3522 Draft Horse Court • Loveland, CO 80538 • (970) 535-6144
P.O. Box 1121 • Hayden, CO 81639 • (970) 276-208
November 8, 2018
GLH Construction, Inc.
780 East Garden Drive
Windsor, Colorado 80550
Attn: Mr. Justin Marshall
Re: Construction Materials Testing and Observation Services Report
Mountain’s Edge
Fort Collins, Colorado
Soilogic Project # 18-2066
Mr. Marshall:
During the period of September 19 through October 9, 2018, Soilogic Inc. (Soilogic)
provided construction materials testing and observation services for the referenced project.
Our services were provided on a part-time basis and included the observation and testing
of overexcavation/backfill materials. Results of the observation and testing services
completed on the referenced date are included with this report.
During the referenced period, Soilogic personnel obtained three (3) representative samples
of the excavated site soils for laboratory evaluation of the moisture density relationship of
those materials. The laboratory testing completed on the obtained samples included a
standard Proctor (ASTM D-698) test. Results of the completed standard Proctor tests were
used to evaluate the percent compaction and moisture variability with reworked soils in the
field and are included with this report.
During the referenced period, Soilogic personnel performed field moisture/density tests on
overexcavation/backfill materials that had been placed and compacted prior to and during
our site visits. The field moisture/density tests were completed at random locations and
elevations within the backfill areas and were performed in general accordance with ASTM
Specification D-2922. The field moisture/density test results met the project compaction
requirement of at least 95% of standard Proctor maximum dry density and moisture content
requirement of ±2% of standard Proctor optimum moisture content.
Construction Materials Testing and Observation Services Report
Mountain’s Edge
Fort Collins, Colorado
Soilogic # 18-2066
2
We appreciate the opportunity to be of service to you on this project. If you have any
questions concerning the enclosed information or if we can be of further assistance to you
in any way, please do not hesitate to contact us.
Very Truly Yours,
Soilogic, Inc. Reviewed by:
Jason Horner, E.I. Wolf von Carlowitz, P.E.
Project Engineer Principal Engineer
MOUNTAIN'S EDGE
Fort Collins, Colorado
Project # 18-2066
September 2018
Field Moisture/Density Testing Summary
Test Test Proctor Moisture
Moisture
Variability
Field Results
Dry
Material Tested and Location
Project Date Daily Depth
Density Moisture Compaction
1 9/19 1 Grade Overexcavation/Backfill - Block 4 - Lots 1/2 C 9.8%
Number Number ID
Percent
Compaction
(Pass/Fail)
101.2 -4.2% 88% *FAIL* *FAIL*
2 9/19 2 -2' Overexcavation/Backfill - Block 4 - Lots 2/3 *FAIL*
3 9/21 1 -1' Overexcavation/Backfill - Roadway - Crown View - 25' N of Knolls Endd C 14.6% 112.0 0.6%
C 8.0% 103.1 -6.0% 90% *FAIL*
97% Pass Pass
4 9/21 2 -2' Overexcavation/Backfill - Roadway - Crown View - 25' S of Knolls Endd C 12.0% 112.0 -2.0% 97% Pass Pass
5 9/21 3 -17' Overexcavation/Backfill - Building 12 Pass
6 9/21 4 -17' Overexcavation/Backfill - Building 14 C 13.1% 113.9 -0.9%
C 12.5% 112.8 -1.5% 98% Pass
99% Pass Pass
98% Pass Pass
8 9/24 2 -13' Overexcavation/Backfill - Roadway - Downs Way - 250' S of Bluegrass C 16.0% 111.5 2.0% 97% Pass Pass
7 9/24 1 -14' Overexcavation/Backfill - Roadway - Downs Way - 25' S of Bluegrass C 15.2% 112.6 1.2%
97% Pass Pass
10 9/24 4 -17' Overexcavation/Backfill - Building 20 C 12.5% 113.0 -1.5% 98% Pass Pass
9 9/24 3 -18' Overexcavation/Backfill - Building 20 C 12.5% 112.0 -1.5%
11 9/24 5 -18' Overexcavation/Backfill - Building 20 Pass
12 9/24 6 -17' Overexcavation/Backfill - Building 20 C 12.0% 112.0 -2.0%
C 12.7% 113.5 -1.3% 99% Pass
97% Pass Pass
96% Pass Pass
14 9/25 2 -13' Retest #2 C 14.5% 113.0 0.5% 98% Pass Pass
13 9/25 1 -14' Retest #1 C 15.0% 110.5 1.0%
99% Pass Pass
16 9/25 4 -12' Overexcavation/Backfill - 75' S of Knolls End C 16.0% 109.9 2.0% 96% Pass Pass
15 9/25 3 -13' Overexcavation/Backfill - Roadway - Crown View - 175' S of Knolls End C 13.0% 114.0 -1.0%
17 9/25 5 -16' Overexcavation/Backfill - Building 12 Pass
18 9/25 6 -15' Overexcavation/Backfill - Building 13 C 12.7% 110.0 -1.3%
C 16.0% 111.5 2.0% 97% Pass
96% Pass Pass
96% Pass Pass
20 9/25 8 -15' Overexcavation/Backfill - Building 15 C 16.0% 109.8 2.0% 95% Pass Pass
19 9/25 7 -16' Overexcavation/Backfill - Building 14 C 15.5% 110.5 1.5%
97% Pass Pass
22 9/26 2 -14' Overexcavation/Backfill - Building 14 C 14.5% 110.8 0.5% 96% Pass Pass
21 9/26 1 -14' Overexcavation/Backfill - Building 13 C 13.5% 111.2 -0.5%
23 9/26 3 -13' Overexcavation/Backfill - Building 15 Pass
24 9/26 4 -1' Overexcavation/Backfill - Precipice Dr - 160' S of Knolls End C 14.5% 111.5 0.5%
C 13.0% 113.7 -1.0% 99% Pass
97% Pass Pass
98% Pass Pass
26 9/27 1 -13' Overexcavation/Backfill - Building 15 C 12.8% 110.9 -1.2% 96% Pass Pass
MOUNTAIN'S EDGE
Fort Collins, Colorado
Project # 18-2066
October 2018
Field Moisture/Density Testing Summary
Test Test Proctor Moisture
Moisture
Variability
Field Results
Dry
Material Tested and Location
Project Date Daily Depth
Density Moisture Compaction
40 9/28 1 -11' Overexcavation/Backfill - Building 20 C 13.5%
Number Number ID
Percent
Compaction
(Pass/Fail)
111.2 -0.5% 97% Pass Pass
41 9/28 2 -10' Overexcavation/Backfill - Building 20 Pass
42 9/28 3 -10' Overexcavation/Backfill - Building 20 C 13.0% 112.8 -1.0%
C 14.5% 110.8 0.5% 96% Pass
98% Pass Pass
43 9/28 4 -9' Overexcavation/Backfill - Lot 11 C 14.5% 111.5 0.5% 97% Pass Pass
44 9/28 5 -8' Overexcavation/Backfill - Lot 12 Pass
45 9/28 6 -9' Overexcavation/Backfill - Lot 13 C 12.8% 110.9 -1.2%
C 13.2% 112.2 -0.8% 98% Pass
96% Pass Pass
46 9/28 7 -8' Overexcavation/Backfill - Lot 14 C 13.6% 109.7 -0.4% 95% Pass Pass
47 9/28 8 -9' Overexcavation/Backfill - Building 20 Pass
48 9/28 9 -8' Overexcavation/Backfill - Building 20 C 14.5% 111.9 0.5%
C 14.1% 110.5 0.1% 96% Pass
97% Pass Pass
49 9/28 10 -7' Overexcavation/Backfill - Lot 11 C 13.8% 109.8 -0.2% 95% Pass Pass
50 9/28 11 -6' Overexcavation/Backfill - Lot 12 Pass
51 9/28 12 -7' Overexcavation/Backfill - Lot 13 C 15.0% 111.7 1.0%
C 15.0% 110.5 1.0% 96% Pass
97% Pass Pass
52 9/28 13 -6' Overexcavation/Backfill - Lot 14 C 14.5% 112.2 0.5% 98% Pass Pass
53 10/1 1 -7' Overexcavation/Backfill - Building 20 Pass
54 10/1 2 -6' Overexcavation/Backfill - Building 20 C 13.5% 112.8 -0.5%
C 13.7% 113.5 -0.3% 99% Pass
98% Pass Pass
55 10/1 3 -7' Overexcavation/Backfill - Building 20 C 12.9% 114.2 -1.1% 99% Pass Pass
56 10/1 4 -5' Overexcavation/Backfill - 11 Pass
57 10/1 5 -5' Overexcavation/Backfill - 12 C 13.7% 113.2 -0.3%
C 13.1% 113.6 -0.9% 99% Pass
98% Pass Pass
58 10/1 6 -4' Overexcavation/Backfill - 13 C 14.0% 112.9 0.0% 98% Pass Pass
59 10/1 7 -5' Overexcavation/Backfill - 14 Pass
60 10/2 1 -4' Overexcavation/Backfill - Building 20 C 14.2% 111.6 0.2%
C 14.2% 113.6 0.2% 99% Pass
97% Pass Pass
61 10/2 2 -5' Overexcavation/Backfill - Building 20 C 13.5% 112.7 -0.5% 98% Pass Pass
62 10/2 3 -4' Overexcavation/Backfill - Building 20 Pass
63 10/2 4 -5' Overexcavation/Backfill - Building 20 C 15.8% 111.0 1.8%
C 15.0% 110.5 1.0% 96% Pass
97% Pass Pass
64 10/2 5 -3' Overexcavation/Backfill - Lot 11 C 13.8% 111.5 -0.2% 97% Pass Pass
65 10/2 6 -2' Overexcavation/Backfill - Lot 12 Pass
MOUNTAIN'S EDGE
Fort Collins, Colorado
Project # 18-2066
October 2018
Field Moisture/Density Testing Summary
Test Test Proctor Moisture
Moisture
Variability
Field Results
Dry
Material Tested and Location
Project Date Daily Depth
Density Moisture Compaction
76 10/8 1 -1' Overexcavation/Backfill - Building 6 C 12.8%
Number Number ID
Percent
Compaction
(Pass/Fail)
112.5 -1.2% 98% Pass Pass
77 10/8 2 -1' Overexcavation/Backfill - Building 8 Pass
78 10/8 3 Grade Overexcavation/Backfill - Building 4 C 14.0% 111.8 0.0%
C 13.2% 114.1 -0.8% 99% Pass
97% Pass Pass
79 10/8 4 -1' Overexcavation/Backfill - Ridge Top Dr - 75' S of Knolls End C 14.2% 110.1 0.2% 96% Pass Pass
80 10/8 5 Grade Overexcavation/Backfill - Building 10 Pass
81 10/8 6 -1' Overexcavation/Backfill - Building 9 C 15.2% 111.7 1.2%
C 14.0% 109.9 0.0% 96% Pass
97% Pass Pass
82 10/8 7 -2' Overexcavation/Backfill - Building 7 C 14.3% 112.0 0.3% 97% Pass Pass
83 10/9 1 -1' Overexcavation/Backfill - Building 3 Pass
84 10/9 2 -1' Overexcavation/Backfill - Building 5 C 14.0% 112.2 0.0%
C 14.2% 111.9 0.2% 97% Pass
98% Pass Pass
85 10/9 3 -1' Overexcavation/Backfill - Building 7 C 15.0% 113.1 1.0% 98% Pass Pass
86 10/9 4 Grade Overexcavation/Backfill - Building 9 Pass
87 10/9 5 Grade Overexcavation/Backfill - Building 1 C 14.5% 112.9 0.5%
C 14.2% 113.8 0.2% 99% Pass
98% Pass Pass
88 10/9 6 Grade Overexcavation/Backfill - Building 5 C 15.6% 109.8 1.6% 95% Pass Pass
89 10/9 7 -1' Overexcavation/Backfill - Bluegrass Dr - 100' E of Downs Way Pass
90 10/9 8 Grade Overexcavation/Backfill - Bluegrass Dr - 100' W of Overland Trail C 14.9% 111.1 0.9%
C 15.0% 110.2 1.0% 96% Pass
97% Pass Pass
Maximum Dry Density (pcf) 119.0 118.0 115.0
Compaction Requirement
Proctor ID: A B C
Moisture Content Requirement ±2% ±2% ±2%
Optimum Moisture Content (%) 13.0% 13.0% 14.0%
Procedure D-698 D-698 D-698
Compaction Requirement 95% Min 95% Min 95% Min
Soilogic, Inc.
3522 Draft Horse Court • Loveland, CO 80538 • (970) 535-6144
March 7, 2019
GLH Construction, Inc.
780 East Garden Drive
Windsor, Colorado 80550
Attn: Mr. Justin Marshall
Re: Construction Materials Testing and Observation Services Report
Mountain’s Edge
Fort Collins, Colorado
Soilogic Project # 18-2066
Mr. Marshall:
During the period of November 1 through December 26, 2018, Soilogic Inc. (Soilogic)
provided construction materials testing and observation services for the referenced project.
Our services were provided on a part-time basis and included the observation and testing
of utlity materials. Results of the observation and testing services completed on the
referenced date are included with this report.
During the referenced period, Soilogic personnel performed field moisture/density tests on
sewer, water and storm sewer utility backfill materials that had been placed and compacted
prior to and during our site visits. The field moisture/density tests were completed at
random locations and elevations within the backfill areas and were performed in general
accordance with ASTM Specification D-2922. The field moisture/density test results met
the project compaction requirement of at least 95% of standard Proctor maximum dry
density and moisture content requirement of ±2% of standard Proctor optimum moisture
content.
Construction Materials Testing and Observation Services Report
Mountain’s Edge
Fort Collins, Colorado
Soilogic # 18-2066
2
We appreciate the opportunity to be of service to you on this project. If you have any
questions concerning the enclosed information or if we can be of further assistance to you
in any way, please do not hesitate to contact us.
Very Truly Yours,
Soilogic, Inc. Reviewed by:
Jason Horner, E.I. Wolf von Carlowitz, P.E.
