HomeMy WebLinkAboutRIDGEWOOD HILLS FOURTH FILING - Filed FDT-FIELD DENSITY TEST - 2020-01-29 (2)CONCRETE SAMPLE PICK-UP REPORT
Report Number: 20191099.0032
Service Date: 11/14/19 1901 Sharp Point Dr, Ste C
Report Date: 11/20/19 Fort Collins, CO 80525-4429
Task: Site Work / Utilities / CIty ROW 970-484-0359
Client Project
M Timm Development Ridgewood Hills Apartments
Attn: Bill Timm 7363 Avondale Road
233 E Carrillo St Ste D Fort Collins, CO 80525
Santa Barbara, CA 93101
Project Number: 20191099
Services:
Terracon Rep.: Andrew Steinhauer
Reported To:
Contractor: M. Timm
Report Distribution:
(1) M Timm Development, Bill Timm (1) City Of Fort Collins CO, Kim
Keiswetter
(1) Dirt One Excavating, Tom Thompson (1) M Timm Development, Kevin Egan Reviewed By: ____________________________________
(1) M Timm Development, Larry McGee (1) Terracon Consultants, Inc., Eric
Bernhardt
Eric Buol
Project Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CT0006, 9-28-10, Rev.7 Page 1 of 1
SAMPLE TYPE: 4x8 Concrete Cylinders
DATE CAST: 11/13/19
1 set(s) of 3 samples per set were retrieved and transported to our laboratory and placed in a temperature and humidity-
controlled environment for compressive strength testing.