HomeMy WebLinkAboutCROWNE AT OLD TOWN NORTH - Filed SEPD-SURFACE EXPLORATION/PAVEMENT DESIGN REPORT - 2018-09-05Responsive ■ Resourceful ■ Reliable
REPORT TOPICS
REPORT TOPICS
REPORT SUMMARY ....................................................................................................... i
INTRODUCTION ............................................................................................................. 1
PROJECT DESCRIPTION .............................................................................................. 1
SITE CONDITIONS ......................................................................................................... 2
GEOTECHNICAL CHARACTERIZATION ...................................................................... 2
CORROSIVITY................................................................................................................ 4
GEOTECHNICAL OVERVIEW ....................................................................................... 4
EARTHWORK................................................................................................................. 4
PAVEMENTS .................................................................................................................. 7
GENERAL COMMENTS ............................................................................................... 10
Note: This report was originally delivered in a web-based format. Orange Bold text in the report indicates a referenced
section heading. The PDF version also includes hyperlinks which direct the reader to that section and clicking on the
logo will bring you back to this page. For more interactive features, please view your project online at
client.terracon.com.
ATTACHMENTS
SITE LOCATION AND EXPLORATION PLANS
EXPLORATION RESULTS (EXPLORATION AND TESTING PROCEDURES, Boring
Logs and Laboratory Data)
SUPPORTING INFORMATION (General Notes and Unified Soil Classification System)
Geotechnical Engineering Report
City-maintained Roadways at Crowne at Old Town North ■ Fort Collins, Colorado
September 4, 2018 ■ Terracon Project No. 20185095
Responsive ■ Resourceful ■ Reliable i
REPORT SUMMARY
Topic
1
Overview Statement
2
Project
Overview
A geotechnical exploration has been performed for Jerome Street which is a city-
maintained roadway planned at the Crowne at Old Town North project to be constructed
southwest of the intersection of Conifer Street and Blue Spruce Drive in Fort Collins,
Colorado. Three (3) borings were performed to depths of approximately 10½ feet
below existing site grades.
Subsurface
Conditions
Subsurface conditions encountered in our exploratory borings generally consisted of
about 4 to 7 feet of fill consisting of lean clay with varying amounts of sand over well
graded gravel with varying amounts of silt and sand, which extended to the maximum
depths of exploration of about 10 feet below existing site grades. Boring logs are
presented in the Exploration Results section of this report.
Groundwater
Conditions
Groundwater was encountered in some of our test borings at the time of drilling at
depths of about 9 feet below existing site grades. Groundwater levels can fluctuate in
response to site development and to varying seasonal and weather conditions,
irrigation on or adjacent to the site and fluctuations in nearby water features. We do
not anticipate groundwater will significantly impact the proposed construction.
Geotechnical
Concerns
Expansive soils are present on this site and these conditions constitute a geologic
hazard. This report provides recommendations to help mitigate the effects of soil
shrinkage and expansion. However, even if these procedures are followed, some
movement and cracking in the pavements is possible. Eliminating the risk of movement
and cosmetic distress is generally not feasible, but it may be possible to further reduce
the risk of movement if significantly more expensive measures are used during
construction, such as treating the subgrade soils with fly ash. It is imperative the
recommendations described in section Grading and Drainage section of the
Earthwork section of this report be followed to reduce potential movement.
Ground
Improvements
Results of swell testing indicated swell mitigation may be necessary at this site. We
believe swell-mitigation could be completed by properly moisture conditioning the top
12 inches of finished pavement subgrade prior to placement of aggregate base course
and asphalt materials. Even with properly prepared and compacted soils, the possibility
of damage to the pavements, such as uneven areas and cracking is possible. As an
alternative, we believe an initial application of lime and a secondary application of fly
ash could be used to treat the upper 12 inches of the on-site soil for swell-mitigation.
Grading and
Drainage
The amount of movement of pavements will be related to the wetting of underlying
supporting soils. Therefore, it is imperative the recommendations discussed in the
Grading and Drainage section of the Earthwork section this report be followed to
reduce potential movement.
Pavements
Recommended Pavement thicknesses for this project include 5 inches of asphalt over
7 inches of aggregate base course on Jerome Street. Additional pavement section
alternatives and discussion are presented in the report.
Geotechnical Engineering Report
City-maintained Roadways at Crowne at Old Town North ■ Fort Collins, Colorado
September 4, 2018 ■ Terracon Project No. 20185095
Responsive ■ Resourceful ■ Reliable ii
Topic
1
Overview Statement
2
1. If the reader is reviewing this report as a pdf, the topics (bold orange font) above can be used to access the
appropriate section of the report by simply clicking on the topic itself.
2. This summary is for convenience only. It should be used in conjunction with the entire report for design
purposes. It should be recognized that specific details were not included or fully developed in this section,
and the report must be read in its entirety for a comprehensive understanding of the items contained herein.
Responsive ■ Resourceful ■ Reliable 1
INTRODUCTION
Geotechnical Engineering Report
City-maintained Roadways at Crowne at Old Town North
Southwest of Conifer Street and Blue Spruce Drive
Fort Collins, Colorado
Terracon Project No. 20185095
September 4, 2018
INTRODUCTION
This report presents the results of our subsurface exploration and geotechnical engineering
services performed for Jerome Street within the Crowne at Old Town North subdivision to be
located southwest of the intersection of Conifer Street and Blue Spruce Drive in Fort Collins,
Colorado. The purpose of these services is to provide information and geotechnical engineering
recommendations relative to:
■ Subsurface soil conditions ■ Site preparation and earthwork
■ Groundwater conditions ■ Pavement design and construction
The geotechnical engineering scope of services for this project included the advancement of three
(3) test borings to depths of approximately 10 feet below existing site grades.
Maps showing the site and boring locations are shown in the Site Location and Exploration
Plan sections, respectively. The results of the laboratory testing performed on soil samples
obtained from the site during the field exploration are included on the boring logs and as separate
graphs in the Exploration Results section of this report.
PROJECT DESCRIPTION
Our initial understanding of the project was provided in our proposal and was discussed in the
project planning stage. A period of collaboration has transpired since the project was initiated,
and our final understanding of the project conditions is as follows:
Item Description
Information Provided
The following project information is based on conversation with the Connell
Resources, Inc. who is currently completing the earthwork for the project.
Project Description
We understand the new pavements are being constructed as part of the
project. Based on site plans, we understand two main city-maintained
roads will run through the proposed apartment structures. Jerome Street
spans north-south roughly through the center of the development.
Geotechnical Engineering Report
City-maintained Roadways at Crowne at Old Town North ■ Fort Collins, Colorado
September 4, 2018 ■ Terracon Project No. 20185095
Responsive ■ Resourceful ■ Reliable 2
Item Description
Grading/Slopes We understand the roadway is currently at finished grade.
