 1618 2 days Tue 7/27/21 Wed 7/28/21 15,34 36 Demo 1618 4 days Thu 7/29/21 Tue 8/3/21 35 37 Demo Parking lot/Site North 1608 3 days Wed 8/4/21 Fri 8/6/21 36 38 Demo 1608 8 days Mon 8/9/21 Wed 8/18/21 29,37 39 Demo 1610 FDN 3 days Tue 9/7/21 Thu 9/9/21 48 40 Backfill 2 days Fri 9/10/21 Mon 9/13/21 39 41 Move Historic Building 43 days Tue 7/13/21 Thu 9/9/21 May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Qtr 2, 2021 Qtr 3, 2021 Qtr 4, 2021 Qtr 1, 2022 Qtr 2, 2022 Qtr 3, 2022 Alpine Bank - 4146 Elder Construction Inc Page 1 DocuSign Envelope ID: 0BCB5A82-6F06-40ED-9B94-1046355F8D4F ID Task Name Duration Start Finish Predecessors 42 Excavate New FDN 4 days Wed 8/4/21 Mon 8/9/21 36 43 FRP Foundation 5 days Tue 8/10/21 Mon 8/16/21 42 44 Backfill 2 days Tue 8/17/21 Wed 8/18/21 43 45 Open Gap Disconnect All Utilities 2 days Tue 7/13/21 Wed 7/14/21 22 46 Prep Bldg for Jacking 5 days Thu 8/19/21 Wed 8/25/21 44 47 Move Building 3 days Thu 8/26/21 Mon 8/30/21 46 48 Set Building 5 days Tue 8/31/21 Mon 9/6/21 47 49 Tie-in New Utilities 3 days Tue 9/7/21 Thu 9/9/21 48 50 Building Permit Issued 1 day Mon 9/6/21 Mon 9/6/21 51 Construction 225 days Mon 7/26/21Fri 6/3/22 50 52 Relocate OH Lines UG 60 days Mon 7/26/21Fri 10/15/21 53 Relocate OH lines UG 60 days Mon 7/26/21 Fri 10/15/21 54 Site Work 51 days Tue 9/7/21 Tue 11/16/21 55 Clear and Grub/Over Excavation/Import 15 days Tue 9/7/21 Mon 9/27/21 50 56 Survey Bldg Offsets 1 day Tue 9/28/21 Tue 9/28/21 55 57 Foundation 12 days Wed 9/29/21 Thu 10/14/2156 58 FDN Sleeving 1 day Thu 10/7/21 Thu 10/7/21 57FF-5 days 59 FDN Waterproofing/Insulate 2 days Fri 10/15/21 Mon 10/18/2157 60 Sanitary Sewer 4 days Tue 9/14/21 Fri 9/17/21 55SS+5 days 61 Domestic Water Tie-ins 7 days Mon 9/20/21 Tue 9/28/21 60 62 Fire Line Tie-ins 7 days Mon 9/20/21 Tue 9/28/21 60 63 Electrical Service/Transformer 4 days Wed 9/29/21 Mon 10/4/21 62 64 UG Stormwater System 10 days Tue 9/28/21 Mon 10/11/2155 65 Backfill/Grade Pad Site 4 days Tue 10/19/21Fri 10/22/21 59 66 Underground Electrical 8 days Mon 10/25/21Wed 11/3/21 65 67 Underground Plumbing 8 days Mon 10/25/21Wed 11/3/21 65 68 Underground R/I for Drive Thru Teller 3 days Mon 11/1/21 Wed 11/3/21 66FF,67FF 69 Underground Inspections 1 day Thu 11/4/21 Thu 11/4/21 66,67 70 Backfill/Compact 2 days Fri 11/5/21 Mon 11/8/21 69 71 Stego/Slab Prep 3 days Tue 11/9/21 Thu 11/11/2170 72 Place Slab 1 day Fri 11/12/21 Fri 11/12/21 71 73 Rough Grade Lot 2 days Mon 11/15/21Tue 11/16/2172 74 Form/Pour Light Pole Bases 4 days Fri 11/5/21 Wed 11/10/2169 75 Core and Shell 60 days Mon 11/15/21Fri 2/4/22 76 Elevator Core 7 days Mon 11/15/21Tue 11/23/2172 77 Frame lvl 1 Walls/Columns 7 days Wed 11/24/21Thu 12/2/21 76 78 Floor Joists/Deck 4 days Fri 12/3/21 Wed 12/8/21 77 79 Interior Stairs 2 days Fri 12/3/21 Mon 12/6/21 