minimum requirement of at least 95% of the material’s standard Proctor maximum dry
density.
FIELD EXPLORATION
To develop subsurface information for use in the pavement design, a total of 31 borings
were completed. In the project roadways were water and sewer utilities were installed as
part of the site development, one (1) boring was advanced over the utility trench area to a
depth of approximately five (5) feet below roadway subgrade level and one (1) boring
advanced outside the utility trench area to a depth of approximately 10 feet. One (1)
boring extended to a depth of approximately 10 feet below roadway subgrade elevation
was completed along Quinby Street which does not contain water and sewer utilities.
The test areas were established at approximate 500 foot intervals along the roadway
alignments in accordance with the Larimer County Urban Area Street Standards
(LCUASS). The boring locations were established in the field by Soilogic personnel by
pacing and estimating angles and distances from identifiable site references. The boring
locations should be considered accurate only to the degree implied by the methods used
to make the field measurements. Diagrams indicating the approximate boring locations
are included with this report. A graphic log of each of the auger borings is also included.
The test holes were advanced using 4-inch diameter continuous-flight auger powered by a
truck-mounted CME-45 drill rig. Samples of the subsurface materials were obtained at
regular intervals using California barrel sampling procedures in general accordance with
ASTM specification D-1586. As part of the D-1586 sampling procedure, standard
sampling barrels are driven into the substrata using a 140-pound hammer falling a
distance of 30 inches. The number of blows required to advance the sampler a distance
of 12 inches is recorded and helpful in estimating the consistency or relative density of
the soils encountered. In the California barrel sampling procedure, lesser disturbed
samples are obtained in removable brass liners. Samples of the subsurface materials
obtained in the field were sealed and returned to the laboratory for further evaluation,
classification and testing.
Geotechnical Subsurface Exploration and Pavement Design Report
East Ridge Phase 1B Pavements
Fort Collins, Colorado
Soilogic # 16-2046P
3
LABORATORY TESTING
The samples collected were tested in the laboratory to measure natural moisture content
and visually and/or manually classified in accordance with the Unified Soil Classification
System (USCS). The USCS group symbols are indicated on the attached boring logs. An
outline of the USCS classification system is included with this report.
As part of the laboratory testing, a calibrated hand penetrometer (CHP) was used to
estimate the unconfined compressive strength of essentially-cohesive specimens. The
CHP also provides a more reliable estimate of soil consistency than tactual observation
alone. Dry density, Atterberg limits, -200 wash and swell/consolidation tests were
completed on selected samples to help establish specific soil characteristics. Atterberg
limits tests are used to determine soil plasticity. The percent passing the #200 size sieve
(-200 wash test) is used to determine the percentage of fine-grained soils (clay and silt) in
a sample. Swell/consolidation tests are performed to evaluate soil volume change
potential with variation in moisture content. Swell/consolidation tests completed on
samples obtained at a depth of approximately 2 feet below ground surface were inundated
with water at a 150 psf confining pressure while samples obtained at a depth of
approximately 4 feet below ground surface were inundated at a 500 psf confining
pressure. One representative sample of the subgrade soils obtained during drilling of the
Phase 1A pavements was submitted to a local laboratory for resistance value (R-value)
testing for use in pavement design. The results of the completed laboratory tests are
outlined on the attached boring logs, swell/consolidation and R-value test summary
sheets.
SUBSURFACE CONDITIONS
The subsurface materials encountered in the completed site borings can be summarized as
follows. Light to dark brown/reddish brown/rust sandy lean clay/clayey sand was
encountered at the surface at the boring locations. A portion of the near-surface lean
clay/clayey sand appeared to be placed fill and/or utility backfill. The sandy lean
clay/clayey sand varied from soft to very stiff in terms of consistency or loose to medium
dense in terms of relative density, exhibited no to low swell potential at in-situ moisture
and density conditions and extended to the bottom of borings B-1A, B-2, B-3, B-3A, B-
Geotechnical Subsurface Exploration and Pavement Design Report
East Ridge Phase 1B Pavements
Fort Collins, Colorado
Soilogic # 16-2046P
4
4A, B-5A, B-6A, B-7A, B-8, B-8A, B-9, B-9A, B-10, B-10A, B-11, B-11A, B-12A, B-
13A, B-14A and B-15A at depths ranging from approximately 5 to 10 feet below grade.
At the location of borings B-1, B-4 through B-7, B-12, B-13, B-15, B-16 and B-16A, the
lean clay/clayey sand extended to depths ranging from approximately 2 to 9½ feet below
ground surface and was underlain by rust/brown silty sand and gravel. The sand and
gravel varied from loose to medium dense in terms of relative density, would be expected
to be non-expansive or possess low swell potential based on the materials physical
properties and engineering characteristics and extended to the bottom of these borings
except boring B-14 at a depth of approximately 10 feet below grade. At the location of
boring B-14, the silty sand and gravel transitioned back into lean clay at a depth of
approximately 8 feet below ground surface. Boring B-14 was terminated at a depth of
approximately 10 feet below grade in the lean clay soils.
The stratigraphy indicated on the included boring logs represents the approximate
location of changes in soil types. Actual changes may be more gradual than those
indicated.
Groundwater was not encountered in any of the completed site borings at the time of
drilling. Groundwater levels will vary seasonally and over time based on weather
conditions, site development, irrigation practices and other hydrologic conditions.
Perched and/or trapped groundwater conditions may also be encountered at times
throughout the year. Perched water is commonly encountered in soils overlying less
permeable soil layers and/or bedrock. Trapped water is typically encountered within
more permeable zones of layered soil and bedrock systems. The location and amount of
perched/trapped water can also vary over time.
ANALYSIS AND RECOMMENDATIONS
Roadway Subgrade Development
The lean clay/clayey sand subgrade soils encountered in the completed site borings
exhibited no to low swell potential at in-situ moisture and density conditions, and in our
opinion, could be used for direct support of the roadway pavements. Immediately prior
to paving, we recommend the exposed subgrade soils be scarified to a depth of 9 inches,
Geotechnical Subsurface Exploration and Pavement Design Report
East Ridge Phase 1B Pavements
Fort Collins, Colorado
Soilogic # 16-2046P
5
adjusted in moisture content and compacted to at least 95% of the materials standard
Proctor maximum dry density. The moisture content of the scarified subgrade soils
should be adjusted to be within the range of ±2% of standard Proctor optimum moisture
content at the time of compaction. If fly ash stabilization of the pavement subgrade soils
will be completed, reconditioning of the subgrade soils prior to fly ash treatment would
not be required.
Care should be taken to avoid disturbing the developed subgrade soils prior to paving.
In addition, efforts to maintain the proper moisture content in the subgrade soils should
be made. If subgrade soils are disturbed by the construction activities or allowed to dry
out or become elevated in moisture content, those materials should be reworked in place
or removed and replaced prior to surfacing.
Proof-rolling of the roadway subgrade soils should be completed prior to paving to help
identify any areas of soft/unstable soils. Those areas identified as unstable would need to
be mended prior to paving. Isolated areas of instability can be mended on a case by case
basis. If more extensive areas of subgrade instability are encountered and depending on
the time of year when construction occurs and other hydrologic conditions, stabilization
of the subgrade soils may become necessary to develop a suitable paving platform.
Based on the materials encountered in the completed site borings and results of
laboratory testing, it is our opinion fly ash stabilization of the pavement subgrades could
be completed to develop a suitable paving platform. With the increase in support
strength developed by the stabilization procedures, it is our opinion the zone of stabilized
subgrade could be included in the pavement section design, slightly reducing the required
thickness of overlying asphaltic concrete and/or aggregate base course. Pavement section
design options incorporating some structural credit for the fly ash stabilized subgrade
soils are outlined below in Table I. Fly ash stabilization can eliminate some of the
uncertainty associated with attempting to pave during periods of inclement weather.
For half credit and if fly ash stabilization will be completed, we recommend the addition
of 12% class ‘C’ fly ash based on component dry unit weights. A 12-inch thick stabilized
zone should be constructed by thoroughly blending the fly ash with the in-place subgrade
soils. Some “fluffing” of the finish subgrade level should be expected with the
stabilization procedures. The blended materials should be adjusted to within ±2% of
Geotechnical Subsurface Exploration and Pavement Design Report
East Ridge Phase 1B Pavements
Fort Collins, Colorado
Soilogic # 16-2046P
6
standard Proctor optimum moisture content and compacted to at least 95% of the
material’s standard Proctor maximum dry density within two (2) hours of fly ash
addition.
Pavement Design
Site pavement could be supported directly on stable reconditioned subgrade soils or fly
ash treated subgrade soils developed as outlined above. The pavement subgrade soils are
expected to consist of reconditioned lean clay/clayey sand. These soils classify as A-6
soils in accordance with The American Association of State Highway and Transportation
Officials (AASHTO) classification system and would be expected to exhibit low to
moderate remolded shear strength. An R-value of 17 was determined on a representative
subgrade sample obtained from the Phase 1A on-site borings. Based on the similar soils
encountered in the Phase 1B borings, an R-value of 17 was used in the pavement section
design. Design ESAL’s were provided by City of Fort Collins personnel. Serviceability
loss and reliability were obtained from the current LCUASS.
Outlined below in Table I. are proposed pavement section designs for the subject
roadways. Alternative pavement sections could be considered and we would be happy to
discuss any design alternatives at your request.