Pavements
Traffic loads were provided to us by the City of Fort Collins. The following
traffic conditions were used for the design of Lupine Drive Pavements:
■ Jerome Street: Minor Connector, 18-kip equivalent single-axle load
(ESAL) of 182,500
SITE CONDITIONS
The following description of site conditions is derived from our site visit in association with the
field exploration and our review of publicly available geologic and topographic maps.
Item Description
Parcel Information
The project site is located southwest of the intersection of Conifer Street and
Blue Spruce Drive in Fort Collins, Colorado. The project includes Jerome
Street which is a city-maintained roadway within the proposed subdivision.
The approximate Latitude/Longitude of the center of the site is 40.60156°
N/105.07313°W (Please refer to Site Location).
Existing
Improvements
We understand the site was originally a vacant field and is currently under
construction for the proposed roadway.
Surrounding
Developments
The site is bordered by retail and commercial buildings to the north and west.
To the south and east of the site is undeveloped land followed by single-family
residential developments.
Current Ground
Cover
The site is currently covered with graded native soils and properly placed fills
in preparation for the construction of the proposed roadways.
Existing Topography The site is relatively flat and has been graded for proposed roadways.
GEOTECHNICAL CHARACTERIZATION
Subsurface Profile
Specific conditions encountered at each boring location are indicated on the individual boring logs.
Stratification boundaries on the boring logs represent the approximate location of changes in soil
types; in situ, the transition between materials may be gradual. Details for each of the borings can
be found in Exploration Results. A discussion of field sampling and laboratory testing procedures
and test results are presented in Exploration and Testing Procedures. Based on the results of
the borings, subsurface conditions on the project site can be generalized as follows:
Geotechnical Engineering Report
City-maintained Roadways at Crowne at Old Town North ■ Fort Collins, Colorado
September 4, 2018 ■ Terracon Project No. 20185095
Responsive ■ Resourceful ■ Reliable 3
Material Description Approximate Depth to Bottom of Stratum
Fill consisting of lean clay with varying amounts of
sand
About 4 to 7 feet below existing site grades.
Fill consisting of well graded gravel with silt and
sand
To the maximum depth of exploration of about 10
feet.
Groundwater Conditions
The boreholes were observed while drilling and after completion for the presence and level of
groundwater. The water levels observed in the boreholes are noted on the attached boring logs,
and are summarized below:
Boring Number Depth to groundwater while drilling, ft.
1 9
2 9
3 Not encountered
These observations represent groundwater conditions at the time of the field exploration, and may
not be indicative of other times or at other locations. Groundwater levels can be expected to
fluctuate with varying seasonal and weather conditions, and other factors. Groundwater level
fluctuations occur due to seasonal variations, amount of rainfall, runoff and other factors not
evident at the time the borings were performed. Therefore, groundwater levels during
construction or at other times in the life of the pavements may be higher or lower than the levels
indicated on the boring logs. However, we do not anticipate groundwater will significantly impact
the proposed construction.
Laboratory Testing
Representative soil samples were selected for swell-consolidation testing and exhibited no
movement to 2.8 percent swell when wetted. Samples of site soils selected for plasticity testing
exhibited low to moderate plasticity with liquid limits ranging from non-plastic to 41 and plasticity
indices ranging from non-plastic to 22. Laboratory test results are presented in the Exploration
Results section of this report.
Geotechnical Engineering Report
City-maintained Roadways at Crowne at Old Town North ■ Fort Collins, Colorado
September 4, 2018 ■ Terracon Project No. 20185095
Responsive ■ Resourceful ■ Reliable 4
CORROSIVITY
At the time this report was prepared, the laboratory testing for water-soluble sulfates had not been
completed. We will submit a supplemental section with the testing results and recommendations
once the testing has been completed. However, previous test results indicate comparatively high
water-soluble sulfate concentrations should be expected.
GEOTECHNICAL OVERVIEW
Based on subsurface conditions encountered in the borings, the site appears suitable for the
proposed construction from a geotechnical point of view provided certain precautions and design
and construction recommendations described in this report are followed and the owner
understands the inherent risks associated with construction on sites underlain by expansive soils.
We have identified expansive soils as a possible geotechnical conditions that could impact design,
construction and performance of the proposed pavements. This condition will require particular
attention in project planning, design and during construction and are discussed in greater detail
in the following sections.
Expansive Soils
Expansive soils are present on this site and these conditions constitute a geologic hazard. This
report provides recommendations to help mitigate the effects of soil shrinkage and expansion.
However, even if these procedures are followed, some movement and cracking in the pavements
is possible. Eliminating the risk of movement and cosmetic distress is generally not feasible, but
it may be possible to further reduce the risk of movement if significantly more expensive measures
are used during construction, such as treating the subgrade soils with fly ash. It is imperative the
recommendations described in section Grading and Drainage section of the Earthwork section
of this report be followed to reduce potential movement.
The General Comments section provides an understanding of the report limitations.
EARTHWORK
The following presents recommendations for fly ash treatment and placement of aggregate base
course on the project. All earthwork on the project should be observed and evaluated by Terracon
on a full-time basis. The evaluation of earthwork should include observation of fly ash treatment,
testing of aggregate base course, subgrade stabilization, and other geotechnical conditions
exposed during the construction of the project.
Geotechnical Engineering Report
City-maintained Roadways at Crowne at Old Town North ■ Fort Collins, Colorado
September 4, 2018 ■ Terracon Project No. 20185095
Responsive ■ Resourceful ■ Reliable 5
Swell-Mitigation and Subgrade Stabilization
Results of swell testing indicated swell mitigation is necessary at this site. We believe swell-
mitigation could be completed by scarifying, properly moisture conditioning and compacting the
top 12 inches of finished pavement subgrade prior to placement of aggregate base course and
asphalt materials. Even with properly prepared and compacted soils, the possibility of damage
to the pavements, such as uneven areas and cracking is possible. As an alternative, we believe
fly ash could be used to treat the upper 12 inches of the on-site soil for swell-mitigation.
The sulfate testing for this roadway was not complete at the time of this report; however, based
on comparatively high sulfate concentrations encountered on Lupine Drive, we anticipate high
sulfate concentration on the soils currently below the proposed roadway. The sulfate
concentrations in the soils previously tested are above typical acceptable limits to allow for
conventional chemical stabilization of subgrade soils. If fly ash is used to stabilize subgrade below
the proposed pavements planned as part of this project, we recommend an initial application of
lime, followed by a 5 to 7 days mellowing period. After mellowing, the subgrade soils can be
treated with fly ash.
Lime and Fly Ash Treatment Recommendations
In order to reduce the risk of heave caused by adverse reaction between the sulfates in the
subgrade soils and the stabilization agent, we recommend chemical stabilization be performed
using double treatment application with lime and fly ash. We recommend the following general
procedures for construction of chemically treated pavement subgrade soils for the city-maintained
roadways on the project site.
