HomeMy WebLinkAboutEAST RIDGE SECOND - Filed FDT-FIELD DENSITY TEST - 2019-06-05Soilogic, Inc.
3522 Draft Horse Court • Loveland, CO 80538 • (970) 535-6144
May 22, 2019
Bison Ridge Construction, LLC
3524 Draft Horse Court
Loveland, Colorado 80538
Attn: Mr. Guillermo Hernandez
Re: Construction Materials Testing and Observation Services Report
East Ridge Phase 2
Fort Collins, Colorado
Soilogic Project # 19-2026
Mr. Hernandez:
During the period of April 25 through May 14, 2019, Soilogic Inc. (Soilogic) provided
construction materials testing and observation services for the referenced project. Our
services were provided on a part-time basis and included the observation and testing of
utility backfill materials. Results of the observation and testing services completed during
the referenced period are included with this report.
During the referenced period, Soilogic personnel obtained one (1) representative sample of
the excavated site soils for laboratory evaluation of the moisture density relationship of
that material. The laboratory testing completed on the obtained sample included a standard
Proctor (ASTM D-698) test. Results of the completed standard Proctor test were used to
evaluate the percent compaction and moisture variability with reworked soils in the field
and are included with this report.
During the referenced period, Soilogic personnel performed field moisture/density tests on
sewer and water utility backfill materials that had been placed and compacted prior to and
during our site visits. The field moisture/density tests were completed at random locations
and elevations within the backfill areas and were performed in general accordance with
ASTM Specification D-2922. Results of the field moisture/density tests completed during
the referenced period are included with this report. The field moisture/density test results
met the project compaction requirement of at least 95% of the material’s standard Proctor
maximum dry density and -1% to +3% of the material’s optimum moisture content.
Construction Materials Testing and Observation Services Report
East Ridge Phase 2
Fort Collins, Colorado
Soilogic # 19-2026
2
We appreciate the opportunity to be of service to you on this project. If you have any
questions concerning the enclosed information or if we can be of further assistance to you
in any way, please do not hesitate to contact us.
Very Truly Yours,
Soilogic, Inc. Reviewed by:
Jason Horner, E.I. Wolf von Carlowitz, P.E.
Project Engineer Principal Engineer
EAST RIDGE PHASE 2
Density
Fort Collins, Colorado
Project # 19-2026
April 2019
Field Moisture/Density Testing Summary
Material Tested and Location
Project Date Daily Depth
Number Number ID Moisture Compaction
Percent
Compaction
Test Test Proctor Moisture (Pass/Fail)
Moisture
Variability
Field Results
Dry
1 4/25 1 -6' Sewer Service Backfill - Block 1 - Lot 9 Pass