TABLE 1 – PAVEMENT SECTION DESIGN
Roadway
Classification
ESAL’s
Reliability
% Loss
Resilient Modulus (Mr)
Design Structural Number
Option A – Composite
Asphalt (Grading S or SX)
Aggregate Base (Class 6)
(Structural Number)
Option B – Composite on Fly Ash
Asphalt (Grading S or SX)
Aggregate Base (Class 6)
Fly Ash Treated Subgrade
(Structural Number)
Comet Street, Reliant
Street and Crusader
Street (East)
Local Residential
36,500
75%
2.5
4478
(2.16)
4” (0.44/inch)
6” (0.11/inch)
(2.42)
4” (0.44/inch)
4” (0.11/inch)
12” (10 @ .05/inch)
(2.70)
Quinby Street,
Alley/Private Drive
Local Residential/Alley
73,000
75%
Geotechnical Subsurface Exploration and Pavement Design Report
East Ridge Phase 1B Pavements
Fort Collins, Colorado
Soilogic # 16-2046P
7
Asphaltic concrete should consist of a bituminous plant mix composed of a mixture of
aggregate, filler, binders and additives if required meeting the design requirements of the
City of Fort Collins. Aggregate used in the asphaltic concrete should meet specific
gradation requirements such as Colorado Department of Transportation (CDOT) grading
S (3/4 inch minus) or SX (1/2 inch minus) specifications. We understand grading S
materials will be required for collector roadways. Asphalt used in the hot mix should
consist of performance graded PG (58-28) for local residential and minor collector
roadways. Hot mix asphalt designed using “Superpave” criteria should be compacted to
within 92 to 96% of the materials Maximum Theoretical Density. Aggregate base should
be consistent with CDOT requirements for Class 5 or 6 aggregate base, placed in loose
lifts not to exceed 9 inches thick, adjusted to within ±2% of the material’s standard
Proctor optimum moisture content and compacted to at least 95% of the materials
standard Proctor maximum dry density.
The proposed pavement section designs do not include an allowance for excessive
loading conditions imposed by heavy construction vehicles or equipment. Heavily
loaded concrete or other building material trucks and construction equipment can cause
some localized distress to the roadway pavements.
Drainage
Positive drainage is imperative for satisfactory long term performance of the roadway
pavements. Water which is allowed to pond adjacent to site pavements can result in a
loss of subgrade support and premature failure of the overlying pavement section.
LIMITATIONS
This report was prepared based upon the data obtained from the completed site
exploration, laboratory testing, engineering analysis and any other information discussed.
The completed borings provide an indication of subsurface conditions at the boring
locations only. Variations in subsurface conditions can occur in relatively short distances
away from the borings. This report does not reflect any variations which may occur
across the site or away from the borings. If variations in the subsurface conditions
Geotechnical Subsurface Exploration and Pavement Design Report
East Ridge Phase 1B Pavements
Fort Collins, Colorado
Soilogic # 16-2046P
8
anticipated become evident, the geotechnical engineer should be notified immediately so
that further evaluation and supplemental recommendations can be provided.
The scope of services for this project does not include either specifically or by
implication any biological or environmental assessment of the site or identification or
prevention of pollutants or hazardous materials or conditions. Other studies should be
completed if concerns over the potential of such contamination or pollution exist.
The geotechnical engineer should be retained to review the plans and specifications so
that comments can be made regarding the interpretation and implementation of our
geotechnical recommendations in the design and specifications. The geotechnical
engineer should also be retained to provide testing and observation services during
construction to help determine that the design requirements are fulfilled.
This report has been prepared for the exclusive use of our client for specific application
to the project discussed and has been prepared in accordance with the generally accepted
standard of care for the profession. No warranties express or implied, are made. The
conclusions and recommendations contained in this report should not be considered valid
in the event that any changes in the nature, design or location of the project as outlined in
this report are planned, unless those changes are reviewed and the conclusions of this
report modified and verified in writing by the geotechnical engineer.
Geotechnical Subsurface Exploration and Pavement Design Report
East Ridge Phase 1B Pavements
Fort Collins, Colorado
Soilogic # 16-2046P
9
We appreciate the opportunity to be of service to you on this project. If you have any
questions concerning the enclosed information or if we can be of further assistance to you
in any way, please do not hesitate to contact us.
Very Truly Yours,
Soilogic, Inc. Reviewed by:
Wolf von Carlowitz, P.E. Darrel DiCarlo, P.E.
Principal Engineer Senior Project Engineer
36746 44271
LOG OF BORING B-1
1/1 CME 45
4" CFA
Automatic
CP/ZG
Estimated Swell % Passing
SOIL DESCRIPTION Depth "N" MC DD qu % Swell @ Pressure # 200 Sieve
(ft) (%) (pcf) (psf) 500 psf (psf) LL PI (%)
-
1
-
CL SANDY LEAN CLAY 2
brown/rust -
medium stiff to very stiff 3 CS 20 6.7 118.3 9000+ 0.9% 700 - - -
-
With Scattered Gravel 4
-
5 CS 10 12.4 - 9000+ - - - - -
-
6
-
7
-
8
-
SM-GM SILTY SAND AND GRAVEL 9
reddish brown -
loose 10 CS 14 1.8 - 9000+ - - - - -
BOTTOM OF BORING 10.0' -
11
-
12
-
13
-
14
-
15
-
16
-
17
-
18
-
19
-
20
-
21
-
22
-
23
-
24
-
25
EAST RIDGE PHASE 1B PAVEMENTS
FORT COLLINS, COLORADO
LOG OF BORING B-1A
1/1 CME 45
4" CFA
Automatic
CP/ZG
Estimated Swell % Passing
SOIL DESCRIPTION Depth "N" MC DD qu % Swell @ Pressure # 200 Sieve
(ft) (%) (pcf) (psf) 500 psf (psf) LL PI (%)
-
1
CL FILL - SANDY LEAN CLAY -
brown/rust 2
medium stiff -
3 CS 7 9.2 - 9000+ - - - - -
-
4
-
5 CS 10 11.3 118.8 None <500 - - -
BOTTOM OF BORING 5.0' -
6
-
7
-
8
-
9
-
10
-
11
-
12
-
13
-
14
-
15
-
16
-
17
-
18
-
19
-
20
-
21
-
22
-
23
-
24
-
25
Sheet Drilling Rig: Water Depth Information
EAST RIDGE PHASE 1B PAVEMENTS
LOG OF BORING B-2
1/1 CME 45
4" CFA
Automatic
CP/ZG
Estimated Swell % Passing
SOIL DESCRIPTION Depth "N" MC DD qu % Swell @ Pressure # 200 Sieve
(ft) (%) (pcf) (psf) 500 psf (psf) LL PI (%)
-
1
-
SC-CL CLAYEY SAND/SANDY LEAN CLAY 2
brown -
loose to medium dense/stiff to v. stiff 3 CS 26 5.7 109.8 0.9% 600 - - -
-
4
-
5 CS 11 13.4 116.8 0.3% 600 - - -
-
6
-
7
-
8
-
9
-
10 CS 13 16.2 103.4 9000+ - - - - -
BOTTOM OF BORING 10.0' -
11
-
12
-
13
-
14
-
15
-
16
-
17
-
18
-
19
-
20
-
21
-
22
-
23
-
24
-
25
Sheet Drilling Rig: Water Depth Information
EAST RIDGE PHASE 1B PAVEMENTS
LOG OF BORING B-3
1/1 CME 45
4" CFA
Automatic
WvC/ZG
Estimated Swell % Passing
SOIL DESCRIPTION Depth "N" MC DD qu % Swell @ Pressure # 200 Sieve
(ft) (%) (pcf) (psf) 500 psf (psf) LL PI (%)
-
1
-
CL FILL - SANDY LEAN CLAY 2
brown/rust -
medium stiff to stiff 3 CS 14 17.6 112.7 9000+ 0.9% - - - -
-
With Scattered Gravel 4
-
