HomeMy WebLinkAboutMOUNTAIN'S EDGE - Filed SEPD-SURFACE EXPLORATION/PAVEMENT DESIGN REPORT - 2019-03-20Soilogic, Inc.
3522 Draft Horse Court Loveland, CO 80538 (970) 535-6144
March 8, 2019
GLH Construction, LLC
780 East Garden Drive
Windsor, Colorado 80550
Attn: Mr. Justin T. Marshall
Re: Geotechnical Subsurface Exploration and Pavement Design Report
Overland Trail Widening at Mountain’s Edge
Fort Collins, Colorado
Soilogic Project # 18-2066P
Mr. Marshall:
Soilogic, Inc. (Soilogic) personnel have completed the geotechnical subsurface
exploration and pavement section design you requested for the proposed improvements to
Overland Trail as part of the off-site roadway improvements associated with the
Mountain’s Edge Subdivision in Fort Collins, Colorado. The results of our subsurface
exploration and pertinent geotechnical engineering recommendations are included with
this report. Final pavement section design recommendations for Overland Trail are also
included.
The purpose of our exploration was to describe the subsurface conditions encountered in
the completed site borings and develop the test data necessary to provide
recommendations concerning construction of the widening area roadway embankments
and final pavement section design options for the widening area. The conclusions and
recommendations outlined in this report are based on the results of the completed field
and laboratory testing and our experience with subsurface conditions in this area.
We understand this project involves the widening of Overland Trail as part of the off-site
roadway improvements associated with the Mountain’s Edge Subdivision in Fort Collins,
Colorado. At this time, we understand Overland Trail will be widened to the east to
allow for turn lane construction facilitating access into the development. We understand
an interim 2-lane arterial roadway configuration will be constructed with the ultimate
buildout consisting of a 4-lane arterial. Overland Trail currently serves as a two-lane
asphaltic concrete surfaced roadway with gravel shoulders. Maximum fills on the order
APPROVED
03/19/2019
Geotechnical Subsurface Exploration and Pavement Design Report
Overland Trail Widening at Mountain’s Edge
Fort Collins, Colorado
Soilogic # 18-2066P
2
of 3 feet are anticipated to develop widening area embankment. At the time of drilling, a
majority of the widening area embankment construction had been completed.
FIELD EXPLORATION
To develop subsurface information for the proposed improvements, a total of three (3)
soil borings were drilled at approximate 500 foot intervals along the length of the
proposed widening to a depth of approximately 10 feet below the existing embankment
surface. The boring locations were established in the field by Soilogic personnel based
on approved offsite roadway improvement plan and using a mechanical surveyor’s wheel.
A diagram indicating the approximate boring locations is included with this report.
The test holes were advanced using 4-inch diameter continuous-flight auger, powered by
a truck-mounted CME-45 drill rig. Samples of the subsurface materials were obtained at
regular intervals using California and split-barrel sampling procedures in general
accordance with ASTM specification D-1586. As part of the D-1586 sampling
procedure, the standard sampling barrels are driven into the substrata using a 140-pound
hammer falling a distance of 30 inches. The number of blows required to advance the
samplers a distance of 12 inches is recorded and helpful in estimating the consistency or
relative density or hardness of the soils and/or bedrock encountered. In the California
barrel sampling procedure, lesser disturbed samples are obtained in removable brass
liners. Samples of the subsurface materials obtained in the field were sealed and returned
to the laboratory for further evaluation, classification and testing.
LABORATORY TESTING
The samples collected were tested in the laboratory to measure natural moisture content
and visually and/or manually classified in accordance with the Unified Soil Classification
System (USCS). The USCS group symbols are indicated on the attached boring logs. An
outline of the USCS classification system is included with this report.
As part of the laboratory testing, a calibrated hand penetrometer (CHP) was used to
estimate the unconfined compressive strength of essentially-cohesive specimens. The
CHP also provides a more reliable estimate of soil consistency than tactual observation
Geotechnical Subsurface Exploration and Pavement Design Report
Overland Trail Widening at Mountain’s Edge
Fort Collins, Colorado
Soilogic # 18-2066P
3
alone. Dry density, Atterberg limits, -200 wash and swell/consolidation tests were
completed on selected samples to help establish specific soil characteristics. Atterberg
limits tests are used to determine soil plasticity. The percent passing the #200 size sieve
(-200 wash) test is used to determine the percentage of fine-grained materials (clay and
silt) in a sample. Swell/consolidation tests are performed to evaluate soil volume change
potential with variation in moisture content. Swell/consolidation tests completed on
samples obtained at a depth of approximately 2 feet below ground surface were inundated
with water at a 150 psf confining pressure, while samples obtained at a depth of
approximately four (4) feet below ground surface were inundated with water at a 500 psf
confining pressure. As part of the completed laboratory testing, one (1) Resistance value
(R-value) test was completed on a representative subgrade sample for use in evaluation of
the existing subgrade. The results of the completed laboratory test are outlined on the
attached boring logs and swell/consolidation and R-value test summaries.