The pavement subgrade should be shaped to final grade. We recommend initially treating the
upper 12 inches of the pavement subgrade uniformly with 3 percent lime by weight. The lime
should meet the requirements of ASTM C207, Type N and be mixed as outlined in ASTM C977.
Water should be added (as needed) to the lime-soil mixture during the mixing process until a
uniform, homogeneous mixture is achieved at or slightly above optimum moisture content for the
mixture. Following initial mixing with the lime, we recommend allowing the lime-soil mixture to
mellow for a period of 5 to 7 days. The mellowing time needed for the initial stabilization process
will depend on weather conditions, continuous moistening of the lime-soil mixture, protection
measures to promote ettringite formation, and soil properties. Terracon will assist the project
team with determining the appropriate mellowing time as the process approaches 5 days.
Following the mellowing period, we recommend thoroughly remixing the lime-soil mixture to
mechanically break down any ettringite formation that has occurred. An additional 8 percent fly
ash should then be remixed uniformly into the lime-soil mixture. Fly ash should meet the
requirements specified in ASTM C618 for Class C fly ash. The fly ash-lime-soil mixture should
be moisture conditioned to within 2 percent of optimum moisture content and compacted to at
Geotechnical Engineering Report
City-maintained Roadways at Crowne at Old Town North ■ Fort Collins, Colorado
September 4, 2018 ■ Terracon Project No. 20185095
Responsive ■ Resourceful ■ Reliable 6
least 95 percent of the mixture’s maximum dry unit weight as determined by ASTM D698.
Compaction of the mixture should be completed within 2 hours of the addition of water to the fly
ash-lime-soil mixture. The subgrade should be compacted and sealed with a pneumatic-tire roller
that is sufficiently light in weight so as to not cause hairline cracking of the treated subgrade.
After completion of the double application and compaction, the treated subgrade should be
allowed to cure for a minimum of 48 hours prior to placing aggregate base course. A longer cure
time may be necessary depending on adverse weather conditions and protection measures
implemented by the contractor. During this cure time, the surface of the treated subgrade should
be kept moist by periodically sprinkling with water.
Strength gains of the treated subgrade will be slower during cooler weather periods, particularly
if the temperature drops below 40 degrees Fahrenheit. Construction traffic on the treated
subgrade prior to placement of the aggregate base course and pavement construction should be
limited and the subgrade should be protected from freezing or drying at all times until paving.
Covering the subgrade or other protective measures may be required.
Once trimming and the final subgrade elevation has been reached, the treated subgrade should
be proof-rolled with a rubber tire vehicle with at least 18 kips per axle. Areas of the treated
subgrade that are soft, excessively wet, or unstable should be repaired by drying and/or removal
and replacement. Chemically treated soils can be re-used as backfill for repaired areas.
Compaction Requirements
Fly ash treated subgrade (if used) and aggregate base course should be placed and compacted in
horizontal lifts, using equipment and procedures that will produce recommended moisture contents
and densities throughout the lift.
Item Description
Fill lift thickness
9 inches or less in loose thickness when heavy, self-
propelled compaction equipment is used
4 to 6 inches in loose thickness when hand-guided
equipment (i.e. jumping jack or plate compactor) is used
Minimum compaction requirements
95 percent of the maximum dry unit weight as determined by
AASHTO T99.
Moisture content cohesive soil (clay) -1 to +3 % of the optimum moisture content
Moisture content cohesionless soil
(sand)
-3 to +3 % of the optimum moisture content
Geotechnical Engineering Report
City-maintained Roadways at Crowne at Old Town North ■ Fort Collins, Colorado
September 4, 2018 ■ Terracon Project No. 20185095
Responsive ■ Resourceful ■ Reliable 7
Item Description
1. We recommend engineered fill be tested for moisture content and compaction during placement.
Should the results of the in-place density tests indicate the specified moisture or compaction limits
have not been met, the area represented by the test should be reworked and retested as required
until the specified moisture and compaction requirements are achieved.
2. Specifically, moisture levels should be maintained low enough to allow for satisfactory compaction to
be achieved without the fill material pumping when proofrolled.
3. Moisture conditioned clay materials should not be allowed to dry out. A loss of moisture within these
materials could result in an increase in the material’s expansive potential. Subsequent wetting of these
materials could result in undesirable movement.
Grading and Drainage
All grades must be adjusted to provide effective drainage away from the proposed pavements
during construction and maintained throughout the life of the proposed project. Infiltration of water
into excavations must be prevented during construction. Water permitted to pond near or
adjacent to the perimeter of the pavements (either during or post-construction) can result in
significantly higher soil movements than those discussed in this report. As a result, any
estimations of potential movement described in this report cannot be relied upon if positive
drainage is not obtained and maintained, and water is allowed to infiltrate the fill and/or subgrade.
Backfill against curbs and gutters should be properly compacted and free of all construction debris
to reduce the possibility of moisture infiltration. After construction of the proposed pavements and
prior to project completion, we recommend verification of final grading be performed to document
positive drainage, as described above, has been achieved
The General Comments section provides an understanding of the report limitations.
PAVEMENTS
Pavements - Subgrade Preparation
The subgrade should be carefully evaluated at the time of pavement construction for signs of
disturbance or instability. We recommend the pavement subgrade be thoroughly proofrolled with
a loaded tandem-axle dump truck prior to final grading and paving. Areas of soft spots should be
stabilized with removal, moisture conditioning and recompaction. All pavement areas should be
moisture conditioned and properly compacted to the recommendations in this report immediately
prior to paving.
Samples of the fill material selected for swell-consolidation testing swelled approximately no
movement to 2.8 percent when wetted under an applied pressure of 150 psf which is more than the
Geotechnical Engineering Report
City-maintained Roadways at Crowne at Old Town North ■ Fort Collins, Colorado
September 4, 2018 ■ Terracon Project No. 20185095
Responsive ■ Resourceful ■ Reliable 8
maximum 2 percent criteria established for determining if swell-mitigation procedures in the
pavement sections are required per LCUASS standards. Therefore, swell-mitigation of the
subgrade materials prior to pavement operations is required. We believe scarifying, moisture
conditioning and properly compacting the upper 12 inches of on-site soils immediately prior to
placement of pavement materials will help mitigate possible swell potential of on-site soils. As a
lower risk alternative, fly ash treatment can be used, provided the subgrade soils are first treated
with lime in order to reduce the risk of heave caused by adverse reaction between the sulfates
likely in the subgrade soils and the stabilization agent. Recommendations for lime and fly ash
treatment are provided in the Earthwork section of this report.
Pavements – Design Recommendations
Design of pavements for the project have been based on the procedures outlined in the 1993
Guideline for Design of Pavement Structures prepared by the American Association of State
Highway and Transportation Officials (AASHTO) and the Larimer County Urban Area Street
Standards (LCUASS).
