Loading...
HomeMy WebLinkAboutFOOTHILLS UNITARIAN CHURCH EXPANSION - Filed L-LIGHTING PLAN -NOTE: THE SITE PHOTOMETRICS ARE BASED ON ASSUMED OUTPUT OF EXISTING LIGHT FIXTURES. NEW SITE LIGHTING WILL ONLY INCLUDE WALL MOUNTED FIXTURES AT NEW ENTRANCE/EXIT DOORS.NEW LIGHTS OVER DOORS (4)0 5 10 15 25 45SCALEPROJECT NUMBERDRAWN BYDATEREVISIONSCHECKED BYCOPYRIGHT 2021 EWERS ARCHITECTURE PCstructural engineercivil engineerKL&A, INC.BASELINE ENGINEERINGmechanical + electrical engineerGIVEN & ASSOCIATES, INClandscape architectSAARINEN ASSOCIATESAs indicatedAutodesk Docs://1700-Foothills Unitarian/1700-CD4.rvt3/28/2022 10:32:25 AMSITE LIGHTING PLAN1815 YORKTOWN AVENUE FORT COLLINS COLORADO1700Author02.16.22CheckerA.4FINAL DEVELOPMENT PLANLIGHT FIXTURE OVER NEW EXTERIOR DOORS:NORTHL - 17 485L - 17 485 M 125/2600/3200/3PANEL 'M' PANEL 'G' 'LCP'1600/3600/3200/3PANEL 'H' N G 175/2 150/2 PANEL 'E' PANEL 'K'PANEL 'D' PANEL 'F'150/3100/350/2PANEL 'DP' SPACE SPACE SPACE SPACE . M PANEL 'C'600/260/2PANEL 'E' PANEL 'K' PANEL 'D' PANEL 'F' PANEL 'A' N G 150/2125/2125/2175/2225/2PANEL 'EM' GENERAL NOTES:DRAWING NOTES: MAIN DISTRIBUTION PANEL: - A.M.P. TYPE F - 1600A, 120/208V 3P, 4W 65k AIC, NEMA 3R ENCLOSURE 'MDP' UTILITY METER NEW UTILITY TRANSFORMER UPPER LEVEL GROUND LEVEL ELEVATOR 20HP, 60FLA PV EQUIPMENT 1600U 600200 100125-1 #6 CU #3/0 CU #3/0 CU #4 CU #250KCMIL CU BONDING JUMPER ELEVATOR CONTROL PANEL 1 2 3 4 5 6 7 X F0 50-1 600 200 150-1 175-1 6 6 9 9 10 10 10 10 400A 400A 200A 200A PHASE 1: SCOPE TO BE COMPLETED PRIOR TO DEMOLITION OF EXISTING SERVICE SCOPE TO BE COMPLETED PRIOR TO EXISTING SERVICE DEMOLITION PHASE 3: NEW CONSTRUCTION PHASE 3: NEW CONSTRUCTION 200A3P 150A RK1 NEMA 3R 11 ROOF X F1 X F2 X F4 X F7 X F8 X F3 F5 X X F6 X F9 X F10 12 12 9 13 15 14 1"C. TO METER HOUSING UTILITY TRANSFORMER UPPER LEVEL GROUND LEVEL 6 6 6 8 8 7 7 PHASE 2: DEMOLITION OF EXISTING SERVICE 225-1175-1125-1125-1150-1 60-1 60-1 600-1 600-1 50-1 1. ALL EQUIPMENT SHOWN IN THICK DASHED LINES IS TO BE DEMOLISHED. 2. ALL EQUIPMENT SHOWN IN THIN SOLID LINES IS EXISTING TO REMAIN. 3. ALL EQUIPMENT SHOWN IN THICK SOLID LINES IS NEW EQUIPMENT TO BE INSTALLED PRIOR TO DEMOLITION OF THE EXISTING SERVICE. 4. SEE NOTES ON ONE-LINE DIAGRAM AND DRAWING NOTES FOR PHASING OF CONSTRUCTION. 5. MAIN DISTRIBUTION PANEL “MDP” SHALL BE AMERICAN MIDWEST POWER TYPE F SWITCHBOARD WITH 2 SECTIONS. SUBSTITUTIONS WILL ONLY BE CONSIDERED IF THE DIMENSIONS ARE LESS THAN OR EQUAL TO THOSE SHOWN ON THESE PLANS. 