Project Engineer Principal Engineer
Procedure D-698 D-698 D-698
Compaction Requirement 95% Min 95% Min 95% Min
Moisture Content Requirement ±2% ±2% ±2%
Optimum Moisture Content (%) 13.0% 13.0% 14.0%
Maximum Dry Density (pcf) 119.0 118.0 115.0
Compaction Requirement
Proctor ID: A B C
39 9/27 14 -11' Overexcavation/Backfill - Building 20 C 14.0% 112.9 0.0% 98% Pass Pass
99% Pass Pass
38 9/27 13 -12' Overexcavation/Backfill - Building 20 C 13.7% 113.2 -0.3% 98% Pass Pass
37 9/27 12 -9' Overexcavation/Backfill - Lot 14 C 13.1% 113.6 -0.9%
35 9/27 10 -9' Overexcavation/Backfill - Lot 12 Pass
36 9/27 11 -10' Overexcavation/Backfill - Lot 13 C 12.9% 112.4 -1.1%
C 13.5% 112.8 -0.5% 98% Pass
98% Pass Pass
98% Pass Pass
34 9/27 9 -10' Overexcavation/Backfill - Lot 11 C 13.7% 113.5 -0.3% 99% Pass Pass
33 9/27 8 -13' Overexcavation/Backfill - Building 20 C 14.5% 112.2 0.5%
96% Pass Pass
32 9/27 7 -15' Overexcavation/Backfill - Building 20 C 15.0% 111.7 1.0% 97% Pass Pass
31 9/27 6 -14' Overexcavation/Backfill - Building 20 C 15.0% 110.5 1.0%
29 9/27 4 -1' Overexcavation/Backfill - Building 6 Pass
30 9/27 5 -15' Overexcavation/Backfill - Building 20 C 13.8% 109.8 -0.2%
C 14.5% 111.9 0.5% 97% Pass
95% Pass Pass
95% Pass Pass
28 9/27 3 -1' Overexcavation/Backfill - Building 8 C 14.1% 110.5 0.1% 96% Pass Pass
27 9/27 2 -12' Overexcavation/Backfill - Building 13 C 13.6% 109.7 -0.4%
98% Pass Pass
26 9/27 1 -13' Overexcavation/Backfill - Building 15 C 12.8% 110.9 -1.2% 96% Pass Pass
25 9/26 5 -12' Overexcavation/Backfill - Building 12 C 13.2% 112.2 -0.8%
23 9/26 3 -13' Overexcavation/Backfill - Building 15 Pass
24 9/26 4 -1' Overexcavation/Backfill - Precipice Dr - 160' S of Knolls End C 14.5% 111.5 0.5%
C 13.0% 113.7 -1.0% 99% Pass
97% Pass Pass
97% Pass Pass
22 9/26 2 -14' Overexcavation/Backfill - Building 14 C 14.5% 110.8 0.5% 96% Pass Pass
21 9/26 1 -14' Overexcavation/Backfill - Building 13 C 13.5% 111.2 -0.5%
96% Pass Pass
20 9/25 8 -15' Overexcavation/Backfill - Building 15 C 16.0% 109.8 2.0% 95% Pass Pass
19 9/25 7 -16' Overexcavation/Backfill - Building 14 C 15.5% 110.5 1.5%
17 9/25 5 -16' Overexcavation/Backfill - Building 12 Pass
18 9/25 6 -15' Overexcavation/Backfill - Building 13 C 12.7% 110.0 -1.3%
C 16.0% 111.5 2.0% 97% Pass
96% Pass Pass
99% Pass Pass
16 9/25 4 -12' Overexcavation/Backfill - 75' S of Knolls End C 16.0% 109.9 2.0% 96% Pass Pass
15 9/25 3 -13' Overexcavation/Backfill - Roadway - Crown View - 175' S of Knolls End C 13.0% 114.0 -1.0%
96% Pass Pass
14 9/25 2 -13' Retest #2 C 14.5% 113.0 0.5% 98% Pass Pass
13 9/25 1 -14' Retest #1 C 15.0% 110.5 1.0%
11 9/24 5 -18' Overexcavation/Backfill - Building 20 Pass
12 9/24 6 -17' Overexcavation/Backfill - Building 20 C 12.0% 112.0 -2.0%
C 12.7% 113.5 -1.3% 99% Pass
97% Pass Pass
97% Pass Pass
10 9/24 4 -17' Overexcavation/Backfill - Building 20 C 12.5% 113.0 -1.5% 98% Pass Pass
9 9/24 3 -18' Overexcavation/Backfill - Building 20 C 12.5% 112.0 -1.5%
98% Pass Pass
8 9/24 2 -13' Overexcavation/Backfill - Roadway - Downs Way - 250' S of Bluegrass C 16.0% 111.5 2.0% 97% Pass Pass
Procedure D-698
Compaction Requirement 95% Min
Moisture Content Requirement ±2%
Optimum Moisture Content (%) 13.0%
Maximum Dry Density (pcf) 119.0
Compaction Requirement
Proctor ID: A
74 10/3 7 -1' Overexcavation/Backfill - Lot 13 Pass
75 10/3 8 Grade Overexcavation/Backfill - Lot 14 C 14.2% 114.1 0.2%
C 15.5% 111.7 1.5% 97% Pass
99% Pass Pass
96% Pass Pass
73 10/3 6 -1' Overexcavation/Backfill - Lot 12 C 14.9% 112.0 0.9% 97% Pass Pass
72 10/3 5 Grade Overexcavation/Backfill - Lot 11 C 15.0% 109.9 1.0%
99% Pass Pass
71 10/3 4 -1' Overexcavation/Backfill - Building 20 C 13.0% 114.0 -1.0% 99% Pass Pass
70 10/3 3 Grade Overexcavation/Backfill - Building 20 C 13.8% 113.5 -0.2%
68 10/3 1 -3' Overexcavation/Backfill - Building 20 Pass
69 10/3 2 -1' Overexcavation/Backfill - Building 20 C 14.0% 112.2 0.0%
C 12.5% 111.3 -1.5% 97% Pass
98% Pass Pass
98% Pass Pass
67 10/2 8 -2' Overexcavation/Backfill - Lot 14 C 12.8% 112.6 -1.2% 98% Pass Pass
66 10/2 7 -3' Overexcavation/Backfill - Lot 13 C 15.0% 113.2 1.0%
97% Pass Pass
65 10/2 6 -2' Overexcavation/Backfill - Lot 12 C 14.0% 112.0 0.0% 97% Pass Pass
64 10/2 5 -3' Overexcavation/Backfill - Lot 11 C 13.8% 111.5 -0.2%
62 10/2 3 -4' Overexcavation/Backfill - Building 20 Pass
63 10/2 4 -5' Overexcavation/Backfill - Building 20 C 15.8% 111.0 1.8%
C 15.0% 110.5 1.0% 96% Pass
97% Pass Pass
97% Pass Pass
61 10/2 2 -5' Overexcavation/Backfill - Building 20 C 13.5% 112.7 -0.5% 98% Pass Pass
60 10/2 1 -4' Overexcavation/Backfill - Building 20 C 14.2% 111.6 0.2%
98% Pass Pass
59 10/1 7 -5' Overexcavation/Backfill - 14 C 14.2% 113.6 0.2% 99% Pass Pass
58 10/1 6 -4' Overexcavation/Backfill - 13 C 14.0% 112.9 0.0%
56 10/1 4 -5' Overexcavation/Backfill - 11 Pass
57 10/1 5 -5' Overexcavation/Backfill - 12 C 13.7% 113.2 -0.3%
C 13.1% 113.6 -0.9% 99% Pass
98% Pass Pass
98% Pass Pass
55 10/1 3 -7' Overexcavation/Backfill - Building 20 C 12.9% 114.2 -1.1% 99% Pass Pass
54 10/1 2 -6' Overexcavation/Backfill - Building 20 C 13.5% 112.8 -0.5%
98% Pass Pass
53 10/1 1 -7' Overexcavation/Backfill - Building 20 C 13.7% 113.5 -0.3% 99% Pass Pass
52 9/28 13 -6' Overexcavation/Backfill - Lot 14 C 14.5% 112.2 0.5%
50 9/28 11 -6' Overexcavation/Backfill - Lot 12 Pass
51 9/28 12 -7' Overexcavation/Backfill - Lot 13 C 15.0% 111.7 1.0%
C 15.0% 110.5 1.0% 96% Pass
97% Pass Pass
97% Pass Pass
49 9/28 10 -7' Overexcavation/Backfill - Lot 11 C 13.8% 109.8 -0.2% 95% Pass Pass
48 9/28 9 -8' Overexcavation/Backfill - Building 20 C 14.5% 111.9 0.5%
95% Pass Pass
47 9/28 8 -9' Overexcavation/Backfill - Building 20 C 14.1% 110.5 0.1% 96% Pass Pass
46 9/28 7 -8' Overexcavation/Backfill - Lot 14 C 13.6% 109.7 -0.4%
44 9/28 5 -8' Overexcavation/Backfill - Lot 12 Pass
45 9/28 6 -9' Overexcavation/Backfill - Lot 13 C 12.8% 110.9 -1.2%
C 13.2% 112.2 -0.8% 98% Pass
Procedure D-698 D-698 D-698
Compaction Requirement 95% Min 95% Min 95% Min
Moisture Content Requirement ±2% ±2% ±2%
Optimum Moisture Content (%) 13.0% 13.0% 14.0%
Maximum Dry Density (pcf) 119.0 118.0 115.0
Compaction Requirement
Proctor ID: A B C
90 10/9 8 Grade Overexcavation/Backfill - Bluegrass Dr - 100' W of Overland Trail C 14.9% 111.1 0.9% 97% Pass Pass
95% Pass Pass
89 10/9 7 -1' Overexcavation/Backfill - Bluegrass Dr - 100' E of Downs Way C 15.0% 110.2 1.0% 96% Pass Pass
88 10/9 6 Grade Overexcavation/Backfill - Building 5 C 15.6% 109.8 1.6%
86 10/9 4 Grade Overexcavation/Backfill - Building 9 Pass
87 10/9 5 Grade Overexcavation/Backfill - Building 1 C 14.5% 112.9 0.5%
C 14.2% 113.8 0.2% 99% Pass
98% Pass Pass
98% Pass Pass
85 10/9 3 -1' Overexcavation/Backfill - Building 7 C 15.0% 113.1 1.0% 98% Pass Pass
84 10/9 2 -1' Overexcavation/Backfill - Building 5 C 14.0% 112.2 0.0%
97% Pass Pass
83 10/9 1 -1' Overexcavation/Backfill - Building 3 C 14.2% 111.9 0.2% 97% Pass Pass
82 10/8 7 -2' Overexcavation/Backfill - Building 7 C 14.3% 112.0 0.3%
80 10/8 5 Grade Overexcavation/Backfill - Building 10 Pass
81 10/8 6 -1' Overexcavation/Backfill - Building 9 C 15.2% 111.7 1.2%
C 14.0% 109.9 0.0% 96% Pass
97% Pass Pass
Pass
79 10/8 4 -1' Overexcavation/Backfill - Ridge Top Dr - 75' S of Knolls End C 14.2% 110.1 0.2% 96% Pass Pass
Pass
77 10/8 2 -1' Overexcavation/Backfill - Building 8 Pass
78 10/8 3 Grade Overexcavation/Backfill - Building 4 C 14.0% 111.8 0.0%
C 13.2% 114.1 -0.8% 99% Pass
97% Pass
Moisture Compaction
76 10/8 1 -1' Overexcavation/Backfill - Building 6 C 12.8%
Number Number ID
Percent
Compaction
(Pass/Fail)
112.5 -1.2% 98% Pass
Test Test Proctor Moisture
Moisture
Variability
Field Results
Dry
Material Tested and Location
Project Date Daily Depth
Density
Fort Collins, Colorado
Project # 18-2066
October 2018
Field Moisture/Density Testing Summary
MOUNTAIN'S EDGE
Procedure D-698 D-698 D-698
Compaction Requirement 95% Min 95% Min 95% Min
Moisture Content Requirement ±2% ±2% ±2%
Optimum Moisture Content (%) 13.0% 13.0% 14.0%
Maximum Dry Density (pcf) 119.0 118.0 115.0
Compaction Requirement
Proctor ID: A B C
127 11/6 20 -4' Sewer Service Backfill - Block 22 - Lot 9 A 13.9% 116.7 0.9% 98% Pass Pass
125 11/6 18 -4' Sewer Service Backfill - Block 22 - Lot 10 Pass
126 11/6 19 -2' Sewer Main Backfill - MH A2 - 100' N A 13.3% 116.0 0.3%
A 12.9% 115.7 -0.1% 97% Pass
97% Pass Pass
97% Pass Pass
124 11/6 17 Grade Sewer Main Backfill - MH A2 - 3' N A 14.0% 115.9 1.0% 97% Pass Pass
123 11/6 16 Grade Sewer Main Backfill - MH A1 - 75' E A 13.8% 115.7 0.8%
96% Pass Pass
122 11/6 15 Grade Sewer Main Backfill - MH A1 - 2' E A 12.7% 115.9 -0.3% 97% Pass Pass
121 11/6 14 -2' Sewer Main Backfill - MH A2.1B - 75' S A 14.3% 114.7 1.3%
119 11/6 12 -6' Sewer Main Backfill - MH A2.1B - 180' N Pass
120 11/6 13 -4' Sewer Main Backfill - MH A2.1B - 3' W A 14.2% 115.6 1.2%
A 13.7% 116.1 0.7% 98% Pass
97% Pass Pass
97% Pass Pass
118 11/6 11 -6' Sewer Service Backfill - Block 22 - Lot 7 A 13.5% 116.7 0.5% 98% Pass Pass
117 11/6 10 -6' Sewer Service Backfill - Block 22 - Lot 6 A 14.0% 115.2 1.0%
98% Pass Pass
116 11/6 9 -6' Sewer Service Backfill - Block 22 - Lot 5 A 13.0% 114.9 0.0% 97% Pass Pass
115 11/6 8 -6' Sewer Service Backfill - Block 22 - Lot 4 A 14.4% 116.3 1.4%
113 11/6 6 -6' Sewer Service Backfill - Building 16 - Lot 6 Pass
114 11/6 7 -6' Sewer Service Backfill - Building 16 - Lot 7 A 13.4% 116.0 0.4%
A 13.6% 115.8 0.6% 97% Pass
97% Pass Pass
99% Pass Pass
112 11/6 5 -6' Sewer Service Backfill - Building 16 - Lot 5 A 14.0% 115.7 1.0% 97% Pass Pass
111 11/6 4 -6' Sewer Service Backfill - Building 16 - Lot 4 A 14.2% 117.3 1.2%
98% Pass Pass
110 11/6 3 -6' Sewer Service Backfill - Building 16 - Lot 3 A 13.7% 116.0 0.7% 97% Pass Pass
109 11/6 2 -6' Sewer Service Backfill - Building 16 - Lot 2 A 13.2% 116.2 0.2%
107 11/5 8 -6' Sewer Service Backfill - Building 16 - Lot 1 Pass
108 11/6 1 -6' Sewer Main Backfill - MH A2.1B - A 13.0% 115.9 0.0%
A 14.1% 115.9 1.1% 97% Pass
97% Pass Pass
98% Pass Pass
106 11/5 7 -6' Sewer Service Backfill - Block 22 - Lot 8 A 13.0% 116.6 0.0% 98% Pass Pass
105 11/5 6 -6' Sewer Main Backfill - MH A2 - 6' N A 13.0% 116.3 0.0%
97% Pass Pass
104 11/5 5 -6' Sewer Main Backfill - MH A2 .1B - 1' E A 13.6% 116.8 0.6% 98% Pass Pass
103 11/5 4 -6' Sewer Main Backfill - MH A2 - 65' N A 14.1% 115.7 1.1%
101 11/5 2 -6' Sewer Service Backfill - Block 22 - Lot 9 Pass
102 11/5 3 -6' Sewer Service Backfill - Block 22 - Lot 10 A 13.9% 114.3 0.9%
A 14.5% 116.3 1.5% 98% Pass
96% Pass Pass
97% Pass Pass
100 11/5 1 -4' Sewer Main Backfill - MH A2 - 3' E A 13.7% 115.7 0.7% 97% Pass Pass
99 11/2 4 -4' Sewer Main Backfill - MH A2 - 15' N A 13.2% 114.9 0.2%
98% Pass Pass
98 11/2 3 -6' Sewer Main Backfill - MH A2 - 4' E A 12.6% 116.0 -0.4% 97% Pass Pass
97 11/2 2 -2' Sewer Main Backfill - MH A1 - 30' W A 12.5% 116.8 -0.5%
95 11/1 5 -4' Sewer Main Backfill - MH A1 - 20' W Pass
96 11/2 1 -2' Sewer Main Backfill - MH A1 - 2' N A 12.0% 117.2 -1.0%
Procedure D-698 D-698 D-698
Compaction Requirement 95% Min 95% Min 95% Min
Moisture Content Requirement ±2% ±2% ±2%