SUBSURFACE CONDITIONS
Dark brown, brown, beige clayey sand to sandy lean clay with gravel was encountered at
the surface at the boring locations. A portion of the near-surface clayey sand/lean clay
appeared to be fill soils placed to developed finish subgrade elevation. The clayey
sand/lean clay varied from loose to dense in terms of relative density or from medium
stiff to hard in terms of consistency, exhibited no to low swell potential at current
moisture and density conditions and extended to the bottom of all borings at a depth of
approximately 10 feet below ground surface.
The stratigraphy indicated on the included boring logs represents the approximate
location of changes in soil types. Actual changes may be more gradual than those
indicated.
Groundwater was not encountered in the completed site borings at the time of drilling.
Groundwater levels will vary seasonally and over time based on weather conditions, site
development, irrigation practices and other hydrologic conditions. Perched and/or
trapped groundwater conditions may also be encountered at times throughout the year.
Perched water is commonly encountered in soils overlying less permeable soil layers
and/or bedrock. Trapped water is typically encountered within more permeable zones of
Geotechnical Subsurface Exploration and Pavement Design Report
Overland Trail Widening at Mountain’s Edge
Fort Collins, Colorado
Soilogic # 18-2066P
4
layered soil and bedrock systems. The location and amount of perched and/or trapped
water can also vary over time.
ANALYSIS AND RECOMMENDATIONS
Roadway Embankment Construction
The clayey sand/lean clay with gravel subgrade soils encountered in the completed site
borings exhibited no to low swell potential (with the average swell less than 2.0%) at in-
situ moisture and density conditions and in our opinion, could be used for direct support
of any additional embankment fill and pavement materials.
Prior to the placement of any additional embankment fill or aggregate base course
materials, we recommend the exposed subgrade soils be scarified to a depth of 9 inches,
adjusted in moisture content and compacted to at least 95% of the materials standard
Proctor maximum dry density. The moisture content of the reconditioned subgrade soils
should be adjusted to be within the range of ±2% of standard Proctor optimum moisture
content at the time of compaction. Slopes steeper than 4(H) to 1(V) that are expected to
receive fill should be continuously benched during fill placement to reduce the potential
for development of a shear plane between the existing soils and proposed fill.
Fill soils required to develop the roadway embankment should consist of approved low
volume change (LVC) soils free from organic matter, debris and other objectionable
materials. The clayey sand/lean clay overburden soils located on the Mountain’s Edge
Subdivision site could be used as fill to develop the widening area embankment.
Additional embankment fill (if any) should have a minimum R-value of 15. We
recommend suitable fill materials be placed in loose lifts not to exceed 9 inches thick,
adjusted to within the range of ±2% of standard Proctor optimum moisture content and
compacted to at least 95% of standard Proctor maximum dry density.
The reconditioned subgrade soils and properly placed and compacted fill soils developed
as outlined above could be used for direct support of new pavements. Proofrolling of the
finished subgrade soils should be completed prior to paving to help identify any areas of
soft/unstable soils. Those areas identified as unstable would need to be mended prior to
Geotechnical Subsurface Exploration and Pavement Design Report
Overland Trail Widening at Mountain’s Edge
Fort Collins, Colorado
Soilogic # 18-2066P
5
paving. Isolated areas of instability can be mended on a case by case basis. If more
extensive areas of subgrade instability are encountered, and depending on the time of
year when construction occurs and other hydrologic conditions, stabilization of the
subgrade soils may become necessary to develop a suitable paving platform. Based on
the materials encountered in the completed site borings and results of laboratory testing,
it is our opinion fly ash stabilization of the pavement subgrades could be completed to
develop a suitable paving platform. With the increase in support strength developed by
the chemical stabilization procedures, it is our opinion the zone of stabilized subgrade
could be included in the pavement section design, reducing the required thickness of
overlying aggregate base course and/or asphaltic concrete. A pavement section design
option incorporating partial structural credit for the fly ash stabilized subgrade soils is
outlined below in Table I. If full structural credit for the fly ash stabilized subgrade soils
is preferred, a fly ash mix design will need to be completed and the strength of the
subgrade soils verified at the time of stabilization. Fly ash stabilization can eliminate
some of the uncertainty associated with attempting to pave during periods of inclement
weather.
