Loading...
HomeMy WebLinkAboutOLD TOWN NORTH FIFTH FILING - Filed DCP-DEV. CONSTRUCTION PERMIT - 2020-12-08City of Fort Collins, Colorado DEVELOPMENT CONSTRUCTION PERMIT Permit Number: 20-15 Issuance Date: 12/02/2020 Project Name: Old Town North Fifth Filing Project AKA: Kay’s Place Project Location: Lots; M-1 through M-4, Lots G-1 through G-4 of Block 2, And Tract F. Range 69 West, of the 6 th PM, City of Fort Collins, CO Permittee: Mitchell A. Greeno/ Philgreen Construction, Inc City and developer contacts: See attached Exhibit ‘A’ for names and phone numbers of all contact persons for this project. Fees: Permit Application Fee check#1528 400.00 Construction Inspection Fee check#1528 $ 1,943.80 Pavement Impact Fee – excavation permit check#1528 $ 1,684.00 Total amount due $ 4,027.80 Development Bond or other approved security: Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. $58,124.14 Form of security deposited with the City: LOC #: 15000176 PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design drawings and specifications the certification of all materials testing by an Engineer. The Permittee shall have an Engineer prepare revised design drawings and secure City approval for all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required by the City in the Development Agreement, that the improvements are constructed in conformance with the approved Utility Plans and the standards and specifications of the City. The Permittee shall provide “as-constructed” plans prepared by an Engineer prior to the City’s acceptance of the constructed public improvements. (All references above to the terms “Project Engineer” and “Engineer” shall mean a Professional Engineer licensed in Colorado.) 2. All contractors who perform work on this project must be bonded and licensed in conformance with City requirements. 3. Construction time restrictions: N/A 12/2/2020