5 CS 6 12.8 111.4 9000+ - - - - -
-
6
-
CL SANDY LEAN CLAY 7
reddish brown -
stiff 8
-
9
-
10 CS 15 22.5 101.5 9000+ - - - - -
BOTTOM OF BORING 10.0' -
11
-
12
-
13
-
14
-
15
-
16
-
17
-
18
-
19
-
20
-
21
-
22
-
23
-
24
-
25
24 Hours After Drilling -
USCS
LOG OF BORING B-3A
1/1 CME 45
4" CFA
Automatic
WvC/ZG
Estimated Swell % Passing
SOIL DESCRIPTION Depth "N" MC DD qu % Swell @ Pressure # 200 Sieve
(ft) (%) (pcf) (psf) 500 psf (psf) LL PI (%)
-
1
CL FILL - SANDY LEAN CLAY -
brown/rust 2
medium stiff to stiff -
With Scattered Gravel 3 CS 13 14.8 115.9 9000+ - - - - -
-
4
-
5 CS 9 14.6 110.8 9000+ 0.3% - - - -
BOTTOM OF BORING 5.0' -
6
-
7
-
8
-
9
-
10
-
11
-
12
-
13
-
14
-
15
-
16
-
17
-
18
-
19
-
20
-
21
-
22
-
23
-
24
-
25
24 Hours After Drilling -
USCS
LOG OF BORING B-4
1/1 CME 45
4" CFA
Automatic
WvC/ZG
Estimated Swell % Passing
SOIL DESCRIPTION Depth "N" MC DD qu % Swell @ Pressure # 200 Sieve
(ft) (%) (pcf) (psf) 500 psf (psf) LL PI (%)
-
1
FILL - SANDY LEAN CLAY -
brown 2
stiff -
With Scattered Gravel 3 CS 18 9.3 134.1 9000+ - - - - -
-
4
-
CL SANDY LEAN CLAY 5 CS 22 5.0 103.8 9000+ None <500 - - -
light brown -
very stiff 6
-
7
-
8
-
9
-
SM-GMSILTY SAND AND GRAVEL - red brn, m dns 10 CS 19 1.5 - 9000+ - - - - -
BOTTOM OF BORING 10.0' -
11
-
12
-
13
-
14
-
15
-
16
-
17
-
18
-
19
-
20
-
21
-
22
-
23
-
24
-
25
24 Hours After Drilling -
USCS
LOG OF BORING B-4A
1/1 CME 45
4" CFA
Automatic
WvC/ZG
Estimated Swell % Passing
SOIL DESCRIPTION Depth "N" MC DD qu % Swell @ Pressure # 200 Sieve
(ft) (%) (pcf) (psf) 500 psf (psf) LL PI (%)
-
1
CL FILL - SANDY LEAN CLAY -
brown 2
stiff -
3 CS 15 7.6 109.7 9000+ 0.5% - - - -
With Scattered Gravel -
Varies to Clayey Sand 4
-
5 CS 15 7.9 115.1 9000+ - - 24 8 31.1%
BOTTOM OF BORING 5.0' -
6
-
7
-
8
-
9
-
10
-
11
-
12
-
13
-
14
-
15
-
16
-
17
-
18
-
19
-
20
-
21
-
22
-
23
-
24
-
25
24 Hours After Drilling -
USCS
LOG OF BORING B-5
1/1 CME 45
4" CFA
Automatic
WvC/ZG
Estimated Swell % Passing
SOIL DESCRIPTION Depth "N" MC DD qu % Swell @ Pressure # 200 Sieve
(ft) (%) (pcf) (psf) 500 psf (psf) LL PI (%)
-
1
-
CL-SC SILTY LEAN CLAY/CLAYEY SAND 2
light reddish brown -
stiff/loose to med dense 3 CS 15 4.8 104.5 9000+ 0.3% - - - -
-
With Scattered Gravel 4
-
5 CS 14 4.7 112.0 9000+ - - - - -
-
6
-
7
-
SM-GM SILTY SAND AND GRAVEL 8
reddish brown -
medium dense 9
-
10 CS 17 2.2 - 9000+ - - - - -
BOTTOM OF BORING 10.0' -
11
-
12
-
13
-
14
-
15
-
16
-
17
-
18
-
19
-
20
-
21
-
22
-
23
-
24
-
25
24 Hours After Drilling -
USCS
LOG OF BORING B-5A
1/1 CME 45
4" CFA
Automatic
WvC/ZG
Estimated Swell % Passing
SOIL DESCRIPTION Depth "N" MC DD qu % Swell @ Pressure # 200 Sieve
(ft) (%) (pcf) (psf) 500 psf (psf) LL PI (%)
-
1
SC-CL FILL - CLAYEY SAND/SANDY LEAN CLAY -
light brown 2
loose/med stiff to stiff -
3 CS 9 4.3 110.8 9000+ - - - - -
-
4
-
5 CS 13 5.0 108.7 9000+ 1.2% - - - -
BOTTOM OF BORING 5.0' -
6
-
7
-
8
-
9
-
10
-
11
-
12
-
13
-
14
-
15
-
16
-
17
-
18
-
19
-
20
-
21
-
22
-
23
-
24
-
25
24 Hours After Drilling -
USCS
LOG OF BORING B-6
1/1 CME 45
4" CFA
Automatic
CP/ZG
Estimated Swell % Passing
SOIL DESCRIPTION Depth "N" MC DD qu % Swell @ Pressure # 200 Sieve
(ft) (%) (pcf) (psf) 500 psf (psf) LL PI (%)
-
1
-
SC CLAYEY SAND 2
brown/rust -
loose to medium dense 3 CS 13 8.9 125.2 9000+ 0.3% - - - -
-
With Scattered Gravel 4
-
5 CS 15 4.5 - 9000+ - - - - -
-
6
-
SM-GM SILTY SAND AND GRAVEL 7
reddish brown -
medium dense 8
-
9
-
10 CS 34 2.1 - 9000+ - - - - -
BOTTOM OF BORING 10.0' -
11
-
12
-
13
-
14
-
15
-
16
-
17
-
18
-
19
-
20
-
21
-
22
-
23
-
24
-
25
24 Hours After Drilling -
USCS
LOG OF BORING B-6A
1/1 CME 45
4" CFA
Automatic
CP/ZG
Estimated Swell % Passing
SOIL DESCRIPTION Depth "N" MC DD qu % Swell @ Pressure # 200 Sieve
(ft) (%) (pcf) (psf) 500 psf (psf) LL PI (%)
-
1
CL FILL - CLAYEY SAND -
brown 2
loose to medium dense -
With Gravel 3 CS 12 9.1 124.9 9000+ - - - - -
-
4
-
5 CS 15 8.1 125.5 9000+ None <500 - - -
BOTTOM OF BORING 5.0' -
6
-
7
-
8
-
9
-
10
-
11
-
12
-
13
-
14
-
15
-
16
-
17
-
18
-
19
-
20
-
21
-
22
-
23
-
24
-
25
24 Hours After Drilling -
USCS
LOG OF BORING B-7
1/1 CME 45
4" CFA
Automatic
CP/ZG
Estimated Swell % Passing
SOIL DESCRIPTION Depth "N" MC DD qu % Swell @ Pressure # 200 Sieve
(ft) (%) (pcf) (psf) 500 psf (psf) LL PI (%)
-
1
-
CL CLAYEY SAND 2
brown/rust -
loose 3 CS 16 14.3 94.2 9000+ - - - - -
-
With Scattered Gravel 4
-
5 CS 16 3.1 111.2 9000+ None <500 - - -
-
6
-
7
-
8
-
SM-GM SILTY SAND AND GRAVEL 9
reddish brown -
medium dense 10 CS 20 2.1 - 9000+ - - - - -
BOTTOM OF BORING 10.0' -
11
-
12
-
13
-
14
-
15
-
16
-
17
-
18
-
19
-
20
-
21
-
22
-
23
-
24
-
25
24 Hours After Drilling -
USCS
LOG OF BORING B-7A
1/1 CME 45
4" CFA
Automatic
CP/ZG
Estimated Swell % Passing
SOIL DESCRIPTION Depth "N" MC DD qu % Swell @ Pressure # 200 Sieve
(ft) (%) (pcf) (psf) 500 psf (psf) LL PI (%)
-
1
SC FILL - CLAYEY SAND -
brown/rust 2
loose to medium dense -
With Gravel 3 CS 19 4.1 122.0 9000+ None <500 - - -
-
4
-
5 CS 10 4.7 111.9 9000+ - - - - -
BOTTOM OF BORING 5.0' -
6
-
7
-
8
-
9
-
10
-
11
-
12
-
13
-
14
-
15
-
16
-
17
-
18
-
19
-
20
-
21
-
22
-
23
-
24
-
25
24 Hours After Drilling -
USCS
LOG OF BORING B-8
1/1 CME 45
4" CFA
Automatic
WvC/ZG
Estimated Swell % Passing
SOIL DESCRIPTION Depth "N" MC DD qu % Swell @ Pressure # 200 Sieve
(ft) (%) (pcf) (psf) 500 psf (psf) LL PI (%)
-
1
-
SL-SC SILTY LEAN CLAY/CLAYEY SAND 2
light reddish brown -
very stiff/medium dense 3 CS 24 4.5 104.1 9000+ - - - - -
-
4
-
5 CS 22 5.8 104.1 9000+ None <500 - - -
-
6
-
7
-
8
-
9
-
10 CS 28 9.5 115.4 9000+ - - - - -
BOTTOM OF BORING 10.0' -
11
-
12
-
13
-
14
-
15
-
16
-
17
-
18
-
19
-
20
-
21
-
22
-
23
-
24
-
25
24 Hours After Drilling -
USCS
LOG OF BORING B-8A
1/1 CME 45
4" CFA
Automatic
WvC/ZG
Estimated Swell % Passing
SOIL DESCRIPTION Depth "N" MC DD qu % Swell @ Pressure # 200 Sieve
(ft) (%) (pcf) (psf) 500 psf (psf) LL PI (%)
-
1
CL-SC FILL - SANDY LEAN CLAY/CLAYEY SAND -
brown 2
stiff/loose -
With Scattered Gravel 3 CS 13 8.5 107.4 0.5% - - - -
-
4
-
5 CS 14 11.1 123.4 9000+ - - - - -
BOTTOM OF BORING 5.0' -
6
-
7
-
8
-
9
-
10
-
11
-
12
-
13
-
14
-
15
-
16
-
17
-
18
-
19
-
20
-
21
-
22
-
23
-
24
-
25
24 Hours After Drilling -
USCS
LOG OF BORING B-9
1/1 CME 45
4" CFA
Automatic
CP/ZG
Estimated Swell % Passing
SOIL DESCRIPTION Depth "N" MC DD qu % Swell @ Pressure # 200 Sieve
(ft) (%) (pcf) (psf) 500 psf (psf) LL PI (%)
-
1
-
CL SANDY LEAN CLAY 2
brown to dark brown -
med stiff to v stiff/loose to med dense 3 CS 31 13.7 115.0 9000+ 1.1% 800 - - -
-
4
-
5 CS 16 7.9 - 9000+ - - - - -
-
6
-
7
-
8
Reddish Brown/Rust @ 8.5' -
9
-
10 CS 9 21.9 - 9000+ - - - - -
BOTTOM OF BORING 10.0' -
11
-
12
-
13
-
14
-
15
-
16
-
17
-
18
-
19
-
20
-
21
-
22
-
23
-
24
-
25
Sheet Drilling Rig: Water Depth Information
EAST RIDGE PHASE 1B PAVEMENTS
LOG OF BORING B-9A
1/1 CME 45
4" CFA
Automatic
CP/ZG
Estimated Swell % Passing
SOIL DESCRIPTION Depth "N" MC DD qu % Swell @ Pressure # 200 Sieve
(ft) (%) (pcf) (psf) 500 psf (psf) LL PI (%)
-
1
CL FILL - SANDY LEAN CLAY -
dark brown 2
stiff to very stiff -
With Gravel 3 CS 19 13.0 120.4 0.9% 1100 - - -
-
4
-
5 CS 15 12.7 121.1 9000+ - - - - -