Traffic patterns and anticipated loading conditions were provided to us by the City of Fort Collins.
For our pavement thicknesses design recommendations, we used an 18-kip equivalent single-
axle load (ESAL) of 182,500 for Jerome Street. This traffic design values should be verified by
the civil engineer or owner prior to final design and construction. If the actual traffic values vary
from the assumed values, the pavement thickness recommendations may not be applicable.
When the actual traffic design information is available Terracon should be contacted so that the
design recommendations can be reviewed and revised if necessary.
For flexible pavement design, a terminal serviceability index of 2.3 was utilized along with an inherent
reliability of 85 percent and a design life of 20 years. Using the calculated design R-value of 16,
appropriate ESAL, environmental criteria and other factors, the structural numbers (SN) of the
pavement sections were determined on the basis of the 1993 AASHTO design equation.
In addition to the flexible pavement design analyses, a rigid pavement design analysis was
completed based upon AASHTO design procedures. Rigid pavement design is based on an
evaluation of the Modulus of Subgrade Reaction of the soils (k-value), the Modulus of Rupture of
the concrete, and other factors previously outlined. The design k-value of 80 for the subgrade
soil was determined by correlation to the laboratory test results. A modulus of rupture of 600 psi
(working stress 450 psi) was used for pavement concrete. The rigid pavement thickness for each
traffic category was determined on the basis of the AASHTO design equation.
Recommended minimum pavement sections are provided in the table below.
Geotechnical Engineering Report
City-maintained Roadways at Crowne at Old Town North ■ Fort Collins, Colorado
September 4, 2018 ■ Terracon Project No. 20185095
Responsive ■ Resourceful ■ Reliable 9
Alternative
Recommended Pavement Thicknesses (Inches)
Asphaltic
Concrete
Surface
Aggregate
Base
Course
Fly Ash
Treated
Subgrade
Portland
Cement
Concrete
Total
A 5 7 - - 12
B 4 6 12 - 22
C - - 5½ 5½
Aggregate base course (if used on the site) should consist of a blend of sand and gravel which
meets strict specifications for quality and gradation. Use of materials meeting Colorado
Department of Transportation (CDOT) Class 5 or 6 specifications is recommended for aggregate
base course. Aggregate base course should be placed in lifts not exceeding 6 inches and
compacted to a minimum of 95 percent of the maximum dry unit weight as determined by ASTM
D698.
Asphaltic concrete should be composed of a mixture of aggregate, filler and additives (if required)
and approved bituminous material. The asphalt concrete should conform to approved mix
designs stating the Superpave properties, optimum asphalt content, job mix formula and
recommended mixing and placing temperatures. Aggregate used in asphalt concrete should
meet particular gradations. Material meeting CDOT Grading S or SX specifications or equivalent
is recommended for asphalt concrete. Mix designs should be submitted prior to construction to
verify their adequacy. Asphalt material should be placed in maximum 3-inch lifts and compacted
within a range of 92 to 96 percent of the theoretical maximum (Rice) density (ASTM D2041).
Where rigid pavements are used, the concrete should be produced from an approved mix design
with the following minimum properties:
Properties Value
Compressive strength 4,000 psi
Cement type Type I or II portland cement
Entrained air content (%) 5 to 8
Concrete aggregate ASTM C33 and CDOT section 703
Concrete should be deposited by truck mixers or agitators and placed a maximum of 90 minutes
from the time the water is added to the mix. Longitudinal and transverse joints should be provided
as needed in concrete pavements for expansion/contraction and isolation per ACI 325. The
location and extent of joints should be based upon the final pavement geometry. Joints should
be sealed to prevent entry of foreign material and doweled where necessary for load transfer.
Geotechnical Engineering Report
City-maintained Roadways at Crowne at Old Town North ■ Fort Collins, Colorado
September 4, 2018 ■ Terracon Project No. 20185095
Responsive ■ Resourceful ■ Reliable 10
Pavement performance is affected by its surroundings. In addition to providing preventive
maintenance, the civil engineer should consider the following recommendations in the design and
layout of pavements:
■ Site grades should slope a minimum of 2 percent away from the pavements;
■ The subgrade and the pavement surface have a minimum 2 percent slope to promote proper
surface drainage;
■ Consider appropriate edge drainage and pavement under drain systems;
■ Install pavement drainage surrounding areas anticipated for frequent wetting;
■ Install joint sealant and seal cracks immediately;
■ Seal all landscaped areas in, or adjacent to pavements to reduce moisture migration to
subgrade soils; and
■ Placing compacted, low permeability backfill against the exterior side of curb and gutter.
Pavements – Construction Considerations
Openings in pavement, such as landscape islands, are sources for water infiltration into
surrounding pavements. Water collects in the islands and migrates into the surrounding subgrade
soils thereby degrading support of the pavement. This is especially applicable for islands with
raised concrete curbs, irrigated foliage, and low permeability near-surface soils. The civil design
for the pavements with these conditions should include features to restrict or to collect and
discharge excess water from the islands. Examples of features are edge drains connected to the
storm water collection system or other suitable outlet and impermeable barriers preventing lateral
migration of water such as a cutoff wall installed to a depth below the pavement structure.
Pavements – Maintenance
Preventative maintenance should be planned and provided for an ongoing pavement
management program in order to enhance future pavement performance. Preventive
maintenance consists of both localized maintenance (e.g. crack and joint sealing and patching)
and global maintenance (e.g. surface sealing). Preventative maintenance is usually the first
priority when implementing a planned pavement maintenance program and provides the highest
return on investment for pavements.
GENERAL COMMENTS
As the project progresses, we address assumptions by incorporating information provided by the
design team, if any. Revised project information that reflects actual conditions important to our
services is reflected in the final report. The design team should collaborate with Terracon to
confirm these assumptions and to prepare the final design plans and specifications. This facilitates
the incorporation of our opinions related to implementation of our geotechnical recommendations.
Geotechnical Engineering Report
City-maintained Roadways at Crowne at Old Town North ■ Fort Collins, Colorado
September 4, 2018 ■ Terracon Project No. 20185095
Responsive ■ Resourceful ■ Reliable 11
Any information conveyed prior to the final report is for informational purposes only and should
not be considered or used for decision-making purposes.
Our analysis and opinions are based upon our understanding of the project, the geotechnical
conditions in the area, and the data obtained from our site exploration. Natural variations will occur
between exploration point locations or due to the modifying effects of construction or weather.
The nature and extent of such variations may not become evident until during or after construction.
Terracon should be retained as the Geotechnical Engineer, where noted in the final report, to
provide observation and testing services during pertinent construction phases. If variations
appear, we can provide further evaluation and supplemental recommendations. If variations are
noted in the absence of our observation and testing services on-site, we should be immediately
notified so that we can provide evaluation and supplemental recommendations.