Optimum Moisture Content (%) 13.0% 13.0% 14.0%
Maximum Dry Density (pcf) 119.0 118.0 115.0
Compaction Requirement
Proctor ID: A B C
97% Pass Pass
168 11/8 21 -6' Retest #150 Pass
169 11/8 22 -6' Retest #151 A 13.6% 115.8 0.6%
A 13.0% 115.2 0.0% 97% Pass
96% Pass Pass
167 11/8 20 -2' Sewer Main Backfill - MH A3 - 50' E A 13.9% 114.9 0.9% 97% Pass Pass
166 11/8 19 -4' Sewer Main Backfill - MH A3 - 75' W A 14.5% 114.0 1.5%
97% Pass Pass
165 11/8 18 -4' Sewer Main Backfill - MH A4 - 40' E A 14.8% 115.6 1.8% 97% Pass Pass
164 11/8 17 -6' Sewer Main Backfill - MH A3 - 125' W A 13.7% 115.2 0.7%
162 11/8 15 -6' Sewer Main Backfill - MH A3 - 3' E Pass
163 11/8 16 -6' Sewer Main Backfill - MH A3 - 6' W A 14.2% 115.8 1.2%
A 13.5% 115.3 0.5% 97% Pass
97% Pass Pass
97% Pass Pass
161 11/8 14 -6' Sewer Main Backfill - MH A2 - 75' W A 13.7% 114.2 0.7% 96% Pass Pass
160 11/8 13 Grade Sewer Main Backfill - MH A2.2B - 120' S A 14.2% 115.7 1.2%
96% Pass Pass
159 11/8 12 Grade Sewer Main Backfill - MH A2.2B - 4' W A 14.0% 115.0 1.0% 97% Pass Pass
158 11/8 11 -2' Sewer Main Backfill - MH A2.2B - 150' S A 13.9% 114.6 0.9%
156 11/8 9 -2' Sewer Main Backfill - MH A2.2B - 2' S Pass
157 11/8 10 -2' Sewer Main Backfill - MH A2.2B - 60' S A 13.5% 115.6 0.5%
A 13.8% 113.9 0.8% 96% Pass
97% Pass Pass
97% Pass Pass
155 11/8 8 -4' Sewer Main Backfill - MH A2.2B - 5' E A 14.1% 115.5 1.1% 97% Pass Pass
154 11/8 7 -4' Sewer Service Backfill - Block 22 - Lot 3 A 14.0% 116.0 1.0%
96% Pass Pass
153 11/8 6 -4' Sewer Service Backfill - Block 22 - Lot 2 A 14.3% 114.9 1.3% 97% Pass Pass
152 11/8 5 -4' Sewer Service Backfill - Block 22 - Lot 1 A 14.9% 114.5 1.9%
150 11/8 3 -6' Sewer Main Backfill - MH A2.2B - 4' E *FAIL*
151 11/8 4 -6' Sewer Main Backfill - MH A2.2B - 3' W A 17.1% 105.0 4.1%
A 16.5% 102.1 3.5% 86% *FAIL*
88% *FAIL* *FAIL*
98% Pass Pass
149 11/8 2 -6' Sewer Service Backfill - Block 22 - Lot 1 A 14.6% 115.0 1.6% 97% Pass Pass
148 11/8 1 -6' Sewer Main Backfill - MH A2.2B - 80' S A 13.8% 116.3 0.8%
97% Pass Pass
147 11/7 20 -6' Sewer Service Backfill - Block 22 - Lot 2 A 13.9% 117.2 0.9% 98% Pass Pass
146 11/7 19 -6' Sewer Service Backfill - Block 22 - Lot 3 A 13.8% 115.7 0.8%
144 11/7 17 -2' Sewer Main Backfill - MH A2.1B - 150' N Pass
145 11/7 18 Grade Sewer Main Backfill - MH A2.1B - 200' N A 14.2% 115.4 1.2%
A 14.7% 114.6 1.7% 96% Pass
97% Pass Pass
97% Pass Pass
143 11/7 16 Grade Sewer Main Backfill - MH A2.1B - 6' N A 15.0% 113.6 2.0% 95% Pass Pass
142 11/7 15 -2' Sewer Service Backfill - Block 22 - Lot 4 A 14.4% 115.9 1.4%
97% Pass Pass
141 11/7 14 -4' Sewer Service Backfill - Block 22 - Lot 5 A 12.4% 115.4 -0.6% 97% Pass Pass
140 11/7 13 -4' Sewer Service Backfill - Block 22 - Lot 6 A 13.3% 115.6 0.3%
138 11/7 11 -4' Sewer Service Backfill - Block 22 - Lot 7 Pass
139 11/7 12 -4' Sewer Main Backfill - MH A2.1B - 125' N A 12.8% 115.7 -0.2%
A 13.2% 113.8 0.2% 96% Pass
Procedure D-698 D-698 D-698
Compaction Requirement 95% Min 95% Min 95% Min
Moisture Content Requirement ±2% ±2% ±2%
Optimum Moisture Content (%) 13.0% 13.0% 14.0%
Maximum Dry Density (pcf) 119.0 118.0 115.0
Compaction Requirement
Proctor ID: A B C
97% Pass Pass
209 11/12 20 -2' Sewer Service Backfill - Building 2 - Lot 3 A 14.0% 116.0 1.0% 97% Pass Pass
208 11/12 19 -2' Sewer Service Backfill - Building 2 - Lot 2 A 13.0% 115.3 0.0%
97% Pass Pass
207 11/12 18 -2' Sewer Service Backfill - Building 2 - Lot 1 A 13.5% 116.2 0.5% 98% Pass Pass
206 11/12 17 -2' Sewer Main Backfill - MH A5 - 4' E A 13.9% 115.6 0.9%
204 11/12 15 -4' Sewer Main Backfill - MH A5 - 120' N Pass
205 11/12 16 -6' Sewer Main Backfill - MH A6 - 75' S A 14.0% 115.9 1.0%
A 13.1% 114.9 0.1% 97% Pass
97% Pass Pass
96% Pass Pass
203 11/12 14 -4' Sewer Main Backfill - MH A5 - 10' N A 12.7% 115.8 -0.3% 97% Pass Pass
202 11/12 13 -4' Sewer Service Backfill - Building 1 - Lot 7 A 13.3% 114.6 0.3%
97% Pass Pass
201 11/12 12 -4' Sewer Service Backfill - Building 1 - Lot 6 A 14.2% 116.0 1.2% 97% Pass Pass
200 11/12 11 -4' Sewer Service Backfill - Building 1 - Lot 5 A 13.7% 115.7 0.7%
198 11/12 9 -4' Sewer Service Backfill - Building 1 - Lot 3 Pass
199 11/12 10 -4' Sewer Service Backfill - Building 1 - Lot 4 A 13.6% 116.8 0.6%
A 13.1% 114.8 0.1% 96% Pass
98% Pass Pass
98% Pass Pass
197 11/12 8 -4' Sewer Service Backfill - Building 1 - Lot 2 A 12.9% 114.7 -0.1% 96% Pass Pass
196 11/12 7 -4' Sewer Service Backfill - Building 1 - Lot 1 A 12.5% 116.3 -0.5%
97% Pass Pass
195 11/12 6 -6' Sewer Main Backfill - MH A5 - 100' N A 13.2% 115.8 0.2% 97% Pass Pass
194 11/12 5 -6' Sewer Service Backfill - Building 2 - Lot 7 A 13.5% 116.0 0.5%
192 11/12 3 -6' Sewer Service Backfill - Building 2 - Lot 5 Pass
193 11/12 4 -6' Sewer Service Backfill - Building 2 - Lot 6 A 13.0% 116.0 0.0%
A 12.8% 114.8 -0.2% 96% Pass
97% Pass Pass
96% Pass Pass
191 11/12 2 -6' Sewer Service Backfill - Building 2 - Lot 4 A 14.2% 115.0 1.2% 97% Pass Pass
190 11/12 1 -6' Sewer Service Backfill - Building 2 - Lot 3 A 13.6% 114.2 0.6%
96% Pass Pass
189 11/9 20 -6' Sewer Service Backfill - Building 2 - Lot 2 A 13.7% 115.3 0.7% 97% Pass Pass
188 11/9 19 -6' Sewer Service Backfill - Building 2 - Lot 1 A 13.0% 114.7 0.0%
186 11/9 17 Grade Sewer Main Backfill - MH A4 - 5' W Pass
187 11/9 18 Grade Sewer Main Backfill - MH A4 - 70' W A 12.9% 115.5 -0.1%
A 12.8% 114.0 -0.2% 96% Pass
97% Pass Pass
98% Pass Pass
185 11/9 16 Grade Sewer Main Backfill - MH A4 - 4' E A 13.6% 116.2 0.6% 98% Pass Pass
184 11/9 15 -2' Sewer Main Backfill - MH A4 - 50' W A 14.5% 116.8 1.5%
97% Pass Pass
183 11/9 14 -2' Sewer Main Backfill - MH A4 - 6' W A 14.3% 116.2 1.3% 98% Pass Pass
182 11/9 13 -6' Sewer Main Backfill - MH A5 - 30' N A 13.7% 115.6 0.7%
180 11/9 11 -6' Sewer Main Backfill - MH A5 - 5' E Pass
181 11/9 12 -4' Sewer Main Backfill - MH A5 - 2' S A 14.2% 114.9 1.2%
A 15.0% 113.9 2.0% 96% Pass
97% Pass Pass
98% Pass Pass
179 11/9 10 -6' Sewer Main Backfill - MH A4 - 60' W A 14.0% 115.9 1.0% 97% Pass Pass
178 11/9 9 -6' Sewer Main Backfill - MH A4 - 8' W A 13.5% 116.6 0.5%
MOUNTAIN'S EDGE
Fort Collins, Colorado
Project # 18-2066
November 2018
Field Moisture/Density Testing Summary
Test Test Proctor Moisture
Moisture
Variability
Field Results
Dry
Material Tested and Location
Project Date Daily Depth
Density Moisture Compaction
210 11/13 1 -2' Sewer Service Backfill - Building 2 - Lot 4 A 13.9%
Number Number ID
Percent
Compaction
(Pass/Fail)
115.9 0.9% 97% Pass Pass
211 11/13 2 -2' Sewer Service Backfill - Building 2 - Lot 5 Pass
212 11/13 3 -2' Sewer Service Backfill - Building 2 - Lot 6 A 13.5% 116.9 0.5%
A 14.0% 114.2 1.0% 96% Pass
98% Pass Pass
213 11/13 4 -2' Sewer Service Backfill - Building 2 - Lot 7 A 13.1% 117.3 0.1% 99% Pass Pass
214 11/13 5 -2' Sewer Main Backfill - MH A5- 135' N Pass
215 11/13 6 -2' Sewer Service Backfill - Building 1 - Lot 1 A 12.9% 115.8 -0.1%
A 14.6% 114.0 1.6% 96% Pass
97% Pass Pass
216 11/13 7 -2' Sewer Service Backfill - Building 1 - Lot 2 A 13.0% 116.2 0.0% 98% Pass Pass
217 11/13 8 -2' Sewer Service Backfill - Building 1 - Lot 3 Pass
218 11/13 9 -2' Sewer Service Backfill - Building 1 - Lot 4 A 13.6% 116.3 0.6%
A 13.3% 116.9 0.3% 98% Pass
98% Pass Pass
219 11/13 10 -2' Sewer Service Backfill - Building 1 - Lot 5 A 14.2% 116.9 1.2% 98% Pass Pass
220 11/13 11 -2' Sewer Service Backfill - Building 1 - Lot 6 Pass
221 11/13 12 -2' Sewer Service Backfill - Building 1 - Lot 7 A 13.7% 117.3 0.7%
A 14.6% 114.8 1.6% 96% Pass
99% Pass Pass
222 11/13 13 -2' Sewer main Backfill - MH A6- 100' S A 13.6% 116.8 0.6% 98% Pass Pass
223 11/13 14 -6' Sewer main Backfill - MH A6- 30' S Pass
224 11/13 15 -6' Sewer main Backfill - MH A6- 3' W A 12.5% 114.5 -0.5%
A 12.8% 115.6 -0.2% 97% Pass
96% Pass Pass
225 11/13 16 -6' Sewer main Backfill - MH A6- 5' E A 13.1% 117.0 0.1% 98% Pass Pass
226 11/13 17 -6' Sewer Service Backfill - Building 3 - Lot 1 Pass
227 11/13 18 -6' Sewer Service Backfill - Building 3 - Lot 2 A 13.6% 115.9 0.6%
A 13.2% 117.2 0.2% 98% Pass
97% Pass Pass
228 11/13 19 -6' Sewer Service Backfill - Building 3 - Lot 3 A 13.8% 116.5 0.8% 98% Pass Pass
229 11/13 20 -6' Sewer Service Backfill - Building 3 - Lot 4 Pass
230 11/14 1 -6' Sewer Service Backfill - Building 4 - Lot 1 A 13.6% 117.2 0.6%
A 13.1% 116.8 0.1% 98% Pass
98% Pass Pass
231 11/14 2 -6' Sewer Service Backfill - Building 4 - Lot 2 A 13.8% 116.5 0.8% 98% Pass Pass
232 11/14 3 -6' Sewer Service Backfill - Building 4 - Lot 3 Pass
233 11/14 4 -6' Sewer Service Backfill - Building 4 - Lot 4 A 12.9% 116.0 -0.1%
A 14.2% 115.9 1.2% 97% Pass
97% Pass Pass
234 11/14 5 -6' Sewer Service Backfill - Building 4 - Lot 5 A 14.0% 116.9 1.0% 98% Pass Pass
235 11/14 6 -4' Sewer Service Backfill - Building 3 - Lot 1 Pass
MOUNTAIN'S EDGE
Fort Collins, Colorado
Project # 18-2066
November 2018
Field Moisture/Density Testing Summary
Test Test Proctor Moisture
Moisture
Variability
Field Results
Dry
Material Tested and Location
Project Date Daily Depth
Density Moisture Compaction
250 11/15 1 -4' Sewer Main Backfill - Mh A6 - 150' N A 12.9%
Number Number ID
Percent
Compaction
(Pass/Fail)
115.8 -0.1% 97% Pass Pass
251 11/15 2 -2' Sewer Main Backfill - Mh A6 - 100' N Pass
252 11/15 3 -4' Sewer Service Backfill - Building 6 - lot 1 A 13.6% 117.0 0.6%
A 13.1% 117.0 0.1% 98% Pass
98% Pass Pass
253 11/15 4 -4' Sewer Service Backfill - Building 6 - lot 2 A 13.0% 116.4 0.0% 98% Pass Pass
254 11/15 5 -4' Sewer Service Backfill - Building 6 - lot 3 Pass
255 11/15 6 -4' Sewer Service Backfill - Building 6 - lot 4 A 14.2% 113.8 1.2%
A 12.7% 116.0 -0.3% 97% Pass
96% Pass Pass
256 11/15 7 -2' Sewer Main Backfill - Mh A7 - 100' S A 13.8% 114.0 0.8% 96% Pass Pass
257 11/15 8 Grade Sewer Main Backfill - Mh A6 - 120' N Pass
258 11/15 9 -5' Sewer Main Backfill - Mh A7 - 8' S A 14.0% 114.7 1.0%
A 13.6% 115.6 0.6% 97% Pass
96% Pass Pass
259 11/15 10 -5' Sewer Main Backfill - Mh A7 - 4' W A 14.5% 115.5 1.5% 97% Pass Pass
260 11/15 11 -4' Sewer Main Backfill - Mh A7 - 50' W Pass
261 11/15 12 -4' Sewer Main Backfill - Mh A7 - 60' S A 13.6% 115.6 0.6%
A 13.4% 116.8 0.4% 98% Pass
97% Pass Pass
262 11/15 13 -4' Sewer Service Backfill - Building 7 - Lot 1 A 12.7% 113.8 -0.3% 96% Pass Pass
263 11/15 14 -4' Sewer Service Backfill - Building 7 - Lot 2 Pass
264 11/15 15 -4' Sewer Service Backfill - Building 7 - Lot 3 A 14.2% 116.9 1.2%
A 13.1% 115.0 0.1% 97% Pass
98% Pass Pass
265 11/15 16 -4' Sewer Service Backfill - Building 7 - Lot 4 A 13.0% 115.6 0.0% 97% Pass Pass
266 11/15 17 -4' Sewer Service Backfill - Building 7 - Lot 5 Pass
267 11/16 1 -4' Sewer Service Backfill - Building 7 - Lot 1 A 13.6% 117.2 0.6%
A 12.5% 116.9 -0.5% 98% Pass
98% Pass Pass
268 11/16 2 -4' Sewer Service Backfill - Building 7 - Lot 2 A 14.2% 116.3 1.2% 98% Pass Pass
269 11/16 3 -4' Sewer Service Backfill - Building 7 - Lot 3 Pass
270 11/16 4 -4' Sewer Service Backfill - Building 7 - Lot 4 A 12.9% 115.5 -0.1%
A 13.5% 116.4 0.5% 98% Pass
97% Pass Pass
271 11/16 5 -4' Sewer Service Backfill - Building 7 - Lot 5 A 13.3% 117.1 0.3% 98% Pass Pass
272 11/16 6 -2' Sewer Service Backfill - Building 6 - Lot 1 Pass