If fly ash stabilization will be completed, we recommend the addition of 13% class ‘C’
fly ash based on component dry unit weights. A 12-inch thick stabilized zone should be
constructed by thoroughly blending the fly ash with the in-place subgrade soils. Some
“fluffing” of the finish subgrade level should be expected with the stabilization
procedures. The blended materials should be adjusted to within ±2% of standard Proctor
optimum moisture content and compacted to at least 95% of the material’s standard
Proctor maximum dry density within two (2) hours of fly ash addition.
Care should be taken to avoid disturbing the developed subgrade soils prior to paving.
In addition, efforts to maintain the proper moisture content in the subgrade soils should
be made. If subgrade soils are disturbed by the construction activities or allowed to dry
out or become elevated in moisture content, those materials should be reworked in place
or removed and replaced prior to surfacing.
Pavement Design
For design of new pavements, a Traffic Impact Study (TIS) completed for the subject
property and associated roadways by Eugene G. Coppola, P.E. dated May 31, 2016 was
Geotechnical Subsurface Exploration and Pavement Design Report
Overland Trail Widening at Mountain’s Edge
Fort Collins, Colorado
Soilogic # 18-2066P
6
reviewed. Short term total traffic was determined using the traffic count information
provided in the TIS. The greatest total traffic volume anticipated to utilize Overland
Trail is located north of the Drake Road intersection and these values were used in
design. Total Peak Hour Traffic volumes were estimated at 10% of Total Annual
Average Daily Traffic. Long term total traffic was calculated utilizing a 3% annual
growth rate. Design ESAL’s were determined using the midpoint of short-term and long-
term total traffic, a lane factor of 0.45 for a 4-lane arterial and an estimated 3% heavy
truck traffic (1.5% single-unit trucks and 1.5% combination-unit trucks). Traffic
conversion calculations are included with this report. An R-value of 15 was determined
on a representative subgrade sample obtained from the completed site borings and was
used in the pavement section design. A pavement section design for the proposed
construction was completed in accordance with the Larimer County Urban Area Street
Standards (LCUASS) and is outlined below in Table I. Alternative pavement sections
could be considered and we would be happy to discuss any design alternatives at your
request.
TABLE I – NEW PAVEMENT SECTION DESIGN
Roadway
Classification
Calculated ESAL’s
R-value/CDOT (Mr)
Reliability (%)
Serviceability Loss
Design Str. Number
Overland Trail
4-Lane Arterial
1,163,552
R-15, 4165
90%
2.0
(4.23)
Option A – Composite
Asphaltic Concrete (Grading S)
Aggregate Base (Class 5 or 6)
(Structural Number)
7½” (0.44/inch
9” (0.11/inch)
(4.29)
Option B – Composite with Fly Ash
Asphaltic Concrete (Grading S)
Aggregate Base (Class 5 or 6)
Fly Ash Treated Subgrade
(Structural Number)
6½” (0.44/inch
8” (0.11/inch)
1” (10 @ .05/inch)
(4.24)
Asphaltic concrete should consist of a bituminous plant mix composed of a mixture of
aggregate, filler, binders and additives (if required), meeting City of Fort Collins
(LCUASS) design criteria. Based on the roadway classification, we expect grading S
Geotechnical Subsurface Exploration and Pavement Design Report
Overland Trail Widening at Mountain’s Edge
Fort Collins, Colorado
Soilogic # 18-2066P
7
materials will be required for the roadway improvements utilizing 100 design gyrations.
We understand PG(64-22) asphaltic cement will be required for lower lifts in the hot-mix
asphalt section with PG(64-28) required for the surface lift. Hot mix asphalt designed
using “Superpave” criteria should be compacted to within 92 to 96% of the materials
Maximum Theoretical Density. Aggregate base should be consistent with CDOT
requirements for Class 5 or 6 aggregate base, placed in loose lifts not to exceed 9 inches
thick and compacted to at least 95% of the materials standard Proctor maximum dry
density.
Drainage
Positive drainage is imperative for long-term performance of the improved roadway.