Our scope of services does not include either specifically or by implication any environmental or
biological (e.g., mold, fungi, bacteria) assessment of the site or identification or prevention of
pollutants, hazardous materials or conditions. If the owner is concerned about the potential for
such contamination or pollution, other studies should be undertaken.
Our services and any correspondence or collaboration through this system are intended for the
sole benefit and exclusive use of our client for specific application to the project discussed and
are accomplished in accordance with generally accepted geotechnical engineering practices with
no third party beneficiaries intended. Any third party access to services or correspondence is
solely for information purposes to support the services provided by Terracon to our client. Reliance
upon the services and any work product is limited to our client, and is not intended for third parties.
Any use or reliance of the provided information by third parties is done solely at their own risk. No
warranties, either express or implied, are intended or made.
Site characteristics as provided are for design purposes and not to estimate excavation cost. Any
use of our report in that regard is done at the sole risk of the excavating cost estimator as there
may be variations on the site that are not apparent in the data that could significantly impact
excavation cost. Any parties charged with estimating excavation costs should seek their own site
characterization for specific purposes to obtain the specific level of detail necessary for costing.
Site safety, and cost estimating including, excavation support, and dewatering
requirements/design are the responsibility of others. If changes in the nature, design, or location
of the project are planned, our conclusions and recommendations shall not be considered valid
unless we review the changes and either verify or modify our conclusions in writing.
ATTACH MENTS
ATTACHMENTS
SITE LOCA TION AND EXPLORATION PLANS
SITE LOCATION AND EXPLORATION PLANS
SITE LOCATION
City-Maintained Roadways at Crowne at Old Town North ■ Fort Collins, CO
September 4, 2018 ■ Terracon Project No. 20185095
TOPOGRAPHIC MAP IMAGE COURTESY OF THE U.S. GEOLOGICAL SURVEY
QUADRANGLES INCLUDE: WELLINGTON, CO (1978) and FORT COLLINS, CO (1984).
DIAGRAM IS FOR GENERAL LOCATION ONLY, AND IS
NOT INTENDED FOR CONSTRUCTION PURPOSES
SITE
EXPLORATION PLAN
City-Maintained Roadways at Crowne at Old Town North ■ Fort Collins, CO
September 4, 2018 ■ Terracon Project No. 20185095
DIAGRAM IS FOR GENERAL LOCATION ONLY, AND IS
NOT INTENDED FOR CONSTRUCTION PURPOSES
AERIAL PHOTOGRAPHY PROVIDED
BY MICROSOFT BING MAPS
EXPLORATION RESULTS
EXPLORATION RESULTS
Geotechnical Engineering Report
City-maintained Roadways at Crowne at Old Town North ■ Fort Collins, Colorado
September 4, 2018 ■ Terracon Project No. 20185095
Responsive ■ Resourceful ■ Reliable
EXPLORATION AND TESTING PROCEDURES
Field Exploration
The field exploration program consisted of the following:
Number of Borings Planned Boring Depth (feet)
1
Planned Location
3 10 or auger refusal
Approximately every 500 feet along
Jerome Street
1. Proposed borings will be completed to the planned depths below existing site grades or practical
auger refusal, if shallower.
Boring Layout and Elevations: We used handheld GPS equipment to locate borings with an
estimated horizontal accuracy of +/-20 feet. We understand the ground surface elevation at the
time we completed our borings was at the finished grade of the planned Lupine Drive.
Subsurface Exploration Procedures: We advanced soil borings with a truck-mounted drill rig
using 4-inch solid-stem continuous-flight augers. Three samples were obtained in the upper 10
feet of each boring. Soil sampling was performed using modified California barrel, and standard
split-barrel sampling procedures. For the standard split-barrel sampling procedure, a standard 2-
inch outer diameter split-barrel sampling spoon is driven into the ground by a 140-pound
automatic hammer falling a distance of 30 inches. The number of blows required to advance the
sampling spoon the last 12 inches of a normal 18-inch penetration is recorded as the Standard
Penetration Test (SPT) resistance value. The SPT resistance values, also referred to as N-values,
are indicated on the boring logs at the test depths. For the modified California barrel sampling
procedure, a 2½-inch outer diameter split-barrel sampling spoon is used for sampling. Modified
California barrel sampling procedures are similar to standard split-barrel sampling procedures;
however, blow counts are typically recorded for 6-inch intervals for a total of 12 inches of
penetration. In addition, a bulk sample of soils obtained in the upper 5 feet of both borings
completed for the proposed roadways was collected. The samples were placed in appropriate
containers, taken to our soil laboratory for testing, and classified by a geotechnical engineer.
In addition, we observed and recorded groundwater levels during drilling observations.
Our exploration team prepared field boring logs as part of standard drilling operations including
sampling depths, penetration distances, and other relevant sampling information. Field logs include
visual classifications of materials encountered during drilling, and our interpretation of subsurface
conditions between samples. Final boring logs, prepared from field logs, represent the
geotechnical engineer's interpretation, and include modifications based on observations and
laboratory test results.
Geotechnical Engineering Report
City-maintained Roadways at Crowne at Old Town North ■ Fort Collins, Colorado
September 4, 2018 ■ Terracon Project No. 20185095
Responsive ■ Resourceful ■ Reliable
Property Disturbance: We backfilled borings with auger cuttings after completion. Our services
did not include repair of the site beyond backfilling our boreholes. Excess auger cuttings were
dispersed in the general vicinity of the boreholes. Because backfill material often settles below
the surface after a period, we recommend checking boreholes periodically and backfilling, if
necessary. We can provide this service, or grout the boreholes for additional fees, at your request.
Laboratory Testing
The project engineer reviewed field data and assigned various laboratory tests to better
understand the engineering properties of various soil strata. Laboratory testing was conducted in
general accordance with applicable or other locally recognized standards. Testing was performed
under the direction of a geotechnical engineer and included the following:
■ Visual classification ■ Moisture content
■ Dry density ■ Atterberg limits
■ Grain-size analysis ■ One-dimensional swell
■ Water-soluble sulfates ■ R-value
Our laboratory testing program included examination of soil samples by an engineer. Based on
the material’s texture and plasticity, we described and classified soil samples in accordance with
the Unified Soil Classification System (USCS). Soil and bedrock samples obtained during our
field work will be disposed of after laboratory testing is complete unless a specific request is made
to temporarily store the samples for a longer period of time.