77 80 Frame lvl 2 Walls/Columns 6 days Thu 12/9/21 Thu 12/16/2178,79 81 Roof Trusses/Sheathe 5 days Fri 12/17/21 Thu 12/23/2180 82 Framing Inspection 1 day Thu 12/9/21 Thu 12/9/21 77,78 9/6 May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Qtr 2, 2021 Qtr 3, 2021 Qtr 4, 2021 Qtr 1, 2022 Qtr 2, 2022 Qtr 3, 2022 Alpine Bank - 4146 Elder Construction Inc Page 2 DocuSign Envelope ID: 0BCB5A82-6F06-40ED-9B94-1046355F8D4F ID Task Name Duration Start Finish Predecessors 83 Sheathe 5 days Fri 12/10/21 Thu 12/16/2182 84 Roofing 6 days Fri 12/24/21 Fri 12/31/21 81 85 Building Wrap 4 days Fri 12/17/21 Wed 12/22/2183 86 Set Knox Box 1 day Thu 12/23/21Thu 12/23/2185 87 Store Front Windows and Doors 8 days Thu 12/23/21Mon 1/3/22 85 88 Core and Shell In-wall MEP rough-in 4 days Thu 12/23/21Tue 12/28/2185 89 Insulate Exterior Walls 4 days Wed 12/29/21Mon 1/3/22 88 90 Exterior Masonry 15 days Thu 12/23/21Wed 1/12/22 85 91 Cedar Shake Siding 10 days Thu 1/13/22 Wed 1/26/22 90 92 Deck Railing 2 days Thu 1/13/22 Fri 1/14/22 90 93 Metal Trim/Gutter 5 days Thu 1/27/22 Wed 2/2/22 84,91 94 Exterior MEP Trim 2 days Thu 1/27/22 Fri 1/28/22 90,91 95 Signage 2 days Mon 1/31/22 Tue 2/1/22 94 96 Caulking 2 days Wed 2/2/22 Thu 2/3/22 95 97 Blower door Testing 1 day Fri 2/4/22 Fri 2/4/22 96 98 Interior Buildout 104 days Tue 1/4/22 Fri 5/27/22 99 Layout Walls 2 days Tue 1/4/22 Wed 1/5/22 84,85,87 100 Layout HVAC 1 day Thu 1/6/22 Thu 1/6/22 99 101 Frame Interior Walls 9 days Fri 1/7/22 Wed 1/19/22 100 102 Set Door Frames 2 days Tue 1/18/22 Wed 1/19/22 101FF 103 Fire Rough 10 days Thu 1/20/22 Wed 2/2/22 101 104 HVAC Rough 10 days Thu 1/20/22 Wed 2/2/22 101 105 COFC Inspect 1 day Thu 2/3/22 Thu 2/3/22 104 106 Insulate Duct 2 days Thu 2/3/22 Fri 2/4/22 104 107 Rough Plumbing 5 days Mon 2/7/22 Fri 2/11/22 106 108 Rough Electric 10 days Tue 2/8/22 Mon 2/21/22 106SS+3 days 109 Rough MEP Inspections 1 day Tue 2/22/22 Tue 2/22/22 106,107,108 110 Insulate Plumbing 2 days Wed 2/23/22 Thu 2/24/22 109 111 Frame Soffits/Ceilings 5 days Wed 2/23/22 Tue 3/1/22 109 112 Through Wall Pneumatic Tube Rough 2 days Wed 3/2/22 Thu 3/3/22 111 113 Low Voltage Rough 7 days Mon 2/14/22 Tue 2/22/22 107 114 Backing and Blocking 5 days Tue 2/22/22 Mon 2/28/22 115 115 Box Walk 1 day Mon 2/21/22 Mon 2/21/22 108FF 116 Box Walk Revisions 3 days Tue 2/22/22 Thu 2/24/22 115 117 Install Elevator 15 days Wed 2/23/22 Tue 3/15/22 109 118 Insulate Walls 2 days Tue 3/1/22 Wed 3/2/22 109,114,115 119 Framing Inspection 1 day Thu 3/3/22 Thu 3/3/22 118 120 Hang Drywall 7 days Fri 3/4/22 Mon 3/14/22 118,119 121 Finish Drywall 16 days Tue 3/15/22 Tue 4/5/22 120 122 Prime/Paint First Coat 4 days Wed 4/6/22 Mon 4/11/22 121 123 Wainscot 3 days Tue 4/12/22 Thu 4/14/22 122 May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Qtr 2, 2021 