BOTTOM OF BORING 5.0' -
6
-
7
-
8
-
9
-
10
-
11
-
12
-
13
-
14
-
15
-
16
-
17
-
18
-
19
-
20
-
21
-
22
-
23
-
24
-
25
Sheet Drilling Rig: Water Depth Information
EAST RIDGE PHASE 1B PAVEMENTS
LOG OF BORING B-10
1/1 CME 45
4" CFA
Automatic
CP/ZG
Estimated Swell % Passing
SOIL DESCRIPTION Depth "N" MC DD qu % Swell @ Pressure # 200 Sieve
(ft) (%) (pcf) (psf) 500 psf (psf) LL PI (%)
-
1
-
CL SANDY LEAN CLAY 2
brown to dark brown -
soft to very stiff 3 CS 11 8.9 108.1 9000+ - - - - -
With Scattered Gravel -
4
-
5 CS 19 10.9 123.6 9000+ None <500 - - -
-
6
-
7
-
8
-
Reddish Brown with Depth 9
-
10 CS 4 9.2 91.6 9000+ - - - - -
BOTTOM OF BORING 10.0' -
11
-
12
-
13
-
14
-
15
-
16
-
17
-
18
-
19
-
20
-
21
-
22
-
23
-
24
-
25
Sheet Drilling Rig: Water Depth Information
EAST RIDGE PHASE 1B PAVEMENTS
LOG OF BORING B-10A
1/1 CME 45
4" CFA
Automatic
CP/ZG
Estimated Swell % Passing
SOIL DESCRIPTION Depth "N" MC DD qu % Swell @ Pressure # 200 Sieve
(ft) (%) (pcf) (psf) 500 psf (psf) LL PI (%)
-
1
SC FILL - CLAYEY SAND -
reddish brown 2
loose -
3 CS 9 7.8 112.8 9000+ 0.6% 800 - - -
With Scattered Gravel -
4
-
5 CS 10 10.4 111.7 9000+ - - - - -
BOTTOM OF BORING 5.0' -
6
-
7
-
8
-
9
-
10
-
11
-
12
-
13
-
14
-
15
-
16
-
17
-
18
-
19
-
20
-
21
-
22
-
23
-
24
-
25
Sheet Drilling Rig: Water Depth Information
EAST RIDGE PHASE 1B PAVEMENTS
LOG OF BORING B-11
1/1 CME 45
4" CFA
Automatic
CP/ZG
Estimated Swell % Passing
SOIL DESCRIPTION Depth "N" MC DD qu % Swell @ Pressure # 200 Sieve
(ft) (%) (pcf) (psf) 500 psf (psf) LL PI (%)
-
1
-
CL-SC SANDY LEAN CLAY/CLAYEY SAND 2
brown -
med stiff to v stiff/loose to med dense 3 CS 27 6.4 - 9000+ - - - - -
-
4
-
5 CS 18 6.8 92.4 9000+ - - - - -
-
6
-
7
-
8
-
9
-
10 CS 8 17.8 - 9000+ - - - - -
BOTTOM OF BORING 10.0' -
11
-
12
-
13
-
14
-
15
-
16
-
17
-
18
-
19
-
20
-
21
-
22
-
23
-
24
-
25
Sheet Drilling Rig: Water Depth Information
EAST RIDGE PHASE 1B PAVEMENTS
LOG OF BORING B-11A
1/1 CME 45
4" CFA
Automatic
CP/ZG
Estimated Swell % Passing
SOIL DESCRIPTION Depth "N" MC DD qu % Swell @ Pressure # 200 Sieve
(ft) (%) (pcf) (psf) 500 psf (psf) LL PI (%)
-
1
CL FILL - SANDY LEAN CLAY -
brown 2
soft to stiff -
3 CS 15 13.7 120.1 9000+ - - - - -
-
4
-
5 CS 5 15.5 - 9000+ - - - - -
BOTTOM OF BORING 5.0' -
6
-
7
-
8
-
9
-
10
-
11
-
12
-
13
-
14
-
15
-
16
-
17
-
18
-
19
-
20
-
21
-
22
-
23
-
24
-
25
Sheet Drilling Rig: Water Depth Information
EAST RIDGE PHASE 1B PAVEMENTS
LOG OF BORING B-12
1/1 CME 45
4" CFA
Automatic
WvC/ZG
Estimated Swell % Passing
SOIL DESCRIPTION Depth "N" MC DD qu % Swell @ Pressure # 200 Sieve
(ft) (%) (pcf) (psf) 500 psf (psf) LL PI (%)
-
1
-
CL CLAYEY SAND 2
light brown -
loose 3 CS 8 7.0 110.5 9000+ 0.2% - - - -
-
4
-
5 CS 8 3.7 - 9000+ - - - - -
-
6
-
7
-
SM-GM SILTY SAND AND GRAVEL 8
reddish brown -
medium dense 9
-
10 CS 25 1.8 - 9000+ - - - - -
BOTTOM OF BORING 10.0' -
11
-
12
-
13
-
14
-
15
-
16
-
17
-
18
-
19
-
20
-
21
-
22
-
23
-
24
-
25
24 Hours After Drilling -
USCS
LOG OF BORING B-12A
1/1 CME 45
4" CFA
Automatic
WvC/ZG
Estimated Swell % Passing
SOIL DESCRIPTION Depth "N" MC DD qu % Swell @ Pressure # 200 Sieve
(ft) (%) (pcf) (psf) 500 psf (psf) LL PI (%)
-
1
CL-SC FILL - SANDY LEAN CLAY/CLAYEY SAND -
brown 2
stiff/loose to med dense -
With Gravel 3 CS 12 11.2 120.6 9000+ - - - - -
-
4
-
5 CS 15 6.0 - 9000+ - - - - -
BOTTOM OF BORING 5.0' -
6
-
7
-
8
-
9
-
10
-
11
-
12
-
13
-
14
-
15
-
16
-
17
-
18
-
19
-
20
-
21
-
22
-
23
-
24
-
25
24 Hours After Drilling -
USCS
LOG OF BORING B-13
1/1 CME 45
4" CFA
Automatic
WvC/ZG
Estimated Swell % Passing
SOIL DESCRIPTION Depth "N" MC DD qu % Swell @ Pressure # 200 Sieve
(ft) (%) (pcf) (psf) 500 psf (psf) LL PI (%)
-
1
-
CL-SC SILTY LEAN CLAY/CLAYEY SAND 2
light brown -
very stiff/medium dense 3 CS 23 5.5 102.7 9000+ - - - - -
-
4
-
5 CS 28 1.7 113.4 9000+ None <500 - - -
-
6
SM-GM SILTY SAND AND GRAVEL -
light reddish brown 7
medium dense -
8
-
9
-
10 CS 25 2.1 - 9000+ - - - - -
BOTTOM OF BORING 10.0' -
11
-
12
-
13
-
14
-
15
-
16
-
17
-
18
-
19
-
20
-
21
-
22
-
23
-
24
-
25
24 Hours After Drilling -
USCS
LOG OF BORING B-13A
1/1 CME 45
4" CFA
Automatic
WvC/ZG
Estimated Swell % Passing
SOIL DESCRIPTION Depth "N" MC DD qu % Swell @ Pressure # 200 Sieve
(ft) (%) (pcf) (psf) 500 psf (psf) LL PI (%)
-
1
CL FILL - SANDY LEAN CLAY -
brown 2
stiff to very stiff -
With Scattered Gravel 3 CS 15 5.0 108.6 9000+ 1.7% 1000 - - -
-
4
-
5 CS 23 7.7 107.4 9000+ - - - - -
BOTTOM OF BORING 5.0' -
6
-
7
-
8
-
9
-
10
-
11
-
12
-
13
-
14
-
15
-
16
-
17
-
18
-
19
-
20
-
21
-
22
-
23
-
24
-
25
24 Hours After Drilling -
USCS
LOG OF BORING B-14
1/1 CME 45
4" CFA
Automatic
WvC/ZG
Estimated Swell % Passing
SOIL DESCRIPTION Depth "N" MC DD qu % Swell @ Pressure # 200 Sieve
(ft) (%) (pcf) (psf) 500 psf (psf) LL PI (%)
-
SC-CL CLAYEY SAND/SANDY LEAN CLAY 1
brown -
2
-
3 CS 16 0.8 - 9000+ - - - - -
-
SM-GM SILTY SAND AND GRAVEL 4
light reddish brown -
medium dense 5 CS 23 1.2 - 9000+ - - - - -
-
6
-
7
-
8
CL SILTY LEAN CLAY -
brown 9
medium stiff -
10 CS 9 28.6 93.4 9000+ - - - - -
BOTTOM OF BORING 10.0' -
11
-
12
-
13
-
14
-
15
-
16
-
17
-
18
-
19
-
20
-
21
-
22
-
23
-
24
-
25
24 Hours After Drilling -
USCS
LOG OF BORING B-14A
1/1 CME 45
4" CFA
Automatic
WvC/ZG
Estimated Swell % Passing
SOIL DESCRIPTION Depth "N" MC DD qu % Swell @ Pressure # 200 Sieve
(ft) (%) (pcf) (psf) 500 psf (psf) LL PI (%)
-
1
CL FILL - SANDY LEAN CLAY -
brown 2
medium stiff to stiff -
With Scattered Gravel 3 CS 9 8.5 120.7 9000+ - - - - -
-
4
-
5 CS 13 12.2 117.4 9000+ None <500 - - -
BOTTOM OF BORING 5.0' -
6
-
7
-
8
-
9
-
10
-
11
-
12
-
13
-
14
-
15
-
16
-
17
-
18
-
19
-
20
-
21
-
22
-
23
-
24
-
25
24 Hours After Drilling -
USCS
LOG OF BORING B-15
1/1 CME 45
4" CFA
Automatic
WvC/ZG
Estimated Swell % Passing
SOIL DESCRIPTION Depth "N" MC DD qu % Swell @ Pressure # 200 Sieve
(ft) (%) (pcf) (psf) 500 psf (psf) LL PI (%)
-
1
-
CL SANDY LEAN CLAY 2
brown -
stiff 3 CS 11 6.4 - 9000+ - - - - -
-
4
-
5 CS 36 4.9 117.0 9000+ - - 28 11 30.1%
-
SM-GM SILTY SAND AND GRAVEL 6
reddish brown -
medium dense 7
-
8
-
9
-
10 CS 15 1.6 - 9000+ - - - - -
BOTTOM OF BORING 10.0' -
11
-
12
-
13
-
14
-
15
-
16
-
17
-
18
-
19
-
20
-
21
-
22
-
23
-
24
-
25
24 Hours After Drilling -
USCS
LOG OF BORING B-15A
1/1 CME 45
4" CFA
Automatic
WvC/ZG
Estimated Swell % Passing
SOIL DESCRIPTION Depth "N" MC DD qu % Swell @ Pressure # 200 Sieve
(ft) (%) (pcf) (psf) 500 psf (psf) LL PI (%)
-
1
CL FILL - SANDY LEAN CLAY -
brown 2
-
medium stiff to stiff 3 CS 8 10.2 116.8 9000+ None <150 - - -
-
4
-
5 CS 11 16.1 108.8 9000+ - - - - -
BOTTOM OF BORING 5.0' -
6
-
7
-
8
-
9
-
10
-
11
-
12
-
13
-
14
-
15
-
16
-
17
-
18
-
19
-
20
-
21
-
22
-
23
-
24
-
25
24 Hours After Drilling -
USCS
LOG OF BORING B-16
1/1 CME 45
4" CFA
Automatic
WvC/ZG
Estimated Swell % Passing
SOIL DESCRIPTION Depth "N" MC DD qu % Swell @ Pressure # 200 Sieve
(ft) (%) (pcf) (psf) 500 psf (psf) LL PI (%)
-
1
-
SC-CL CLAYEY SAND/SANDY LEAN CLAY 2
brown -
medium dense/very stiff 3 CS 20 6.5 - 9000+ - - - - -
-
4
-
5 CS 15 6.8 92.4 9000+ - - - - -
-
SC-GC CLAYEY SAND AND GRAVEL 6
light brown -
medium dense 7