Water which is allowed to pond on asphalt pavements can degrade these pavement
materials over time. In addition, water which is allowed to pond adjacent to the roadway
pavements can result in a loss of subgrade support and premature failure of the overlying
pavement section.
LIMITATIONS
This report was prepared based upon the data obtained from the completed site
exploration, laboratory testing, engineering analysis and any other information discussed.
The completed borings provide an indication of subsurface conditions at the boring
locations only. Variations in subsurface conditions can occur in relatively short distances
away from the borings. This report does not reflect any variations which may occur
across the site or away from the borings. If variations in the subsurface conditions
anticipated become evident, the geotechnical engineer should be notified immediately so
that further evaluation and supplemental recommendations can be provided.
The scope of services for this project does not include either specifically or by
implication any biological or environmental assessment of the site or identification or
prevention of pollutants or hazardous materials or conditions. Other studies should be
completed if concerns over the potential of such contamination or pollution exist.
Geotechnical Subsurface Exploration and Pavement Design Report
Overland Trail Widening at Mountain’s Edge
Fort Collins, Colorado
Soilogic # 18-2066P
8
The geotechnical engineer should be retained to review the plans and specifications so
that comments can be made regarding the interpretation and implementation of our
geotechnical recommendations in the design and specifications. The geotechnical
engineer should also be retained to provide testing and observation services during
construction to help determine that the design requirements are fulfilled.
This report has been prepared for the exclusive use of our client for specific application
to the project discussed and has been prepared in accordance with the generally accepted
standard of care for the profession. No warranties express or implied, are made. The
conclusions and recommendations contained in this report should not be considered valid
in the event that any changes in the nature, design or location of the project as outlined in
this report are planned, unless those changes are reviewed and the conclusions of this
report modified and verified in writing by the geotechnical engineer.
We appreciate the opportunity to be of service to you on this project. If you have any
questions concerning the enclosed information or if we can be of further service to you in
any way, please do not hesitate to contact us.
Very Truly Yours,
Soilogic, Inc. Reviewed by:
Zach Gordon, E.I. Wolf von Carlowitz, P.E.
Project Engineer Principal Engineer
LOG OF BORING B-1
1/1 CME 45
4" CFA
Automatic
JL / BM
Estimated Swell % Passing
SOIL DESCRIPTION Depth "N" MC DD qu % Swell @ Pressure # 200 Sieve
(ft) (%) (pcf) (psf) 500 psf (psf) LL PI (%)
-
1
-
2
-
3 CS 22 12.7 123.1 9000+ 0.1% @ 150 - - - -
-
SC-CL CLAYEY SAND to SANDY LEAN CLAY 4
w/G with GRAVEL -
dark brown, brown, beige 5 CS 17 5.7 - 1000 - - - - -
loose to medium dense / -
medium stiff to very stiff 6
-
7
-
8
-
9
-
10 CS 10 6.5 87.4 - - - - - -
BOTTOM OF BORING @ 10.0' -
11
-
12
-
13
-
14
-
15
-
16
-
17
-
18
-
19
-
20
-
21
-
22
-
23
-
24
-
25
USCS
Sampler
LOG OF BORING B-2
1/1 CME 45
4" CFA
Automatic
JL / BM
Estimated Swell % Passing