16 73
16
14
110
114
30-17-13
4-4-5
N=9
4-6
4-6-10
N=16
0/150
6.0
10.5
FILL - LEAN CLAY WITH SAND (CL), with gravel, brown to light
brown
POORLY GRADED GRAVEL WITH SILT AND SAND, brown,
medium dense
Boring Terminated at 10.5 Feet
GRAPHIC LOG
Stratification lines are approximate. In-situ, the transition may be gradual. Hammer Type: Automatic
THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 20185095 CITY-MAINTAINED R.GPJ TERRACON_DATATEMPLATE.GDT 8/24/18
PERCENT FINES
WATER
CONTENT (%)
DRY UNIT
WEIGHT (pcf)
LL-PL-PI
ATTERBERG
LIMITS
WATER LEVEL
OBSERVATIONS
DEPTH (Ft.)
5
10
SAMPLE TYPE
FIELD TEST
RESULTS
SWELL / LOAD
(%/psf)
DEPTH
LOCATION See Exploration Plan
Latitude: 40.6025° Longitude: -105.0738°
Page 1 of 1
Advancement Method:
4-inch solid-stem auger
Abandonment Method:
Boring backfilled with soil cuttings upon completion.
1901 Sharp Point Dr, Ste C
Fort Collins, CO
Notes:
Project No.: 20185095
Drill Rig: CME-55
BORING LOG NO. 3
CLIENT: Crowne Partners, Inc.
Birmingham, AL
Driller: Drilling Engineers, Inc.
Boring Completed: 08-17-2018
PROJECT: City-Maintained Roadways at Crowne at
Old Town North
11
20
6
8 NP
5-6-10
N=16
7-12
5-7-12
N=19
4.0
10.5
FILL - LEAN CLAY WITH SAND , with gravel, brown to light brown
POORLY GRADED GRAVEL WITH SILT AND SAND (GP-GM),
brown, medium dense
Boring Terminated at 10.5 Feet
GRAPHIC LOG
Stratification lines are approximate. In-situ, the transition may be gradual. Hammer Type: Automatic
THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 20185095 CITY-MAINTAINED R.GPJ TERRACON_DATATEMPLATE.GDT 8/24/18
PERCENT FINES
WATER
CONTENT (%)
DRY UNIT
WEIGHT (pcf)
LL-PL-PI
ATTERBERG
LIMITS
WATER LEVEL
OBSERVATIONS
DEPTH (Ft.)
5
10
SAMPLE TYPE
FIELD TEST
RESULTS
SWELL / LOAD
(%/psf)
DEPTH
LOCATION See Exploration Plan
Latitude: 40.6015° Longitude: -105.0739°
Page 1 of 1
Advancement Method:
4-inch solid-stem auger
Abandonment Method:
Boring backfilled with soil cuttings upon completion.
1901 Sharp Point Dr, Ste C
Fort Collins, CO
Notes:
Project No.: 20185095
Drill Rig: CME-55
BORING LOG NO. 4
CLIENT: Crowne Partners, Inc.
Birmingham, AL
Driller: Drilling Engineers, Inc.
Boring Completed: 08-17-2018
PROJECT: City-Maintained Roadways at Crowne at
Old Town North
See Exploration and Testing Procedures for a
description of field and laboratory procedures used
and additional data (If any).
See Supporting Information for explanation of
92
17
21
18
103 41-19-22
6-8-10
N=18
6-10
13-17-20
N=37
+2.8/150
7.0
10.5
FILL - LEAN CLAY (CL), with gravel, brown to light brown
POORLY GRADED GRAVEL WITH SILT AND SAND, brown,
medium dense
Boring Terminated at 10.5 Feet
GRAPHIC LOG
Stratification lines are approximate. In-situ, the transition may be gradual. Hammer Type: Automatic
THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 20185095 CITY-MAINTAINED R.GPJ TERRACON_DATATEMPLATE.GDT 8/24/18
PERCENT FINES
WATER
CONTENT (%)
DRY UNIT
WEIGHT (pcf)
LL-PL-PI
ATTERBERG
LIMITS
WATER LEVEL
OBSERVATIONS
DEPTH (Ft.)
5
10
SAMPLE TYPE
FIELD TEST
RESULTS
SWELL / LOAD
(%/psf)
DEPTH
LOCATION See Exploration Plan
Latitude: 40.6005° Longitude: -105.0742°
Page 1 of 1
Advancement Method:
4-inch solid-stem auger
Abandonment Method:
Boring backfilled with soil cuttings upon completion.
1901 Sharp Point Dr, Ste C
Fort Collins, CO
Notes:
Project No.: 20185095
Drill Rig: CME-55
BORING LOG NO. 5
CLIENT: Crowne Partners, Inc.
Birmingham, AL
Driller: Drilling Engineers, Inc.
Boring Completed: 08-17-2018
PROJECT: City-Maintained Roadways at Crowne at
Old Town North
See Exploration and Testing Procedures for a
description of field and laboratory procedures used
0
10
20
30
40
50
60
0 20 40 60 80 100
CL or OL CH or OH
ML or OL
MH or OH
"U" Line
"A" Line
ATTERBERG LIMITS RESULTS
ASTM D4318
P
L
A
S
T
I
C
I
T
Y
I
N
D
E
X
LIQUID LIMIT
1901 Sharp Point Dr, Ste C
Fort Collins, CO
PROJECT NUMBER: 20185095
SITE: Southwest of Conifer Street and Blue
Spruce Drive
Fort Collins, Colorado
PROJECT: City-Maintained Roadways at Crowne
at Old Town North
CLIENT: Crowne Partners, Inc.
Birmingham, AL
LABORATORY TESTS ARE NOT VALID IF SEPARATED FROM ORIGINAL REPORT. ATTERBERG LIMITS 20185095 CITY-MAINTAINED R.GPJ TERRACON_DATATEMPLATE.GDT 8/24/18
30
NP
41
17
NP
19
13
NP
22
CL
GP-GM
CL
LEAN CLAY with SAND
POORLY GRADED GRAVEL with SILT and SAND
LEAN CLAY
Boring ID Depth LL PL PI Fines USCS Description
3
4
0
5
10
15
20
25
30
35
40
45
50
55
60
65
70
75
80
85
90
95
100
100 10 1 0.1 0.01 0.001
30
40
50
1.5
6 200
8
10
4 14
1
3/4
1/2
60
GRAIN SIZE IN MILLIMETERS
PERCENT FINER BY WEIGHT
U.HYDROMETERS. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS
4
3/8
3 100
3 140
2
GRAIN SIZE DISTRIBUTION
ASTM D422 / ASTM C136
6
16
20
1901 Sharp Point Dr, Ste C
Fort Collins, CO
PROJECT NUMBER: 20185095
SITE: Southwest of Conifer Street and Blue
Spruce Drive
Fort Collins, Colorado
PROJECT: City-Maintained Roadways at Crowne
at Old Town North
CLIENT: Crowne Partners, Inc.