1 PROVIDE CIRCUIT BREAKER WITH ARC ENERGY REDUCTION IN COMPLIANCE WITH NEC 240.87. PROVIDE BUSSMAN POWER MODULE SHUNT TRIP FOR REQUIRED SELECTIVE COORDINATION AND FIRE SAFETY INTERFACE WITH HEAT DETECTORS IN ELEVATOR SHAFT. MIN 22K AIC RATING. COORDINATE FINAL REQUIREMENTS AND LOCATION WITH ELEVATOR SHOP DRAWINGS PRIOR TO CONSTRUCTION. VERIFY ELEVATOR FEEDER REQUIREMENTS WITH ELEVATOR EQUIPMENT SUBMITTALS PRIOR TO ROUGH-IN PROVIDE 100A/3P FUSED DISCONNECT SWITCH WITH 100A DUAL ELEMENT FUSES FOR ELEVATOR DISCONNECT. COORDINATE FINAL DISCONNEC REQUIREMENTS AND LOCATION WITH ELEVATOR SHOP DRAWINGS PRIOR TO CONSTRUCTION. PROVIDE 2" CONDUIT RUN TO ROOFTOP FOR PV EQUIPMENT CONNECTIONS. DISCONNECT AND BREAKER SIZE BASED ON 1.5W/FT2 PV ARRAY. COORDINATE EXACT CONDUIT ROUTING AND ANY ADDITIONAL REQUIREMENTS WITH OWNER PRIOR TO ROUGH-IN. EXISTING ELECTRICAL PANEL SHALL BE RE-FED FROM NEW DISTRIBUTION PANEL "DP". RE-USE EXISTING CONDUIT AND CONDUCTORS WHERE POSSIBLE. MAINTAIN CIRCUIT CONTINUITY FOR ALL EXISTING LOADS FED FROM PANEL. RELOCATE EXISTING LOADS ON EXISTING PANELS "A" AND "C" TO NEW PANEL "DP". MAINTAIN CIRCUIT CONTINUITY FOR ALL EXISTING LOADS FED FROM PANELS. EXISTING SERVICE, INCLUDING UTILITY TRANSFORMER, METER, AND SWITCHBOARD, SHALL BE DEMOLISHED. COORDINATE REMOVAL OF EXISTING TRANSFORMER AND UTILITY METER WITH UTILITY. COORDINATE SERVICE DEMOLITION TIMELINE WITH OWNER AND UTILITY TO MINIMIZE DOWNTIME. PRIOR TO DEMOLITION OF THE EXISTING ELECTRICAL SERVICE, PROVIDE CONDUIT RUN AND CONDUCTORS (PER FEEDER SCHEDULE) TO INTERCEPT EXISTING CONDUIT AND CONDUCTORS FEEDING EXISTING PANELS TO MINIMIZE DURATION OF POWER INTERRUPTION. DETERMINE EXACT INTERCEPT LOCATION IN FIELD AND COORDINATE SCHEDULE WITH FORT COLLINS UTILITIES AND OWNER. 2 3 4 5 6 7 8 9 10 11 12 13 14 15 NEW EQUIPMENT TO BE INSTALLED AFTER NEW ELECTRICAL SERVICE HAS BEEN INSTALLED. COORDINATE SCHEDULE FOR ANY INTERRUPTIONS TO BUILDING POWER REQUIRED FOR EQUIPMENT INSTALLATION WITH OWNER. MAIN DISTRIBUTION PANEL “MDP” SHALL BE AMERICAN MIDWEST POWER TYPE F SWITCHBOARD WITH 2 SECTIONS. SUBSTITUTIONS WILL ONLY BE CONSIDERED IF THE DIMENSIONS ARE LESS THAN OR EQUAL TO THOSE SHOWN ON THESE PLANS. PANEL "DP" AND FEEDER TO BE INSTALLED PRIOR TO DEMOLITION OF EXISTING MAIN UTILITY ROOM. ROUTE FEEDER THROUGH EXISTING EDUCATION WING, BELOW GRADE ACROSS COURTYARD