-
8
-
9
-
10 CS 18 4.7 - 9000+ - - - - -
BOTTOM OF BORING 10.0' -
11
-
12
-
13
-
14
-
15
-
16
-
17
-
18
-
19
-
20
-
21
-
22
-
23
-
24
-
25
24 Hours After Drilling -
USCS
LOG OF BORING B-16A
1/1 CME 45
4" CFA
Automatic
WvC/ZG
Estimated Swell % Passing
SOIL DESCRIPTION Depth "N" MC DD qu % Swell @ Pressure # 200 Sieve
(ft) (%) (pcf) (psf) 500 psf (psf) LL PI (%)
-
1
CL FILL - SANDY LEAN CLAY -
brown 2
stiff -
With Scattered Gravel 3 CS 13 9.9 121.7 9000+ 0.2% - - - -
-
4
-
SM-GMSILTY SAND AND GRAVEL - red brn, loose 5 CS 14 2.4 - 9000+ - - - - -
BOTTOM OF BORING 5.0' -
6
-
7
-
8
-
9
-
10
-
11
-
12
-
13
-
14
-
15
-
16
-
17
-
18
-
19
-
20
-
21
-
22
-
23
-
24
-
25
24 Hours After Drilling -
USCS
Liquid Limit -
Plasticity Index -
% Passing #200 -
Dry Density (pcf) 118.3
EAST RIDGE PHASE 1B PAVEMENTS
FORT COLLINS, COLORADO
Project # 16-2046P
March 2017
SWELL/CONSOLIDATION TEST SUMMARY
Sample ID: B-1 @ 2
Sample Description: Brown/Rust Sandy Lean Clay
Initial Moisture 6.7%
Final Moisture 17.6%
% Swell @ 500 psf 0.9%
Swell Pressure (psf) 700
-12
-10
-8
-6
-4
-2
0
2
4
6
8
10
12
10 100 1000 10000 100000
---------
Applied Load (psf)
Liquid Limit -
Plasticity Index -
% Passing #200 -
Dry Density (pcf) 118.8
SWELL/CONSOLIDATION TEST SUMMARY
EAST RIDGE PHASE 1B PAVEMENTS
FORT COLLINS, COLORADO
Project # 16-2046P
March 2017
Initial Moisture 11.3%
Sample ID: B-1A @ 4
Sample Description: Fill - Brown/Rust Sandy Lean Clay
Final Moisture 12.3%
% Swell @ 500 psf None
Swell Pressure (psf) <500
-12
-10
-8
-6
-4
-2
0
2
4
6
8
10
12
10 100 1000 10000 100000
---------
Applied Load (psf)
Liquid Limit -
Plasticity Index -
% Passing #200 -
Dry Density (pcf) 109.8
SWELL/CONSOLIDATION TEST SUMMARY
EAST RIDGE PHASE 1B PAVEMENTS
FORT COLLINS, COLORADO
Project # 16-2046P
March 2017
Initial Moisture 5.7%
Sample ID: B-2 @ 2
Sample Description: Brown Clayey Sand/Sandy Lean Clay
Final Moisture 18.0%
% Swell @ 500 psf 0.9%
Swell Pressure (psf) 600
-12
-10
-8
-6
-4
-2
0
2
4
6
8
10
12
10 100 1000 10000 100000
---------
Applied Load (psf)
Liquid Limit -
Plasticity Index -
% Passing #200 -
Dry Density (pcf) 116.8
SWELL/CONSOLIDATION TEST SUMMARY
EAST RIDGE PHASE 1B PAVEMENTS
FORT COLLINS, COLORADO
Project # 16-2046P
March 2017
Initial Moisture 13.4%
Sample ID: B-2 @ 4
Sample Description: Brown Clayey Sand/Sandy Lean Clay
Final Moisture 16.0%
% Swell @ 500 psf 0.3%
Swell Pressure (psf) 600
-12
-10
-8
-6
-4
-2
0
2
4
6
8
10
12
10 100 1000 10000 100000
---------
Applied Load (psf)
Liquid Limit -
Plasticity Index -
% Passing #200 -
Dry Density (pcf) 112.7
SWELL/CONSOLIDATION TEST SUMMARY
EAST RIDGE PHASE 1B PAVEMENTS
FORT COLLINS, COLORADO
Project # 16-2046P
March 2017
Initial Moisture 17.6%
Sample ID: B-3 @ 2
Sample Description: Fill - Brown/Rust Sandy Lean Clay
(Swell Only)
Final Moisture 15.9%
% Swell @ 500 psf 0.9%
Swell Pressure (psf) -
-12
-10
-8
-6
-4
-2
0
2
4
6
8
10
12
10 100 1000 10000 100000
---------
Applied Load (psf)
Liquid Limit -
Plasticity Index -
% Passing #200 -
Dry Density (pcf) 110.8
SWELL/CONSOLIDATION TEST SUMMARY
EAST RIDGE PHASE 1B PAVEMENTS
FORT COLLINS, COLORADO
Project # 16-2046P
March 2017
Initial Moisture 14.6%
Sample ID: B-3A @ 4
Sample Description: Fill Brown/Rust Sandy Lean Clay
(Swell Only)
Final Moisture 18.4%
% Swell @ 500 psf 0.3%
Swell Pressure (psf) -
-12
-10
-8
-6
-4
-2
0
2
4
6
8
10
12
10 100 1000 10000 100000
---------
Applied Load (psf)
Liquid Limit -
Plasticity Index -
% Passing #200 -
Dry Density (pcf) 103.8
SWELL/CONSOLIDATION TEST SUMMARY
EAST RIDGE PHASE 1B PAVEMENTS
FORT COLLINS, COLORADO
Project # 16-2046P
March 2017
Initial Moisture 5.0%
Sample ID: B-4 @ 4
Sample Description: Fill - Light Brown Sandy Lean Clay
(Swell Only)
Final Moisture 18.8%
% Swell @ 500 psf None
Swell Pressure (psf) <500
-12
-10
-8
-6
-4
-2
0
2
4
6
8
10
12
10 100 1000 10000 100000
---------
Applied Load (psf)
Liquid Limit -
Plasticity Index -
% Passing #200 -
Dry Density (pcf) 109.7
SWELL/CONSOLIDATION TEST SUMMARY
EAST RIDGE PHASE 1B PAVEMENTS
FORT COLLINS, COLORADO
Project # 16-2046P
March 2017
Initial Moisture 7.6%
Sample ID: B-4A @ 2
Sample Description: Fill - Brown Sandy Lean Clay
(Swell Only)
Final Moisture 15.5%
% Swell @ 500 psf 0.5%
Swell Pressure (psf) -
-12
-10
-8
-6
-4
-2
0
2
4
6
8
10
12
10 100 1000 10000 100000
---------
Applied Load (psf)
Liquid Limit -
Plasticity Index -
% Passing #200 -
Dry Density (pcf) 104.5
Final Moisture 22.8%
% Swell @ 500 psf 0.3%
Swell Pressure (psf) -
Initial Moisture 4.8%
Sample ID: B-5 @ 2
Sample Description: Light Reddish Brown Silty Lean Clay/Clayey Sand
(Swell Only)
SWELL/CONSOLIDATION TEST SUMMARY
EAST RIDGE PHASE 1B PAVEMENTS
FORT COLLINS, COLORADO
Project # 16-2046P
March 2017
-12
-10
-8
-6
-4
-2
0
2
4
6
8
10
12
10 100 1000 10000 100000
---------
Applied Load (psf)
Liquid Limit -
Plasticity Index -
% Passing #200 -
Dry Density (pcf) 108.7
Final Moisture 21.6%
% Swell @ 500 psf 1.2%
Swell Pressure (psf) -
Initial Moisture 5.0%
Sample ID: B-5A @ 4
Sample Description: Fill - Light Brown Clayey Sand/Sandy Lean Clay
(Swell Only)
SWELL/CONSOLIDATION TEST SUMMARY
EAST RIDGE PHASE 1B PAVEMENTS
FORT COLLINS, COLORADO
Project # 16-2046P
March 2017
-12
-10
-8
-6
-4
-2
0
2
4
6
8
10
12
10 100 1000 10000 100000
---------
Applied Load (psf)
Liquid Limit -
Plasticity Index -
% Passing #200 -
Dry Density (pcf) 125.2
Final Moisture 10.2%
% Swell @ 500 psf 0.3%
Swell Pressure (psf) -
Initial Moisture 8.9%
Sample ID: B-6 @ 2
Sample Description: Brown/Rust Clayey Sand
(Swell Only)
SWELL/CONSOLIDATION TEST SUMMARY
EAST RIDGE PHASE 1B PAVEMENTS
FORT COLLINS, COLORADO
Project # 16-2046P
March 2017
-12
-10
-8
-6
-4
-2
0
2
4
6
8
10
12
10 100 1000 10000 100000
---------
Applied Load (psf)
Liquid Limit -
Plasticity Index -
% Passing #200 -
Dry Density (pcf) 125.5
Final Moisture 9.6%
% Swell @ 500 psf None
Swell Pressure (psf) <500
Initial Moisture 8.1%
Sample ID: B-6A @ 4
Sample Description: Fill - Brown Clayey Sand
(Swell Only)
SWELL/CONSOLIDATION TEST SUMMARY
EAST RIDGE PHASE 1B PAVEMENTS
FORT COLLINS, COLORADO
Project # 16-2046P
March 2017
-12
-10
-8
-6
-4
-2
0
2
4
6
8
10
12
10 100 1000 10000 100000
---------
Applied Load (psf)
Liquid Limit -
Plasticity Index -
% Passing #200 -
Dry Density (pcf) 111.2
Final Moisture 14.2%
% Swell @ 500 psf None
Swell Pressure (psf) <500
Initial Moisture 3.1%
Sample ID: B-7 @ 4
Sample Description: Brown/Rust Clayey Sand
(Swell Only)
SWELL/CONSOLIDATION TEST SUMMARY
EAST RIDGE PHASE 1B PAVEMENTS
FORT COLLINS, COLORADO
Project # 16-2046P
March 2017
-12
-10
-8
-6
-4
-2
0
2
4
6
8
10
12
10 100 1000 10000 100000
---------
Applied Load (psf)
Liquid Limit -
Plasticity Index -
% Passing #200 -
Dry Density (pcf) 122.0
Final Moisture 10.1%
% Swell @ 500 psf None
Swell Pressure (psf) <500
Initial Moisture 4.1%
Sample ID: B-7A @ 2
Sample Description: Fill - Brown/Rust Clayey Sand
(Swell Only)
SWELL/CONSOLIDATION TEST SUMMARY
EAST RIDGE PHASE 1B PAVEMENTS
FORT COLLINS, COLORADO
Project # 16-2046P
March 2017
-12
-10
-8
-6
-4
-2
0
2
4
6
8
10
12
10 100 1000 10000 100000
---------
Applied Load (psf)
Liquid Limit -
Plasticity Index -
% Passing #200 -
