HomeMy WebLinkAboutWATERS EDGE THIRD FILING - Filed DCP-DEV. CONSTRUCTION PERMIT - 2020-12-08City of Fort Collins, Colorado
DEVELOPMENT CONSTRUCTION PERMIT
Permit Number: 20-14 Issuance Date: 11/23/2020
Project Name: Waters Edge Third Filing
Project AKA:
Project Location: Northwest Corner at Turnberry and Brightwater
Permittee: Dan Nickless, Waters Edge Communities
City and developer contacts: See attached Exhibit ‘A’ for names and phone numbers of all
contact persons for this project.
Fees: Permit Application Fee check# 5145 400.00
Construction Inspection Fee check#705586 $ 86774.85
Pavement Impact Fee – excavation permit $ xxx.xx
Total amount due $ 87174.85
Development Bond or other approved security:
Amount of security deposited with the City to guarantee the completion of all public
improvements to be constructed as shown on the approved plans for the development.
$ 3,293,896.74
Form of security deposited with the City: Letter of Credit 10094
PERFORMANCE REQUIREMENTS OF THIS PERMIT:
1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design
drawings and specifications the certification of all materials testing by an Engineer. The Permittee
shall have an Engineer prepare revised design drawings and secure City approval for all revisions to
the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required
by the City in the Development Agreement, that the improvements are constructed in conformance
with the approved Utility Plans and the standards and specifications of the City. The Permittee shall
provide “as-constructed” plans prepared by an Engineer prior to the City’s acceptance of the
constructed public improvements. (All references above to the terms “Project Engineer” and
“Engineer” shall mean a Professional Engineer licensed in Colorado.)
2. All contractors who perform work on this project must be bonded and licensed in conformance
with City requirements.
3. Construction time restrictions: N/A
DocuSign Envelope ID: 09F010E1-149EFABD-4259-14CE-43EE-495D-8444-B7E3-14E7618153E1 F5D9EB27B922
4. The applicant understands that additional permits may be required for this development project
and the applicant shall secure those permits directly from the issuing departments.
5. This permit, along with a complete set of all approved plans and documents for this project
(utility plans, site plan, landscape plan, development agreement, soils report, pavement design,
traffic study, drainage report, plat easements and any other official documents), shall be kept on the
development site available for use by City staff doing inspections.
6. Permit Expiration (in accordance with Section 2.6.3(K) of the Land Use Code, whichever is
applicable):
a. If construction has not begun within sixty (60) days from the date of issuance of this
permit, this permit shall expire and the applicant will forfeit the permit fee paid for this
permit, whereupon the applicant must re-apply for a new permit.
b. In addition, this permit shall expire one year from the date of issuance. The applicant
may apply for an extension by reapplication at least two weeks prior to the expiration date.
Such application shall contain information sufficient to justify the granting of the extension.
An extension may be granted for up to six months.
7. Building permits and certificates of occupancy will only be issued when all conditions contained
in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code are met. If the
Development Agreement does not specify times for completion of public improvements, or if there
is no Development Agreement, then the improvement requirements specified in Section 24-95 of the
City Code shall apply, which provides that construction of all improvements shall be required prior
to the time of issuance of the first building permit.
8. Acceptance by the City of the public improvements shall be after (1) final inspection has been
conducted by the City; (2) punch list items from the final inspection are completed and accepted by
the City; and (3) required certifications from the licensed professional engineer that improvements
are completed to City standards, specifications and approved Utility Plans; and the “as-constructed”
plans have been received and accepted by the City.
9. The warranty on street improvements is for five (5) years from the date of acceptance by the City
of the completed improvements, in accordance with Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and
3.3.2(C) of the Land Use Code, as applicable.
10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any
construction activities on this project. All required perimeter silt fencing and other erosion/sediment
control best management practices (BMPs) that can be installed prior to construction must be in
place and inspected by the City Erosion Control Inspector before any land disturbing activity begins.
The applicant also understands that at no time pollutants, especially dirt, are allowed to leave the
construction site (either by drainage, wind, or track out) and that the applicant shall immediately
address and correct the issue regardless of being formally directed by the City.
11. City of Fort Collins Traffic Operations must be notified prior to the installation of permanent
traffic signing, symbols and striping. The developer shall place temporary tabs or tape, and/or set up
a field meeting for review and approval prior to installation.
