HomeMy WebLinkAboutFOX GROVE PHASE 2 - Filed DCP-DEV. CONSTRUCTION PERMIT - 2020-10-19City of Fort Collins, Colorado DEVELOPMENT CONSTRUCTION PERMIT Permit Number: 20-11 Issuance Date: Project Name: Fox Grove Phase 2 Project AKA: Project Location: I-25 & E. Mulberry St. Permittee: Michael Cannon/ DR Horton City and developer contacts: See attached Exhibit ‘A’ for names and phone numbers of all contact persons for this project. Fees: Permit Application Fee BMISC200336 $ Paid Construction Inspection Fee check#1008647 $ 15,332.25 Pavement Impact Fee – excavation permit $ 133.00 Total amount due $ 15,465.25 Development Bond or other approved security: Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. $ 532,638.11 Form of security deposited with the City: Bond #30111232 PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design drawings and specifications the certification of all materials testing by an Engineer. The Permittee shall have an Engineer prepare revised design drawings and secure City approval for all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required by the City in the Development Agreement, that the improvements are constructed in conformance with the approved Utility Plans and the standards and specifications of the City. The Permittee shall provide “as-constructed” plans prepared by an Engineer prior to the City’s acceptance of the constructed public improvements. (All references above to the terms “Project Engineer” and “Engineer” shall mean a Professional Engineer licensed in Colorado.) 2. All contractors who perform work on this project must be bonded and licensed in conformance with City requirements. 3. Construction time restrictions: N/A DocuSign Envelope ID: AF20F245-6CEF-4397-87C1-DA88CCFCD8EA 9/23/2020 DocuSign Envelope ID: AF20F245-6CEF-4397-87C1-DA88CCFCD8EA DocuSign Envelope ID: AF20F245-6CEF-4397-87C1-DA88CCFCD8EA DocuSign Envelope ID: AF20F245-6CEF-4397-87C1-DA88CCFCD8EA 9/23/2020 DocuSign Envelope ID: AF20F245-6CEF-4397-87C1-DA88CCFCD8EA DocuSign Envelope ID: AF20F245-6CEF-4397-87C1-DA88CCFCD8EA "PROJECT QUANTITIES AND COST ESTIMATE SHEET" 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 A B C D E F G H I J K Fox Grove - 2nd Filing 3/27/2020 DESCRIPTION UNITS OF ESTIMATED INFRASTRUCTURE TOTAL INSPECTION TOTAL (LIST ALL PUBLIC AND APPLICABLE MEASURE QUANTITY CONSTRUCTION ESTIMATED FEE PER UNIT INSPECTION *PRIVATE IMPROVEMENTS) (PROVIDED BY THE COST PER UNIT INFRASTRUCTURE (PROVIDED FEE PROJECT ENGINEER) OF MEASURE COST BY THE CITY) (COST ESTMATE APPROVED BY THE CITY) Sanitary Sewer System Sanitary Sewer Main L.F. 0 $0.00 $0.00 $0.70 $0.00 Manhole EACH 0 $0.00 $0.00 $103.00 $0.00 Sewer Service Line Stub EACH 0 $0.00 $0.00 $70.00 $0.00 Sewer Connection/Disconnect EACH 0 $0.00 $0.00 $35.00 $0.00 Sanitary Sewer Inspection Fees $0.00 Water System Water