Dry Density (pcf) 104.1
Final Moisture 23.1%
% Swell @ 500 psf None
Swell Pressure (psf) <500
Initial Moisture 5.8%
Sample ID: B-8 @ 4
Sample Description: Light Reddish Brown Silty Lean Clay/Clayey Sand
(Swell Only)
SWELL/CONSOLIDATION TEST SUMMARY
EAST RIDGE PHASE 1B PAVEMENTS
FORT COLLINS, COLORADO
Project # 16-2046P
March 2017
-12
-10
-8
-6
-4
-2
0
2
4
6
8
10
12
10 100 1000 10000 100000
---------
Applied Load (psf)
Liquid Limit -
Plasticity Index -
% Passing #200 -
Dry Density (pcf) 107.4
SWELL/CONSOLIDATION TEST SUMMARY
EAST RIDGE PHASE 1B PAVEMENTS
FORT COLLINS, COLORADO
Project # 16-2046P
March 2017
Initial Moisture 8.5%
Sample ID: B-8A @ 2
Sample Description: Fill - Brown Sandy Lean Clay/Clayey Sand
(Swell Only)
Final Moisture 20.0%
% Swell @ 500 psf 0.5%
Swell Pressure (psf) -
-12
-10
-8
-6
-4
-2
0
2
4
6
8
10
12
10 100 1000 10000 100000
---------
Applied Load (psf)
Liquid Limit -
Plasticity Index -
% Passing #200 -
Dry Density (pcf) 115.0
SWELL/CONSOLIDATION TEST SUMMARY
EAST RIDGE PHASE 1B PAVEMENTS
FORT COLLINS, COLORADO
Project # 16-2046P
March 2017
Initial Moisture 13.7%
Sample ID: B-9 @ 2
Sample Description: Brown to Dark Brown Sandy Lean Clay
Final Moisture 17.5%
% Swell @ 500 psf 1.1%
Swell Pressure (psf) 800
-12
-10
-8
-6
-4
-2
0
2
4
6
8
10
12
10 100 1000 10000 100000
---------
Applied Load (psf)
Liquid Limit -
Plasticity Index -
% Passing #200 -
Dry Density (pcf) 120.4
Final Moisture 14.2%
% Swell @ 500 psf 0.9%
Swell Pressure (psf) 1,100
Initial Moisture 13.0%
Sample ID: B-9A @ 2
Sample Description: Fill - Dark Brown Sandy Lean Clay
SWELL/CONSOLIDATION TEST SUMMARY
EAST RIDGE PHASE 1B PAVEMENTS
FORT COLLINS, COLORADO
Project # 16-2046P
March 2017
-12
-10
-8
-6
-4
-2
0
2
4
6
8
10
12
10 100 1000 10000 100000
---------
Applied Load (psf)
Liquid Limit -
Plasticity Index -
% Passing #200 -
Dry Density (pcf) 123.6
SWELL/CONSOLIDATION TEST SUMMARY
EAST RIDGE PHASE 1B PAVEMENTS
FORT COLLINS, COLORADO
Project # 16-2046P
March 2017
Initial Moisture 10.9%
Sample ID: B-10 @ 4
Sample Description: Brown to Dark Brown Sandy Lean Clay
Final Moisture 12.5%
% Swell @ 500 psf None
Swell Pressure (psf) <500
-12
-10
-8
-6
-4
-2
0
2
4
6
8
10
12
10 100 1000 10000 100000
---------
Applied Load (psf)
Liquid Limit -
Plasticity Index -
% Passing #200 -
Dry Density (pcf) 112.8
SWELL/CONSOLIDATION TEST SUMMARY
EAST RIDGE PHASE 1B PAVEMENTS
FORT COLLINS, COLORADO
Project # 16-2046P
March 2017
Initial Moisture 7.8%
Sample ID: B-10A @ 2
Sample Description: Fill - Reddish Brown Clayey Sand
Final Moisture 14.3%
% Swell @ 500 psf 0.6%
Swell Pressure (psf) 800
-12
-10
-8
-6
-4
-2
0
2
4
6
8
10
12
10 100 1000 10000 100000
---------
Applied Load (psf)
Liquid Limit -
Plasticity Index -
% Passing #200 -
Dry Density (pcf) 110.5
Final Moisture 18.4%
% Swell @ 500 psf 0.2%
Swell Pressure (psf) -
Initial Moisture 7.0%
Sample ID: B-12 @ 2
Sample Description: Light Brown Clayey Sand
(Swell Only)
SWELL/CONSOLIDATION TEST SUMMARY
EAST RIDGE PHASE 1B PAVEMENTS
FORT COLLINS, COLORADO
Project # 16-2046P
March 2017
-12
-10
-8
-6
-4
-2
0
2
4
6
8
10
12
10 100 1000 10000 100000
---------
Applied Load (psf)
Liquid Limit -
Plasticity Index -
% Passing #200 -
Dry Density (pcf) 113.4
Final Moisture 17.2%
% Swell @ 500 psf None
Swell Pressure (psf) <500
Initial Moisture 1.7%
Sample ID: B-13 @ 4
Sample Description: Light Brown Silty Lean Clay/Clayey Sand
(Swell Only)
SWELL/CONSOLIDATION TEST SUMMARY
EAST RIDGE PHASE 1B PAVEMENTS
FORT COLLINS, COLORADO
Project # 16-2046P
March 2017
-12
-10
-8
-6
-4
-2
0
2
4
6
8
10
12
10 100 1000 10000 100000
---------
Applied Load (psf)
Liquid Limit -
Plasticity Index -
% Passing #200 -
Dry Density (pcf) 108.6
Final Moisture 16.8%
% Swell @ 500 psf 1.7%
Swell Pressure (psf) 1,000
Initial Moisture 5.0%
Sample ID: B-13A @ 2
Sample Description: Fill - Brown Sandy Lean Clay
SWELL/CONSOLIDATION TEST SUMMARY
EAST RIDGE PHASE 1B PAVEMENTS
FORT COLLINS, COLORADO
Project # 16-2046P
March 2017
-12
-10
-8
-6
-4
-2
0
2
4
6
8
10
12
10 100 1000 10000 100000
---------
Applied Load (psf)
Liquid Limit -
Plasticity Index -
% Passing #200 -
Dry Density (pcf) 117.4
Final Moisture 13.2%
% Swell @ 500 psf None
Swell Pressure (psf) <500
Initial Moisture 12.2%
Sample ID: B-14A @ 4
Sample Description: Fill - Brown Sandy Lean Clay
(Swell Only)
SWELL/CONSOLIDATION TEST SUMMARY
EAST RIDGE PHASE 1B PAVEMENTS
FORT COLLINS, COLORADO
Project # 16-2046P
March 2017
-12
-10
-8
-6
-4
-2
0
2
4
6
8
10
12
10 100 1000 10000 100000
---------
Applied Load (psf)
Liquid Limit -
Plasticity Index -
% Passing #200 -
Dry Density (pcf) 116.8
Final Moisture 11.9%
% Swell @ 500 psf None
Swell Pressure (psf) <150
Initial Moisture 10.2%
Sample ID: B-15A @ 2
Sample Description: Fill - Brown Sandy Lean Clay
(Swell Only)
SWELL/CONSOLIDATION TEST SUMMARY
EAST RIDGE PHASE 1B PAVEMENTS
FORT COLLINS, COLORADO
Project # 16-2046P
March 2017
-12
-10
-8
-6
-4
-2
0
2
4
6
8
10
12
10 100 1000 10000 100000
---------
Applied Load (psf)
Liquid Limit -
Plasticity Index -
% Passing #200 -
Dry Density (pcf) 121.7
Final Moisture 11.1%
% Swell @ 500 psf 0.2%
Swell Pressure (psf) -
Initial Moisture 9.9%
Sample ID: B-16A @ 2
Sample Description: Fill - Brown Sandy Lean Clay
(Swell Only)
SWELL/CONSOLIDATION TEST SUMMARY
EAST RIDGE PHASE 1B PAVEMENTS
FORT COLLINS, COLORADO
Project # 16-2046P
March 2017
-12
-10
-8
-6
-4
-2
0
2
4
6
8
10
12
10 100 1000 10000 100000
---------
Applied Load (psf)
UNIFIED SOIL CLASSIFICATION SYSTEM
Criteria for Assigning Group Symbols and Group Names Using Laboratory TestsA Soil Classification
Group
Symbol
Group NameB
Clean Gravels Cu ! 4 and 1 " Cc " 3E GW Well graded gravelF
Less than 5% finesC Cu
< 4 and/or 1 > Cc > 3E GP Poorly graded gravelF
Fines classify as ML or MH GM Silty gravelF,G, H
Coarse Grained Soils
More than 50% retained
on No. 200 sieve
Gravels
More than 50% of coarse
fraction retained on
No. 4 sieve Gravels with Fines More
than 12% finesC Fines classify as CL or CH GC Clayey gravelF,G,H
Clean Sands Cu ! 6 and 1 " Cc " 3E SW Well graded sandI
Less than 5% finesD Cu
< 6 and/or 1 > Cc > 3E SP Poorly graded sandI
Fines classify as ML or MH SM Silty sandG,H,I
Sands
50% or more of coarse
fraction passes
No. 4 sieve Sands with Fines
More than 12% finesD Fines classify as CL or CH SC Clayey sandG,H,I
Silts and Clays PI > 7 and plots on or above “A” lineJ CL Lean clayK,L,M
Liquid limit less than 50
Inorganic
PI < 4 or plots below “A” lineJ ML SiltK,L,M
Liquid limit - oven
dried
Organic clayK,L,M,N
Fine-Grained Soils
50% or more passes the
No. 200 sieve
Organic
Liquid limit - not
dried
< 0.75 OL
Organic siltK,L,M,O
Inorganic PI plots on or above “A” line CH Fat clayK,L,M
Silts and Clays
Liquid limit 50 or more
PI plots below “A” line MH Elastic siltK,L,M
Organic Liquid limit - oven dried Organic clayK,L,M,P
Liquid limit - not dried
< 0.75 OH
Organic siltK,L,M,Q
Highly organic soils Primarily organic matter, dark in color, and organic odor PT Peat
A Based on the material passing the 3-in. (75-mm) sieve
B If field sample contained cobbles or boulders, or both, add “with cobbles
or boulders, or both” to group name.
