Loading...
HomeMy WebLinkAboutTHE ODELL WINE PROJECT - Filed E-ELEVATION PLAN - 2021-01-141 2 3 4 5 A B A.2 4 A.2 6 A.2 5 A.2 1 6 7 8 A.2 3 A.2 COOLER 2 OFFICE B1 A2 0' 5' 10' 20' 30' BAR NOT IN SCOPE FUTURE SHADE STRUCTURE OUTDOOR SEATING TAPROOM RR RR PRODUCTION OVERALL LENGTH OF (E) BUILDING 80'-9" OVERALL ADDITION LENGTH 17'-6" MECH. UTIL. OVERALL WIDTH OF (E) BUILDING 12'-6" 49'-8" 5'-2" 23'-2" 20'-6 1/2" 37'-0 1/2" OVERALL ADDITION WIDTH 50'-0 7/8" A A 1 2 3 4 5 1 2 3 4 5 SHEET INFORMATION PROJECT INFORMATION PROJECT PHASE SEAL ARCHITECT ISSUE DATE: PROJECT #: CONSULTANT B C D A B C D T - 970.484.0117 F - 970.484.0264 315 East Mountain Ave Suite 100 Fort Collins, CO 80524-2913 © 2015 www.rbbarchitects.com B A 0' 5' 10' 20' 30' 1 2 12 12 12 12 12 17 17 18 18 14 20 B1 A2 T.O. (E) BUILDING LEVEL 1 T.O. ADDITION 116'-3" 100'-0" 111'-6" 8 7 6 5 4 3 2 1 0' 5' 10' 20' 30' 1 2 6 12 16 15 14 17 100'-0" 111'-6" 116'-3" T.O. (E) BUILDING T.O. ADDITION LEVEL 1 23 1 2 3 4 5 6 7 8 0' 5' 10' 20' 30' 1 1 1 2 2 3 4 6 5 5 7 9 10 12 14 15 16 100'-0" 111'-6" 116'-3" T.O. (E) BUILDING T.O. ADDITION LEVEL 1 4 17 23 A B 0' 5' 10' 20' 30' A2 B1 1 7 1 2 2 A A 1 2 3 4 5 1 2 3 4 5 SHEET INFORMATION PROJECT INFORMATION PROJECT PHASE SEAL ARCHITECT ISSUE DATE: PROJECT #: CONSULTANT B C D A B C D T - 970.484.0117 F - 970.484.0264 315 East Mountain Ave Suite 100 Fort Collins, CO 80524-2913 © 2015 www.rbbarchitects.com ARCHITECTS REVISIONS: A.3 1916 PERSPECTIVES ODELL WINE PROJECT 100% CONSTRUCTION DOCUMENTS 02/26/2020 824 E. LINCOLN AVE. FORT COLLINS, CO 80524 3 PERSPECTIVE LOOKING NE 6 PERSPECTIVE AT PATIO LOOKING EAST 1 AERIAL PERSPECTIVE LOOKING NW 2 AERIAL PERSPECTIVE LOOKING NE 4 PERSPECTIVE AT ENTRY LOOKING NE 5 PERSPECTIVE AT PATIO DESCRIPTION DATE ADD-04 3/27/2020 ADD-04 P - 23 715 P - 23 715 116'-3" T.O. (E) BUILDING LEVEL 1 1 B A 0' 5' 10' 20' 30' B1 A2 1 2 17 17 18 18 14 20 9 21 116'-3" 100'-0" T.O. (E) BUILDING LEVEL 1 111'-6" T.O. ADDITION 22 22 B 0' 5' 10' 20' 30' B1 20 2 19 116'-3" 100'-0" T.O. (E) BUILDING LEVEL 1 A A 1 2 3 4 5 1 2 3 4 5 SHEET INFORMATION PROJECT INFORMATION PROJECT PHASE SEAL ARCHITECT ISSUE DATE: PROJECT #: CONSULTANT B C D A B C D T - 970.484.0117 F - 970.484.0264 315 East Mountain Ave Suite 100 Fort Collins, CO 80524-2913 © 2015 www.rbbarchitects.com ARCHITECTS REVISIONS: A.2 1916 BUILDING ELEVATIONS ODELL WINE PROJECT 100% CONSTRUCTION DOCUMENTS 02/26/2020 824 E. LINCOLN AVE. FORT COLLINS, CO 80524 4 SITE 1/8" = 1'-PLAN 0" - SOUTH ELEVATION - ENCLOSED (FUTURE) 5 SITE 1/8" = 1'-PLAN 0" - EAST ELEVATION 6 SITE 1/8" = 1'-PLAN 0" - WEST ELEVATION 1 SITE 1/8" = 1'-PLAN 0" - NORTH ELEVATION 3 SITE 1/8" = 1'-PLAN 0" - SOUTH ELEVATION - OPEN 2 SITE 1/8" = 1'-PLAN 0" - SOUTH ELEVATION SHEET NOTES - ELEVATIONS 1 (E) METAL SIDING TO REMAIN. PAINT DARK GRAY 2 (E) ROOF TO REMAIN 3 (E) OVERHEAD DOOR TO REMAIN. PAINT DARK GRAY 4 (E) DOOR TO REMAIN. PAINT DARK GRAY 5 STOREFRONT WINDOW 6 (E) METAL BUILDING. NOT IN SCOPE 7 WALL MURAL/GRAPHICS APPLIED TO (E) BUILDING 9 STOREFRONT ENTRY 10 ENTRY CANOPY 11 TRANSLUCENT WALL PANEL 12 FUTURE RETRACTABLE WALL PANEL 13 STRUCTURAL BRACING AS REQ'D. 14 TPO MEMBRANE ROOF 15 SHADE SAIL STRUCTURE 16 FUTURE SHADE SAIL 17 STEEL STRUCTURE. PAINT DARK GRAY 18 STONE PLANTER 19 WALL MOUNTED SIGNAGE 20 PLANTING AREA 21 OVERHEAD DOOR 22 SCUPPER AND RAIN CHAIN 23 FUTURE SHADE STRUCTURE DESCRIPTION DATE ADD-04 3/27/2020 ADD-04 ADD-04 P - 23 715 P - 23 715 ARCHITECTS REVISIONS: A.1 1916 FLOOR PLANS ODELL WINE PROJECT 100% CONSTRUCTION DOCUMENTS 02/26/2020 824 E. LINCOLN AVE. FORT COLLINS, CO 80524 1/8" = 1'-0" SITE PLAN - FLOOR PLAN N DESCRIPTION DATE ADD-04 3/27/2020 ADD-04 P - 23 715 P - 23 715