TO PANEL, OUTSIDE EXTENTS OF NEW CONSTRUCTION AND EXCAVATION. PROVIDE LOCKABLE FUSED DISCONNECT SWITCH WITH VISUAL BREAK AND NEMA 3R ENCLOSURE. LOCATE NEXT TO MAIN UTILITY METER AND LABEL INDICATING "PV DISCONNECT". VERIFY DISCONNECT AND FUSE SIZE WITH FINAL PV DESIGN. CT METERING SHALL BE PROVIDED WITH THE CT COMPARTMENT LOCATED WITHIN THE MAIN SWTICHBOARD AND REMOTE MOUNTED METER AS INDICATED, IN ACCORDANCE WITH CHAPTER 8 OF THE FORT COLLINS LIGHT & POWER ELECTRIC SERVICE STANDARDS. UTILITY METER SHALL BE COORDINATED WITH FORT COLLINS LIGHT & POWER ENGINEERING AND INSTALLED IN ACCORDANCE WITH SECTION 8 OF THE FORT COLLINS LIGHT & POWER ELECTRIC SERVICE STANDARDS. THE METER SHALL BE SECURELY FASTENED TO THE EXTERIOR BUILDING WALL AND BE MOUNTED BETWEEN 48 AND 72 INCHES ABOVE FINISHED GRADE. SCALE PROJECT NUMBER DRAWN BY DATE REVISIONS CHECKED BY COPYRIGHT 2021 EWERS ARCHITECTURE PCstructural engineercivil engineerKL&A, INC.BASELINE ENGINEERINGmechanical + electrical engineerGIVEN & ASSOCIATES, INClandscape architectSAARINEN ASSOCIATES12" = 1'-0"D:\Revit 2020\20035 - Foothills Unitarian Addition_MEP_G20_aaron.mull.rvt11/10/2021 9:01:13 AMELECTRICAL ONE-LINE DIAGRAM1815 YORKTOWN AVENUE FORT COLLINS COLORADO20035 Author 11.17.2021 Checker E.1 FINAL DEVELOPEMENT PLAN N.T.S. NEW ONE-LINE DIAGRAM Copy 11N.T.S. DEMO ONE-LINE DIAGRAM Copy 12 FEEDER SCHEDULE 1600U 6 [(4 400 KCMIL AL) 3"PVC.] 600-1 2 [(3 500 KCMIL AL + 1 #2/0 AWG AL G.) 3"C.] 600 2 [(4 500 KCMIL AL + 1 #2/0 AWG AL G.) 3"C.] 225-1 (3 300 KCMIL AL + 1 #2 AWG AL G.) 2-1/2"C. 200 (4 250 KCMIL AL + 1 #4 AWG AL G.) 2-1/2"C. 175-1 (3 #4/0 AWG AL + 1 #4 AWG AL G.) 2-1/2"C. 150-1 (3 #3/0 AWG AL + 1 #4 AWG AL G.) 2"C. 125-1 (3 #2/0 AWG AL + 1 #4 AWG AL G.) 2"C. 100 (4 #1 AWG CU + 1 #8 AWG CU G.) 1-1/2"C. 60-1 (3 #4 AWG CU + 1 #8 AWG CU G.) 1-1/4"C. 50-1 (3 #6 AWG CU + 1 #10 AWG CU G.) 1"C. TOTAL SERVICE AMPS (A) 1248 A TOTAL SERVICE DEMAND (VA): 449575 VA HVAC 188404 100.00% 188404 ELECTRIC HEAT 14500 100.00% 14500 MISCELLANEOUS 66180 100.00% 66180 KITCHEN 33100 65.00% 21515 MOTORS 68975 107.83% 74379 RECEPTACLES 39240 62.74% 24620 LIGHTING 45052 125.00% 56315 LOAD DESCRIPTION CONNECTED (VA) DEMAND FACTOR DEMAND (VA) 11 SPACE 10 SPACE 9 SPACE 8 SPACE 7 ELEVATOR 6 PANEL G 5 PANEL M 4 PANEL H 3 PANEL DP 2 PANEL D 1 PHOTOVOLTAICS CKT CIRCUIT DESCRIPTION SERVICE SIZE 1600 A WIRES 4 PHASE 3 VOLTS 120/208 WYE MDP LOAD SUMMARYL - 17 485L - 17 485