C Gravels with 5 to 12% fines require dual symbols: GW-GM well graded
gravel with silt, GW-GC well graded gravel with clay, GP-GM poorly
graded gravel with silt, GP-GC poorly graded gravel with clay.
D Sands with 5 to 12% fines require dual symbols: SW-SM well graded
sand with silt, SW-SC well graded sand with clay, SP-SM poorly graded
sand with silt, SP-SC poorly graded sand with clay
E Cu = D60/D10 Cc =
GENERAL NOTES
DRILLING & SAMPLING SYMBOLS:
SS: Split Spoon - 1⅜" I.D., 2" O.D., unless otherwise noted HS: Hollow Stem Auger
ST: Thin-Walled Tube – 2.5" O.D., unless otherwise noted PA: Power Auger
RS: Ring Sampler - 2.42" I.D., 3" O.D., unless otherwise noted HA: Hand Auger
CS: California Barrel - 1.92" I.D., 2.5" O.D., unless otherwise noted RB: Rock Bit
BS: Bulk Sample or Auger Sample WB: Wash Boring or Mud Rotary
The number of blows required to advance a standard 2-inch O.D. split-spoon sampler (SS) the last 12 inches of the total 18-inch
penetration with a 140-pound hammer falling 30 inches is considered the “Standard Penetration” or “N-value”. For 2.5” O.D.
California Barrel samplers (CB) the penetration value is reported as the number of blows required to advance the sampler 12
inches using a 140-pound hammer falling 30 inches, reported as “blows per inch,” and is not considered equivalent to the
“Standard Penetration” or “N-value”.
WATER LEVEL MEASUREMENT SYMBOLS:
WL: Water Level WS: While Sampling
WCI: Wet Cave in WD: While Drilling
DCI: Dry Cave in BCR: Before Casing Removal
AB: After Boring ACR: After Casing Removal
Water levels indicated on the boring logs are the levels measured in the borings at the times indicated. Groundwater levels at other
times and other locations across the site could vary. In pervious soils, the indicated levels may reflect the location of groundwater.
In low permeability soils, the accurate determination of groundwater levels may not be possible with only short-term observations.
DESCRIPTIVE SOIL CLASSIFICATION: Soil classification is based on the Unified Classification System. Coarse Grained Soils
have more than 50% of their dry weight retained on a #200 sieve; their principal descriptors are: boulders, cobbles, gravel or sand.
Fine Grained Soils have less than 50% of their dry weight retained on a #200 sieve; they are principally described as clays if they
are plastic, and silts if they are slightly plastic or non-plastic. Major constituents may be added as modifiers and minor constituents
may be added according to the relative proportions based on grain size. In addition to gradation, coarse-grained soils are defined
on the basis of their in-place relative density and fine-grained soils on the basis of their consistency.
FINE-GRAINED SOILS COARSE-GRAINED SOILS BEDROCK
(CB)
Blows/Ft.
(SS)
Blows/Ft.
Consistency
(CB)
Blows/Ft.
(SS)
Blows/Ft.
Relative
Density
(CB)
Blows/Ft.
(SS)
Blows/Ft.
Consistency
< 3 0-2 Very Soft 0-5 < 3 Very Loose < 24 < 20 Weathered
3-5 3-4 Soft 6-14 4-9 Loose 24-35 20-29 Firm
6-10 5-8 Medium Stiff 15-46 10-29 Medium Dense 36-60 30-49 Medium Hard
11-18 9-15 Stiff 47-79 30-50 Dense 61-96 50-79 Hard
19-36 16-30 Very Stiff > 79 > 50 Very Dense > 96 > 79 Very Hard
> 36 > 30 Hard
RELATIVE PROPORTIONS OF SAND AND
GRAVEL
GRAIN SIZE TERMINOLOGY
Descriptive Terms of
Other Constituents
Percent of
Dry Weight
Major Component
of Sample
Particle Size
Trace < 15 Boulders Over 12 in. (300mm)
With 15 – 29 Cobbles 12 in. to 3 in. (300mm to 75 mm)
Modifier > 30 Gravel 3 in. to #4 sieve (75mm to 4.75 mm)
Sand
Silt or Clay
#4 to #200 sieve (4.75mm to 0.075mm)
Passing #200 Sieve (0.075mm)
RELATIVE PROPORTIONS OF FINES PLASTICITY DESCRIPTION
Descriptive Terms of
Other Constituents
Percent of
Dry Weight
Term Plasticity Index
Trace
With
Modifiers
< 5
5 – 12
> 12
Non-plastic
Low
Medium
High
0
1-10
11-30
30+
F If soil contains ! 15% sand, add “with sand” to group name.
G If fines classify as CL-ML, use dual symbol GC-GM, or SC-SM.
HIf fines are organic, add “with organic fines” to group name.
I If soil contains ! 15% gravel, add “with gravel” to group name.
J If Atterberg limits plot in shaded area, soil is a CL-ML, silty clay.
K If soil contains 15 to 29% plus No. 200, add “with sand” or “with
gravel,” whichever is predominant.
L If soil contains ! 30% plus No. 200 predominantly sand, add
“sandy” to group name.
M If soil contains ! 30% plus No. 200, predominantly gravel, add
“gravelly” to group name.
N PI ! 4 and plots on or above “A” line.
O PI < 4 or plots below “A” line.
P PI plots on or above “A” line.
Q PI plots below “A” line.