273 11/16 7 -2' Sewer Service Backfill - Building 6 - Lot 2 A 13.9% 116.9 0.9%
A 13.7% 115.3 0.7% 97% Pass
98% Pass Pass
274 11/16 8 -2' Sewer Service Backfill - Building 6 - Lot 3 A 14.3% 115.0 1.3% 97% Pass Pass
275 11/16 9 -2' Sewer Service Backfill - Building 6 - Lot 4 Pass
MOUNTAIN'S EDGE
Fort Collins, Colorado
Project # 18-2066
November 2018
Field Moisture/Density Testing Summary
Test Test Proctor Moisture
Moisture
Variability
Field Results
Dry
Material Tested and Location
Project Date Daily Depth
Density Moisture Compaction
286 11/19 1 -3' Sewer Service Backfill - Building 19 - Lot 6 & 7 A 13.2%
Number Number ID
Percent
Compaction
(Pass/Fail)
115.0 0.2% 97% Pass Pass
287 11/19 2 -4' Sewer Main Backfill - MH A3 - 4' S Pass
288 11/19 3 -3' Sewer Service Backfill - Building 19 - Lot 4 & 5 A 11.9% 116.7 -1.1%
A 12.8% 116.2 -0.2% 98% Pass
98% Pass Pass
289 11/19 4 -3' Sewer Service Backfill - Building 19 - Lot 1 A 12.5% 115.9 -0.5% 97% Pass Pass
290 11/19 5 -3' Sewer Service Backfill - Building 19 - Lot 2 Pass
291 11/19 6 -3' Sewer Service Backfill - Building 19 - Lot 3 A 13.5% 116.2 0.5%
A 13.2% 116.3 0.2% 98% Pass
98% Pass Pass
292 11/19 7 -1' Sewer Service Backfill - Building 19 - Lot 6 & 7 A 13.7% 116.0 0.7% 97% Pass Pass
293 11/19 8 -1' Sewer Service Backfill - Building 19 - Lot 4 & 5 Pass
294 11/19 9 -1' Sewer Service Backfill - Building 19 - Lot 1 A 12.9% 116.8 -0.1%
A 14.2% 117.5 1.2% 99% Pass
98% Pass Pass
295 11/19 10 -1' Sewer Service Backfill - Building 19 - Lot 2 A 12.5% 115.7 -0.5% 97% Pass Pass
296 11/19 11 -1' Sewer Service Backfill - Building 19 - Lot 3 Pass
297 11/19 12 -4' Sewer Main Backfill - MH A4 - 15' S A 12.1% 116.2 -0.9%
A 11.8% 114.8 -1.2% 96% Pass
98% Pass Pass
298 11/19 13 -3' Sewer Service Backfill - Building 18 - Lot 3 & 4 A 12.5% 115.5 -0.5% 97% Pass Pass
299 11/19 14 -3' Sewer Service Backfill - Building 18 - Lot 1 & 2 Pass
300 11/19 15 -1' Sewer Service Backfill - Building 18 - Lot 3 & 4 A 13.0% 114.9 0.0%
A 13.1% 114.5 0.1% 96% Pass
97% Pass Pass
301 11/19 16 -1' Sewer Service Backfill - Building 18 - Lot 1 & 2 A 13.7% 115.2 0.7% 97% Pass Pass
302 11/19 17 -2' Sewer Main Backfill - MH A4 - 5' S Pass
303 11/19 18 Grade Sewer Main Backfill - MH A4 - 8' S A 12.5% 116.5 -0.5%
A 12.3% 115.3 -0.7% 97% Pass
98% Pass Pass
304 11/19 19 Grade Sewer Main Backfill - MH A4 - 10' S A 12.7% 116.2 -0.3% 98% Pass Pass
305 11/21 1 -4' Sewer Service Backfill - Block 21 - Lot 1 Pass
306 11/21 2 -4' Sewer Service Backfill - Block 21 - Lot 2 A 14.0% 116.8 1.0%
A 13.3% 115.9 0.3% 97% Pass
98% Pass Pass
307 11/21 3 -4' Sewer Service Backfill - Block 21 - Lot 3 A 14.2% 117.2 1.2% 98% Pass Pass
308 11/21 4 -4' Sewer Service Backfill - Block 21 - Lot 4 Pass
309 11/21 5 -3' Sewer Main Backfill - MH A2.2A - 2' N A 14.6% 114.0 1.6%
A 13.7% 113.8 0.7% 96% Pass
96% Pass Pass
310 11/21 6 -3' Sewer Main Backfill - MH A2.2A - 55' N A 13.8% 115.5 0.8% 97% Pass Pass
311 11/21 7 -3' Sewer Main Backfill - MH A2 - 75' S Pass
MOUNTAIN'S EDGE
Fort Collins, Colorado
Project # 18-2066
November 2018
Field Moisture/Density Testing Summary
Test Test Proctor Moisture
Moisture
Variability
Field Results
Dry
Material Tested and Location
Project Date Daily Depth
Density Moisture Compaction
323 11/26 1 Grade Sewer Service Backfill - Building 20 - Lot 1 A 13.0%
Number Number ID
Percent
Compaction
(Pass/Fail)
116.0 0.0% 97% Pass Pass
324 11/26 2 Grade Sewer Service Backfill - Building 20 - Lot 2 Pass
325 11/26 3 Grade Sewer Service Backfill - Building 20 - Lot 3 A 12.9% 116.7 -0.1%
A 12.3% 116.2 -0.7% 98% Pass
98% Pass Pass
326 11/26 4 Grade Sewer Service Backfill - Building 20 - Lot 4 A 13.5% 116.4 0.5% 98% Pass Pass
327 11/26 5 Grade Sewer Service Backfill - Building 20 - Lot 5 Pass
328 11/26 6 Grade Sewer Main Backfill - MH A2 - 65' S A 13.9% 114.5 0.9%
A 12.8% 115.7 -0.2% 97% Pass
96% Pass Pass
329 11/26 7 Grade Sewer Main Backfill - MH A2.2A - 1' W A 13.1% 115.8 0.1% 97% Pass Pass
330 11/26 8 -4' Sewer Service Backfill - Building 17 - Lot 1 Pass
331 11/26 9 -4' Sewer Service Backfill - Building 17 - Lot 2 A 13.3% 116.0 0.3%
A 12.8% 117.2 -0.2% 98% Pass
97% Pass Pass
332 11/26 10 -4' Sewer Service Backfill - Building 17 - Lot 3 A 13.7% 116.7 0.7% 98% Pass Pass
333 11/26 11 -4' Sewer Service Backfill - Building 17 - Lot 4 Pass
334 11/26 12 -4' Sewer Service Backfill - Building 17 - Lot 5 A 14.0% 115.9 1.0%
A 14.2% 116.4 1.2% 98% Pass
97% Pass Pass
335 11/26 13 -6' Sewer Main Backfill - Int Bluegrass & Crest Top - 100' N A 11.9% 116.0 -1.1% 97% Pass Pass
336 11/26 14 -4' Sewer Main Backfill - Int Bluegrass & Crest Top - 120' N Pass
337 11/26 15 -2' Sewer Service Backfill - Building 17 - Lot 1 A 13.0% 116.7 0.0%
A 12.9% 116.5 -0.1% 98% Pass
98% Pass Pass
338 11/26 16 -2' Sewer Service Backfill - Building 17 - Lot 2 A 13.6% 116.3 0.6% 98% Pass Pass
339 11/26 17 -2' Sewer Service Backfill - Building 17 - Lot 3 Pass
340 11/26 18 -2' Sewer Service Backfill - Building 17 - Lot 4 A 12.8% 116.0 -0.2%
A 13.4% 116.2 0.4% 98% Pass
97% Pass Pass
341 11/26 19 -2' Sewer Service Backfill - Building 17 - Lot 5 A 12.3% 115.8 -0.7% 97% Pass Pass
342 11/27 1 -2' Sewer Service Backfill - Building 12 - Lot 3 Pass
343 11/27 2 -2' Sewer Service Backfill - Building 12 - Lot 4 A 13.2% 113.9 0.2%
A 12.8% 115.8 -0.2% 97% Pass
96% Pass Pass
344 11/27 3 -2' Sewer Service Backfill - Building 12 - Lot 5 A 13.5% 114.5 0.5% 96% Pass Pass
345 11/27 4 -2' Sewer Main Backfill - MH A8 - 100' S Pass
346 11/27 5 -2' Sewer Main Backfill - MH A8 - 8' S A 11.9% 115.9 -1.1%
A 11.2% 115.6 -1.8% 97% Pass
97% Pass Pass
347 11/27 6 Grade Sewer Service Backfill - Building 12 - Lot 1 A 12.1% 116.3 -0.9% 98% Pass Pass
348 11/27 7 Grade Sewer Service Backfill - Building 12 - Lot 2 Pass
MOUNTAIN'S EDGE
Fort Collins, Colorado
Project # 18-2066
November 2018
Field Moisture/Density Testing Summary
Test Test Proctor Moisture
Moisture
Variability
Field Results
Dry
Material Tested and Location
Project Date Daily Depth
Density Moisture Compaction
362 11/28 1 -2' Sewer Service Backfill - Building 13 - Lot 1 A 13.0%
Number Number ID
Percent
Compaction
(Pass/Fail)
115.7 0.0% 97% Pass Pass
363 11/28 2 -2' Sewer Service Backfill - Building 13 - Lot 2 Pass
364 11/28 3 -2' Sewer Service Backfill - Building 13 - Lot 3 A 14.0% 115.8 1.0%
A 13.2% 115.1 0.2% 97% Pass
97% Pass Pass
365 11/28 4 -2' Sewer Service Backfill - Building 13 - Lot 4 A 13.7% 117.2 0.7% 98% Pass Pass
366 11/28 5 -2' Sewer Service Backfill - Building 15 - Lot 1 Pass
367 11/28 6 Grade Sewer Service Backfill - Building 15 - Lot 2 A 12.5% 115.9 -0.5%
A 13.6% 116.0 0.6% 97% Pass
97% Pass Pass
368 11/28 7 Grade Sewer Service Backfill - Building 15 - Lot 3 A 12.8% 115.2 -0.2% 97% Pass Pass
369 11/28 8 Grade Sewer Service Backfill - Building 15 - Lot 4 Pass
370 11/28 9 Grade Sewer Service Backfill - Building 15 - Lot 5 A 13.2% 114.8 0.2%
A 13.1% 115.0 0.1% 97% Pass
96% Pass Pass
371 11/28 10 Grade Sewer Main Backfill - MH A8.1 - 60' N A 12.0% 113.5 -1.0% 95% Pass Pass
372 11/28 11 -3' Sewer Main Backfill - MH A - 75' S Pass
373 11/28 12 -3' Sewer Main Backfill - MH A - 5' S A 12.2% 115.9 -0.8%
A 11.8% 114.9 -1.2% 97% Pass
97% Pass Pass
374 11/28 13 -3' Sewer Service Backfill - Building 13 - Lot 1 A 13.2% 115.8 0.2% 97% Pass Pass
375 11/28 14 -2' Sewer Service Backfill - Building 13 - Lot 2 Pass
376 11/28 15 -2' Sewer Service Backfill - Building 13 - Lot 3 A 13.5% 116.2 0.5%
A 12.8% 117.0 -0.2% 98% Pass
98% Pass Pass
377 11/28 16 -2' Sewer Service Backfill - Building 13 - Lot 4 A 13.6% 115.8 0.6% 97% Pass Pass
378 11/28 17 -2' Sewer Main Backfill - MH A8.1 - 10' N Pass
379 11/28 18 -2' Sewer Service Backfill - Building 12 - Lot 1 A 12.9% 118.2 -0.1%
A 12.7% 115.5 -0.3% 97% Pass
99% Pass Pass
380 11/28 19 -2' Sewer Service Backfill - Building 12 - Lot 2 A 13.8% 117.0 0.8% 98% Pass Pass
381 11/29 1 -2' Sewer Service Backfill - Building 14 - Lot 1 Pass
382 11/29 2 -2' Sewer Service Backfill - Building 14 - Lot 2 A 13.7% 116.2 0.7%
A 12.6% 115.8 -0.4% 97% Pass
98% Pass Pass
383 11/29 3 -2' Sewer Service Backfill - Building 14 - Lot 3 A 13.5% 116.6 0.5% 98% Pass Pass
384 11/29 4 -2' Sewer Service Backfill - Building 14 - Lot 4 Pass
385 11/29 5 -2' Sewer Service Backfill - Building 14 - Lot 5 A 12.8% 115.5 -0.2%
A 13.0% 115.7 0.0% 97% Pass
97% Pass Pass
386 11/29 6 Grade Sewer Service Backfill - Building 14 - Lot 1 A 12.5% 117.5 -0.5% 99% Pass Pass
387 11/29 7 Grade Sewer Service Backfill - Building 14 - Lot 2 Pass
MOUNTAIN'S EDGE
Fort Collins, Colorado
Project # 18-2066
November 2018
Field Moisture/Density Testing Summary
Test Test Proctor Moisture
Moisture
Variability
Field Results
Dry
Material Tested and Location
Project Date Daily Depth
Density Moisture Compaction
400 11/30 1 -3' Sewer Main Backfill - MH A7 - 7' E A 13.7%
Number Number ID
Percent
Compaction
(Pass/Fail)
116.5 0.7% 98% Pass Pass
401 11/30 2 -3' Sewer Main Backfill - MH A7 - 1' E Pass
402 11/30 3 -3' Sewer Main Backfill - MH A7 - 50' W A 12.7% 118.2 -0.3%
A 12.5% 114.5 -0.5% 96% Pass
99% Pass Pass
403 11/30 4 -3' Sewer Service Backfill - Building 10 - Lot 1 A 13.1% 117.6 0.1% 99% Pass Pass
404 11/30 5 -3' Sewer Service Backfill - Building 10 - Lot 2 Pass
405 11/30 6 -3' Sewer Service Backfill - Building 10 - Lot 3 A 14.0% 116.6 1.0%
A 13.5% 115.6 0.5% 97% Pass
98% Pass Pass
406 11/30 7 -3' Sewer Service Backfill - Building 10 - Lot 4 A 13.1% 118.0 0.1% 99% Pass Pass
407 11/30 8 -3' Sewer Service Backfill - Building 10 - Lot 5 Pass
408 11/30 9 -3' Sewer Service Backfill - Building 10 - Lot 6 A 12.6% 114.8 -0.4%
A 12.1% 118.2 -0.9% 99% Pass
96% Pass Pass
409 11/30 10 -3' Sewer Service Backfill - Building 10 - Lot 7 A 11.9% 115.0 -1.1% 97% Pass Pass
410 11/30 11 -1' Sewer Service Backfill - Building 9 - Lot 1 Pass
411 11/30 12 -1' Sewer Service Backfill - Building 9 - Lot 2 A 11.2% 116.9 -1.8%
A 11.5% 117.0 -1.5% 98% Pass
98% Pass Pass
412 11/30 13 -1' Sewer Service Backfill - Building 9 - Lot 3 A 12.0% 116.5 -1.0% 98% Pass Pass
413 11/30 14 -1' Sewer Service Backfill - Building 9 - Lot 4 Pass
414 11/30 15 -1' Sewer Service Backfill - Building 9 - Lot 5 A 13.1% 118.1 0.1%
A 12.5% 117.0 -0.5% 98% Pass
99% Pass Pass
415 11/30 16 -2' Sewer Main Backfill - MH A7 - 5' W A 12.6% 117.7 -0.4% 99% Pass Pass
416 11/30 17 -2' Sewer Main Backfill - MH A7 - 60' W Pass
417 11/30 18 -4' Sewer Main Backfill - MH A8 - 40' W A 12.2% 115.5 -0.8%
A 11.9% 116.2 -1.1% 98% Pass
97% Pass Pass
418 11/30 19 -4' Sewer Main Backfill - MH A8 - 3' W A 11.5% 118.6 -1.5% 100% Pass Pass
419 12/1 1 -4' Sewer Main Backfill - MH A8 - 25' E Pass
420 12/1 2 -4' Sewer Main Backfill - MH A9 - 5' W A 13.5% 116.2 0.5%
A 12.8% 117.8 -0.2% 99% Pass
98% Pass Pass
421 12/1 3 -3' Sewer Service Backfill - Block 11 - Lot 1 A 11.9% 115.3 -1.1% 97% Pass Pass
422 12/1 4 -3' Sewer Service Backfill - Block 11 - Lot 2 Pass
423 12/1 5 -3' Sewer Service Backfill - Block 11 - Lot 3 A 11.5% 118.0 -1.5%
A 11.2% 115.2 -1.8% 97% Pass
99% Pass Pass
424 12/1 6 -3' Sewer Service Backfill - Block 11 - Lot 4 A 12.0% 118.0 -1.0% 99% Pass Pass