Qtr 3, 2021 Qtr 4, 2021 Qtr 1, 2022 Qtr 2, 2022 Qtr 3, 2022 Alpine Bank - 4146 Elder Construction Inc Page 3 DocuSign Envelope ID: 0BCB5A82-6F06-40ED-9B94-1046355F8D4F ID Task Name Duration Start Finish Predecessors 124 Ceiling Grid 4 days Tue 4/12/22 Fri 4/15/22 122 125 Special Ceiling Framing 5 days Tue 4/12/22 Mon 4/18/22 122 126 OH MEP Trim 5 days Mon 4/18/22 Fri 4/22/22 124 127 Sprinkler Drops 3 days Tue 4/19/22 Thu 4/21/22 124,125,111 128 Inspect 1 day Mon 4/25/22 Mon 4/25/22 126,127 129 Drop Ceiling Tiles/Spec Ceiling 7 days Tue 4/26/22 Wed 5/4/22 128 130 Bathroom/Shower Tile 10 days Tue 4/12/22 Mon 4/25/22 122 131 Casework 6 days Mon 4/25/22 Mon 5/2/22 126 132 Countertops 3 days Thu 5/12/22 Mon 5/16/22 131FF+10 days 133 Fireplace/Surround 3 days Fri 4/15/22 Tue 4/19/22 123 134 Interior Beam Wraps 2 days Fri 4/15/22 Mon 4/18/22 123 135 VCT 1 day Tue 5/3/22 Tue 5/3/22 131 136 LVP 6 days Tue 5/3/22 Tue 5/10/22 131 137 Carpet 5 days Wed 5/11/22 Tue 5/17/22 136 138 Electrical Trim 8 days Thu 5/5/22 Mon 5/16/22 131,129 139 Light Fixtures 5 days Thu 5/5/22 Wed 5/11/22 122,121,129 140 Plumbing Trim 5 days Tue 4/26/22 Mon 5/2/22 130 141 HVAC Trim 5 days Thu 5/5/22 Wed 5/11/22 122,129 142 Fire Trim 5 days Thu 5/5/22 Wed 5/11/22 129 143 Final Paint 4 days Wed 5/18/22 Mon 5/23/22 137 144 Bath Accessories 2 days Fri 4/29/22 Mon 5/2/22 140SS+3 days 145 Doors and Hardware 4 days Tue 5/24/22 Fri 5/27/22 143 146 Shades 3 days Tue 5/24/22 Thu 5/26/22 143 147 AV equipment Install 2 days Tue 5/24/22 Wed 5/25/22 143 148 TAB 2 days Thu 5/12/22 Fri 5/13/22 141 149 CDOT Turn Lane Expansion 28 days Mon 3/7/22 Wed 4/13/22 150 Traffic Control 3 days Mon 3/7/22 Wed 3/9/22 151 Survey 2 days Thu 3/10/22 Fri 3/11/22 150 152 Demo/Excavate 5 days Mon 3/14/22 Fri 3/18/22 151 153 Grade New Sidewalk/Inlet Tie-Ins 5 days Mon 3/21/22 Fri 3/25/22 152 154 Inspection 1 day Mon 3/28/22 Mon 3/28/22 153 155 Backfill/Compact 2 days Tue 3/29/22 Wed 3/30/22 154 156 Testing 1 day Thu 3/31/22 Thu 3/31/22 155 157 Place Sidewalk Concrete 2 days Fri 4/1/22 Mon 4/4/22 156 158 Concrete Pavement 3 days Tue 4/5/22 Thu 4/7/22 157 159 Striping/Signage 1 day Fri 4/8/22 Fri 4/8/22 158 160 Inspection 1 day Mon 4/11/22 Mon 4/11/22 159 161 Remove Traffic Control 2 days Tue 4/12/22 Wed 4/13/22 160 162 Final Sitework/Landscape 85 days Mon 2/7/22 Fri 6/3/22 163 Rough Grade Lot 3 days Mon 2/7/22 Wed 2/9/22 97 164 Lot Grading Cert 1 day Thu 2/10/22 Thu 2/10/22 163 May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Qtr 2, 2021 Qtr 3, 2021 Qtr 4, 2021 Qtr 1, 2022 Qtr 2, 2022 Qtr 3, 2022 Alpine Bank - 4146 Elder Construction Inc Page 4 DocuSign Envelope ID: 0BCB5A82-6F06-40ED-9B94-1046355F8D4F ID Task Name Duration Start Finish Predecessors 165 Irrigation Sleeving 3 days Fri 2/11/22 Tue 2/15/22 164 166 C&G Site 6 days Wed 