Main L.F. 0 $0.00 $0.00 $0.70 $0.00 Water Service Line Stub EACH 0 $0.00 $0.00 $70.00 $0.00 Fire Hydrant EACH 0 $0.00 $0.00 $70.00 $0.00 Valves EACH 0 $0.00 $0.00 $70.00 $0.00 Meter Pit (3/4" ) EACH 0 $0.00 $0.00 $35.00 $0.00 Meter Pit (1 1/2") EACH 0 $0.00 $0.00 $35.00 $0.00 Meter Pit (3" ) EACH 0 $0.00 $0.00 $35.00 $0.00 Water Main (Fire Line)* L.F. 0 $0.00 $0.00 $0.70 $0.00 Water Fitting ( Bend, Tee, Cross ) EACH 0 $0.00 $0.00 $35.00 $0.00 Fireline Fitting ( Bend, Tee, Cross ) EACH 0 $0.00 $0.00 $35.00 $0.00 Water Connection/Disconnect EACH 0 $0.00 $0.00 $35.00 $0.00 Water Inspection Fees $0.00 Public Storm Sewer System Reinforced Concrete Pipe (18") L.F. 125 $54.00 $6,750.00 $0.70 $87.50 Reinforced Concrete Pipe (24") L.F. 241 $62.00 $14,942.00 $1.70 $309.70 Reinforced Concrete Pipe (30") L.F. 85 $75.00 $6,375.00 $2.70 $70.00 Reinforced Concrete Pipe (23"x14") L.F. 29 $59.00 $1,711.00 $3.70 $70.00 Reinforced Concrete Pipe (30"x19") L.F. 64 $68.00 $4,352.00 $4.70 $70.00 Underdrain L.F. 0 $0.00 $0.00 $0.70 $0.00 Concrete Headwall L.F. 0 $0.00 $0.00 $3.50 $0.00 Water Quality Outlet Structure C.Y. 0 $0.00 $0.00 $3.50 $0.00 All Inlet Types/Chase EACH 6 $4,000.00 $24,000.00 $103.00 $618.00 Manhole EACH 3 $3,800.00 $11,400.00 $103.00 $309.00 Storm Connection/Disconnect EACH 1 $1,000.00 $1,000.00 $35.00 $35.00 Public Storm Inspection Fees $1,569.20 Street System/ Trench Grading L.S. 1 $25,000.00 $25,000.00 Asphalt Pavement SY 5,602 $38.00 $212,884.44 $0.45 $2,489.00 Asphalt Mill & Overlay SY 695 $38.00 $26,410.00 $0.45 $280.75 Concrete Pavement SY 0 $0.00 $0.00 $0.45 $0.00 Colored Concrete Pavement SY 0 $0.00 $0.00 $0.45 $0.00 Curb & Gutter L.F. 3,216 $25.00 $80,400.00 $1.00 $3,236.00 Sidewalk *** L.F. 3,113 $19.00 $59,147.00 $1.00 $3,133.00 Pedestrian Ramps L.F. 104 $150.00 $15,600.00 $1.00 $124.00 Fire Access Grass Crete S.Y. 0 $0.00 $0.00 $0.45 $0.00 Gutter Pan S.Y. 0 $0.00 $0.00 $0.45 $0.00 Drive Approach S.Y. 0 $0.00 $0.00 $0.45 $0.00 Storm Trench L.F. 534 $0.00 $0.00 $0.70 $373.80 Sewer Trench L.F. 2,971 $4.00 $11,884.00 $0.70 $2,079.70 Water Trench L.F. 2,924 $4.00 $11,696.00 $0.70 $2,046.80 Street System Inspection Fees $13,763.05 Excavation Permit Application L.S. 0 $30.00 Pavement Patching S.Y. 182 $105.00 $19,086.67 $0.45 $103.00 Potholing E.A. 0 $0.00 $0.00 $10.00 $0.00 Pavement Impact Fees 6+ S.F. 0 $0.00 Pavement age Excavation Permit Fees $133.00 TOTAL INSPECTION FEES $15,465.25 TOTAL PUBLIC INFRASTRUCTURE COST $532,638.11 * PRIVATE IMPROVEMENTS REQUIRING CITY INSPECTIONS WILL NEED TO BE INCLUDED. HOWEVER PRIVATE IMPROVEMENTS WILL NOT BE INCLUDED IN THE TOTAL INFRASTRUCTURE COST FOR BONDING. ** INCLUDES TRENCH PRICE *** SIDEWALK LENGTH IS INCREASED DUE TO OVERSIZE WIDTH. STANDARD SIDEWALK INSPECTION FEE WIDTH IS 4.5' 03-27-2020 DocuSign Envelope ID: AF20F245-6CEF-4397-87C1-DA88CCFCD8EA