425 12/1 7 -3' Sewer Service Backfill - Block 11 - Lot 5 Pass
MOUNTAIN'S EDGE
Fort Collins, Colorado
Project # 18-2066
December 2018
Field Moisture/Density Testing Summary
Test Test Proctor Moisture
Moisture
Variability
Field Results
Dry
Material Tested and Location
Project Date Daily Depth
Density Moisture Compaction
438 12/2 1 -2' Sewer Main Backfill - MH A8 - 75' E A 13.3%
Number Number ID
Percent
Compaction
(Pass/Fail)
117.8 0.3% 99% Pass Pass
439 12/2 2 -1' Sewer Service Backfill - Building 11 - Lot 1 Pass
440 12/2 3 -1' Sewer Service Backfill - Building 11 - Lot 2 A 14.2% 115.4 1.2%
A 14.0% 116.6 1.0% 98% Pass
97% Pass Pass
441 12/2 4 -1' Sewer Service Backfill - Building 11 - Lot 3 A 13.7% 116.9 0.7% 98% Pass Pass
442 12/2 5 -1' Sewer Service Backfill - Building 11 - Lot 4 Pass
443 12/2 6 -1' Sewer Service Backfill - Building 11 - Lot 5 A 13.9% 116.3 0.9%
A 14.6% 117.2 1.6% 98% Pass
98% Pass Pass
444 12/2 7 -1' Sewer Main Backfill - MH A7 - 40' W A 13.1% 114.1 0.1% 96% Pass Pass
445 12/2 8 -1' Sewer Main Backfill - MH A7 - 30' E Pass
446 12/2 9 Grade Sewer Main Backfill - MH A7 - 5' W A 14.1% 114.9 1.1%
A 13.6% 115.3 0.6% 97% Pass
97% Pass Pass
447 12/2 10 Grade Sewer Main Backfill - MH A7 - 10' E A 13.4% 115.9 0.4% 97% Pass Pass
448 12/2 11 -1' Sewer Main Backfill - MH A8 - 60' E Pass
449 12/2 12 -1' Sewer Main Backfill - MH A8 - 8' E A 13.7% 117.2 0.7%
A 14.2% 116.8 1.2% 98% Pass
98% Pass Pass
450 12/2 13 Grade Sewer Main Backfill - MH A8 - 4' W A 13.4% 118.3 0.4% 99% Pass Pass
451 12/2 14 Grade Sewer Main Backfill - MH A9 - 8' E Pass
452 12/21 1 -4' Sewer Service Backfill - Block 21 - Lot 1 A 13.4% 115.5 0.4%
A 13.8% 114.0 0.8% 96% Pass
97% Pass Pass
453 12/21 2 -4' Sewer Service Backfill - Block 21 - Lot 2 A 14.1% 116.2 1.1% 98% Pass Pass
454 12/21 3 -4' Sewer Service Backfill - Block 21 - Lot 3 Pass
455 12/21 4 -4' Sewer Service Backfill - Block 21 - Lot 4 A 14.8% 114.9 1.8%
A 14.5% 115.7 1.5% 97% Pass
97% Pass Pass
456 12/21 5 -3' Sewer Main Backfill - MH A2.2A - 2' N A 13.9% 115.3 0.9% 97% Pass Pass
457 12/21 6 -3' Sewer Main Backfill - MH A2.2A - 55' N Pass
458 12/21 7 -3' Sewer Main Backfill - MH A2 - 75' S A 12.5% 116.3 -0.5%
A 12.7% 114.1 -0.3% 96% Pass
98% Pass Pass
459 12/21 8 -2' Sewer Main Backfill - MH A2 - 100' S A 12.9% 114.0 -0.1% 96% Pass Pass
460 12/21 9 -2' Sewer Main Backfill - MH A2.2A - 8' N Pass
461 12/21 10 -1' Sewer Service Backfill - Block 21 - Lot 1 A 13.7% 115.9 0.7%
A 13.6% 115.6 0.6% 97% Pass
97% Pass Pass
462 12/21 11 -1' Sewer Service Backfill - Block 21 - Lot 2 A 14.0% 115.3 1.0% 97% Pass Pass
463 12/21 12 -1' Sewer Service Backfill - Block 21 - Lot 3 Pass
MOUNTAIN'S EDGE
Fort Collins, Colorado
Project # 18-2066
December 2018
Field Moisture/Density Testing Summary
Test Test Proctor Moisture
Moisture
Variability
Field Results
Dry
Material Tested and Location
Project Date Daily Depth
Density Moisture Compaction
470 12/26 1 Grade Sewer Service Backfill - Building 20 - Lot 1 A 11.9%
Number Number ID
Percent
Compaction
(Pass/Fail)
117.0 -1.1% 98% Pass Pass
471 12/26 2 Grade Sewer Service Backfill - Building 20 - Lot 2 Pass
472 12/26 3 Grade Sewer Service Backfill - Building 20 - Lot 3 A 12.9% 117.4 -0.1%
A 12.3% 118.2 -0.7% 99% Pass
99% Pass Pass
473 12/26 4 Grade Sewer Service Backfill - Building 20 - Lot 4 A 13.5% 116.4 0.5% 98% Pass Pass
474 12/26 5 Grade Sewer Service Backfill - Building 20 - Lot 5 Pass
475 12/26 6 Grade Sewer Main Backfill - MH A2 - 65' S A 13.9% 114.5 0.9%
A 12.8% 115.7 -0.2% 97% Pass
96% Pass Pass
476 12/26 7 Grade Sewer Main Backfill - MH A2.2A - 1' W A 13.1% 115.8 0.1% 97% Pass Pass
477 12/26 8 -4' Sewer Service Backfill - Building 17 - Lot 1 Pass
478 12/26 9 -4' Sewer Service Backfill - Building 17 - Lot 2 A 13.3% 117.0 0.3%
A 12.8% 117.2 -0.2% 98% Pass
98% Pass Pass
479 12/26 10 -4' Sewer Service Backfill - Building 17 - Lot 3 A 13.7% 117.1 0.7% 98% Pass Pass
480 12/26 11 -4' Sewer Service Backfill - Building 17 - Lot 4 Pass
481 12/26 12 -4' Sewer Service Backfill - Building 17 - Lot 5 A 14.0% 115.9 1.0%
A 14.2% 116.4 1.2% 98% Pass
97% Pass Pass
482 12/26 13 -6' Sewer Main Backfill - Int Bluegrass & Crest Top - 100' N A 12.0% 116.0 -1.0% 97% Pass Pass
483 12/26 14 -4' Sewer Main Backfill - Int Bluegrass & Crest Top - 120' N Pass
484 12/26 15 -2' Sewer Service Backfill - Building 17 - Lot 1 A 13.0% 117.7 0.0%
A 12.9% 116.5 -0.1% 98% Pass
99% Pass Pass
485 12/26 16 -2' Sewer Service Backfill - Building 17 - Lot 2 A 13.6% 116.3 0.6% 98% Pass Pass
486 12/26 17 -2' Sewer Service Backfill - Building 17 - Lot 3 Pass
487 12/26 18 -2' Sewer Service Backfill - Building 17 - Lot 4 A 12.8% 118.0 -0.2%
A 13.4% 117.2 0.4% 98% Pass
99% Pass Pass
488 12/26 19 -2' Sewer Service Backfill - Building 17 - Lot 5 A 12.3% 115.8 -0.7% 97% Pass Pass
Maximum Dry Density (pcf) 119.0 118.0 115.0
Compaction Requirement
Proctor ID: A B C
Moisture Content Requirement ±2% ±2% ±2%
Optimum Moisture Content (%) 13.0% 13.0% 14.0%
Procedure D-698 D-698 D-698
Compaction Requirement 95% Min 95% Min 95% Min
MOUNTAIN'S EDGE
Fort Collins, Colorado
Project # 18-2066
November 2018
Field Moisture/Density Testing Summary
Test Test Proctor Moisture
Moisture
Variability
Field Results
Dry
Material Tested and Location
Project Date Daily Depth
Density Moisture Compaction
489 11/19 1 -2' Water Service Backfill - Building 20 - Lot 1 A 13.2%
Number Number ID
Percent
Compaction
(Pass/Fail)
116.0 0.2% 97% Pass Pass
490 11/19 2 -2' Water Service Backfill - Building 20 - Lot 2 Pass
491 11/19 3 -2' Water Service Backfill - Building 20 - Lot 3 A 13.6% 115.7 0.6%
A 12.5% 114.6 -0.5% 96% Pass
97% Pass Pass
492 11/19 4 -2' Water Service Backfill - Building 20 - Lot 4 A 14.2% 114.2 1.2% 96% Pass Pass
493 11/19 5 -2' Water Service Backfill - Building 20 - Lot 5 Pass
494 11/19 6 -2' Water Main Backfill - Int Crown & Upland - 60' S A 13.7% 115.9 0.7%
A 14.0% 114.0 1.0% 96% Pass
97% Pass Pass
495 11/19 7 Grade Water Service Backfill - Building 20 - Lot 1 A 13.6% 116.0 0.6% 97% Pass Pass
496 11/19 8 Grade Water Service Backfill - Building 20 - Lot 2 Pass
497 11/19 9 Grade Water Service Backfill - Building 20 - Lot 3 A 12.9% 116.5 -0.1%
A 13.3% 115.7 0.3% 97% Pass
98% Pass Pass
498 11/19 10 Grade Water Service Backfill - Building 20 - Lot 4 A 13.0% 117.2 0.0% 98% Pass Pass
499 11/19 11 Grade Water Main Backfill - Int Crown & Upland - 50' S Pass
500 11/20 1 -2' Water Main Backfill - Int Crown & Upland - 2' N A 13.3% 117.0 0.3%
A 14.0% 114.2 1.0% 96% Pass
98% Pass Pass
501 11/20 2 -1' Water Main Backfill - Int Crown & Upland - 40' N A 14.0% 114.2 1.0% 96% Pass Pass
502 11/20 3 Grade Water Main Backfill - Int Crown & Upland - 100' N Pass
503 11/20 4 -2' Water Main Backfill - Int Crown & Upland - 120' N A 14.2% 115.2 1.2%
A 13.6% 116.8 0.6% 98% Pass
97% Pass Pass
504 11/20 5 -1' Water Main Backfill - Int Crown & Upland - 150' N A 13.2% 115.7 0.2% 97% Pass Pass
505 11/20 6 Grade Water Main Backfill - Int Crown & Upland - 200' N Pass
506 11/21 1 -4' Water Service Backfill - Block 22 - Lot 1 A 14.0% 115.2 1.0%
A 13.7% 116.0 0.7% 97% Pass
97% Pass Pass
507 11/21 2 -2' Water Service Backfill - Block 22 - Lot 2 A 14.2% 116.1 1.2% 98% Pass Pass
508 11/21 3 -2' Water Service Backfill - Block 22 - Lot 3 Pass
509 11/21 4 -1' Water Service Backfill - Block 22 - Lot 4 A 13.2% 115.9 0.2%
A 13.5% 117.3 0.5% 99% Pass
97% Pass Pass
510 11/21 5 -1' Water Service Backfill - Block 22 - Lot 5 A 13.6% 114.6 0.6% 96% Pass Pass
511 11/21 6 -1' Water Service Backfill - Block 22 - Lot 6 Pass
512 11/21 7 -1' Water Service Backfill - Block 22 - Lot 7 A 12.8% 115.5 -0.2%
A 12.9% 114.9 -0.1% 97% Pass
97% Pass Pass
513 11/21 8 -1' Water Service Backfill - Block 22 - Lot 8 A 13.2% 116.3 0.2% 98% Pass Pass
514 11/21 9 -1' Water Service Backfill - Block 22 - Lot 9 Pass
MOUNTAIN'S EDGE
Fort Collins, Colorado
Project # 18-2066
November 2018
Field Moisture/Density Testing Summary
Test Test Proctor Moisture
Moisture
Variability
Field Results
Dry
Material Tested and Location
Project Date Daily Depth
Density Moisture Compaction
522 11/26 1 -1' Water Main Backfill - Int Downs Way & Bluegrass - 50' S A 11.2%
Number Number ID
Percent
Compaction
(Pass/Fail)
116.0 -1.8% 97% Pass Pass
523 11/26 2 -1' Water Service Backfill - Block 21 - Lot 1 Pass
524 11/26 3 -1' Water Service Backfill - Block 21 - Lot 2 A 12.0% 116.5 -1.0%
A 11.9% 117.0 -1.1% 98% Pass
98% Pass Pass
525 11/26 4 -1' Water Service Backfill - Block 21 - Lot 3 A 11.5% 117.7 -1.5% 99% Pass Pass
526 11/26 5 -1' Water Service Backfill - Block 21 - Lot 4 Pass
527 11/26 6 Grade Water Main Backfill - Int Downs Way & Bluegrass - 10' S A 12.5% 116.7 -0.5%
A 11.2% 116.3 -1.8% 98% Pass
98% Pass Pass
528 11/26 7 Grade Water Main Backfill - Int Downs Way & Bluegrass - 60' S A 12.3% 115.8 -0.7% 97% Pass Pass
529 11/26 8 Grade Water Service Backfill - Building 20 - Lot 5 Pass
530 11/26 9 -2' Water Main Backfill - Int Downs Way & Bluegrass - 50' W A 13.7% 115.9 0.7%
A 13.0% 116.2 0.0% 98% Pass
97% Pass Pass
531 11/26 10 -2' Water Main Backfill - Int Downs Way & Bluegrass - 120' S A 12.7% 115.8 -0.3% 97% Pass Pass
532 11/26 11 -2' Water Main Backfill - Int Ridge Top & Bluegrass - 100' E Pass
533 11/26 12 -2' Water Service Backfill - Building 1 - Lot 1 A 11.8% 117.6 -1.2%
A 11.9% 116.3 -1.1% 98% Pass
99% Pass Pass
534 11/26 13 -2' Water Service Backfill - Building 1 - Lot 2 A 12.2% 116.2 -0.8% 98% Pass Pass
535 11/26 14 -2' Water Service Backfill - Building 1 - Lot 3 Pass
536 11/26 15 -2' Water Service Backfill - Building 1 - Lot 4 A 11.3% 118.1 -1.7%
A 12.3% 118.0 -0.7% 99% Pass
99% Pass Pass
537 11/26 16 -2' Water Service Backfill - Building 1 - Lot 5 A 11.5% 116.7 -1.5% 98% Pass Pass
538 11/26 17 -2' Water Service Backfill - Building 1 - Lot 6 Pass
539 11/26 18 -2' Water Service Backfill - Building 1 - Lot 7 A 12.5% 116.0 -0.5%
A 12.7% 115.8 -0.3% 97% Pass
97% Pass Pass
540 11/26 19 -2' Water Main Backfill - Int Ridge Top & Bluegrass - 50' W A 11.9% 115.9 -1.1% 97% Pass Pass
541 11/27 1 -2' Water Main Backfill - Int Ridge Top & Bluegrass - 100' N Pass
542 11/27 2 -1' Water Main Backfill - Int Ridge Top & Bluegrass - 120' N A 11.9% 116.7 -1.1%
A 11.6% 116.3 -1.4% 98% Pass
98% Pass Pass
543 11/27 3 -2' Water Service Backfill - Building 2 - Lot 1 A 12.1% 115.9 -0.9% 97% Pass Pass
544 11/27 4 -2' Water Service Backfill - Building 2 - Lot 2 Pass
545 11/27 5 -2' Water Service Backfill - Building 2 - Lot 3 A 12.5% 116.0 -0.5%
A 11.7% 115.3 -1.3% 97% Pass
97% Pass Pass
546 11/27 6 -2' Water Service Backfill - Building 2 - Lot 4 A 12.3% 117.1 -0.7% 98% Pass Pass
547 11/27 7 -2' Water Service Backfill - Building 2 - Lot 5 Pass
MOUNTAIN'S EDGE
Fort Collins, Colorado
Project # 18-2066
November 2018
Field Moisture/Density Testing Summary
Test Test Proctor Moisture
Moisture
Variability
Field Results
Dry
Material Tested and Location
Project Date Daily Depth
Density Moisture Compaction
561 11/28 1 Grade Water Main Backfill - Int Bluegrass & Ridge Top - 75' N A 11.9%
Number Number ID
Percent
Compaction
(Pass/Fail)
116.3 -1.1% 98% Pass Pass