2/16/22 Wed 2/23/22 165 167 Bollards 1 day Wed 2/23/22 Wed 2/23/22 166FF 168 Concrete Flatwork 8 days Thu 2/24/22 Mon 3/7/22 166 169 Final Grade/Compact 4 days Tue 3/8/22 Fri 3/11/22 168 170 Pneumatic Tube Trimout 3 days Thu 2/24/22 Mon 2/28/22 167 171 Asphalt Paving 4 days Mon 3/14/22 Thu 3/17/22 169 172 Soil Ammendments/Final Grade 5 days Fri 3/18/22 Thu 3/24/22 171 173 Plantings 7 days Fri 3/25/22 Mon 4/4/22 172 174 Irrigation 5 days Tue 4/5/22 Mon 4/11/22 173 175 Site Furnishings 3 days Fri 3/18/22 Tue 3/22/22 171 176 Covered Bike Rack 1 day Fri 3/18/22 Fri 3/18/22 171 177 Exterior signage/striping 2 days Fri 3/18/22 Mon 3/21/22 171 178 Trash Enclosure 4 days Tue 3/8/22 Fri 3/11/22 168 179 Exterior Teller Trimout 1 day Tue 3/1/22 Tue 3/1/22 167,170 180 Final Inspections 2 days Mon 5/30/22 Tue 5/31/22 174,175,177,161,148,145 181 PFA Inspection 1 day Mon 5/30/22 Mon 5/30/22 174,175,177,161,148,145 182 Punchlist 1 day Wed 5/25/22 Wed 5/25/22 181SS-3 days,180SS-3 days 183 Punchlist Correction 7 days Thu 5/26/22 Fri 6/3/22 182 184 Building Turnover 1 day Fri 6/3/22 Fri 6/3/22 183FF May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Qtr 2, 2021 Qtr 3, 2021 Qtr 4, 2021 Qtr 1, 2022 Qtr 2, 2022 Qtr 3, 2022 Alpine Bank - 4146 Elder Construction Inc Page 5 DocuSign Envelope ID: 0BCB5A82-6F06-40ED-9B94-1046355F8D4F Alpine Bank Date: 8/11/2021 Attendee Company/ Title (as it pertains to the Project)Phone Number Email 1 Greta Brooks City of Fort Collins/ Engineering Dev Rev 970-221-6794 gbrooks@fcgov.com 2 Spencer Smith City of Fort Collins/ Dev Rev Engineer 970-221-6603 smsmith@fcgov.com 3 Jason Komes COFC/ Env Svcs 970-416-4235 jkomes@fcgov.com 4 Aaron Wagner COFC/ Parks 970-682-0344 aawagner@fcgov.com 5 Don Kapperman Comcast 970-567-0245 don_kapperman@cable.comcast.com 6 Jason Martin COFC/ Chief Construction Inspector 970-416-2779 jmartin@fcgov.com 7 Phil Dalrymple Galloway & Company/ PE 303-770-8884 phildalrymple@gallowayus.com 8 Matt Bundren Galloway & Company 303-962-8580 mattbundren@gallowayus.com 9 Jim McChesney COFC/ Water Utilities Inspector 970-556-8179 jmcchesney@fcgov.com 10 Tom Utech COFC/ Traffic Ops 970-222-1739 tutech@fcgov.com 11 Sophie Buckingham COFC/ Engineering 970-416-4344 sbuckingham@fcgov.com 12 Justin Sowell Elder Construction/ Elder Construction Superintendent 970-786-0102 justinsowell@elderconstructioninc.com 13 Sean Windsor Elder Construction/ Elder Construction PM 970-652-6047 sean.windsor@elderconstructioninc.com 14 Linda Hardin COFC/ Env Svcs 970-416-2701 lhardin@fcgov.com 15 Wes Lamarque COFC/ Water Utilities 970-416-2418 wlamarque@fcgov.com 16 Rob Irish COFC/ L&P 970-224-6167 rirish@fcgov.com 17 Brad Ward COFC/ Connexion bward@fcgov.com Development Construction Permit Meeting DocuSign Envelope ID: 0BCB5A82-6F06-40ED-9B94-1046355F8D4F