DocuSign Envelope ID: 09F010E1-149EFABD-4259-14CE-43EE-495D-8444-B7E3-14E7618153E1 F5D9EB27B922
12. A permit must be obtained from the City Forester before any trees or shrubs as noted on the
approved plans are planted, pruned, or removed in public right-of-way. This includes the area
between the sidewalk and curb, medians, and other city property. This permit from the City Forester
shall approve the location and species to be planted. Failure to obtain this permit is a violation of the
City of Fort Collins Municipal Code subject to citation (Section 27-31) and may also result in
replacing or relocation trees and a hold on the issuance of a certificate of occupancy.
13. No work (including grading) shall be started in State Highway right-of-way until a permit is
issued by the Colorado Department of Transportation to allow such work to begin.
14. Other conditions: N/A
Permittee’s acknowledgment signature:
By signing this permit, I acknowledge that I am acting with the knowledge, consent, and authority of
the owners of the property (including all owners having legal or equitable interest in the real property, as
defined in Section 1-2 of the City Code; and including common areas legally connected to or associated
with the property which is the subject of this application) without whose consent and authority the
requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City
officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such
property to perform work required of the applicant if the applicant were to fail to perform the required
work. I also acknowledge that I have read this permit document with all its requirements and
conditions, and I agree to all of the terms and conditions so stated in this permit.
Applicant/Project Manager’s Signature: ____________________________ Date: ____________
Approval for issuance:
City Engineer Approval: __________________________Date: __________________________
(Permit Issuance Date)
DocuSign Envelope ID: 09F010E1-4259-43EE-8444-14E7618153E1
11/24/2020
DocuSign Envelope ID: 149EFABD-14CE-495D-B7E3-F5D9EB27B922
11/24/2020
EXHIBIT ‘A’
DEVELOPMENT PROJECT CONTACT PERSONS
Project Name:Waters Edge Third Filing
Name, address and numbers
City Staff Contact Persons:
Development Engineer: Dave Betley
281 N. College Avenue, Fort Collins, CO 80524
(970) 221-6573
dbetley@fcgov.com
Construction Inspector: Kim Weiswetter
281 N. College Avenue, Fort Collins, CO 80524
(970) 568-6546
kweiswetter@fcgov.com
Stormwater Engineering: Wes Lamarque
700 Wood Street, Fort Collins, CO 80521
(970) 416-2418
wlamarque@fcgov.com
Erosion Control Inspector: Jesse Schlam
700 Wood Street, Fort Collins, CO 80521
(970) 224-6700
jschlam@fcgov.com
Natural Resources: Scott Benton
281 N. College Avenue, Fort Collins, CO 80524
(970) 224-6189
sbenton@fcgov.com
Traffic Operations: Nicole Hahn
626 Linden Street, Fort Collins, CO 80524
(970) 217-8461
nhahn@fcgov.com
Street closures: Tom Utech
626 Linden Street, Fort Collins, CO 80524
(970) 221-6815
tutech@fcgov.com
DocuSign Envelope ID: 09F010E1-149EFABD-4259-14CE-43EE-495D-8444-B7E3-14E7618153E1 F5D9EB27B922
Page 5 of 5
Forestry: Molly Roche
413 S. Bryan Avenue, Fort Collins, CO 80521
(224) 616-1992
mroche@fcgov.om
Light and Power: Tyler Siegmund
700 Wood Street, Fort Collins, CO 80521
(970) 416-2772
tsiegmund@fcgov.com
Developer’s Contact Persons:
Project Manager/Owner: Dan Nickless
Waters Edge Communities
5935 S. Zang St. #230 Littleton, CO 80127
303-949-2629
dan@actuallp.com
Developer: Dan Nickless
Waters Edge Communities
5935 S Zang St. #230 Littleton, CO 80127
303-949-2629
dan@actuallp.com
Project Engineer: John Gooch
Aspen Engineers
19 Old Town Square St. 238, Fort Collins, CO 80523
970-420-5345
johng@aspen-engineering.com
General Contractor: Shane Westlind
Connell Resources
7785 Highland Meadows Pkwy, Unit A Windsor, CO
80528
970-217-7147
swestlind@connellresources.com
DocuSign Envelope ID: 09F010E1-149EFABD-4259-14CE-43EE-495D-8444-B7E3-14E7618153E1 F5D9EB27B922