562 11/28 2 Grade Water Main Backfill - Int Bluegrass & Ridge Top - 75' N Pass
563 11/28 3 -2' Water Main Backfill - Int Knolls End & Ridge Top - 75' N A 12.7% 117.7 -0.3%
A 11.8% 118.0 -1.2% 99% Pass
99% Pass Pass
564 11/28 4 -1' Water Service Backfill - Building 5 - Lot 2 A 12.9% 118.0 -0.1% 99% Pass Pass
565 11/28 5 -1' Water Service Backfill - Building 5 - Lot 3 Pass
566 11/28 6 -1' Water Service Backfill - Building 5 - Lot 4 A 13.2% 117.1 0.2%
A 13.0% 117.0 0.0% 98% Pass
98% Pass Pass
567 11/28 7 -1' Water Service Backfill - Building 5 - Lot 5 A 11.5% 116.9 -1.5% 98% Pass Pass
568 11/28 8 -1' Water Service Backfill - Building 7 - Lot 1 Pass
569 11/28 9 -1' Water Service Backfill - Building 7 - Lot 2 A 12.3% 115.8 -0.7%
A 12.0% 116.5 -1.0% 98% Pass
97% Pass Pass
570 11/28 10 -1' Water Service Backfill - Building 7 - Lot 3 A 11.7% 116.7 -1.3% 98% Pass Pass
571 11/28 11 -1' Water Service Backfill - Building 7 - Lot 4 Pass
572 11/28 12 -1' Water Service Backfill - Building 7 - Lot 5 A 11.9% 116.0 -1.1%
A 12.3% 116.8 -0.7% 98% Pass
97% Pass Pass
573 11/28 13 -2' Water Main Backfill - Int Knolls End & Ridge Top - 40' S A 12.7% 116.8 -0.3% 98% Pass Pass
574 11/28 14 -1' Water Service Backfill - Building 9 - Lot 1 Pass
575 11/28 15 -1' Water Service Backfill - Building 9 - Lot 2 A 11.4% 115.9 -1.6%
A 12.5% 115.7 -0.5% 97% Pass
97% Pass Pass
576 11/28 16 -1' Water Service Backfill - Building 9 - Lot 3 A 13.0% 116.2 0.0% 98% Pass Pass
577 11/28 17 -1' Water Service Backfill - Building 9 - Lot 4 Pass
578 11/28 18 -1' Water Service Backfill - Building 9 - Lot 5 A 12.4% 117.8 -0.6%
A 13.2% 116.0 0.2% 97% Pass
99% Pass Pass
579 11/29 1 -2' Water Main Backfill - Int Knolls End & Ridge Top - 50' W A 12.4% 116.8 -0.6% 98% Pass Pass
580 11/29 2 -2' Water Main Backfill - Int Knolls End & Ridge Top - 75' E Pass
581 11/29 3 Grade Water Main Backfill - Int Knolls End & Ridge Top - 150' S A 12.0% 117.5 -1.0%
A 11.9% 116.1 -1.1% 98% Pass
99% Pass Pass
582 11/29 4 -1' Water Service Backfill - Building 8 - Lot 1 A 13.1% 116.9 0.1% 98% Pass Pass
583 11/29 5 -1' Water Service Backfill - Building 8 - Lot 2 Pass
584 11/29 6 -1' Water Service Backfill - Building 8 - Lot 3 A 13.4% 116.1 0.4%
A 12.7% 117.8 -0.3% 99% Pass
98% Pass Pass
585 11/29 7 -1' Water Service Backfill - Building 8 - Lot 4 A 11.9% 115.9 -1.1% 97% Pass Pass
586 11/29 8 -1' Water Service Backfill - Building 8 - Lot 5 Pass
MOUNTAIN'S EDGE
Fort Collins, Colorado
Project # 18-2066
December 2018
Field Moisture/Density Testing Summary
Test Test Proctor Moisture
Moisture
Variability
Field Results
Dry
Material Tested and Location
Project Date Daily Depth
Density Moisture Compaction
603 12/3 1 -1' Water Service Backfill - Building 11 - Lot 1 A 13.6%
Number Number ID
Percent
Compaction
(Pass/Fail)
116.1 0.6% 98% Pass Pass
604 12/3 2 -1' Water Service Backfill - Building 11 - Lot 2 Pass
605 12/3 3 -1' Water Service Backfill - Building 11 - Lot 3 A 12.0% 118.0 -1.0%
A 13.1% 117.2 0.1% 98% Pass
99% Pass Pass
606 12/3 4 -1' Water Service Backfill - Building 11 - Lot 4 A 12.9% 118.2 -0.1% 99% Pass Pass
607 12/3 5 -1' Water Service Backfill - Building 11 - Lot 5 Pass
608 12/3 6 -1' Water Main Backfill - Int Knolls End & Precipice - 50' W A 11.4% 117.5 -1.6%
A 11.7% 117.8 -1.3% 99% Pass
99% Pass Pass
609 12/3 7 -1' Water Service Backfill - Building 12 - Lot 1 A 12.3% 115.9 -0.7% 97% Pass Pass
610 12/3 8 -1' Water Service Backfill - Building 12 - Lot 2 Pass
611 12/3 9 -1' Water Service Backfill - Building 12 - Lot 3 A 13.1% 114.7 0.1%
A 13.7% 115.4 0.7% 97% Pass
96% Pass Pass
612 12/3 10 -1' Water Service Backfill - Building 12 - Lot 4 A 12.2% 116.8 -0.8% 98% Pass Pass
613 12/3 11 -1' Water Service Backfill - Building 12 - Lot 5 Pass
614 12/3 12 -2' Water Main Backfill - Int Knolls End & Precipice - 75' S A 12.7% 116.8 -0.3%
A 12.5% 116.2 -0.5% 98% Pass
98% Pass Pass
615 12/4 1 -2' Water Service Backfill - Building 13 - Lot 1 A 12.5% 116.7 -0.5% 98% Pass Pass
616 12/4 2 -2' Water Service Backfill - Building 13 - Lot 2 Pass
617 12/4 3 -2' Water Service Backfill - Building 13 - Lot 3 A 12.7% 116.2 -0.3%
A 13.3% 116.0 0.3% 97% Pass
98% Pass Pass
618 12/4 4 -2' Water Service Backfill - Building 13 - Lot 4 A 13.2% 116.8 0.2% 98% Pass Pass
619 12/4 5 -2' Water Main Backfill - Int Knolls End & Precipice - 200' S Pass
620 12/5 1 -2' Water Service Backfill - Building 15 - Lot 1 A 13.2% 115.9 0.2%
A 12.8% 117.7 -0.2% 99% Pass
97% Pass Pass
621 12/5 2 -2' Water Service Backfill - Building 15 - Lot 2 A 13.7% 116.4 0.7% 98% Pass Pass
622 12/5 3 -2' Water Service Backfill - Building 15 - Lot 3 Pass
623 12/5 4 -2' Water Service Backfill - Building 15 - Lot 4 A 11.5% 116.2 -1.5%
A 13.0% 116.8 0.0% 98% Pass
98% Pass Pass
624 12/5 5 -2' Water Service Backfill - Building 15 - Lot 5 A 11.6% 118.0 -1.4% 99% Pass Pass
625 12/5 6 -2' Water Service Backfill - Building 12 - Lot 1 Pass
626 12/5 7 -2' Water Service Backfill - Building 12 - Lot 2 A 12.2% 115.3 -0.8%
A 11.0% 117.0 -2.0% 98% Pass
97% Pass Pass
627 12/5 8 -2' Water Service Backfill - Building 12 - Lot 3 A 12.7% 116.0 -0.3% 97% Pass Pass
628 12/5 9 -2' Water Service Backfill - Building 12 - Lot 4 Pass
MOUNTAIN'S EDGE
Fort Collins, Colorado
Project # 18-2066
December 2018
Field Moisture/Density Testing Summary
Test Test Proctor Moisture
Moisture
Variability
Field Results
Dry
Material Tested and Location
Project Date Daily Depth
Density Moisture Compaction
642 12/11 1 Grade Water Service Backfill - Building 15 - Lot 1 A 12.3%
Number Number ID
Percent
Compaction
(Pass/Fail)
115.9 -0.7% 97% Pass Pass
643 12/11 2 Grade Water Service Backfill - Building 15 - Lot 2 Pass
644 12/11 3 Grade Water Service Backfill - Building 15 - Lot 3 A 13.5% 116.9 0.5%
A 12.4% 117.1 -0.6% 98% Pass
98% Pass Pass
645 12/11 4 Grade Water Service Backfill - Building 15 - Lot 4 A 13.3% 115.8 0.3% 97% Pass Pass
646 12/11 5 Grade Water Service Backfill - Building 15 - Lot 5 Pass
647 12/11 6 -1' Water Main Backfill - Int Knolls End & Precipice - 200' S A 14.0% 114.1 1.0%
A 14.3% 113.8 1.3% 96% Pass
96% Pass Pass
648 12/11 7 -2' Water Service Backfill - Building 14 - Lot 1 A 12.1% 116.9 -0.9% 98% Pass Pass
649 12/11 8 -2' Water Service Backfill - Building 14 - Lot 2 Pass
650 12/11 9 -2' Water Service Backfill - Building 14 - Lot 3 A 13.2% 118.3 0.2%
A 13.4% 117.1 0.4% 98% Pass
99% Pass Pass
651 12/11 10 -2' Water Service Backfill - Building 14 - Lot 4 A 13.0% 118.0 0.0% 99% Pass Pass
652 12/11 11 -2' Water Service Backfill - Building 14 - Lot 5 Pass
653 12/12 1 Grade Water Service Backfill - Building 14 - Lot 1 A 11.9% 114.5 -1.1%
A 12.6% 117.7 -0.4% 99% Pass
96% Pass Pass
654 12/12 2 Grade Water Service Backfill - Building 14 - Lot 2 A 12.1% 115.0 -0.9% 97% Pass Pass
655 12/12 3 Grade Water Service Backfill - Building 14 - Lot 3 Pass
656 12/12 4 Grade Water Service Backfill - Building 14 - Lot 4 A 13.2% 116.1 0.2%
A 12.7% 116.7 -0.3% 98% Pass
98% Pass Pass
657 12/12 5 Grade Water Service Backfill - Building 14 - Lot 5 A 13.3% 117.2 0.3% 98% Pass Pass
658 12/12 6 Grade Water Main Backfill - Int Knolls End & Precipice - 250' S Pass
659 12/12 7 -1' Water Service Backfill - Building 17 - Lot 1 A 11.6% 116.7 -1.4%
A 12.0% 115.3 -1.0% 97% Pass
98% Pass Pass
660 12/12 8 -1' Water Service Backfill - Building 17 - Lot 2 A 11.9% 118.0 -1.1% 99% Pass Pass
661 12/12 9 -1' Water Service Backfill - Building 17 - Lot 3 Pass
662 12/12 10 -1' Water Service Backfill - Building 17 - Lot 4 A 13.4% 116.2 0.4%
A 12.2% 116.0 -0.8% 97% Pass
98% Pass Pass
663 12/12 11 -1' Water Main Backfill - Int Crest Top & Bluegrass - 100' N A 12.3% 115.3 -0.7% 97% Pass Pass
664 12/12 12 -1' Water Service Backfill - Building 16 - Lot 1 Pass
665 12/12 13 -1' Water Service Backfill - Building 16 - Lot 2 A 11.7% 117.1 -1.3%
A 11.9% 116.4 -1.1% 98% Pass
98% Pass Pass
666 12/12 14 -1' Water Service Backfill - Building 16 - Lot 3 A 12.5% 116.0 -0.5% 97% Pass Pass
667 12/12 15 -1' Water Service Backfill - Building 16 - Lot 4 Pass
MOUNTAIN'S EDGE
Fort Collins, Colorado
Project # 18-2066
December 2018
Field Moisture/Density Testing Summary
Test Test Proctor Moisture
Moisture
Variability
Field Results
Dry
Material Tested and Location
Project Date Daily Depth
Density Moisture Compaction
680 11/27 1 -4' Storm Drain Backfill - Overland Tr - STA 15+68 A 12.3%
Number Number ID
Percent
Compaction
(Pass/Fail)
116.2 -0.7% 98% Pass Pass
681 11/27 2 -5' Storm Drain Backfill - Overland Tr - STA 15+40 Pass
682 11/27 3 -6' Storm Drain Backfill - Overland Tr - STA 15+55 A 12.3% 116.7 -0.7%
A 13.0% 117.0 0.0% 98% Pass
98% Pass Pass
683 12/18 1 Grade Storm Drain Backfill - Int Crown View & Precipice - 40' N A 13.7% 113.9 0.7% 96% Pass Pass
684 12/18 2 Grade Storm Drain Backfill - Int Crown View & Knolls End - 85' N Pass
685 12/18 3 Grade Storm Drain Backfill - Int Crown View & Knolls End - 20' W A 12.1% 116.2 -0.9%
A 12.0% 115.8 -1.0% 97% Pass
98% Pass Pass
686 12/18 4 Grade Storm Drain Backfill - Int Bluegrass & Downs Way - 80' W A 11.5% 116.7 -1.5% 98% Pass Pass
687 12/21 1 Grade Storm Drain Backfill - Int Bluegrass & Downs Way - 200' N Pass
688 12/21 2 Grade Storm Drain Backfill - Int Bluegrass & Downs Way - 20' S A 12.2% 117.0 -0.8%
A 11.0% 116.0 -2.0% 97% Pass
98% Pass Pass
689 12/21 3 Grade Storm Drain Backfill - Int Bluegrass & Overland Trail - 75' E A 11.5% 117.1 -1.5% 98% Pass Pass
Maximum Dry Density (pcf) 119.0 118.0 115.0
Compaction Requirement
Proctor ID: A B C
Moisture Content Requirement ±2% ±2% ±2%
Optimum Moisture Content (%) 13.0% 13.0% 14.0%
Procedure D-698 D-698 D-698
Compaction Requirement 95% Min 95% Min 95% Min
668 12/12 16 -1' Water Service Backfill - Building 16 - Lot 5 A 11.9% 114.2 -1.1%
A 11.1% 115.9 -1.9% 97% Pass
96% Pass Pass
669 12/12 17 -1' Water Service Backfill - Building 16 - Lot 6 A 12.0% 115.8 -1.0% 97% Pass Pass
670 12/12 18 -1' Water Service Backfill - Building 16 - Lot 7 Pass
671 12/13 1 Grade Water Main Backfill - Int Crest Top & Bluegrass - 80' N A 14.2% 117.0 1.2%
A 11.3% 116.3 -1.7% 98% Pass
98% Pass Pass
672 12/13 2 -2' Water Service Backfill - Building 19 - Lot 1 & 2 A 13.5% 115.2 0.5% 97% Pass Pass
673 12/13 3 -1' Water Service Backfill - Building 19 - Lot 3 & 4 Pass
674 12/13 4 -1' Water Service Backfill - Building 19 - Lot 5 & 6 A 13.0% 116.7 0.0%
A 13.0% 116.3 0.0% 98% Pass
98% Pass Pass
675 12/13 5 -1' Water Service Backfill - Building 19 - Lot 7 A 13.1% 115.5 0.1% 97% Pass Pass
676 12/13 6 -2' Water Main Backfill - Int Bluegrass & Upland - 50' S Pass
677 12/13 7 -1' Water Main Backfill - Int Bluegrass & Upland - 65' S A 14.1% 116.0 1.1%
A 13.5% 117.8 0.5% 99% Pass
97% Pass Pass
678 12/13 8 -1' Water Service Backfill - Building 19 - Lot 1 & 2 A 13.7% 118.0 0.7% 99% Pass Pass
679 12/13 9 -1' Water Service Backfill - Building 19 - Lot 3 & 4 A 13.6% 116.5 0.6% 98% Pass Pass
Maximum Dry Density (pcf) 119.0 118.0 115.0
Compaction Requirement
Proctor ID: A B C
Moisture Content Requirement ±2% ±2% ±2%
Optimum Moisture Content (%) 13.0% 13.0% 14.0%
Procedure D-698 D-698 D-698
Compaction Requirement 95% Min 95% Min 95% Min