2 4/25 2 -6' Sewer Service Backfill - Block 1 - Lot 10 A 11.5% 115.0 -0.5%
A 12.2% 110.8 0.2% 96% Pass
99% Pass Pass
96% Pass Pass
4 4/25 4 -6' Sewer Service Backfill - Block 1 - Lot 12 A 12.3% 114.2 0.3% 98% Pass Pass
3 4/25 3 -6' Sewer Service Backfill - Block 1 - Lot 11 A 12.3% 110.9 0.3%
5 4/25 5 -6' Sewer Service Backfill - Block 1 - Lot 13 A 13.0% 111.1 1.0% 96% Pass Pass
99% Pass Pass
7 4/25 7 -6' Sewer Service Backfill - Block 1 - Lot 15 A 12.8% 114.1 0.8% 98% Pass Pass
6 4/25 6 -6' Sewer Service Backfill - Block 1 - Lot 14 A 11.7% 114.8 -0.3%
95% Pass Pass
9 4/25 9 -6' Sewer Service Backfill - Block 1 - Lot 17 A 12.5% 113.4 0.5% 98% Pass Pass
8 4/25 8 -6' Sewer Service Backfill - Block 1 - Lot 16 A 15.0% 110.3 3.0%
10 4/25 10 -6' Sewer Service Backfill - Block 1 - Lot 18 A 14.4% 110.9 2.4% 96% Pass Pass
11 4/25 11 -6' Sewer Main Backfill - MH 1-4.11 - 1' S A 14.7% 111.1 2.7% 96% Pass Pass
97% Pass Pass
13 4/25 13 -6' Sewer Main Backfill - MH 1-4.10 - 80' S A 12.0% 112.2 0.0% 97% Pass Pass
12 4/25 12 -6' Sewer Main Backfill - MH 1-4.10 - 10' N A 13.0% 113.0 1.0%
96% Pass Pass
15 4/25 15 -4' Sewer Main Backfill - MH 1-4.11 - 35' S A 11.4% 115.0 -0.6% 99% Pass Pass
14 4/25 14 -6' Sewer Main Backfill - MH 1-4.11 - 70' S A 14.4% 110.9 2.4%
16 4/25 16 -4' Sewer Main Backfill - MH 1-4.10 - 50' N A 14.7% 110.8 2.7% 96% Pass Pass
17 4/25 17 -4' Sewer Main Backfill - MH 1-4.10 - 20' N A 12.0% 114.1 0.0% 98% Pass Pass
97% Pass Pass
19 4/25 19 -4' Sewer Main Backfill - MH 1-4.9 - 10' S A 11.7% 115.0 -0.3% 99% Pass Pass
18 4/25 18 -4' Sewer Main Backfill - MH 1-4.10 - 40' S A 11.9% 112.3 -0.1%
96% Pass Pass
21 4/26 2 Grade Sewer Service Backfill - Block 1 - Lot 10 A 13.0% 114.7 1.0% 99% Pass Pass
20 4/26 1 Grade Sewer Service Backfill - Block 1 - Lot 9 A 14.2% 111.7 2.2%
22 4/26 3 Grade Sewer Service Backfill - Block 1 - Lot 11 A 13.0% 111.9 1.0% 96% Pass Pass
23 4/26 4 Grade Sewer Service Backfill - Block 1 - Lot 12 A 12.4% 115.0 0.4% 99% Pass Pass
97% Pass Pass
25 4/26 6 Grade Sewer Service Backfill - Block 1 - Lot 14 A 14.5% 111.0 2.5% 96% Pass Pass
24 4/26 5 Grade Sewer Service Backfill - Block 1 - Lot 13 A 13.3% 112.4 1.3%
95% Pass Pass
27 4/26 8 Grade Sewer Service Backfill - Block 1 - Lot 16 A 11.1% 115.0 -0.9% 99% Pass Pass
26 4/26 7 Grade Sewer Service Backfill - Block 1 - Lot 15 A 15.0% 110.3 3.0%
28 4/26 9 Grade Sewer Service Backfill - Block 1 - Lot 17 A 12.2% 113.2 0.2% 98% Pass Pass
29 4/26 10 Grade Sewer Service Backfill - Block 1 - Lot 18 A 12.9% 114.8 0.9% 99% Pass Pass
96% Pass Pass
31 4/26 12 Grade Sewer Main Backfill - MH 1-4.10 - 15' N A 15.0% 110.8 3.0% 96% Pass Pass
30 4/26 11 -3' Sewer Main Backfill - MH 1-4.11 - 1' N A 14.2% 111.5 2.2%
96% Pass Pass
Procedure D-698
Compaction Requirement 95% Min
Moisture Content Requirement -1 to +3%
Optimum Moisture Content (%) 12.0%
Maximum Dry Density (pcf) 116.0
Compaction Requirement