Birmingham, AL
LABORATORY TESTS ARE NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GRAIN SIZE: USCS-2 20185095 CITY-MAINTAINED R.GPJ TERRACON_DATATEMPLATE.GDT 8/24/18
LEAN CLAY with SAND (CL)
POORLY GRADED GRAVEL with SILT and SAND (GP-GM)
-10
-8
-6
-4
-2
0
2
4
100 1,000 10,000
AXIAL STRAIN, %
PRESSURE, psf
SWELL CONSOLIDATION TEST
ASTM D4546
NOTES: Sample exhibited no movement upon wetting under an applied pressure of 150 psf.
1901 Sharp Point Dr, Ste C
Fort Collins, CO
PROJECT NUMBER: 20185095
SITE: Southwest of Conifer Street and Blue
Spruce Drive
Fort Collins, Colorado
PROJECT: City-Maintained Roadways at Crowne
at Old Town North
CLIENT: Crowne Partners, Inc.
Birmingham, AL
LABORATORY TESTS ARE NOT VALID IF SEPARATED FROM ORIGINAL REPORT. TC_CONSOL_STRAIN-USCS 20185095 CITY-MAINTAINED R.GPJ TERRACON_DATATEMPLATE.GDT 8/24/18
3 2 - 3.5 ft LEAN CLAY with SAND(CL) 110 16
Specimen Identification Classification , pcf WC, %
-10
-8
-6
-4
-2
0
2
4
100 1,000 10,000
AXIAL STRAIN, %
PRESSURE, psf
SWELL CONSOLIDATION TEST
ASTM D4546
NOTES: Sample exhibited 2.8 percent swell upon wetting under an applied pressure of 150 psf.
1901 Sharp Point Dr, Ste C
Fort Collins, CO
PROJECT NUMBER: 20185095
SITE: Southwest of Conifer Street and Blue
Spruce Drive
Fort Collins, Colorado
PROJECT: City-Maintained Roadways at Crowne
at Old Town North
CLIENT: Crowne Partners, Inc.
Birmingham, AL
LABORATORY TESTS ARE NOT VALID IF SEPARATED FROM ORIGINAL REPORT. TC_CONSOL_STRAIN-USCS 20185095 CITY-MAINTAINED R.GPJ TERRACON_DATATEMPLATE.GDT 8/24/18
5 4 - 5 ft LEAN CLAY(CL) 103 21
Specimen Identification Classification , pcf WC, %
1901 Sharp Point Dr, Suite C
Fort Collins, Colorado 80525
(970) 484-0359 FAX (970) 484-0454
CLIENT: Crowne Partners, Inc. DATE OF TEST: 23-Aug-18
PROJECT: City-Maintained Roadways at Crowne
LOCATION: Bulk from Jerome Street
TERRACON NO. 20185095 CLASSIFICATION: Lean clay with sand
TEST SPECIMEN NO. 1 2 3
COMPACTION PRESSURE (PSI) 80 120 160
DENSITY (PCF) 104.6 107.7 108.3
MOISTURE CONTENT (%) 22.0 21.0 19.9
EXPANSION PRESSURE (PSI) 0.00 0.00 0.00
HORIZONTAL PRESSURE @ 160 PSI 136 123 110
SAMPLE HEIGHT (INCHES) 2.23 2.16 2.20
EXUDATION PRESSURE (PSI) 159.6 303.3 446.5
CORRECTED R-VALUE 9.9 16.5 25.3
UNCORRECTED R-VALUE 11.1 19.1 28.7
R-VALUE @ 300 PSI EXUDATION PRESSURE = 16
AASHTO T190
PRESSURE OF COMPACTED SOIL
RESISTANCE R-VALUE & EXPANSION
SAMPLE DATA TEST RESULTS
0
10
20
30
40
50
60
70
80
90
100
0 100 200 300 400 500 600 700 800
R-VALUE
EXUDATION PRESSURE - PSI
SUPPORTING INFORMA TION
SUPPORTING INFORMATION
City-Maintained Roadways at Crowne at Old Town North Fort Collins, Colorado
September 4, 2018 Terracon Project No. 20185095
less than 0.25
0.50 to 1.00
> 4.00
Unconfined
Compressive Strength
Qu, (tsf)
0.25 to 0.50
1.00 to 2.00
2.00 to 4.00
Modified
California
Ring
Sampler
Standard
Penetration
Test
Trace
PLASTICITY DESCRIPTION
Water levels indicated on the soil boring logs are
the levels measured in the borehole at the times
indicated. Groundwater level variations will occur
over time. In low permeability soils, accurate
determination of groundwater levels is not possible
with short term water level observations.
DESCRIPTION OF SYMBOLS AND ABBREVIATIONS
GENERAL NOTES
> 30
11 - 30
Low 1 - 10
Non-plastic
Plasticity Index
#4 to #200 sieve (4.75mm to 0.075mm
Boulders
Cobbles 12 in. to 3 in. (300mm to 75mm)
Gravel 3 in. to #4 sieve (75mm to 4.75 mm)
Sand
Silt or Clay Passing #200 sieve (0.075mm)
Particle Size
Water Level After
a Specified Period of Time
Water Level After a
Specified Period of Time
Water Initially
Encountered
Soil classification is based on the Unified Soil Classification System. Coarse Grained Soils have more than 50% of their dry
weight retained on a #200 sieve; their principal descriptors are: boulders, cobbles, gravel or sand. Fine Grained Soils have less
than 50% of their dry weight retained on a #200 sieve; they are principally described as clays if they are plastic, and silts if they
are slightly plastic or non-plastic. Major constituents may be added as modifiers and minor constituents may be added
according to the relative proportions based on grain size. In addition to gradation, coarse-grained soils are defined on the basis
of their in-place relative density and fine-grained soils on the basis of their consistency.