629 12/5 10 -2' Water Service Backfill - Building 12 - Lot 5 A 13.3% 117.3 0.3%
A 11.4% 116.9 -1.6% 98% Pass
99% Pass Pass
630 12/5 11 -1' Water Main Backfill - Int Knolls End & Precipice - 80' S A 13.0% 117.6 0.0% 99% Pass Pass
631 12/10 1 Grade Water Main Backfill - Int Knolls End & Precipice - 60' S Pass
632 12/10 2 Grade Water Service Backfill - Building 13 - Lot 1 A 11.5% 116.9 -1.5%
A 13.0% 117.4 0.0% 99% Pass
98% Pass Pass
633 12/10 3 Grade Water Service Backfill - Building 13 - Lot 2 A 12.6% 115.5 -0.4% 97% Pass Pass
634 12/10 4 Grade Water Service Backfill - Building 13 - Lot 3 Pass
635 12/10 5 Grade Water Service Backfill - Building 13 - Lot 4 A 13.1% 114.9 0.1%
A 12.9% 115.0 -0.1% 97% Pass
97% Pass Pass
636 12/10 6 Grade Water Main Backfill - Int Knolls End & Precipice - 120' S A 13.5% 114.1 0.5% 96% Pass Pass
637 12/10 7 Grade Water Service Backfill - Building 12 - Lot 1 Pass
638 12/10 8 Grade Water Service Backfill - Building 12 - Lot 2 A 12.8% 116.8 -0.2%
A 13.0% 115.3 0.0% 97% Pass
98% Pass Pass
639 12/10 9 Grade Water Service Backfill - Building 12 - Lot 3 A 12.4% 117.3 -0.6% 99% Pass Pass
640 12/10 10 Grade Water Service Backfill - Building 12 - Lot 4 Pass
641 12/10 11 Grade Water Service Backfill - Building 12 - Lot 5 A 11.0% 116.7 -2.0%
A 11.3% 117.0 -1.7% 98% Pass
98% Pass Pass
Maximum Dry Density (pcf) 119.0 118.0 115.0
Compaction Requirement
Proctor ID: A B C
Moisture Content Requirement ±2% ±2% ±2%
Optimum Moisture Content (%) 13.0% 13.0% 14.0%
Procedure D-698 D-698 D-698
Compaction Requirement 95% Min 95% Min 95% Min
587 11/29 9 -1' Water Service Backfill - Building 6 - Lot 1 A 11.0% 116.2 -2.0%
A 11.5% 117.8 -1.5% 99% Pass
98% Pass Pass
588 11/29 10 -1' Water Service Backfill - Building 6 - Lot 2 A 12.1% 115.4 -0.9% 97% Pass Pass
589 11/29 11 -1' Water Service Backfill - Building 6 - Lot 3 Pass
590 11/29 12 -1' Water Service Backfill - Building 6 - Lot 4 A 11.3% 115.9 -1.7%
A 12.5% 116.0 -0.5% 97% Pass
97% Pass Pass
591 11/29 13 Grade Water Main Backfill - Int Bluegrass & Ridge Top - 200' N A 12.9% 114.0 -0.1% 96% Pass Pass
592 11/30 1 -1' Water Service Backfill - Building 10 - Lot 1 Pass
593 11/30 2 -1' Water Service Backfill - Building 10 - Lot 2 A 12.7% 117.4 -0.3%
A 12.1% 116.3 -0.9% 98% Pass
99% Pass Pass
594 11/30 3 -1' Water Service Backfill - Building 10 - Lot 3 A 12.5% 116.5 -0.5% 98% Pass Pass
595 11/30 4 -1' Water Service Backfill - Building 10 - Lot 4 Pass
596 11/30 5 -1' Water Service Backfill - Building 10 - Lot 5 A 11.4% 117.1 -1.6%
A 11.8% 116.9 -1.2% 98% Pass
98% Pass Pass
597 11/30 6 -1' Water Service Backfill - Building 10 - Lot 6 A 12.7% 115.2 -0.3% 97% Pass Pass
598 11/30 7 -1' Water Service Backfill - Building 10 - Lot 7 Pass
599 11/30 8 -2' Water Main Backfill - Int Precipice & Knolls End - 60' W A 12.1% 116.9 -0.9%
A 11.9% 116.2 -1.1% 98% Pass
98% Pass Pass
600 11/30 9 -2' Water Main Backfill - Int Precipice & Knolls End - 40' E A 11.0% 118.0 -2.0% 99% Pass Pass
601 11/30 10 Grade Water Main Backfill - Int Ridge Top & Knolls End - 75' E Pass
602 11/30 11 Grade Water Main Backfill - Int Precipice & Knolls End - 75' E A 12.7% 116.3 -0.3%
A 11.8% 117.5 -1.2% 99% Pass
98% Pass Pass
Maximum Dry Density (pcf) 119.0 118.0 115.0
Compaction Requirement
Proctor ID: A B C
Moisture Content Requirement ±2% ±2% ±2%
Optimum Moisture Content (%) 13.0% 13.0% 14.0%
Procedure D-698 D-698 D-698
Compaction Requirement 95% Min 95% Min 95% Min
548 11/27 8 -2' Water Service Backfill - Building 2 - Lot 6 A 13.0% 118.0 0.0%
A 13.2% 116.9 0.2% 98% Pass
99% Pass Pass
549 11/27 9 -2' Water Service Backfill - Building 2 - Lot 7 A 12.1% 115.7 -0.9% 97% Pass Pass
550 11/27 10 -2' Water Main Backfill - Int Ridge Top & Bluegrass - 200' N Pass
551 11/27 11 -2' Water Main Backfill - Int Ridge Top & Bluegrass - 250' N A 11.7% 116.8 -1.3%
A 12.0% 116.3 -1.0% 98% Pass
98% Pass Pass
552 11/27 12 -2' Water Service Backfill - Building 3 - Lot 1 A 13.2% 116.1 0.2% 98% Pass Pass
553 11/27 13 -2' Water Service Backfill - Building 3 - Lot 2 Pass
554 11/27 14 -2' Water Service Backfill - Building 3 - Lot 3 A 13.0% 115.8 0.0%
A 12.1% 115.9 -0.9% 97% Pass
97% Pass Pass
555 11/27 15 -2' Water Service Backfill - Building 3 - Lot 4 A 12.8% 116.0 -0.2% 97% Pass Pass
556 11/27 16 -2' Water Service Backfill - Building 4 - Lot 1 Pass
557 11/27 17 -22' Water Service Backfill - Building 4 - Lot 2 A 12.5% 116.5 -0.5%
A 12.9% 116.2 -0.1% 98% Pass
98% Pass Pass
558 11/27 18 -2' Water Service Backfill - Building 4 - Lot 3 A 11.9% 116.0 -1.1% 97% Pass Pass
559 11/27 19 -2' Water Service Backfill - Building 4 - Lot 4 Pass
560 11/27 20 -2' Water Service Backfill - Building 4 - Lot 5 A 11.8% 116.3 -1.2%
A 12.0% 116.9 -1.0% 98% Pass
98% Pass Pass
Maximum Dry Density (pcf) 119.0 118.0 115.0
Compaction Requirement
Proctor ID: A B C
Moisture Content Requirement ±2% ±2% ±2%
Optimum Moisture Content (%) 13.0% 13.0% 14.0%
Procedure D-698 D-698 D-698
Compaction Requirement 95% Min 95% Min 95% Min
515 11/21 10 -1' Water Service Backfill - Block 22 - Lot 10 A 14.1% 117.5 1.1%
A 13.7% 116.9 0.7% 98% Pass
99% Pass Pass
516 11/21 11 -1' Water Main Backfill - Int Crown & Bluegrass - 150' N A 13.9% 116.8 0.9% 98% Pass Pass
517 11/21 12 -1' Water Main Backfill - Int Crown & Bluegrass - 300' N Pass
518 11/21 13 -1' Water Main Backfill - Int Crown & Bluegrass - 175' N A 13.2% 115.7 0.2%
A 12.8% 117.2 -0.2% 98% Pass
97% Pass Pass
519 11/21 14 Grade Water Main Backfill - Int Crown & Bluegrass - 250' N A 13.1% 116.2 0.1% 98% Pass Pass
520 11/21 15 Grade Water Main Backfill - Int Crown & Bluegrass - 150' N Pass
521 11/21 16 Grade Water Main Backfill - Int Crown & Bluegrass - 300' N A 13.7% 114.8 0.7%
A 13.8% 115.9 0.8% 97% Pass
96% Pass Pass
Maximum Dry Density (pcf) 119.0 118.0 115.0
Compaction Requirement
Proctor ID: A B C
Moisture Content Requirement ±2% ±2% ±2%
Optimum Moisture Content (%) 13.0% 13.0% 14.0%
Procedure D-698 D-698 D-698
Compaction Requirement 95% Min 95% Min 95% Min
464 12/21 13 -1' Sewer Service Backfill - Block 21 - Lot 4 A 13.4% 116.8 0.4%
A 13.5% 115.4 0.5% 97% Pass
98% Pass Pass
465 12/21 14 -2' Sewer Service Backfill - Block 20 - Lot 1 A 14.2% 114.8 1.2% 96% Pass Pass
466 12/21 15 -2' Sewer Service Backfill - Block 20 - Lot 2 Pass
467 12/21 16 -2' Sewer Service Backfill - Block 20 - Lot 3 A 13.6% 114.9 0.6%
A 13.1% 115.5 0.1% 97% Pass
97% Pass Pass
468 12/21 17 -2' Sewer Service Backfill - Block 20 - Lot 4 A 14.6% 115.3 1.6% 97% Pass Pass
469 12/21 18 -2' Sewer Service Backfill - Block 20 - Lot 5 A 13.7% 116.3 0.7% 98% Pass Pass
Maximum Dry Density (pcf) 119.0 118.0 115.0
Compaction Requirement
Proctor ID: A B C
Moisture Content Requirement ±2% ±2% ±2%
Optimum Moisture Content (%) 13.0% 13.0% 14.0%
Procedure D-698 D-698 D-698
Compaction Requirement 95% Min 95% Min 95% Min
426 12/1 8 -3' Sewer Main Backfill - MH A9 - 10' W A 11.8% 116.7 -1.2%
A 12.5% 117.0 -0.5% 98% Pass
98% Pass Pass
427 12/1 9 -3' Sewer Main Backfill - MH A8 - 8' E A 11.7% 117.2 -1.3% 98% Pass Pass
428 12/1 10 -2' Sewer Main Backfill - MH A8 - 3' E Pass
429 12/1 11 -1' Sewer Main Backfill - MH A9 - 8' W A 13.6% 115.9 0.6%
A 12.2% 116.0 -0.8% 97% Pass
97% Pass Pass
430 12/1 12 -1' Sewer Service Backfill - Building 10 - Lot 1 A 11.9% 113.9 -1.1% 96% Pass Pass
431 12/1 13 -1' Sewer Service Backfill - Building 10 - Lot 2 Pass
432 12/1 14 -1' Sewer Service Backfill - Building 10 - Lot 3 A 12.8% 114.8 -0.2%
A 13.0% 115.6 0.0% 97% Pass
96% Pass Pass
433 12/1 15 -1' Sewer Service Backfill - Building 10 - Lot 4 A 12.7% 115.2 -0.3% 97% Pass Pass
434 12/1 16 -1' Sewer Service Backfill - Building 10 - Lot 5 Pass
435 12/1 17 -1' Sewer Service Backfill - Building 10 - Lot 6 A 12.8% 117.2 -0.2%
A 11.5% 116.5 -1.5% 98% Pass
98% Pass Pass
436 12/1 18 -1' Sewer Service Backfill - Building 10 - Lot 7 A 11.9% 118.0 -1.1% 99% Pass Pass
437 12/1 19 -1' Sewer Main Backfill - MH A7 - 5' E A 12.3% 117.6 -0.7% 99% Pass Pass
Maximum Dry Density (pcf) 119.0 118.0 115.0
Compaction Requirement
Proctor ID: A B C
Moisture Content Requirement ±2% ±2% ±2%
Optimum Moisture Content (%) 13.0% 13.0% 14.0%
Procedure D-698 D-698 D-698
Compaction Requirement 95% Min 95% Min 95% Min
388 11/29 8 Grade Sewer Service Backfill - Building 14 - Lot 3 A 11.9% 116.0 -1.1%
A 11.0% 116.3 -2.0% 98% Pass
97% Pass Pass
389 11/29 9 Grade Sewer Service Backfill - Building 14 - Lot 4 A 11.8% 116.8 -1.2% 98% Pass Pass
390 11/29 10 Grade Sewer Service Backfill - Building 14 - Lot 5 Pass
391 11/29 11 -4' Sewer Main Backfill - MH A7 - 60' W A 13.1% 115.7 0.1%
A 12.0% 116.7 -1.0% 98% Pass
97% Pass Pass
392 11/29 12 -4' Sewer Main Backfill - MH A7 - 4' W A 12.9% 115.7 -0.1% 97% Pass Pass
393 11/29 13 -4' Sewer Main Backfill - MH A7 - 10' E Pass
394 11/29 14 -4' Sewer Main Backfill - MH A7 - 100' E A 13.8% 115.8 0.8%
A 13.5% 114.2 0.5% 96% Pass
97% Pass Pass
395 11/29 15 -3' Sewer Service Backfill - Building 9 - Lot 1 A 12.5% 116.0 -0.5% 97% Pass Pass
396 11/29 16 -3' Sewer Service Backfill - Building 9 - Lot 2 Pass
397 11/29 17 -3' Sewer Service Backfill - Building 9 - Lot 3 A 11.9% 117.2 -1.1%
A 12.9% 117.7 -0.1% 99% Pass
98% Pass Pass
398 11/29 18 -3' Sewer Service Backfill - Building 9 - Lot 4 A 12.2% 117.0 -0.8% 98% Pass Pass
399 11/29 19 -3' Sewer Service Backfill - Building 9 - Lot 5 A 12.5% 116.8 -0.5% 98% Pass Pass
Maximum Dry Density (pcf) 119.0 118.0 115.0
Compaction Requirement
Proctor ID: A B C
Moisture Content Requirement ±2% ±2% ±2%
Optimum Moisture Content (%) 13.0% 13.0% 14.0%
Procedure D-698 D-698 D-698
Compaction Requirement 95% Min 95% Min 95% Min
349 11/27 8 Grade Sewer Service Backfill - Building 12 - Lot 3 A 11.5% 116.7 -1.5%
A 12.5% 116.2 -0.5% 98% Pass
98% Pass Pass
350 11/27 9 Grade Sewer Service Backfill - Building 12 - Lot 4 A 11.9% 116.8 -1.1% 98% Pass Pass
351 11/27 10 Grade Sewer Service Backfill - Building 12 - Lot 5 Pass
352 11/27 11 -2' Sewer Service Backfill - Building 15 - Lot 1 A 12.7% 116.0 -0.3%
A 12.3% 116.2 -0.7% 98% Pass
97% Pass Pass
353 11/27 12 -2' Sewer Service Backfill - Building 15 - Lot 2 A 13.5% 116.1 0.5% 98% Pass Pass
354 11/27 13 -2' Sewer Service Backfill - Building 15 - Lot 3 Pass
355 11/27 14 -2' Sewer Service Backfill - Building 15 - Lot 4 A 13.0% 116.3 0.0%
A 12.9% 117.2 -0.1% 98% Pass
98% Pass Pass
356 11/27 15 -2' Sewer Service Backfill - Building 15 - Lot 5 A 12.1% 117.4 -0.9% 99% Pass Pass
357 11/27 16 Grade Sewer Service Backfill - Building 12 - Lot 1 Pass
358 11/27 17 Grade Sewer Service Backfill - Building 12 - Lot 2 A 11.8% 116.5 -1.2%
A 12.0% 116.7 -1.0% 98% Pass
98% Pass Pass
359 11/27 18 Grade Sewer Service Backfill - Building 12 - Lot 3 A 12.5% 115.0 -0.5% 97% Pass Pass
360 11/27 19 Grade Sewer Service Backfill - Building 12 - Lot 4 Pass
361 11/27 20 Grade Sewer Service Backfill - Building 12 - Lot 5 A 12.5% 115.8 -0.5%
A 12.7% 114.7 -0.3% 96% Pass
97% Pass Pass
Maximum Dry Density (pcf) 119.0 118.0 115.0
Compaction Requirement
Proctor ID: A B C
Moisture Content Requirement ±2% ±2% ±2%
Optimum Moisture Content (%) 13.0% 13.0% 14.0%
Procedure D-698 D-698 D-698
Compaction Requirement 95% Min 95% Min 95% Min