SOIL DESCRIPTION Depth "N" MC DD qu % Swell @ Pressure # 200 Sieve
(ft) (%) (pcf) (psf) 500 psf (psf) LL PI (%)
-
1
-
2
-
3 CS 21 13.7 107.3 9000+ 1.2% @ 150 - 31 25 42.1%
-
SC-CL CLAYEY SAND to SANDY LEAN CLAY 4
w/G with GRAVEL -
dark brown, brown, beige 5 CS 48 3.8 105.9 9000+ 0.3% 600 - - -
medium dense to dense / -
very stiff to hard 6
-
7
-
8
-
9
-
10 CS 37 4.0 137.0 9000+ - - - - -
BOTTOM OF BORING @ 10.0' -
11
-
12
-
13
-
14
-
15
-
16
-
17
-
18
-
19
-
20
-
21
-
22
-
23
-
24
-
25
24 Hours After Drilling -
USCS
LOG OF BORING B-3
1/1 CME 45
4" CFA
Automatic
JL / BM
Estimated Swell % Passing
SOIL DESCRIPTION Depth "N" MC DD qu % Swell @ Pressure # 200 Sieve
(ft) (%) (pcf) (psf) 500 psf (psf) LL PI (%)
-
1
-
2
-
3 CS 20 13.0 112.5 9000+ 2.5% @ 150 - - - -
-
SC-CL CLAYEY SAND to SANDY LEAN CLAY 4
w/G with GRAVEL -
dark brown, brown, beige 5 CS 9 23.3 98.4 8000 - - - - -
loose to medium dense / -
medium stiff to very stiff 6
-
7
-
8
-
9
-
10 CS 10 10.3 113.4 9000+ - - - - -
BOTTOM OF BORING @ 10.0' -
11
-
12
-
13
-
14
-
15
-
16
-
17
-
18
-
19
-
20
-
21
-
22
-
23
-
24
-
25
24 Hours After Drilling -
USCS
Liquid Limit -
Plasticity Index -
% Passing #200 -
Dry Density (pcf) 123.1
150
Final Moisture 12.9%
% Swell @ 150 psf 0.1%
Swell Pressure (psf) -
Sample ID: B-1 @ 2
(Swell Only)
Initial Moisture 12.7%
Sample Description: Dark Brown/Brown/Beige Clayey Sand to Sandy Lean Clay w/ Gravel (SC-CL)
SWELL/CONSOLIDATION TEST SUMMARY
OVERLAND TRAIL WIDENING AT MOUNTAINS EDGE
FORT COLLINS, COLORADO
Project # 18-2006P
March 2019
-12
-10
-8
-6
-4
-2
0
2
4
6
8
10
12
10 100 1000 10000 100000
---------
Applied Load (psf)
Liquid Limit 31
Plasticity Index 25
% Passing #200 42.1%
Dry Density (pcf) 107.3
150
Sample Description: Dark Brown/Brown/Beige Clayey Sand to Sandy Lean Clay w/ Gravel (SC-CL)
Final Moisture 18.8%
% Swell @ 150 psf 1.2%
Swell Pressure (psf) -
Sample ID: B-2 @ 2
Initial Moisture 13.7%
SWELL/CONSOLIDATION TEST SUMMARY
OVERLAND TRAIL WIDENING AT MOUNTAINS EDGE
FORT COLLINS, COLORADO
Project # 18-2006P
March 2019
-12
-10
-8
-6
-4
-2
0
2
4
6
8
10
12
10 100 1000 10000 100000
---------
Applied Load (psf)
Liquid Limit -
Plasticity Index -
% Passing #200 -
Dry Density (pcf) 105.9
500
Sample Description: Dark Brown/Brown/Beige Clayey Sand to Sandy Lean Clay w/ Gravel (SC-CL)
Final Moisture 19.5%
% Swell @ 500 psf 0.3%
Swell Pressure (psf) 600
Sample ID: B-2 @ 4
Initial Moisture 3.8%
SWELL/CONSOLIDATION TEST SUMMARY
OVERLAND TRAIL WIDENING AT MOUNTAINS EDGE
FORT COLLINS, COLORADO
Project # 18-2006P
March 2019
-12
-10
-8
-6
-4
-2
0
2
4
6
8
10
12
10 100 1000 10000 100000
---------
Applied Load (psf)
Liquid Limit -
Plasticity Index -
% Passing #200 -
Dry Density (pcf) 112.5
150
Sample Description: Dark Brown/Brown/Beige Clayey Sand to Sandy Lean Clay w/ Gravel (SC-CL)
Final Moisture 16.0%
% Swell @ 150 psf 2.5%
Swell Pressure (psf) -
Sample ID: B-3 @ 2
Initial Moisture 13.0%
SWELL/CONSOLIDATION TEST SUMMARY
OVERLAND TRAIL WIDENING AT MOUNTAINS EDGE
FORT COLLINS, COLORADO
Project # 18-2006P
March 2019
-12
-10
-8
-6
-4
-2
0
2
4
6
8
10
12
10 100 1000 10000 100000
---------
Applied Load (psf)
Short Term Total Daily Traffic Ti = 11000 AADT
Long Range Total Daily Traffic Tf = Ti(1+i)n
Growth Rate (i) = 3% n = 20 yrs
Long Range Total Daily Traffic Tf = 19867 AADT
Lane Factor (4-Lane Arterial) Lf = 0.45
Short Range Total Daily Traffic for Design Lane (4-Lane Arterial) Ti = Ti*Lf 4950 AADT
Long Range Total Daily Traffic for Design Lane (4-Lane Arterial) Tf = Tf*Lf 8940 AADT