Proctor ID: A
113.9 1.0% 98% Pass Pass
97% Pass Pass
66 5/13 19 Grade Retest #62 A 13.0%
Pass
65 5/13 18 Grade Water Service Backfill - Block 1 - Lot 9 A 12.7% 113.0 0.7%
A 11.0% 115.0 -1.0% 99% Pass
111.2 2.4% 96% Pass Pass
64 5/13 17 Grade Water Service Backfill - Block 1 - Lot 8
92% Pass *FAIL*
63 5/13 16 Grade Water Service Backfill - Block 1 - Lot 7 A 14.4%
Pass
62 5/13 15 Grade Water Service Backfill - Block 1 - Lot 6 A 12.2% 106.6 0.2%
A 14.8% 112.6 2.8% 97% Pass
115.0 -0.8% 99% Pass Pass
61 5/13 14 Grade Water Service Backfill - Block 1 - Lot 5
99% Pass Pass
60 5/13 13 Grade Water Service Backfill - Block 1 - Lot 4 A 11.2%
Pass
59 5/13 12 Grade Water Service Backfill - Block 1 - Lot 3 A 14.0% 114.4 2.0%
A 14.5% 112.3 2.5% 97% Pass
112.7 2.3% 97% Pass Pass
58 5/13 11 Grade Water Service Backfill - Block 1 - Lot 2
99% Pass Pass
57 5/13 10 Grade Water Service Backfill - Block 1 - Lot 1 A 14.3%
Pass
56 5/13 9 -2' Water Service Backfill - Block 1 - Lot 9 A 12.2% 115.0 0.2%
A 12.3% 112.8 0.3% 97% Pass
112.2 0.2% 97% Pass Pass
55 5/13 8 -2' Water Service Backfill - Block 1 - Lot 8
98% Pass Pass
54 5/13 7 -2' Water Service Backfill - Block 1 - Lot 7 A 12.2%
Pass
53 5/13 6 -2' Water Service Backfill - Block 1 - Lot 6 A 15.0% 113.7 3.0%
A 12.7% 113.2 0.7% 98% Pass
114.9 -0.9% 99% Pass Pass
52 5/13 5 -2' Water Service Backfill - Block 1 - Lot 5
98% Pass Pass
51 5/13 4 -2' Water Service Backfill - Block 1 - Lot 4 A 11.1%
Pass
50 5/13 3 -2' Water Service Backfill - Block 1 - Lot 3 A 12.9% 113.1 0.9%
A 14.5% 111.8 2.5% 96% Pass
114.5 0.0% 99% Pass Pass
49 5/13 2 -2' Water Service Backfill - Block 1 - Lot 2
98% Pass Pass
48 5/13 1 -2' Water Service Backfill - Block 1 - Lot 1 A 12.0%
Pass
47 5/3 9 Grade Water Main Backfill - Vicot - 300' N of Comet A 12.9% 114.2 0.9%
A 11.1% 115.0 -0.9% 99% Pass
113.9 0.0% 98% Pass Pass
46 5/3 8 Grade Water Main Backfill - Vicot - 260' N of Comet
99% Pass Pass
45 5/3 7 Grade Water Main Backfill - Vicot - 110' N of Comet A 12.0%
Pass
Procedure D-698
Compaction Requirement 95% Min
Moisture Content Requirement -1 to +3%
Optimum Moisture Content (%) 12.0%
Maximum Dry Density (pcf) 116.0
Compaction Requirement
Proctor ID: A
96% Pass Pass
Pass
84 5/14 18 Grade Water Service Backfill - Block 1 - Lot 18 A 14.4% 111.3 2.4%
A 13.0% 112.7 1.0% 97% Pass
115.0 -0.3% 99% Pass Pass
83 5/14 17 Grade Water Service Backfill - Block 1 - Lot 17
98% Pass Pass
82 5/14 16 Grade Water Service Backfill - Block 1 - Lot 16 A 11.7%
Pass
81 5/14 15 Grade Water Service Backfill - Block 1 - Lot 15 A 12.0% 113.2 0.0%
A 14.8% 110.3 2.8% 95% Pass
111.1 2.5% 96% Pass Pass
80 5/14 14 Grade Water Service Backfill - Block 1 - Lot 14
96% Pass Pass
79 5/14 13 Grade Water Service Backfill - Block 1 - Lot 13 A 14.5%
Pass
78 5/14 12 Grade Water Service Backfill - Block 1 - Lot 12 A 14.8% 110.9 2.8%
A 12.7% 114.8 0.7% 99% Pass