312 11/21 8 -2' Sewer Main Backfill - MH A2 - 100' S A 13.6% 115.7 0.6%
A 13.1% 116.2 0.1% 98% Pass
97% Pass Pass
313 11/21 9 -2' Sewer Main Backfill - MH A2.2A - 8' N A 14.1% 114.9 1.1% 97% Pass Pass
314 11/21 10 -1' Sewer Service Backfill - Block 21 - Lot 1 Pass
315 11/21 11 -1' Sewer Service Backfill - Block 21 - Lot 2 A 14.2% 114.1 1.2%
A 13.4% 115.3 0.4% 97% Pass
96% Pass Pass
316 11/21 12 -1' Sewer Service Backfill - Block 21 - Lot 3 A 13.7% 116.3 0.7% 98% Pass Pass
317 11/21 13 -1' Sewer Service Backfill - Block 21 - Lot 4 Pass
318 11/21 14 -2' Sewer Service Backfill - Building 20 - Lot 1 A 14.0% 117.2 1.0%
A 13.5% 116.0 0.5% 97% Pass
98% Pass Pass
319 11/21 15 -2' Sewer Service Backfill - Building 20 - Lot 2 A 13.7% 116.9 0.7% 98% Pass Pass
320 11/21 16 -2' Sewer Service Backfill - Building 20 - Lot 3 Pass
321 11/21 17 -2' Sewer Service Backfill - Building 20 - Lot 4 A 12.9% 116.6 -0.1%
A 13.3% 115.3 0.3% 97% Pass
98% Pass Pass
322 11/21 18 -2' Sewer Service Backfill - Building 20 - Lot 5 A 12.5% 116.8 -0.5% 98% Pass Pass
Maximum Dry Density (pcf) 119.0 118.0 115.0
Compaction Requirement
Proctor ID: A B C
Moisture Content Requirement ±2% ±2% ±2%
Optimum Moisture Content (%) 13.0% 13.0% 14.0%
Procedure D-698 D-698 D-698
Compaction Requirement 95% Min 95% Min 95% Min
276 11/16 10 -2' Sewer Service Backfill - Building 5 - Lot 1 A 13.0% 116.2 0.0%
A 14.5% 115.7 1.5% 97% Pass
98% Pass Pass
277 11/16 11 -2' Sewer Service Backfill - Building 5 - Lot 2 A 14.0% 116.0 1.0% 97% Pass Pass
278 11/16 12 -2' Sewer Service Backfill - Building 5 - Lot 3 Pass
279 11/16 13 -2' Sewer Service Backfill - Building 5 - Lot 4 A 13.8% 116.5 0.8%
A 14.5% 117.9 1.5% 99% Pass
98% Pass Pass
280 11/16 14 -2' Sewer Service Backfill - Building 5 - Lot 5 A 13.3% 116.0 0.3% 97% Pass Pass
281 11/16 15 -2' Sewer Main Backfill - MH A7 - 45' S Pass
282 11/16 16 Grade Sewer Main Backfill - MH A7 - 45' S A 13.2% 114.5 0.2%
A 13.6% 116.1 0.6% 98% Pass
96% Pass Pass
283 11/16 17 -2' Sewer Main Backfill - MH A7 - 40' E A 12.8% 116.9 -0.2% 98% Pass Pass
284 11/16 18 Grade Sewer Main Backfill - MH A7 - 4' E Pass
285 11/16 19 Grade Sewer Main Backfill - MH A7 - 45' E A 12.5% 114.7 -0.5%
A 12.9% 115.8 -0.1% 97% Pass
96% Pass Pass
Maximum Dry Density (pcf) 119.0 118.0 115.0
Compaction Requirement
Proctor ID: A B C
Moisture Content Requirement ±2% ±2% ±2%
Optimum Moisture Content (%) 13.0% 13.0% 14.0%
Procedure D-698 D-698 D-698
Compaction Requirement 95% Min 95% Min 95% Min
236 11/14 7 -4' Sewer Service Backfill - Building 3 - Lot 2 A 13.5% 114.8 0.5%
A 13.6% 117.3 0.6% 99% Pass
96% Pass Pass
237 11/14 8 -4' Sewer Service Backfill - Building 3 - Lot 3 A 13.0% 116.8 0.0% 98% Pass Pass
238 11/14 9 -4' Sewer Service Backfill - Building 3 - Lot 4 Pass
239 11/14 10 -4' Sewer Main Backfill - MH A6 - 5' E A 13.9% 114.7 0.9%
A 13.2% 115.5 0.2% 97% Pass
96% Pass Pass
240 11/14 11 -4' Sewer Main Backfill - MH A6 - 60' S A 14.3% 114.0 1.3% 96% Pass Pass
241 11/14 12 -6' Sewer Main Backfill - MH A6 - 10' N Pass
242 11/14 13 -6' Sewer Main Backfill - MH A6 - 100' N A 14.6% 115.6 1.6%
A 15.0% 113.3 2.0% 95% Pass
97% Pass Pass
243 11/14 14 -6' Sewer Service Backfill - Building 5 - Lot 1 A 14.3% 116.9 1.3% 98% Pass Pass
244 11/14 15 -6' Sewer Service Backfill - Building 5 - Lot 2 Pass
245 11/14 16 -6' Sewer Service Backfill - Building 5 - Lot 3 A 13.5% 114.7 0.5%
A 13.9% 117.2 0.9% 98% Pass
96% Pass Pass
246 11/14 17 -4' Sewer Service Backfill - Building 5 - Lot 4 A 13.0% 115.9 0.0% 97% Pass Pass
247 11/14 18 -4' Sewer Service Backfill - Building 5 - Lot 5 Pass
248 11/14 19 -2' Sewer Main Backfill - MH A6 - 2' S A 14.0% 116.5 1.0%
A 14.1% 117.3 1.1% 99% Pass
98% Pass Pass
249 11/14 20 Grade Sewer Main Backfill - MH A6 - 5' N A 13.2% 116.0 0.2% 97% Pass Pass
Maximum Dry Density (pcf) 119.0 118.0 115.0
Compaction Requirement
Proctor ID: A B C
Moisture Content Requirement ±2% ±2% ±2%
Optimum Moisture Content (%) 13.0% 13.0% 14.0%
Procedure D-698 D-698 D-698
Compaction Requirement 95% Min 95% Min 95% Min
98% Pass Pass
177 11/9 8 Grade Sewer Main Backfill - MH A4 - 10' E A 13.7% 116.3 0.7% 98% Pass Pass
176 11/9 7 -6' Sewer Main Backfill - MH A4 - 3' W A 13.2% 116.2 0.2%
174 11/9 5 Grade Sewer Main Backfill - MH A3 - 150' W Pass
175 11/9 6 -2' Sewer Main Backfill - MH A4 - 6' E A 14.6% 117.0 1.6%
A 13.9% 116.0 0.9% 97% Pass
98% Pass Pass
Pass
173 11/9 4 Grade Sewer Main Backfill - MH A3 - 5' W A 14.1% 116.5 1.1% 98% Pass Pass
Pass
171 11/9 2 -2' Sewer Main Backfill - MH A2 - 55' W Pass
172 11/9 3 -2' Sewer Main Backfill - MH A3 - 4' E A 14.5% 115.6 1.5%
A 14.2% 115.3 1.2% 97% Pass
97% Pass
Moisture Compaction
170 11/9 1 -2' Sewer Main Backfill - MH A2 - 5' W A 13.9%
Number Number ID
Percent
Compaction
(Pass/Fail)
114.8 0.9% 96% Pass
Test Test Proctor Moisture
Moisture
Variability
Field Results
Dry
Material Tested and Location
Project Date Daily Depth
Density
Fort Collins, Colorado
Project # 18-2066
November 2018
Field Moisture/Density Testing Summary
MOUNTAIN'S EDGE
97% Pass Pass
97% Pass Pass
137 11/7 10 -4' Sewer Service Backfill - Building 16 - Lot 7 A 13.7% 116.7 0.7% 98% Pass Pass
136 11/7 9 -4' Sewer Service Backfill - Building 16 - Lot 6 A 14.7% 115.9 1.7%
97% Pass Pass
135 11/7 8 -4' Sewer Service Backfill - Building 16 - Lot 5 A 14.2% 116.3 1.2% 98% Pass Pass
134 11/7 7 -4' Sewer Service Backfill - Building 16 - Lot 4 A 13.6% 115.7 0.6%
132 11/7 5 -4' Sewer Service Backfill - Building 16 - Lot 2 Pass
133 11/7 6 -4' Sewer Service Backfill - Building 16 - Lot 3 A 13.9% 114.4 0.9%
A 14.0% 115.8 1.0% 97% Pass
96% Pass Pass
Pass
131 11/7 4 -4' Sewer Service Backfill - Building 16 - Lot 1 A 13.5% 115.6 0.5% 97% Pass Pass
Pass
129 11/7 2 -4' Sewer Main Backfill - MH A2.1B - 2' S Pass
130 11/7 3 -2' Sewer Main Backfill - MH A2.1B - 5' N A 14.0% 116.2 1.0%
A 13.7% 116.5 0.7% 98% Pass
98% Pass
Moisture Compaction
128 11/7 1 -4' Sewer Service Backfill - Block 22 - Lot 8 A 14.3%
Number Number ID
Percent
Compaction
(Pass/Fail)
116.0 1.3% 97% Pass
Test Test Proctor Moisture
Moisture
Variability
Field Results
Dry
Material Tested and Location
Project Date Daily Depth
Density
Fort Collins, Colorado
Project # 18-2066
November 2018
Field Moisture/Density Testing Summary
MOUNTAIN'S EDGE
A 13.5% 116.0 0.5% 97% Pass
98% Pass Pass
Pass
94 11/1 4 -6' Sewer Main Backfill - MH A1 - 45' W A 13.1% 116.8 0.1% 98% Pass Pass
Pass
92 11/1 2 -4' Sewer Main Backfill - MH A1 - 3" N Pass
93 11/1 3 -4' Sewer Main Backfill - MH A1 - 1' S A 12.0% 115.2 -1.0%
A 12.0% 117.5 -1.0% 99% Pass
97% Pass
Moisture Compaction
91 11/1 1 -6' Sewer Main Backfill - MH A1 - 2' S A 12.5%
Number Number ID
Percent
Compaction
(Pass/Fail)
118.2 -0.5% 99% Pass
Test Test Proctor Moisture
Moisture
Variability
Field Results
Dry
Material Tested and Location
Project Date Daily Depth
Density
Fort Collins, Colorado
Project # 18-2066
November 2018
Field Moisture/Density Testing Summary
MOUNTAIN'S EDGE
96% Pass Pass
Pass
43 9/28 4 -9' Overexcavation/Backfill - Lot 11 C 14.5% 111.5 0.5% 97% Pass Pass
Pass
41 9/28 2 -10' Overexcavation/Backfill - Building 20 Pass
42 9/28 3 -10' Overexcavation/Backfill - Building 20 C 13.0% 112.8 -1.0%
C 14.5% 110.8 0.5% 96% Pass
98% Pass
Moisture Compaction
40 9/28 1 -11' Overexcavation/Backfill - Building 20 C 13.5%
Number Number ID
Percent
Compaction
(Pass/Fail)
111.2 -0.5% 97% Pass
Test Test Proctor Moisture
Moisture
Variability
Field Results
Dry
Material Tested and Location
Project Date Daily Depth
Density
Fort Collins, Colorado
Project # 18-2066
October 2018
Field Moisture/Density Testing Summary
MOUNTAIN'S EDGE
7 9/24 1 -14' Overexcavation/Backfill - Roadway - Downs Way - 25' S of Bluegrass C 15.2% 112.6 1.2%
5 9/21 3 -17' Overexcavation/Backfill - Building 12 Pass
6 9/21 4 -17' Overexcavation/Backfill - Building 14 C 13.1% 113.9 -0.9%
C 12.5% 112.8 -1.5% 98% Pass
99% Pass Pass
Pass
4 9/21 2 -2' Overexcavation/Backfill - Roadway - Crown View - 25' S of Knolls Endd C 12.0% 112.0 -2.0% 97% Pass Pass
*FAIL*
2 9/19 2 -2' Overexcavation/Backfill - Block 4 - Lots 2/3 *FAIL*
3 9/21 1 -1' Overexcavation/Backfill - Roadway - Crown View - 25' N of Knolls Endd C 14.6% 112.0 0.6%
C 8.0% 103.1 -6.0% 90% *FAIL*
97% Pass
Moisture Compaction
1 9/19 1 Grade Overexcavation/Backfill - Block 4 - Lots 1/2 C 9.8%
Number Number ID
Percent
Compaction
(Pass/Fail)
101.2 -4.2% 88% *FAIL*
Test Test Proctor Moisture
Moisture
Variability
Field Results
Dry
Material Tested and Location
Project Date Daily Depth
Density
Fort Collins, Colorado
Project # 18-2066
September 2018
Field Moisture/Density Testing Summary
MOUNTAIN'S EDGE
66 10/2 7 -3' Overexcavation/Backfill - Lot 13 C 15.0% 113.2 1.0%
C 14.0% 112.0 0.0% 97% Pass
98% Pass Pass
67 10/2 8 -2' Overexcavation/Backfill - Lot 14 C 12.8% 112.6 -1.2% 98% Pass Pass
68 10/3 1 -3' Overexcavation/Backfill - Building 20 Pass
69 10/3 2 -1' Overexcavation/Backfill - Building 20 C 14.0% 112.2 0.0%
C 12.5% 111.3 -1.5% 97% Pass
98% Pass Pass
70 10/3 3 Grade Overexcavation/Backfill - Building 20 C 13.8% 113.5 -0.2% 99% Pass Pass
71 10/3 4 -1' Overexcavation/Backfill - Building 20 Pass
72 10/3 5 Grade Overexcavation/Backfill - Lot 11 C 15.0% 109.9 1.0%
C 13.0% 114.0 -1.0% 99% Pass
96% Pass Pass
73 10/3 6 -1' Overexcavation/Backfill - Lot 12 C 14.9% 112.0 0.9% 97% Pass Pass
74 10/3 7 -1' Overexcavation/Backfill - Lot 13 Pass
75 10/3 8 Grade Overexcavation/Backfill - Lot 14 C 14.2% 114.1 0.2%
C 15.5% 111.7 1.5% 97% Pass
99% Pass Pass
Maximum Dry Density (pcf) 119.0
Compaction Requirement
Proctor ID: A
Moisture Content Requirement ±2%
Optimum Moisture Content (%) 13.0%
Procedure D-698
Compaction Requirement 95% Min
25 9/26 5 -12' Overexcavation/Backfill - Building 12 C 13.2% 112.2 -0.8%
95% Pass Pass
28 9/27 3 -1' Overexcavation/Backfill - Building 8 C 14.1% 110.5 0.1% 96% Pass Pass
27 9/27 2 -12' Overexcavation/Backfill - Building 13 C 13.6% 109.7 -0.4%
29 9/27 4 -1' Overexcavation/Backfill - Building 6 Pass
30 9/27 5 -15' Overexcavation/Backfill - Building 20 C 13.8% 109.8 -0.2%
C 14.5% 111.9 0.5% 97% Pass
95% Pass Pass
96% Pass Pass
32 9/27 7 -15' Overexcavation/Backfill - Building 20 C 15.0% 111.7 1.0% 97% Pass Pass
31 9/27 6 -14' Overexcavation/Backfill - Building 20 C 15.0% 110.5 1.0%
98% Pass Pass
34 9/27 9 -10' Overexcavation/Backfill - Lot 11 C 13.7% 113.5 -0.3% 99% Pass Pass
33 9/27 8 -13' Overexcavation/Backfill - Building 20 C 14.5% 112.2 0.5%
35 9/27 10 -9' Overexcavation/Backfill - Lot 12 Pass
36 9/27 11 -10' Overexcavation/Backfill - Lot 13 C 12.9% 112.4 -1.1%
C 13.5% 112.8 -0.5% 98% Pass
98% Pass Pass
99% Pass Pass
38 9/27 13 -12' Overexcavation/Backfill - Building 20 C 13.7% 113.2 -0.3% 98% Pass Pass
37 9/27 12 -9' Overexcavation/Backfill - Lot 14 C 13.1% 113.6 -0.9%
39 9/27 14 -11' Overexcavation/Backfill - Building 20 C 14.0% 112.9 0.0% 98% Pass Pass
Maximum Dry Density (pcf) 119.0 118.0 115.0
Compaction Requirement
Proctor ID: A B C
Moisture Content Requirement ±2% ±2% ±2%
Optimum Moisture Content (%) 13.0% 13.0% 14.0%
Procedure D-698 D-698 D-698
Compaction Requirement 95% Min 95% Min 95% Min