Midpoint Tm = (T1+T)/2 = Tm = 6945 AADT
Passenger Vehicles (97% of Total) Tm = 6737 AADT
Single Unit Trucks (1.5% of Total) Tm = 104 AADT
Combination Unit Trucks (1.5% of Total) Tm = 104 AADT
Daily ESAL's = Tm x Equivalency Factor = 3623 * .003 = 20.210 Passenger Vehicles
Daily ESAL's = Tm x Equivalency Factor = 56 * .249 = 25.940 Single Unit Trucks
Daily ESAL's = Tm x Equivalency Factor = 56 * 1.087 = 113.24 Combination Unit Trucks
Total = 159 (Daily ESAL's)
20 Year Design Period ESAL's = (Daily ESAL's * 365 * 20) = 1,163,552 ESAL's
Traffic Conversion Calculations
Overland Trail at Mountains Edge
City of Fort Collins, Colorado
Soilogic # 18-2066P
Design Inputs Asphalt Concrete
CBR, Calculated Mr 3.0 Mr = 5161 psi K = 110 pci
Sugrade Support Used Mr = 4195 psi K = 250 pci
Reliability (%) = 90 90
Standard Deviation So = 0.45 0.35
Initial Serviceability = Po = 4.5 4.5
Terminal Serviceability = Pt = 2.5 2.5
Design Serviceability Loss, = DPSI = 2.0 2.0
Asphalt Layer Coefficients a1 = 0.44 AC Surface and Binder
a2 = AC Base
a2 = 0.11 Aggregate Base
a3 = 0.05 Subbase
Concrete Compressive Strength 4000 psi
Modulus of Elasticity of Concrete = 3,605 ksi
Modulus of Rupture of Concrete: = 580 psi
Load Transfer ("J" Factor) 3.8 See Table 1
Drainage Coefficient 1.0 See Table 2
Pavement Thickness Designs
Traffic Category - Flexible Pavement Tucker
Asphalt Section Traffic (18 kip ESAL) = 1,163,552 Calculated ESALs = 11,868
Flexible Pavement Section Drainage, m Di
AC Surface + Binder 7.5 in
Asphalt Base in
Aggregate Base 1.0 9.0 in
Subbase 1.0 in
Structural Number 4.29 OK
4.7886E-05
Required 4.23
Rigid Pavement Section
Traffic Category - Rigid Pavement Typical Minor Road
Concrete Section Traffic (18 kip ESAL) = 160,000 Calculated ESALs = 295,382
Concrete Thickness, DPCC 5.08
Equation results require 5.2041 Click button to solve for slab Thickness
equality 5.1183 -3.7265
Pavement Design (AASHTO 1993 Method)
Solve for DPCC
Solve for SN required
Design Inputs Asphalt Concrete
CBR, Calculated Mr 3.0 Mr = 5161 psi K = 110 pci
Sugrade Support Used Mr = 4195 psi K = 250 pci
Reliability (%) = 90 90
Standard Deviation So = 0.45 0.35
Initial Serviceability = Po = 4.5 4.5
Terminal Serviceability = Pt = 2.5 2.5
Design Serviceability Loss, = DPSI = 2.0 2.0
Asphalt Layer Coefficients a1 = 0.44 AC Surface and Binder
a2 = AC Base
a2 = 0.11 Aggregate Base
a3 = 0.05 Subbase
Concrete Compressive Strength 4000 psi
Modulus of Elasticity of Concrete = 3,605 ksi
Modulus of Rupture of Concrete: = 580 psi
Load Transfer ("J" Factor) 3.8 See Table 1
Drainage Coefficient 1.0 See Table 2
Pavement Thickness Designs
Traffic Category - Flexible Pavement Tucker
Asphalt Section Traffic (18 kip ESAL) = 1,163,552 Calculated ESALs = 11,868
Flexible Pavement Section Drainage, m Di
AC Surface + Binder 6.5 in
Asphalt Base in
Aggregate Base 1.0 8.0 in
Subbase 1.0 10.0 in
Structural Number 4.24 OK
-4.916E-06
Required 4.23
Rigid Pavement Section
Traffic Category - Rigid Pavement Typical Minor Road
Concrete Section Traffic (18 kip ESAL) = 160,000 Calculated ESALs = 295,382
Concrete Thickness, DPCC 5.08
Equation results require 5.2041 Click button to solve for slab Thickness
equality 5.1183 -3.7265
Pavement Design (AASHTO 1993 Method)
Solve for DPCC
Solve for SN required
UNIFIED SOIL CLASSIFICATION SYSTEM
Criteria for Assigning Group Symbols and Group Names Using Laboratory TestsA Soil Classification
Group
Symbol
Group NameB