Sampler
Atterberg Limits
Start Date 3/13/2017 Auger Type: During Drilling None
Finish Date 3/13/2017 Hammer Type: After Drilling None
Surface Elev. - Field Personnel:
Sheet Drilling Rig: Water Depth Information
EAST RIDGE PHASE 1B PAVEMENTS
FORT COLLINS, COLORADO
Project # 16-2046P
March 2017
Sampler
Atterberg Limits
Start Date 3/13/2017 Auger Type: During Drilling None
Finish Date 3/13/2017 Hammer Type: After Drilling None
Surface Elev. - Field Personnel:
Sheet Drilling Rig: Water Depth Information
EAST RIDGE PHASE 1B PAVEMENTS
FORT COLLINS, COLORADO
Project # 16-2046P
March 2017
Sampler
Atterberg Limits
Start Date 3/13/2017 Auger Type: During Drilling None
Finish Date 3/13/2017 Hammer Type: After Drilling None
Surface Elev. - Field Personnel:
Sheet Drilling Rig: Water Depth Information
EAST RIDGE PHASE 1B PAVEMENTS
FORT COLLINS, COLORADO
Project # 16-2046P
March 2017
Sampler
Atterberg Limits
Start Date 3/13/2017 Auger Type: During Drilling None
Finish Date 3/13/2017 Hammer Type: After Drilling None
Surface Elev. - Field Personnel:
Sheet Drilling Rig: Water Depth Information
EAST RIDGE PHASE 1B PAVEMENTS
FORT COLLINS, COLORADO
Project # 16-2046P
March 2017
Sampler
Atterberg Limits
Start Date 3/13/2017 Auger Type: During Drilling None
Finish Date 3/13/2017 Hammer Type: After Drilling None
Surface Elev. - Field Personnel:
Sheet Drilling Rig: Water Depth Information
EAST RIDGE PHASE 1B PAVEMENTS
FORT COLLINS, COLORADO
Project # 16-2046P
March 2017
Sampler
Atterberg Limits
Start Date 3/13/2017 Auger Type: During Drilling None
Finish Date 3/13/2017 Hammer Type: After Drilling None
Surface Elev. - Field Personnel:
Sheet Drilling Rig: Water Depth Information
EAST RIDGE PHASE 1B PAVEMENTS
FORT COLLINS, COLORADO
Project # 16-2046P
March 2017
Sampler
Atterberg Limits
Start Date 3/13/2017 Auger Type: During Drilling None
Finish Date 3/13/2017 Hammer Type: After Drilling None
Surface Elev. - Field Personnel:
Sheet Drilling Rig: Water Depth Information
EAST RIDGE PHASE 1B PAVEMENTS
FORT COLLINS, COLORADO
Project # 16-2046P
March 2017
Sampler
Atterberg Limits
Start Date 3/13/2017 Auger Type: During Drilling None
Finish Date 3/13/2017 Hammer Type: After Drilling None
Surface Elev. - Field Personnel:
Sheet Drilling Rig: Water Depth Information
EAST RIDGE PHASE 1B PAVEMENTS
FORT COLLINS, COLORADO
Project # 16-2046P
March 2017
Sampler
Atterberg Limits
Start Date 3/13/2017 Auger Type: During Drilling None
Finish Date 3/13/2017 Hammer Type: After Drilling None
Surface Elev. - Field Personnel:
Sheet Drilling Rig: Water Depth Information
EAST RIDGE PHASE 1B PAVEMENTS
FORT COLLINS, COLORADO
Project # 16-2046P
March 2017
Sampler
Atterberg Limits
Start Date 3/13/2017 Auger Type: During Drilling None
Finish Date 3/13/2017 Hammer Type: After Drilling None
Surface Elev. - Field Personnel:
Sheet Drilling Rig: Water Depth Information
EAST RIDGE PHASE 1B PAVEMENTS
FORT COLLINS, COLORADO
Project # 16-2046P
March 2017
FORT COLLINS, COLORADO
Project # 16-2046P
March 2017
Finish Date 2/23/2017 Hammer Type: After Drilling None
Start Date 2/23/2017 Auger Type: During Drilling None
24 Hours After Drilling -
USCS
Sampler
Atterberg Limits
Surface Elev. - Field Personnel:
FORT COLLINS, COLORADO
Project # 16-2046P
March 2017
Finish Date 2/23/2017 Hammer Type: After Drilling None
Start Date 2/23/2017 Auger Type: During Drilling None
24 Hours After Drilling -
USCS
Sampler
Atterberg Limits
Surface Elev. - Field Personnel:
FORT COLLINS, COLORADO
Project # 16-2046P
March 2017
Finish Date 2/22/2017 Hammer Type: After Drilling None
Start Date 2/22/2017 Auger Type: During Drilling None
24 Hours After Drilling -
USCS
Sampler
Atterberg Limits
Surface Elev. - Field Personnel:
FORT COLLINS, COLORADO
Project # 16-2046P
March 2017
Finish Date 2/22/2017 Hammer Type: After Drilling None
Start Date 2/22/2017 Auger Type: During Drilling None
24 Hours After Drilling -
USCS
Sampler
Atterberg Limits
Surface Elev. - Field Personnel:
FORT COLLINS, COLORADO
Project # 16-2046P
March 2017
Finish Date 2/22/2017 Hammer Type: After Drilling None
Start Date 2/22/2017 Auger Type: During Drilling None
24 Hours After Drilling -
USCS
Sampler
Atterberg Limits
Surface Elev. - Field Personnel:
FORT COLLINS, COLORADO
Project # 16-2046P
March 2017
Finish Date 2/22/2017 Hammer Type: After Drilling None
Start Date 2/22/2017 Auger Type: During Drilling None
24 Hours After Drilling -
USCS
Sampler
Atterberg Limits
Surface Elev. - Field Personnel:
Sampler
Atterberg Limits
Start Date 3/13/2017 Auger Type: During Drilling None
Finish Date 3/13/2017 Hammer Type: After Drilling None
Surface Elev. - Field Personnel:
Sheet Drilling Rig: Water Depth Information
EAST RIDGE PHASE 1B PAVEMENTS
FORT COLLINS, COLORADO
Project # 16-2046P
March 2017
Sampler
Atterberg Limits
Start Date 3/13/2017 Auger Type: During Drilling None
Finish Date 3/13/2017 Hammer Type: After Drilling None
Surface Elev. - Field Personnel:
Sheet Drilling Rig: Water Depth Information
EAST RIDGE PHASE 1B PAVEMENTS
FORT COLLINS, COLORADO
Project # 16-2046P
March 2017
Sampler
Atterberg Limits
Start Date 3/15/2017 Auger Type: During Drilling None
Finish Date 3/15/2017 Hammer Type: After Drilling None
Surface Elev. - Field Personnel:
Sheet Drilling Rig: Water Depth Information
EAST RIDGE PHASE 1B PAVEMENTS
FORT COLLINS, COLORADO
Project # 16-2046P
March 2017
Sampler
Atterberg Limits
Start Date 3/15/2017 Auger Type: During Drilling None
Finish Date 3/15/2017 Hammer Type: After Drilling None
Surface Elev. - Field Personnel:
Sheet Drilling Rig: Water Depth Information
EAST RIDGE PHASE 1B PAVEMENTS
FORT COLLINS, COLORADO
Project # 16-2046P
March 2017
Sampler
Atterberg Limits
Start Date 3/15/2017 Auger Type: During Drilling None
Finish Date 3/15/2017 Hammer Type: After Drilling None
Surface Elev. - Field Personnel:
Sheet Drilling Rig: Water Depth Information
EAST RIDGE PHASE 1B PAVEMENTS
FORT COLLINS, COLORADO
Project # 16-2046P
March 2017
Sampler
Atterberg Limits
Start Date 3/15/2017 Auger Type: During Drilling None
Finish Date 3/15/2017 Hammer Type: After Drilling None
Surface Elev. - Field Personnel:
Sheet Drilling Rig: Water Depth Information
EAST RIDGE PHASE 1B PAVEMENTS
FORT COLLINS, COLORADO
Project # 16-2046P
March 2017
Sampler
Atterberg Limits
Start Date 3/13/2017 Auger Type: During Drilling None
Finish Date 3/13/2017 Hammer Type: After Drilling None
Surface Elev. - Field Personnel:
Sheet Drilling Rig: Water Depth Information
EAST RIDGE PHASE 1B PAVEMENTS
FORT COLLINS, COLORADO
Project # 16-2046P
March 2017
Sampler
Atterberg Limits
Start Date 3/13/2017 Auger Type: During Drilling None
Finish Date 3/13/2017 Hammer Type: After Drilling None
Surface Elev. - Field Personnel:
Sheet Drilling Rig: Water Depth Information
EAST RIDGE PHASE 1B PAVEMENTS
FORT COLLINS, COLORADO
Project # 16-2046P
March 2017
Sampler
Atterberg Limits
Start Date 3/13/2017 Auger Type: During Drilling None
Finish Date 3/13/2017 Hammer Type: After Drilling None
Surface Elev. - Field Personnel:
Sheet Drilling Rig: Water Depth Information
EAST RIDGE PHASE 1B PAVEMENTS
FORT COLLINS, COLORADO
Project # 16-2046P
March 2017
Sampler
Atterberg Limits
Start Date 3/13/2017 Auger Type: During Drilling None
Finish Date 3/13/2017 Hammer Type: After Drilling None
Surface Elev. - Field Personnel:
Sheet Drilling Rig: Water Depth Information
EAST RIDGE PHASE 1B PAVEMENTS
FORT COLLINS, COLORADO
Project # 16-2046P
March 2017
Sampler
Atterberg Limits
Start Date 3/13/2017 Auger Type: During Drilling None
Finish Date 3/13/2017 Hammer Type: After Drilling None
Surface Elev. - Field Personnel:
Sheet Drilling Rig: Water Depth Information
EAST RIDGE PHASE 1B PAVEMENTS
FORT COLLINS, COLORADO
Project # 16-2046P
March 2017
Sampler
Atterberg Limits
Start Date 3/13/2017 Auger Type: During Drilling None
Finish Date 3/13/2017 Hammer Type: After Drilling None
Surface Elev. - Field Personnel:
Sheet Drilling Rig: Water Depth Information
EAST RIDGE PHASE 1B PAVEMENTS
FORT COLLINS, COLORADO
Project # 16-2046P
March 2017
FORT COLLINS, COLORADO
Project # 16-2046P
March 2017
Finish Date 2/23/2017 Hammer Type: After Drilling None
Start Date 2/23/2017 Auger Type: During Drilling None
24 Hours After Drilling -
USCS
Sampler
Atterberg Limits
Surface Elev. - Field Personnel:
FORT COLLINS, COLORADO
Project # 16-2046P
March 2017
Finish Date 2/22/2017 Hammer Type: After Drilling None
Start Date 2/22/2017 Auger Type: During Drilling None
24 Hours After Drilling -
USCS
Sampler
Atterberg Limits
Surface Elev. - Field Personnel:
Project # 16-2046P
March 2017
Sheet Drilling Rig: Water Depth Information
Start Date 2/22/2017 Auger Type: During Drilling None
Finish Date 2/22/2017 Hammer Type: After Drilling None
USCS
Sampler
Atterberg Limits
Surface Elev. - Field Personnel: 24 Hours After Drilling -
2.5
4478
(2.40)
4” (0.44/inch)
6” (0.11/inch)
(2.42)
4” (0.44/inch)
4” (0.11/inch)
12” (10 @ .05/inch)
(2.70)
Zeppelin Way and
Conquest Street
Local Residential
109,500
75%
2.5
4478
(2.56)
4” (0.44/inch)
7” (0.11/inch)
(2.53)
4” (0.44/inch)
4” (0.11/inch)
12” (10 @ .05/inch)
(2.70)
Crusader Street
(West)
Minor Collector
146,000
75%
2.2
4478
(2.70)
5” (0.44/inch)
5” (0.11/inch)
(2.75)
4” (0.44/inch)
4” (0.11/inch)
12” (10 @ .05/inch)
(2.70))
Delozier Road
Major Collector
365,000
85%
2.2
4478
(3.29)
5½” (0.44/inch)
8” (0.11/inch)
(3.30)
5” (0.44/inch)
5” (0.11/inch)
12” (10 @ .05/inch)
(3.25)