Loading...
HomeMy WebLinkAboutRIDGEWOOD HILLS FOURTH FILING - Filed FDT-FIELD DENSITY TEST - 2020-01-29 (2)CONCRETE SAMPLE PICK-UP REPORT Report Number: 20191099.0032 Service Date: 11/14/19 1901 Sharp Point Dr, Ste C Report Date: 11/20/19 Fort Collins, CO 80525-4429 Task: Site Work / Utilities / CIty ROW 970-484-0359 Client Project M Timm Development Ridgewood Hills Apartments Attn: Bill Timm 7363 Avondale Road 233 E Carrillo St Ste D Fort Collins, CO 80525 Santa Barbara, CA 93101 Project Number: 20191099 Services: Terracon Rep.: Andrew Steinhauer Reported To: Contractor: M. Timm Report Distribution: (1) M Timm Development, Bill Timm (1) City Of Fort Collins CO, Kim Keiswetter (1) Dirt One Excavating, Tom Thompson (1) M Timm Development, Kevin Egan Reviewed By: ____________________________________ (1) M Timm Development, Larry McGee (1) Terracon Consultants, Inc., Eric Bernhardt Eric Buol Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CT0006, 9-28-10, Rev.7 Page 1 of 1 SAMPLE TYPE: 4x8 Concrete Cylinders DATE CAST: 11/13/19 1 set(s) of 3 samples per set were retrieved and transported to our laboratory and placed in a temperature and humidity- controlled environment for compressive strength testing.