Clean Gravels Cu ! 4 and 1 " Cc " 3E GW Well graded gravelF
Less than 5% finesC Cu
< 4 and/or 1 > Cc > 3E GP Poorly graded gravelF
Fines classify as ML or MH GM Silty gravelF,G, H
Coarse Grained Soils
More than 50% retained
on No. 200 sieve
Gravels
More than 50% of coarse
fraction retained on
No. 4 sieve Gravels with Fines More
than 12% finesC Fines classify as CL or CH GC Clayey gravelF,G,H
Clean Sands Cu ! 6 and 1 " Cc " 3E SW Well graded sandI
Less than 5% finesD Cu
< 6 and/or 1 > Cc > 3E SP Poorly graded sandI
Fines classify as ML or MH SM Silty sandG,H,I
Sands
50% or more of coarse
fraction passes
No. 4 sieve Sands with Fines
More than 12% finesD Fines classify as CL or CH SC Clayey sandG,H,I
Silts and Clays PI > 7 and plots on or above “A” lineJ CL Lean clayK,L,M
Liquid limit less than 50
Inorganic
PI < 4 or plots below “A” lineJ ML SiltK,L,M
Liquid limit - oven
dried
Organic clayK,L,M,N
Fine-Grained Soils
50% or more passes the
No. 200 sieve
Organic
Liquid limit - not
dried
< 0.75 OL
Organic siltK,L,M,O
Inorganic PI plots on or above “A” line CH Fat clayK,L,M
Silts and Clays
Liquid limit 50 or more
PI plots below “A” line MH Elastic siltK,L,M
Organic Liquid limit - oven dried Organic clayK,L,M,P
Liquid limit - not dried
< 0.75 OH
Organic siltK,L,M,Q
Highly organic soils Primarily organic matter, dark in color, and organic odor PT Peat
A Based on the material passing the 3-in. (75-mm) sieve
B If field sample contained cobbles or boulders, or both, add “with cobbles
or boulders, or both” to group name.
C Gravels with 5 to 12% fines require dual symbols: GW-GM well graded
gravel with silt, GW-GC well graded gravel with clay, GP-GM poorly
graded gravel with silt, GP-GC poorly graded gravel with clay.
D Sands with 5 to 12% fines require dual symbols: SW-SM well graded
sand with silt, SW-SC well graded sand with clay, SP-SM poorly graded
sand with silt, SP-SC poorly graded sand with clay
E Cu = D60/D10 Cc =
GENERAL NOTES
DRILLING & SAMPLING SYMBOLS:
SS: Split Spoon - 1⅜" I.D., 2" O.D., unless otherwise noted HS: Hollow Stem Auger
ST: Thin-Walled Tube – 2.5" O.D., unless otherwise noted PA: Power Auger
RS: Ring Sampler - 2.42" I.D., 3" O.D., unless otherwise noted HA: Hand Auger
CS: California Barrel - 1.92" I.D., 2.5" O.D., unless otherwise noted RB: Rock Bit
BS: Bulk Sample or Auger Sample WB: Wash Boring or Mud Rotary
The number of blows required to advance a standard 2-inch O.D. split-spoon sampler (SS) the last 12 inches of the total 18-inch
penetration with a 140-pound hammer falling 30 inches is considered the “Standard Penetration” or “N-value”. For 2.5” O.D.
California Barrel samplers (CB) the penetration value is reported as the number of blows required to advance the sampler 12
inches using a 140-pound hammer falling 30 inches, reported as “blows per inch,” and is not considered equivalent to the
“Standard Penetration” or “N-value”.
WATER LEVEL MEASUREMENT SYMBOLS:
WL: Water Level WS: While Sampling
WCI: Wet Cave in WD: While Drilling
DCI: Dry Cave in BCR: Before Casing Removal
AB: After Boring ACR: After Casing Removal
Water levels indicated on the boring logs are the levels measured in the borings at the times indicated. Groundwater levels at other
times and other locations across the site could vary. In pervious soils, the indicated levels may reflect the location of groundwater.
In low permeability soils, the accurate determination of groundwater levels may not be possible with only short-term observations.