GRAIN SIZE TERMINOLOGY
RELATIVEFINES PROPORTIONS OF SAND AND GRAVEL RELATIVE PROPORTIONS OF
DESCRIPTIVE SOIL CLASSIFICATION
LOCATION AND ELEVATION NOTES
SAMPLING WATER LEVEL FIELD TESTS
N
(HP)
(T)
UNIFIED SOIL CLASSIFICATION SYSTEM
City-maintained Roadways at Crowne at Old Town North ■ Fort Collins, Colorado
September 4, 2018 ■ Terracon Project No. 20185095
UNIFIED SOIL C LASSIFICATION SYSTEM
Criteria for Assigning Group Symbols and Group Names Using Laboratory Tests A
Soil Classification
Group
Symbol
Group Name B
Coarse-Grained Soils:
More than 50% retained
on No. 200 sieve
Gravels:
More than 50% of
coarse fraction
retained on No. 4 sieve
Clean Gravels:
Less than 5% fines C
Cu 4 and 1 Cc 3 E
GW Well-graded gravel F
Cu 4 and/or 1 Cc 3 E
GP Poorly graded gravel F
Gravels with Fines:
More than 12% fines C
Fines classify as ML or MH GM Silty gravel F, G, H
Fines classify as CL or CH GC Clayey gravel F, G, H
Sands:
50% or more of coarse
fraction passes No. 4
sieve
Clean Sands:
Less than 5% fines D
Cu 6 and 1 Cc 3 E
SW Well-graded sand I
Cu 6 and/or 1 Cc 3 E
SP Poorly graded sand I
Sands with Fines:
More than 12% fines D
Fines classify as ML or MH SM Silty sand G, H, I
Fines classify as CL or CH SC Clayey sand G, H, I
Fine-Grained Soils:
50% or more passes the
No. 200 sieve
Silts and Clays:
Liquid limit less than 50
Inorganic:
PI 7 and plots on or above “A”
line J
CL Lean clay K, L, M
PI 4 or plots below “A” line J
ML Silt K, L, M
Organic:
Liquid limit - oven dried
0.75 OL
Organic clay K, L, M, N
Liquid limit - not dried Organic silt K, L, M, O
Silts and Clays:
Liquid limit 50 or more
Inorganic:
PI plots on or above “A” line CH Fat clay K, L, M
PI plots below “A” line MH Elastic Silt K, L, M
Organic:
Liquid limit - oven dried
0.75 OH
Organic clay K, L, M, P
Liquid limit - not dried Organic silt K, L, M, Q
Highly organic soils: Primarily organic matter, dark in color, and organic odor PT Peat
A Based on the material passing the 3-inch (75-mm) sieve
B If field sample contained cobbles or boulders, or both, add “with cobbles
or boulders, or both” to group name.
C Gravels with 5 to 12% fines require dual symbols: GW-GM well-graded
gravel with silt, GW-GC well-graded gravel with clay, GP-GM poorly
graded gravel with silt, GP-GC poorly graded gravel with clay.
D Sands with 5 to 12% fines require dual symbols: SW-SM well-graded
sand with silt, SW-SC well-graded sand with clay, SP-SM poorly graded
sand with silt, SP-SC poorly graded sand with clay
E Cu = D60/D10 Cc =
10 60
2
30
D x D
(D )
F If soil contains 15% sand, add “with sand” to group name.
G If fines classify as CL-ML, use dual symbol GC-GM, or SC-SM.
H If fines are organic, add “with organic fines” to group name.
I If soil contains 15% gravel, add “with gravel” to group name.
J If Atterberg limits plot in shaded area, soil is a CL-ML, silty clay.
K If soil contains 15 to 29% plus No. 200, add “with sand” or “with
gravel,” whichever is predominant.
L If soil contains 30% plus No. 200 predominantly sand, add
“sandy” to group name.
M If soil contains 30% plus No. 200, predominantly gravel, add
“gravelly” to group name.
N PI 4 and plots on or above “A” line.
O PI 4 or plots below “A” line.
P PI plots on or above “A” line.
Q PI plots below “A” line.
(DCP)
UC
(PID)
(OVA)
Standard Penetration Test
Resistance (Blows/Ft.)
Hand Penetrometer
Torvane
Dynamic Cone Penetrometer
Unconfined Compressive
Strength
Photo-Ionization Detector
Organic Vapor Analyzer
Medium
Over 12 in. (300 mm) 0
>12
5-12
<5
Percent of
Dry Weight
Major Component of Sample Term
Modifier
With
Trace
Descriptive Term(s) of
other constituents
Modifier >30
<15
Percent of
Dry Weight
Descriptive Term(s) of
other constituents
With 15-29
High
Unless otherwise noted, Latitude and Longitude are approximately determined using a hand-held GPS device. The accuracy of
such devices is variable. Surface elevation data annotated with +/- indicates that no actual topographical survey was conducted
to confirm the surface elevation. Instead, the surface elevation was approximately determined from topographic maps of the
area.
Descriptive Term
(Consistency)
0 - 6
CONSISTENCY OF FINE-GRAINED SOILS
Hard
Very Loose
Loose
Medium Dense
Dense
Very Dense
Descriptive Term
(Density)
Standard Penetration
or N-Value
Blows/Ft.
0 - 3
4 - 9 7 - 18
10 - 29 19 - 58
30 - 50 59 - 98
> 50 > 99 Very Stiff
Standard Penetration or
N-Value
Blows/Ft.
Ring Sampler
Blows/Ft.
Ring Sampler
Blows/Ft.
5 - 9
Stiff
Medium Stiff
Soft
Very Soft
(50% or more passing the No. 200 sieve.)
Consistency determined by laboratory shear strength testing, field visual-manual
procedures or standard penetration resistance
STRENGTH TERMS
RELATIVE DENSITY OF COARSE-GRAINED SOILS
(More than 50% retained on No. 200 sieve.)
Density determined by Standard Penetration Resistance
2 - 4
4 - 8
8 - 15
15 - 30
> 30
0 - 1
3 - 4
< 3
10 - 18
19 - 42
> 42
LEAN CLAY (CL)
10.752
12.5
25
9.5
30
NP
41
72.6
10.8
91.5
1.4
53.0
0.1
1.425
16
8
21
WC (%) LL
D30 D10 %Gravel %Fines %Clay
3
4
5
4.60
13
NP
22
17
NP
19
261.98
Boring ID Depth USCS Classification PL PI Cc Cu
D100 D60
2 - 3.5
9 - 10.5
4 - 5
Boring ID Depth %Sand %Silt
medium
3
4
5
coarse fine coarse fine
COBBLES
GRAVEL SAND
SILT OR CLAY
2 - 3.5
9 - 10.5
4 - 5
26.0
36.3
8.3
5
2 - 3.5
9 - 10.5
4 - 5
73
11
92
CL-ML
and additional data (If any).
See Supporting Information for explanation of
symbols and abbreviations.
Southwest of Conifer Street and Blue Spruce Drive
Fort Collins, Colorado
SITE:
Boring Started: 08-17-2018
No free water observed
WATER LEVEL OBSERVATIONS
symbols and abbreviations.
Southwest of Conifer Street and Blue Spruce Drive
Fort Collins, Colorado
SITE:
Boring Started: 08-17-2018
9' while drilling
WATER LEVEL OBSERVATIONS
See Exploration and Testing Procedures for a
description of field and laboratory procedures used
and additional data (If any).
See Supporting Information for explanation of
symbols and abbreviations.
Southwest of Conifer Street and Blue Spruce Drive
Fort Collins, Colorado
SITE:
Boring Started: 08-17-2018
9' while drilling
WATER LEVEL OBSERVATIONS
Construction
Observation
and Testing
Close monitoring of the construction operations and implementing drainage
recommendations discussed herein will be critical in achieving the intended
foundation, slab and pavement performance. We therefore recommend that Terracon
be retained to monitor this portion of the work.
General
Comments
This section contains important information about the limitations of this geotechnical
engineering report.