115.0 0.0% 99% Pass Pass
77 5/14 11 Grade Water Service Backfill - Block 1 - Lot 11
97% Pass Pass
76 5/14 10 Grade Water Service Backfill - Block 1 - Lot 10 A 12.0%
Pass
75 5/14 9 -2' Water Service Backfill - Block 1 - Lot 18 A 12.3% 113.0 0.3%
A 11.3% 113.5 -0.7% 98% Pass
114.9 -0.5% 99% Pass Pass
74 5/14 8 -2' Water Service Backfill - Block 1 - Lot 17
98% Pass Pass
73 5/14 7 -2' Water Service Backfill - Block 1 - Lot 16 A 11.5%
Pass
72 5/14 6 -2' Water Service Backfill - Block 1 - Lot 15 A 12.8% 114.2 0.8%
A 12.0% 115.0 0.0% 99% Pass
112.0 1.9% 97% Pass Pass
71 5/14 5 -2' Water Service Backfill - Block 1 - Lot 14
98% Pass Pass
70 5/14 4 -2' Water Service Backfill - Block 1 - Lot 13 A 13.9%
Pass
69 5/14 3 -2' Water Service Backfill - Block 1 - Lot 12 A 14.1% 114.2 2.1%
A 15.0% 110.8 3.0% 96% Pass
114.7 0.4% 99% Pass Pass
68 5/14 2 -2' Water Service Backfill - Block 1 - Lot 11
Density Moisture Compaction
67 5/14 1 -2' Water Service Backfill - Block 1 - Lot 10 A 12.4%
Number Number ID
Test Test Proctor Moisture
Moisture
Variability
Percent
Compaction
Field Results
Dry (Pass/Fail)
Material Tested and Location
Project Date Daily Depth
Fort Collins, Colorado
Project # 19-2026
May 2019
Field Moisture/Density Testing Summary
EAST RIDGE PHASE 2
44 5/3 6 Grade Water Main Backfill - Vicot - 45' N of Comet A 12.2% 115.0 0.2%
A 14.5% 112.5 2.5% 97% Pass
112.7 2.3% 97% Pass Pass
43 5/3 5 -2' Water Main Backfill - Vicot - 315' N of Comet
99% Pass Pass
42 5/3 4 -2' Water Main Backfill - Vicot - 275' N of Comet A 14.3%
Pass
41 5/3 3 -2' Water Main Backfill - Vicot - 140' N of Comet A 12.1% 115.0 0.1%
A 13.0% 111.1 1.0% 96% Pass
110.8 2.3% 96% Pass Pass
40 5/3 2 -2' Water Main Backfill - Vicot - 85' N of Comet
Density Moisture Compaction
39 5/3 1 -2' Water Main Backfill - Vicot - 15' N of Comet A 14.3%
Number Number ID
Test Test Proctor Moisture
Moisture
Variability
Percent
Compaction
Field Results
Dry (Pass/Fail)
Material Tested and Location
Project Date Daily Depth
Fort Collins, Colorado
Project # 19-2026
May 2019
Field Moisture/Density Testing Summary
EAST RIDGE PHASE 2
33 4/26 14 Grade Sewer Main Backfill - MH 1-4.11 - 100' S A 12.8% 112.6 0.8% 97% Pass Pass
32 4/26 13 -0.5' Sewer Main Backfill - MH 1-4.10 - 95' S A 12.5% 111.9 0.5%
34 4/26 15 -2' Sewer Main Backfill - MH 1-4.11 - 25' S A 12.2% 111.9 0.2% 96% Pass Pass
35 4/26 16 -1' Sewer Main Backfill - MH 1-4.10 - 30' N A 15.0% 110.3 3.0% 95% Pass Pass
96% Pass Pass
37 4/26 18 Grade Sewer Main Backfill - MH 1-4.10 - 25' S A 12.8% 111.2 0.8% 96% Pass Pass
36 4/26 17 Grade Sewer Main Backfill - MH 1-4.10 - 50' N A 14.5% 111.2 2.5%
38 4/26 19 Grade Sewer Main Backfill - MH 1-4.9 - 5' S A 12.5% 113.7 0.5% 98% Pass Pass
Compaction Requirement
Proctor ID: A
Moisture Content Requirement -1 to +3%
Optimum Moisture Content (%) 12.0%
Maximum Dry Density (pcf) 116.0
Procedure D-698
Compaction Requirement 95% Min