DESCRIPTIVE SOIL CLASSIFICATION: Soil classification is based on the Unified Classification System. Coarse Grained Soils
have more than 50% of their dry weight retained on a #200 sieve; their principal descriptors are: boulders, cobbles, gravel or sand.
Fine Grained Soils have less than 50% of their dry weight retained on a #200 sieve; they are principally described as clays if they
are plastic, and silts if they are slightly plastic or non-plastic. Major constituents may be added as modifiers and minor constituents
may be added according to the relative proportions based on grain size. In addition to gradation, coarse-grained soils are defined
on the basis of their in-place relative density and fine-grained soils on the basis of their consistency.
FINE-GRAINED SOILS COARSE-GRAINED SOILS BEDROCK
(CB)
Blows/Ft.
(SS)
Blows/Ft.
Consistency
(CB)
Blows/Ft.
(SS)
Blows/Ft.
Relative
Density
(CB)
Blows/Ft.
(SS)
Blows/Ft.
Consistency
< 3 0-2 Very Soft 0-5 < 3 Very Loose < 24 < 20 Weathered
3-5 3-4 Soft 6-14 4-9 Loose 24-35 20-29 Firm
6-10 5-8 Medium Stiff 15-46 10-29 Medium Dense 36-60 30-49 Medium Hard
11-18 9-15 Stiff 47-79 30-50 Dense 61-96 50-79 Hard
19-36 16-30 Very Stiff > 79 > 50 Very Dense > 96 > 79 Very Hard
> 36 > 30 Hard
RELATIVE PROPORTIONS OF SAND AND
GRAVEL
GRAIN SIZE TERMINOLOGY
Descriptive Terms of
Other Constituents
Percent of
Dry Weight
Major Component
of Sample
Particle Size
Trace < 15 Boulders Over 12 in. (300mm)
With 15 – 29 Cobbles 12 in. to 3 in. (300mm to 75 mm)
Modifier > 30 Gravel 3 in. to #4 sieve (75mm to 4.75 mm)
Sand
Silt or Clay
#4 to #200 sieve (4.75mm to 0.075mm)
Passing #200 Sieve (0.075mm)
RELATIVE PROPORTIONS OF FINES PLASTICITY DESCRIPTION
Descriptive Terms of
Other Constituents
Percent of
Dry Weight
Term Plasticity Index
Trace
With
Modifiers
< 5
5 – 12
> 12
Non-plastic
Low
Medium
High
0
1-10
11-30
30+
F If soil contains ! 15% sand, add “with sand” to group name.
G If fines classify as CL-ML, use dual symbol GC-GM, or SC-SM.
HIf fines are organic, add “with organic fines” to group name.
I If soil contains ! 15% gravel, add “with gravel” to group name.
J If Atterberg limits plot in shaded area, soil is a CL-ML, silty clay.
K If soil contains 15 to 29% plus No. 200, add “with sand” or “with
gravel,” whichever is predominant.
L If soil contains ! 30% plus No. 200 predominantly sand, add
“sandy” to group name.
M If soil contains ! 30% plus No. 200, predominantly gravel, add
“gravelly” to group name.
N PI ! 4 and plots on or above “A” line.
O PI < 4 or plots below “A” line.
P PI plots on or above “A” line.
Q PI plots below “A” line.
Sampler
Atterberg Limits
Start Date 3/1/2019 Auger Type: During Drilling None
Finish Date 3/1/2019 Hammer Type: After Drilling None
Surface Elev. - Field Personnel:
Sheet Drilling Rig: Water Depth Information
OVERLAND TRAIL WIDENING AT MOUNTAINS EDGE
FORT COLLINS, COLORADO
Project # 18-2006P
March 2019
Sampler
Atterberg Limits
Start Date 3/1/2019 Auger Type: During Drilling None
Finish Date 3/1/2019 Hammer Type: After Drilling None
Surface Elev. - Field Personnel:
Sheet Drilling Rig: Water Depth Information
OVERLAND TRAIL WIDENING AT MOUNTAINS EDGE
FORT COLLINS, COLORADO
Project # 18-2006P
March 2019
Atterberg Limits
Surface Elev. - Field Personnel: 24 Hours After Drilling -
Finish Date 3/1/2019 Hammer Type: After Drilling None
Sheet Drilling Rig: Water Depth Information
Start Date 3/1/2019 Auger Type: During Drilling None
OVERLAND TRAIL WIDENING AT MOUNTAINS EDGE
FORT COLLINS, COLORADO
Project # 18-2006P
March 2019